Tender For 1.Construction Of Community Soak Pit In Pue School At Alamathy Panchayat 2.Construction Of Community Soak Pit In Panchayat Office At Alamathy Panchayat 3. Construction Of Community Soak Pit In Edapalayam Main Road At Alamathy Panchayat 4.C
Tender Overview
Project Description
Tender for 1.Construction Of Community Soak Pit In Pue School At Alamathy Panchayat 2.Construction Of Community Soak Pit In Panchayat Office At Alamathy Panchayat 3. Construction Of Community Soak Pit In Edapalayam Main Road At Alamathy Panchayat 4.Construction Of Community Soak Pit In Padavettuamman Street At Alamathy Panchayat 5.Construction Of Community Soak Pit In Pillaiyar Koil Street At Alamathy Panchayat 6.Construction Of Community Soak Pit In Panchayat Office At Padiyanallur Panchayat 7.Construction Of Community Soak Pit In Vao Office At Padiyanallur Panchayat 8. Construction Of Community Soak Pit In Pillaiyar Koil Street At Padiyanallur Panchayat 9.Construction Of Community Soak Pit In Periyar Nagar 3Rd Street At Padiyanallur Panchayat 10.Construction Of Community Soak Pit In Pum School At Padiyanallur Panchayat In Sholavaram Block
BOQ
| Sl. No. | Item Description |
| 1 | 1.Construction of community Soak pit in PUE School at Alamathy Panchayat |
| 2 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 3 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 4 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 5 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 6 | Filling the soak pit with 225 mm boulders as per specification |
| 7 | Filling the soak pit with 63/65mm metal as per specification |
| 8 | Filling the soak pit with 20mm metal as per specification |
| 9 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 10 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 11 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 12 | 2.Construction of community Soak pit inPanchayat office at Alamathy Panchayat |
| 13 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 14 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 15 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 16 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 17 | Filling the soak pit with 225 mm boulders as per specification |
| 18 | Filling the soak pit with 63/65mm metal as per specification |
| 19 | Filling the soak pit with 20mm metal as per specification |
| 20 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 21 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 22 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 23 | 3. Construction of community Soak pit in Edapalayam Main road at Alamathy Panchayat |
| 24 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 25 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 26 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 27 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 28 | Filling the soak pit with 225 mm boulders as per specification |
| 29 | Filling the soak pit with 63/65mm metal as per specification |
| 30 | Filling the soak pit with 20mm metal as per specification |
| 31 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 32 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 33 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 34 | 4.Construction of community Soak pit in Padavettuamman street at Alamathy Panchayat |
| 35 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 36 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 37 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 38 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 39 | Filling the soak pit with 225 mm boulders as per specification |
| 40 | Filling the soak pit with 63/65mm metal as per specification |
| 41 | Filling the soak pit with 20mm metal as per specification |
| 42 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 43 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 44 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 45 | 5.Construction of community Soak pit in Pillaiyar koil street at Alamathy Panchayat |
| 46 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 47 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 48 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 49 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 50 | Filling the soak pit with 225 mm boulders as per specification |
| 51 | Filling the soak pit with 63/65mm metal as per specification |
| 52 | Filling the soak pit with 20mm metal as per specification |
| 53 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 54 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 55 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 56 | 6.Construction of community Soak pit in Panchayat office at Padiyanallur Panchayat |
| 57 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 58 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 59 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 60 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 61 | Filling the soak pit with 225 mm boulders as per specification |
| 62 | Filling the soak pit with 63/65mm metal as per specification |
| 63 | Filling the soak pit with 20mm metal as per specification |
| 64 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 65 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 66 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 67 | 7.Construction of community Soak pit in VAO Office at Padiyanallur Panchayat |
| 68 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 69 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 70 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 71 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 72 | Filling the soak pit with 225 mm boulders as per specification |
| 73 | Filling the soak pit with 63/65mm metal as per specification |
| 74 | Filling the soak pit with 20mm metal as per specification |
| 75 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 76 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 77 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 78 | 8. Construction of community Soak pit in Pillaiyar koil street at Padiyanallur Panchayat |
| 79 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 80 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 81 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 82 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 83 | Filling the soak pit with 225 mm boulders as per specification |
| 84 | Filling the soak pit with 63/65mm metal as per specification |
| 85 | Filling the soak pit with 20mm metal as per specification |
| 86 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 87 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 88 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 89 | 9.Construction of community Soak pit in Periyar nagar 3rd street at Padiyanallur Panchayat |
| 90 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 91 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 92 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 93 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 94 | Filling the soak pit with 225 mm boulders as per specification |
| 95 | Filling the soak pit with 63/65mm metal as per specification |
| 96 | Filling the soak pit with 20mm metal as per specification |
| 97 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 98 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 99 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 100 | 10.Construction of community Soak pit in PUM School at Padiyanallur Panchayat |
| 101 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 102 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 103 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 104 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 105 | Filling the soak pit with 225 mm boulders as per specification |
| 106 | Filling the soak pit with 63/65mm metal as per specification |
| 107 | Filling the soak pit with 20mm metal as per specification |
| 108 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 109 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 110 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 111 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender