Tender for 1. providing Guarding To Various Road Crossings Of 11 Kv Housing Board Feeder In Es Local-Ii (Ts. No. 100/2025-26) & W.B.S. No. 32100257-001-Hmr-Ht-058. 2.Prov. Extension Of 3-Ph Lt Line For Left Out Houses From 100 Kva Lahar At Vill. Lahar & 100 Kva Baral At Vill. Baral In Es Dosarka T.S. No. 138/2025-26 (W.B.S. 32100257-001-Hmr-Lt-357) Uesd No. Ii Hamirpur. On Partial Turn Key Basis.
BOQ
| Sl. No. | Item Description |
| 1 | Prov. Guarding to various road crossings of 11 KV Housing Board Feeder RCC Muff 2000mm Long with concrete filling material |
| 2 | Cross Arm: [Channel Iron (100x50x5 mm), Length: 1270 mm |
| 3 | Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures |
| 4 | Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] |
| 5 | 11 kV Pin Insulators |
| 6 | HT Stay Set Complete i/c Guy Assembly and Helically fittings) |
| 7 | Stay wire 7/3.15 mm |
| 8 | HT Earthing set complete |
| 9 | Eye Hook for for Earth wire |
| 10 | MS AI.of Size (2800x50x50x6 mm) for for road crossing |
| 11 | M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)] |
| 12 | Half Clamp made of M.S. Flat of size(50 x 6mm). |
| 13 | Extension of 3-ph LT line for left out houses from 100 KVA Lahar RCC Muff 2000 mm long with concrete filling material |
| 14 | Channel iron Iron (75X40x5 mm), ( Length-1.50Mtr+0.2Mtr)mm x1 Nos. Per Pole |
| 15 | Shackle Insulator (16 kN) |
| 16 | D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts |
| 17 | Earh Knob |
| 18 | LT Stay Set Complete i/c stay clamp) |
| 19 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 20 | Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). |
| 21 | Half Clamp made of MS Flat 50x6mm |
| 22 | LT Earthing Set complete in all respect |
| 23 | Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 24 | Aluminium Paint |
| 25 | Spiral PVC Spacer |
| 26 | ERECTION OF 11KV HT LINE : Erection of Single Pole Run through Structure with Steel Tubular Pole 11Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect. |
| 27 | Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 28 | Erection of HT Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same and prov. earthing connection complete in all respect. |
| 29 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 30 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 31 | Erection of LT Earthing as per latest standard practices /specification of REC / HPSEBL including digging of pit fixing of LT Earth Set, refilling the same and prov. earthing connection completein all respect. |
| 32 | Laying of Conductor, Stringing, Sagging of AAAC 50mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 33 | Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. |
| 34 | Add Transportation charges/mannual carriage , loading unloding of material from site to store & store to site as instruction from Site Incharge complete job in all respect. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender