Supply Of Male connector
Tender Overview
Project Description
Supply Of male connector , male connector 1620 - 3/4, as per drawing : le63230 alt c, packing instruction: suitably pa cked in jute bags [ warranty period: 30 months after the date of delivery ] ] , male connector 32 x40, as per drawing : le63224 alt a, packing instruction: suitably packe d in jute bags [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Male connector 1620 - 3/4", as per drawing : LE63230 Alt c, Packing Instruction: SUITABLY PA CKED IN JUTE BAGS [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | Male connector 32 x40, as per drawing : LE63224 Alt a, Packing Instruction: SUITABLY PACKE D IN JUTE BAGS [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender