Supply Of UNDER FRAME COMPLETE FOR LHB SLR & POWER CAR COACHES.
Tender Overview
Project Description
Supply Of under frame complete for lhb slr & power car coaches. , under frame complete for lhb slr coaches note:-(1)crf items are to bemanufac tured as per dy. cpleiiiletter no. rcf/hsq/plg/mpsh/510003/lhbdated 04/04/2024. (2) protection procedure asper dy cple-iii annexure-app dated 14/05/2024. note-(3).mounting arrangemen t on underframe for biological tank as per drg no. lr11961 alt f ., as per drawing: lr118 73 alt.b schedule of technical requirement specification no. mdts21320 rev-02 & maski ng as per drg no mi007679 alt. nil note: brackets to drg no lr36611 alt. a(qpc=1 nos.) & lr36612 alt. c(qpc=1 nos.) are to be supplied as loose items., packing instruction: pi042 ver 3.0. [ warranty period: 84 months after the date of delivery ] ] , underframe complete for lhb power car note:-(1) crf items are to be manufact ured as per dy. cple-iii letter no. rcf/hsq/plg/mpsh/510003/lhb dated 04/04/2024 (2) protection procedure as per dy cple-iii annexure-app dated 14/05/2024. , as per drawing: lp 11305 alt.g as per schedule of technical requirement specification no. mdts21320 (late st) & shot blasting or grit blasting as per mdts-166 (latest)& masking as per drg. no. mi 007679 alt.nil, packing instruction: pi042 ver 3.0. [ warranty period: 84 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | UNDER FRAME COMPLETE FOR LHB SLR COACHES Note:-(1)CRF items are to bemanufac tured as per Dy. CPLEIIIletter no. RCF/HSQ/PLG/MPSH/510003/LHBDATED 04/04/2024. (2) PROTECTION PROCEDURE ASPER DY CPLE-III ANNEXURE-APP DATED 14/05/2024. Note-(3).MOUNTING ARRANGEMEN T ON UNDERFRAME FOR BIOLOGICAL TANK AS PER DRG No. LR11961 ALT ' f '., as per Drawing: LR118 73 ALT.'b' SCHEDULE OF TECHNICAL REQUIREMENT SPECIFICATION NO. MDTS21320 REV-02 & MASKI NG AS PER DRG NO MI007679 ALT. 'nil' NOTE: BRACKETS TO DRG NO LR36611 ALT. 'a'(QPC=1 nos.) & LR36612 ALT. 'c'(QPC=1 nos.) ARE TO BE SUPPLIED AS LOOSE ITEMS., Packing Instruction: PI042 VER 3.0. [ Warranty Period: 84 Months after the date of delivery ] ] |
| 2 | UNDERFRAME COMPLETE FOR LHB POWER CAR Note:-(1) CRF items are to be manufact ured as per Dy. CPLE-III letter no. RCF/HSQ/PLG/MPSH/510003/LHB DATED 04/04/2024 (2) PROTECTION PROCEDURE AS PER DY CPLE-III ANNEXURE-APP DATED 14/05/2024. , as per Drawing: LP 11305 ALT.'g' AS PER SCHEDULE OF TECHNICAL REQUIREMENT SPECIFICATION NO. MDTS21320 (LATE ST) & SHOT BLASTING OR GRIT BLASTING AS PER MDTS-166 (LATEST)& MASKING AS PER DRG. NO. MI 007679 ALT.'nil', Packing Instruction: PI042 VER 3.0. [ Warranty Period: 84 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 29 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender