Bids Are invited for Hiring Of Consultants - Milestone/Deliverable Based - Technology Consultants, Functional Consultants; Subject Matter Expert; No; Hybrid(As Specified In Scope Of Work) - Carrying Out Topographcial Surveys, River Survey (Cross Sect
Tender Overview
Project Description
Bids Are invited for Hiring Of Consultants - Milestone/Deliverable Based - Technology Consultants, Functional Consultants; Subject Matter Expert; No; Hybrid(As Specified In Scope Of Work) - Carrying Out Topographcial Surveys, River Survey (Cross Section And Longitudinal Direction) And Hydrographic Survey Of The Project Area With Modren Survey Equpiments, Dgps, Lidar Covering All Components In Each Alternative Including Transmission Line, Quarry , Dumping Area And Preparation Of Topographical Maps, In Different/Requisite Scales And Contour Interval With Shifting Of Bench Mark (Bm), Painting & Engraving From Nearest Project/Location As Per Standard Specifications ,Latest Cea Guidelines For Formulation Of Dprs For Psps,Tor And Directions Of Engineer-In-Charge With Submission Of Reports Etc. Including Cost Of Manpower, Material, Labour, Surveying Instruments, C Equipage, Transportation Etc. , Geo Mapping And Preparation Of Detailed Geological Map With Submission Of Reports Of The Whole Project Area Including Major Project Components (Reservoirs,Wcs, Ph, Surge Shaft, Trt, Trc And Axillary Tunnels,Quarry Area Etc.) On Different Scale With Different Contour Interval Including Seismotectonic Map, Lineament Map, Geomorphological Map And Landslide Susceptibility Map Etc. Of The Project Area As Per As Per Latest Cea Guidelines For Formulation Of Dprs For Psps,Tor And Directions Of Engineer-In-Charge. , Conducting Geological And Geotechnical Investigation And Submission Of Reports , Conducting Following Geophysical Studies With All Equipments/Instuments, Material, Manpower And As Per Relevent Is Code, Latest Cea Guidelines For Formulation Of Dprs For Psps And Directions Of Engineer-In-Charge Including Mobilisaion, Demobilization ,Data Analysis, Interpretation And Submission Of Report Complete. , Seismo-Tectonic Evaluation Study And Determination Of Site-Specific Seismic Design Parameters And Submission Of Report As Per Relevent Is Code, Latest Cea Guidelines For Formulation Of Dprs For Psps, Tor And As Per Directions Of Engineer-In-Charge . , Identification Of Quarry Site With Sutability Of Construction Material Including Quality And Quantity And Carrying Out The Laboratry/Field Tests (As Per Tor) Of Construction Material Including Collection Of S Les From Site, Transportion Of The Same For Carrying Out The Laboratory Test From The Nabl Certified Or Govt. Laboratories Including Selection And Finalization Of Quarry Area With Suitability Of Construction Material Along With Quality & Quantity Requried For The Project And Submission Of Report As Per Is Codes, Latest Cea Guidelines For Formulation Of Dprs For Psps, Tor And As Per Directions Of Engineer-In-Charge. , For Obtaining Environment Clearance From Moef&Cc Of Thdc 01 1200 Mw Sonbhadra Psp Including Obtaining Terms Of Reference (Tor), Conducting Eia/Emp Study, Public Consultation, Submit Final Report To Moef&Cc For Environment Clearance As Per Latest Guidelines Of Moef&Cc. , Assistance In Obtaining Forest Clearance (Stage-1 And Stage-2) And Other Clearances.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Carrying out topographcial surveys, river survey (cross section and longitudinal direction) and hydrographic survey of the project area with modren survey equpiments, DGPS, LiDAR covering all components in each alternative including transmission line, quarry , dumping area and preparation of topographical maps, in different/requisite scales and contour interval with shifting of Bench Mark (BM), painting & engraving from nearest project/location as per standard specifications ,latest CEA guidelines for formulation of DPRs for PSPs,TOR and directions of Engineer-In-charge with submission of reports etc. including cost of manpower, material, labour, surveying instruments, camp equipage, transportation etc. | Carrying out topographcial surveys, river survey (cross section and longitudinal direction) and hydrographic survey of the project area with modren survey equpiments, DGPS, LiDAR covering all components in each alternative including transmission line, quarry , dumping area and preparation of topographical maps, in different/requisite scales and contour interval with shifting of Bench Mark (BM), painting & engraving from nearest project/location as per standard specifications ,latest CEA guidelines for formulation of DPRs for PSPs,TOR and directions of Engineer-In-charge with submission of reports etc. including cost of manpower, material, labour, surveying instruments, camp equipage, transportation etc. |
| 2 | Geo mapping and preparation of detailed geological map with submission of reports of the whole project area including major project components (Reservoirs,WCS, PH, Surge Shaft, TRT, TRC and Axillary Tunnels,quarry area etc.) on different scale with different contour interval including Seismotectonic map, Lineament map, Geomorphological map and Landslide Susceptibility map etc. of the project area as per as per latest CEA guidelines for formulation of DPRs for PSPs,TOR and directions of Engineer-In-charge. | Geo mapping and preparation of detailed geological map with submission of reports of the whole project area including major project components (Reservoirs,WCS, PH, Surge Shaft, TRT, TRC and Axillary Tunnels,quarry area etc.) on different scale with different contour interval including Seismotectonic map, Lineament map, Geomorphological map and Landslide Susceptibility map etc. of the project area as per as per latest CEA guidelines for formulation of DPRs for PSPs,TOR and directions of Engineer-In-charge. |
| 3 | Conducting Geological and Geotechnical investigation and submission of reports | Conducting Geological and Geotechnical investigation and submission of reports |
| 4 | Conducting following geophysical Studies with all equipments/instuments, material, manpower and as per relevent IS code, latest CEA guidelines for formulation of DPRs for PSPs and directions of Engineer-In-charge including mobilisaion, demobilization ,data analysis, interpretation and submission of report complete. | Conducting following geophysical Studies with all equipments/instuments, material, manpower and as per relevent IS code, latest CEA guidelines for formulation of DPRs for PSPs and directions of Engineer-In-charge including mobilisaion, demobilization ,data analysis, interpretation and submission of report complete. |
| 5 | Seismo-Tectonic evaluation study and determination of Site-Specific Seismic Design Parameters and submission of report as per relevent IS code, latest CEA guidelines for formulation of DPRs for PSPs, TOR and as per directions of Engineer-In-charge . | Seismo-Tectonic evaluation study and determination of Site-Specific Seismic Design Parameters and submission of report as per relevent IS code, latest CEA guidelines for formulation of DPRs for PSPs, TOR and as per directions of Engineer-In-charge . |
| 6 | Identification of quarry site with sutability of construction material including quality and quantity and carrying out the laboratry/field tests (As per TOR) of construction material including collection of samples from site, transportion of the same for carrying out the laboratory test from the NABL certified or Govt. laboratories including selection and finalization of quarry area with suitability of construction material along with quality & quantity requried for the project and submission of report as per IS codes, latest CEA guidelines for formulation of DPRs for PSPs, TOR and as per directions of Engineer-In-charge. | Identification of quarry site with sutability of construction material including quality and quantity and carrying out the laboratry/field tests (As per TOR) of construction material including collection of samples from site, transportion of the same for carrying out the laboratory test from the NABL certified or Govt. laboratories including selection and finalization of quarry area with suitability of construction material along with quality & quantity requried for the project and submission of report as per IS codes, latest CEA guidelines for formulation of DPRs for PSPs, TOR and as per directions of Engineer-In-charge. |
| 7 | For Obtaining Environment Clearance from MoEF&CC of THDC 01 1200 MW Sonbhadra PSP including obtaining Terms of Reference (ToR), conducting EIA/EMP study, Public Consultation, submit final report to MoEF&CC for Environment clearance as per latest guidelines of MoEF&CC. | For Obtaining Environment Clearance from MoEF&CC of THDC 01 1200 MW Sonbhadra PSP including obtaining Terms of Reference (ToR), conducting EIA/EMP study, Public Consultation, submit final report to MoEF&CC for Environment clearance as per latest guidelines of MoEF&CC. |
| 8 | Assistance in Obtaining Forest Clearance (Stage-1 and stage-2) and other clearances. | Assistance in Obtaining Forest Clearance (Stage-1 and stage-2) and other clearances. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender