Chemicals and Fertilizers Boards / Undertakings / PSU Closing in 16 days TDR #56510654

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit; Unloading, Installation, And Hook Up Of Fat Iat Plate Cooler And Bfw Preheater And Hook-Up Of Intermediate Absorption Tower (Iat

Issued by Boards / Undertakings / PSU · Mumbai Suburban, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
06 Aug 2026
16 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai Suburban → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit; Unloading, Installation, And Hook Up Of Fat Iat Plate Cooler And Bfw Preheater And Hook-Up Of Intermediate Absorption Tower (Iat) In Sap And Cna Plan.. - Lump Sum Charges For Unloading Of The Bfw Preheater Along With Spares. Charges Forcrane Required For The Job Are Inclusive. , Lump Sum Charges For Complete Job Of Replacement Of Bfw Preheater In Sap Plant Asper Scope Of Work. Charges Are Inclusive Of:• Scaffolding Erection And Removal.• Cutting Of The Required Ducts/Pipelines / Structure.• Opening And Box-Up Of The Required Flanges/Manholes.• Spading / Blinding Of Flanges And Removal Of Spades / Blinds And Final Box-Up As Perthe Above Scope Of Work.• Removal Of The Bfw Preheater And Installation Of New Bfw Preheater In Position.This Also Includes Charges For Crane Required For Replacement Of Exchangers.• Loading / Unloading And Shifting Of The Piping, Structural Steel And New Bfwpreheater From Stores / Expansion Yard To Sap Plant.• Loading / Unloading, Weighing And Shifting Of The Removed Old Bfw Preheater Fromsap Plant To Expansion Yard.• Charges For Truck / Trailer And Crane Required For Loading / Unloading And Shifting Ofthe Piping, Structural Steel And Bfw Preheatercharges For Crane Required For Installation Of The Pipelines And Structures. , Charges For Fabrication Of Ss Ducting (Ss304); Size: 40 (Root Run And Hot Pass Will Be Intig Welding And Subsequent Fill-Up Passes Will Be In Arc Welding) (Charges Are Inclusiveof Scaffolding, Dye Penetrant Testing Of The Root Run And Final Run) , Lump Sum Charges For Unloading Of The Fat Plate Cooler Along With Spares. Charges Forcrane/Hydra Required For The Job Are Inclusive. , Lump Sum Charges For Complete Job Of Installation Of Fat/Iat Plate Cooler In Sap Plantas Per Scope Of Work. Charges Are Inclusive Of:• Installation Of New Fat Plate Cooler In Position. This Also Includes Charges Forcrane/Hydra Required For Installation Of Exchangers.• Loading / Unloading And Shifting Of The Piping, Valves And Structural Steel From Stores/ Expansion Yard To Sap Plant.• Charges For , Hook Up Of Iat With Crane/Hydra In Contractor Scope. , Fabrication And Erection Of Ss304 Ducting , Cutting And Removal Of Ss304 Duct , Installation Of Acid Distributors And Candles (Which Includes Installation Of Cast Irontrays(03 Nos.) ,Cast Iron Distribution Header And Iat Candles (09 Nos). , Erection Of Ms Ptfe Pipelines , Fabrication And Erection Of Cs/Ss Pipelines (Size: 1 To 6 ) , Replacement Of Valves (Cs/Ss/A20/Msptfe)150# , Up To 2 , 3 To 6 , 8 To 10 , Structural Repair And Replacement

BOQ

Sl. No. Item TitleItem Description
1Lump sum charges for unloading of the BFW preheater along with spares. Charges forcrane required for the job are inclusive.Lump sum charges for unloading of the BFW preheater along with spares. Charges forcrane required for the job are inclusive.
2Lump sum charges for complete job of replacement of BFW preheater in SAP Plant asper scope of work. Charges are inclusive of:• Scaffolding erection and removal.• Cutting of the required ducts/pipelines / structure.• Opening and box-up of the required flanges/manholes.• Spading / blinding of flanges and removal of spades / blinds and final box-up as perthe above scope of work.• Removal of the BFW preheater and installation of new BFW preheater in position.This also includes charges for crane required for replacement of exchangers.• Loading / Unloading and shifting of the piping, structural steel and new BFWpreheater from Stores / expansion yard to SAP Plant.• Loading / unloading, weighing and shifting of the removed old BFW preheater fromSAP Plant to expansion yard.• Charges for truck / trailer and crane required for loading / unloading and shifting ofthe piping, structural steel and BFW preheaterCharges for crane required for installation of the pipelines and structures.Lump sum charges for complete job of replacement of BFW preheater in SAP Plant asper scope of work. Charges are inclusive of:• Scaffolding erection and removal.• Cutting of the required ducts/pipelines / structure.• Opening and box-up of the required flanges/manholes.• Spading / blinding of flanges and removal of spades / blinds and final box-up as perthe above scope of work.• Removal of the BFW preheater and installation of new BFW preheater in position.This also includes charges for crane required for replacement of exchangers.• Loading / Unloading and shifting of the piping, structural steel and new BFWpreheater from Stores / expansion yard to SAP Plant.• Loading / unloading, weighing and shifting of the removed old BFW preheater fromSAP Plant to expansion yard.• Charges for truck / trailer and crane required for loading / unloading and shifting ofthe piping, structural steel and BFW preheaterCharges for crane required for installation of the pipelines and structures.
3Charges for fabrication of SS ducting (SS304); size: 40” (Root run and hot pass will be inTIG welding and subsequent fill-up passes will be in arc welding) (Charges are inclusiveof scaffolding, Dye Penetrant testing of the root run and final run)Charges for fabrication of SS ducting (SS304); size: 40” (Root run and hot pass will be inTIG welding and subsequent fill-up passes will be in arc welding) (Charges are inclusiveof scaffolding, Dye Penetrant testing of the root run and final run)
4Lump sum charges for unloading of the FAT plate cooler along with spares. Charges forcrane/Hydra required for the job are inclusive.Lump sum charges for unloading of the FAT plate cooler along with spares. Charges forcrane/Hydra required for the job are inclusive.
5Lump sum charges for complete job of installation of FAT/IAT plate cooler in SAP Plantas per scope of work. Charges are inclusive of:• Installation of new FAT plate cooler in position. This also includes charges forcrane/Hydra required for installation of exchangers.• Loading / Unloading and shifting of the piping, valves and structural steel from Stores/ expansion yard to SAP Plant.• Charges forLump sum charges for complete job of installation of FAT/IAT plate cooler in SAP Plantas per scope of work. Charges are inclusive of:• Installation of new FAT plate cooler in position. This also includes charges forcrane/Hydra required for installation of exchangers.• Loading / Unloading and shifting of the piping, valves and structural steel from Stores/ expansion yard to SAP Plant.• Charges for
6Hook up of IAT with crane/hydra in contractor scope.Hook up of IAT with crane/hydra in contractor scope.
7Fabrication and erection of SS304 ductingFabrication and erection of SS304 ducting
8Cutting and removal of SS304 ductCutting and removal of SS304 duct
9Installation of acid distributors and candles (which includes installation of cast irontrays(03 Nos.) ,cast iron distribution header and IAT candles (09 nos).Installation of acid distributors and candles (which includes installation of cast irontrays(03 Nos.) ,cast iron distribution header and IAT candles (09 nos).
10Erection of MS PTFE pipelinesErection of MS PTFE pipelines
11Fabrication and erection of CS/SS pipelines (Size: 1” to 6” )Fabrication and erection of CS/SS pipelines (Size: 1” to 6” )
12Replacement of valves (CS/SS/A20/MSPTFE)150#Replacement of valves (CS/SS/A20/MSPTFE)150#
13Up to 2”Up to 2”
143” to 6”3” to 6”
158” to 10”8” to 10”
16Structural repair and replacementStructural repair and replacement

AI Tender Summary

OUR REF NO 56510654
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 06-08-2026
Authority
Authority Name Rashtriya Chemicals And Fertilizers Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit; Unloading, Installation, And Hook Up Of Fat Iat Plate Cooler And Bfw Preheater And Hook-Up Of Intermediate Absorption Tower (Iat) In Sap And Cna Plan.. - Lump Sum Charges For Unloading Of The Bfw Preheater Along With Spares. Charges Forcrane Required For The Job Are Inclusive. , Lump Sum Charges For Complete Job Of Replacement Of Bfw Preheater In Sap Plant Asper Scope Of Work. Charges Are Inclusive Of:• Scaffolding Erection And Removal.• Cutting Of The Required Ducts/Pipelines / Structure.• Opening And Box-Up Of The Required Flanges/Manholes.• Spading / Blinding Of Flanges And Removal Of Spades / Blinds And Final Box-Up As Perthe Above Scope Of Work.• Removal Of The Bfw Preheater And Installation Of New Bfw Preheater In Position.This Also Includes Charges For Crane Required For Replacement Of Exchangers.• Loading / Unloading And Shifting Of The Piping, Structural Steel And New Bfwpreheater From Stores / Expansion Yard To Sap Plant.• Loading / Unloading, Weighing And Shifting Of The Removed Old Bfw Preheater Fromsap Plant To Expansion Yard.• Charges For Truck / Trailer And Crane Required For Loading / Unloading And Shifting Ofthe Piping, Structural Steel And Bfw Preheatercharges For Crane Required For Installation Of The Pipelines And Structures. , Charges For Fabrication Of Ss Ducting (Ss304); Size: 40 (Root Run And Hot Pass Will Be Intig Welding And Subsequent Fill-Up Passes Will Be In Arc Welding) (Charges Are Inclusiveof Scaffolding, Dye Penetrant Testing Of The Root Run And Final Run) , Lump Sum Charges For Unloading Of The Fat Plate Cooler Along With Spares. Charges Forcrane/Hydra Required For The Job Are Inclusive. , Lump Sum Charges For Complete Job Of Installation Of Fat/Iat Plate Cooler In Sap Plantas Per Scope Of Work. Charges Are Inclusive Of:• Installation Of New Fat Plate Cooler In Position. This Also Includes Charges Forcrane/Hydra Required For Installation Of Exchangers.• Loading / Unloading And Shifting Of The Piping, Valves And Structural Steel From Stores/ Expansion Yard To Sap Plant.• Charges For , Hook Up Of Iat With Crane/Hydra In Contractor Scope. , Fabrication And Erection Of Ss304 Ducting , Cutting And Removal Of Ss304 Duct , Installation Of Acid Distributors And Candles (Which Includes Installation Of Cast Irontrays(03 Nos.) ,Cast Iron Distribution Header And Iat Candles (09 Nos). , Erection Of Ms Ptfe Pipelines , Fabrication And Erection Of Cs/Ss Pipelines (Size: 1 To 6 ) , Replacement Of Valves (Cs/Ss/A20/Msptfe)150# , Up To 2 , 3 To 6 , 8 To 10 , Structural Repair And Replacement
Basic Detail
Tender No GEM/2026/B/7796729
Bidding Type Tender
Location
City Mumbai Suburban
State Maharashtra
Key Dates
Publish Date 16 Jul 2026
Submission Date 06 Aug 2026
Open Date 06 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
dbb2ee2b-d204-47e5-9ad6-3adbeb38a990.pdf
1784198971.xlsx
1784201956.pdf
1784201963.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 06, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 16 days
Aug 06, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
pdf

dbb2ee2b-d204-47e5-9ad6-3adbeb38a990.pdf

xlsx

1784198971.xlsx

pdf

1784201956.pdf

pdf

1784201963.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders