Public Administrative Department Local Bodies Closing in 3 days TDR #56523423

Tender For Improvement Of Drainage System By Laying Underground Sewer Line Along With Road Restoration At P-11 Swamiji Park In Ward No. 112 Under Borough-Xi (Part -C).

Issued by Local Bodies · Kolkata, West Bengal
Tender Value
48.82 Lakhs
Estimated cost
Bid Submission
03 Aug 2026
3 days left
EMD
98000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Improvement Of Drainage System By Laying Underground Sewer Line Along With Road Restoration At P-11 Swamiji Park In Ward No. 112 Under Borough-Xi (Part -C).

BOQ

Name of Work:- IMPROVEMENT OF DRAINAGE SYSTEM BY LAYING UNDERGROUND SEWER LINE ALONG WITH ROAD RESTORATION AT P-11 SWAMIJI PARK IN WARD NO. 112 UNDER BOROUGH-XI (PART -C).
Sl. No. Item Description
1CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C
2CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day
3BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
4Hire and labour charges for 3.75cm. thick close timbering with planks, battens,runners,struts etc. complete removing them incl. penetration of shoring as per direction of the Engineer-in-Charge upto 1 M. trench width. (Vertical surface of contact area with supporting earth to be measured, payment for penetration will not be allowed) a) Depth upto 3.00 M below G.L.
5(C) III: Labour Rate for Sanitary and Plumbing 2.Mazdoor NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates. Page 113 of 124
6BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)
7BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)
8BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)
9SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm
10BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.
11BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
12Manhole connection (upto 450 mm. dia.) including mending good all complete with (1:2:4) cement concrete as per specification and direction of Engineer-in-charge..
13ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)
14SUPPLYING AND INSTALLATION OF PORTABLE PUMPING UNITS (DIESEL DRIVEN) FROM 3\\" TO 5\\" DIA SUCTION AND DELIVERY FOR REMOVAL OF FLOOD WATER AND SEWERAGE WATER ETC. 4\\" DI PORTABLE LPUMP.
15BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019)
16BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth. ( 3rd Corrigenda & addenda dated 04.06.2018)
17BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL (10th Corrigenda & addenda dated 22.01.2020)
18BUILDING WORKS ( C ) Brickworks,Concrete Works etc?33..Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per
19SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018)
20SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
21BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 4. Brick-on-edge floor or pavement with 1st class brick set close in cement mortar (1:6) and laid with cushion of sand below (including cost thereof) including ruled or flush pointing with cement mortar (1:4) on top.
2224.Construction of manhole with chamber of size as given below as per requirement without shaft with cement brick work (1:4) over 150mm. Thick Jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix1:1.5:3) with reinforcement as per standard drawing over the chamber chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plastering (1:4) finished fine with neat cement 1.50 mm. thick in the inside walls and invert, including supplying, fitting and fixing R.C.P.C. manhole cover & frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) & C.I. steps (4kg. Each) including cutting hard crust, excavation, dewatering, back filling and removal of spoils but excluding shoring complete as per standard drawing .(Depth of invert shall be between 1.25 m. and 1.80 m. below G.L.).i) Average depth of invert 1.25 m. below G.L with 250 mm. thick brick work a) 150 mm to 400 mm dia having internal size (1500mmx750mm)
2324.Construction of manhole with chamber of size as given below as per requirement without shaft with cement brick work (1:4) over 150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix1:1.5:3) with reinforcement as per standard drawing over the chamber chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plastering (1:4) finished fine with neat cement 1.50 mm. thick in the inside walls and invert, including supplying, fitting and fixing R.C.P.C. manhole cover & frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) & C.I. steps (4kg. Each) including cutting hard crust, excavation, dewatering, back filling and removal of spoils but excluding shoring complete as per standard drawing .(Depth of invert shall be between 1.25 m. and 1.80 m. below G.L.).ii) Addition to rate of manhole chamber without shaft as per above item for each addition in depth of 150 mm. or part thereof. With 250 mm. thick brick work a) 150 mm to 400 mm dia having internal size (1500mmx750mm)
24Construction of special inspection chamber pit of size 900mm. X 600mm. (inside measurement) without shaft with 250mm. thick cement brick work (1:4) over150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5 mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing 450mm. dia. (15 M.T.) heavy duty R.C.P.C. cover and frame (15 M.T. load-bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 kg. each) including cutting hard crust, excavation, dewatering, back filling and removal of spoils but excluding shoring as per standard drawing .(depth of invert between 1.15m. to 1.80m. below G.L.) i) Average depth of invert 1.15 m. below G.L.
25Supplying, fitting and fixing in position reinforced cement polymer concrete manhole / gully pit cover with matching frame as per I.S. 12592 (M.D.) i) 15 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover : 565 mm. X 410 mm. X 90 mm. Frame : 715 mm. X 565 mm. X 185 mm. Weight : 140 Kg. (approx.)
26Edging with 2nd class bricks, laid dry lengthwise, including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres
27BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. III. EVENT MANAGEMENT : 1) Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptus or other approved timber posts 1.4 m above G.L. and 0.60 m below G. including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade. (Cost of restoration would be paid separately.) (a) 75mm. dia bamboo railing & 125mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.60m apart. (i) Railing with 4 rows. ( 1st Corrigenda & addenda dated 08.01.2018)
28Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe line). A) Class NP-3 Pipe r) 300 mm dia
29COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER GASKET bore dia in mm 300 thickness in mm 40 standard length in m. 2.5
30Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe line). A) Class NP-3 Pipe p) 400 mm dia
31COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER GASKET bore dia in mm 400 thickness in mm 75 standard length in m. 2.5
32Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe line). A) Class NP-3 Pipe n) 500 mm. dia.
33COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER GASKET bore dia in mm 500 thickness in mm 75 standard length in m. 2.5
34Construction of special inspection chamber pit of size 900mm. X 600mm. (inside measurement) without shaft with 250mm. thick cement brick work (1:4) over150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5 mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing 450mm. dia. (15 M.T.) heavy duty R.C.P.C. cover and frame (15 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 kg. each) including cutting hard crust, excavation, dewatering, back filling an removal of spoils but excluding shoring as per standard drawing .(depth of invert between 1.15m. to 1.80m. below G.L.) ii) Addition and deduction of rate of special inspection chamber pit as per above item for each addition or reduction in depth of 150 mm. or part thereof.
35Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm) (For compacted thickness 100mm)
36Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm)
37Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.)
38Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture)
39Bituminous Macadam using Hot Mix Plant(HMP) (Using bitumen VG-40) Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired -compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). A. For Grading 2(19.0 mm nominal size, 50-75mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH. (Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-213(table-3.3-1) & 251&252(item 5.03). 7th Addenda & Corrigenda SOR 2018)
40Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
41SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
42SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
43SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade)
44Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
45Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
46Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)
47Sub Total
48GST 9%
49GST 9%
50CESS 1% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56523423
AUTHORITY Local Bodies
TENDER VALUE 48.82 Lakhs
LAST DATE 03-08-2026
Authority
Authority Name Kolkata Municipal Corporation
Work Description Tender for Improvement Of Drainage System By Laying Underground Sewer Line Along With Road Restoration At P-11 Swamiji Park In Ward No. 112 Under Borough-Xi (Part -C).
Basic Detail
Tender No XI/112/022/2025-26/DPR/C
Bidding Type Tender
Location
City Kolkata
State West Bengal
Key Dates
Publish Date 17 Jul 2026
Submission Date 03 Aug 2026
Open Date 05 Aug 2026
Finance
Tender Value 48.82 Lakhs
Tender Fee Ref. Documents
EMD 98000
Exemption Not Available
Document List
18f40e13-8bc2-438d-8be0-2dfdc9799cdd.html
BOQ_2535807.xls
FORM022.pdf
ROAD_new1.pdf
Tendernotice_1 (15).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Aug 05, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
html

18f40e13-8bc2-438d-8be0-2dfdc9799cdd.html

xls

BOQ_2535807.xls

pdf

FORM022.pdf

pdf

ROAD_new1.pdf

pdf

Tendernotice_1 (15).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders