Railways Government Departments Closing in 29 days TDR #56506372

Supply Of UNDER FRAME COMPLETE FOR LHB SLR & POWER CAR COACHES.

Issued by Government Departments · Kapurthala, Punjab
Tender Value
Ref. Documents
Estimated cost
Bid Submission
17 Aug 2026
29 days left
EMD
9.93 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kapurthala → Punjab
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply Of under frame complete for lhb slr & power car coaches. , under frame complete for lhb slr coaches note:-(1)crf items are to bemanufac tured as per dy. cpleiiiletter no. rcf/hsq/plg/mpsh/510003/lhbdated 04/04/2024. (2) protection procedure asper dy cple-iii annexure-app dated 14/05/2024. note-(3).mounting arrangemen t on underframe for biological tank as per drg no. lr11961 alt f ., as per drawing: lr118 73 alt.b schedule of technical requirement specification no. mdts21320 rev-02 & maski ng as per drg no mi007679 alt. nil note: brackets to drg no lr36611 alt. a(qpc=1 nos.) & lr36612 alt. c(qpc=1 nos.) are to be supplied as loose items., packing instruction: pi042 ver 3.0. [ warranty period: 84 months after the date of delivery ] ] , underframe complete for lhb power car note:-(1) crf items are to be manufact ured as per dy. cple-iii letter no. rcf/hsq/plg/mpsh/510003/lhb dated 04/04/2024 (2) protection procedure as per dy cple-iii annexure-app dated 14/05/2024. , as per drawing: lp 11305 alt.g as per schedule of technical requirement specification no. mdts21320 (late st) & shot blasting or grit blasting as per mdts-166 (latest)& masking as per drg. no. mi 007679 alt.nil, packing instruction: pi042 ver 3.0. [ warranty period: 84 months after the date of delivery ] ]

BOQ

Sl. No.Item Description
1UNDER FRAME COMPLETE FOR LHB SLR COACHES Note:-(1)CRF items are to bemanufac tured as per Dy. CPLEIIIletter no. RCF/HSQ/PLG/MPSH/510003/LHBDATED 04/04/2024. (2) PROTECTION PROCEDURE ASPER DY CPLE-III ANNEXURE-APP DATED 14/05/2024. Note-(3).MOUNTING ARRANGEMEN T ON UNDERFRAME FOR BIOLOGICAL TANK AS PER DRG No. LR11961 ALT ' f '., as per Drawing: LR118 73 ALT.'b' SCHEDULE OF TECHNICAL REQUIREMENT SPECIFICATION NO. MDTS21320 REV-02 & MASKI NG AS PER DRG NO MI007679 ALT. 'nil' NOTE: BRACKETS TO DRG NO LR36611 ALT. 'a'(QPC=1 nos.) & LR36612 ALT. 'c'(QPC=1 nos.) ARE TO BE SUPPLIED AS LOOSE ITEMS., Packing Instruction: PI042 VER 3.0. [ Warranty Period: 84 Months after the date of delivery ] ]
2UNDERFRAME COMPLETE FOR LHB POWER CAR Note:-(1) CRF items are to be manufact ured as per Dy. CPLE-III letter no. RCF/HSQ/PLG/MPSH/510003/LHB DATED 04/04/2024 (2) PROTECTION PROCEDURE AS PER DY CPLE-III ANNEXURE-APP DATED 14/05/2024. , as per Drawing: LP 11305 ALT.'g' AS PER SCHEDULE OF TECHNICAL REQUIREMENT SPECIFICATION NO. MDTS21320 (LATE ST) & SHOT BLASTING OR GRIT BLASTING AS PER MDTS-166 (LATEST)& MASKING AS PER DRG. NO. MI 007679 ALT.'nil', Packing Instruction: PI042 VER 3.0. [ Warranty Period: 84 Months after the date of delivery ] ]

AI Tender Summary

OUR REF NO 56506372
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 17-08-2026
Authority
Authority Name Rail Coach Factory
Work Description Supply Of under frame complete for lhb slr & power car coaches. , under frame complete for lhb slr coaches note:-(1)crf items are to bemanufac tured as per dy. cpleiiiletter no. rcf/hsq/plg/mpsh/510003/lhbdated 04/04/2024. (2) protection procedure asper dy cple-iii annexure-app dated 14/05/2024. note-(3).mounting arrangemen t on underframe for biological tank as per drg no. lr11961 alt f ., as per drawing: lr118 73 alt.b schedule of technical requirement specification no. mdts21320 rev-02 & maski ng as per drg no mi007679 alt. nil note: brackets to drg no lr36611 alt. a(qpc=1 nos.) & lr36612 alt. c(qpc=1 nos.) are to be supplied as loose items., packing instruction: pi042 ver 3.0. [ warranty period: 84 months after the date of delivery ] ] , underframe complete for lhb power car note:-(1) crf items are to be manufact ured as per dy. cple-iii letter no. rcf/hsq/plg/mpsh/510003/lhb dated 04/04/2024 (2) protection procedure as per dy cple-iii annexure-app dated 14/05/2024. , as per drawing: lp 11305 alt.g as per schedule of technical requirement specification no. mdts21320 (late st) & shot blasting or grit blasting as per mdts-166 (latest)& masking as per drg. no. mi 007679 alt.nil, packing instruction: pi042 ver 3.0. [ warranty period: 84 months after the date of delivery ] ]
Basic Detail
Tender No 05261223A
Bidding Type Tender
Location
City Kapurthala
State Punjab
Key Dates
Publish Date 16 Jul 2026
Submission Date 17 Aug 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 9.93 Lakhs
Exemption Not Available
Document List
0e6a15ad-fef9-4ee9-8dcd-d88754a23f64.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 17, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 29 days

Tender Documents

Download All (ZIP) ↓
pdf

0e6a15ad-fef9-4ee9-8dcd-d88754a23f64.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders