Tender For Under The Jamaat Yojana In The Subdivision Obra Under The Electricity Distribution Division, Pipri, 60 Kw Electrical Connection Of Residential Building In Newly Created Obra, Tehsil Obra, Work Of 63 Kva Transformer In Bandha Road, Khairtia Of N
Tender Overview
Project Description
Tender For Under The Jamaat Yojana In The Subdivision Obra Under The Electricity Distribution Division, Pipri, 60 Kw Electrical Connection Of Residential Building In Newly Created Obra, Tehsil Obra, Work Of 63 Kva Transformer In Bandha Road, Khairtia Of Nagar Panchayat Obra, Work Of Shifting Lt And Ht Line At Sharda Mandir Square And Work Of Electrification In Jai Prakash Narayan Sarvodaya Vidyalaya Dudhi Under The Jamaat Yojana In The Subdivision Dudhi. (On Semi-Turnkey Basis)
BOQ
| Sl. No. | Item Description |
| 1 | CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 80 Km.) |
| 2 | STP Support 11 mtr Long |
| 3 | PCC Pole 8.5 Mtrs Long |
| 4 | ACSR Weasel Conductor |
| 5 | 11KV HT CABLE 3*70 Sqmm |
| 6 | Cable LT ABC (3x95+1x70+1x16) Sqmm Conducter |
| 7 | Cable LT ABC (3x120+1x95+1x16) Sqmm |
| 8 | 63 kva Transformer |
| 9 | 100 kva Transformer |
| 10 | DE-CENTRALIZED MATERIALS, Provided by Contractor |
| 11 | 1x35 sqmm Cable For D.B. Energisation |
| 12 | Piercing Cable Connector of 95mm Size |
| 13 | STAY WIRE |
| 14 | SUSPENSION EYE HOOK CLAMP |
| 15 | LT SHACKLE INSULATOR |
| 16 | LT CLAMP WITH NUT & BOLT FOR SHACKLE INSULATOR |
| 17 | LOOP GUARD COMPLTER 3 PHASE |
| 18 | EARTH WIRE CLAMP |
| 19 | NUT & BOLT FOR SHACKLE INSULATOR (ALL SIZE) |
| 20 | 3PH DISTRIBUTION CLAMP |
| 21 | DEAD END CLAMP |
| 22 | J- HOOK |
| 23 | EYE- HOOK |
| 24 | 33 KV 3*300sqmm kit CJK S/T |
| 25 | Three Pahse Distribution Box With clamp |
| 26 | CABLE JOINTING KIT 3*70SQMM,O/D |
| 27 | CLAMP FOR STP POLE ALL SIZE |
| 28 | ALUMINIUM PAINT |
| 29 | AC/DC clamp meter (FLUKE) |
| 30 | MEGGER 05KV MOTWANI |
| 31 | 11KV PIN INSULATOR |
| 32 | 11KV PIN WITH NUT |
| 33 | 11 KV DISC FITTING |
| 34 | 11KV DIS INSULATOR |
| 35 | X ARM MS ANGLE 65*65*6MM V TYPE |
| 36 | STAY SET COMPLETE |
| 37 | EARTHING COMPLETE (Rod) |
| 38 | AL Lug 120 SQMM |
| 39 | AL Lug 240 SQMM |
| 40 | AL Lug 250 SQMM |
| 41 | AL Lug 400 SQMM |
| 42 | M.S. Angle Iron 65×65x6 mm bracing with 4 clamp |
| 43 | Top Channel M.S.100x50x2240 |
| 44 | Dropper Channel M.S. 100×50×2000 mm |
| 45 | TF BASE MS ANGLE 100X50X2240 |
| 46 | G.I. wire 6 SWG and 10 SWG for guarding, lacing and street light cable catenary |
| 47 | Guarding Cross-arm (M.S. angle 65x65x6mm/1.6 Meter long),5.8kg./M=9.28kg. |
| 48 | 11 Kv F Clamp |
| 49 | M.S. T- off Channel |
| 50 | LT Fuse Set Protection Unit for 63 kVA DT with SMC Box |
| 51 | 11KV FUSE SET |
| 52 | LT COPPER FUSE 10SWG |
| 53 | LT COPPER FUSE 11 SWG |
| 54 | LT COPPER FUSE 13 SWG |
| 55 | Danger Board With Nut & Botlts |
| 56 | Cross Arm Holding Clamp with Nut & Bolt |
| 57 | Various type nut &bolts |
| 58 | Barbed GI Wire |
| 59 | Barbed Wire 6 SWg |
| 60 | P.G. Clamp For weasel Conducter With Nut & Bolt |
| 61 | LT Pvc Tape |
| 62 | Cu 'Z' Clamp 50x225x10mm |
| 63 | Cu 'Z' Clamp 62x225x12mm |
| 64 | 25 Feet Allu. Extension Ladder |
| 65 | Stone Pad |
| 66 | T-off , Top Dropper Clamp |
| 67 | SS Base Angle |
| 68 | F-Bracket With Nuts& Bolts |
| 69 | Fuse Set |
| 70 | Copper L-Piece 50x225x10mm |
| 71 | 11K.V.Polymeric Pin Insulator With Nuts & Bolts |
| 72 | 11K.V. Polymeric Disc Insulator T&C Type 4500Kg. With Fitting |
| 73 | L.T. PVC CABLE 3.5*50 Sqmm |
| 74 | L.T. PVC CABLE 3.5*16 Sqmm |
| 75 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 76 | Cairrage of T/F from Store to site Construction of Plinth & Fencing of All Type T/F and Installation With All Accessories.(63 KVA & 100 KVA) |
| 77 | Cairrage from store to site and Erection of single,double and four support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work. Proper Grouting of Poles. |
| 78 | Eraction and Grouting of stay with all accessories. |
| 79 | Earthing Complete with All Accessories. |
| 80 | Cairrage from store to site and Laying of ACSR Weasel Conductor with all accessories . |
| 81 | Cairrage from store to site and Laying of HT CABLE 3*70 Sqmm with all accessories . |
| 82 | Cairrage from store to site and Laying ofLT ABC (3x95+1x70+1x16) Sqmm & Cable LT ABC (3x120+1x95+1x16) Sqmm with all accessories . |
| 83 | Laying of L.T. PVC CABLE 3.5*50 Sqmm & L.T. PVC CABLE 3.5*16 Sqmm with all accessories . |
| 84 | Cairrage of dismental line material ,Transformer and other material from site to store. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender