Tender For Tender For providing And Erection/ Permanent Restoration Of Vulnerable Points Of Temporarily Restored Dtr & Ht/Lt Line Due To Natural Calamity At Village Bhanjal, Sanoli, Karluhi, Matehar, Saunkali And Chowar Under Esd Mubarikpur. Ch. To.
Tender Overview
Project Description
Tender for Tender For providing And Erection/ Permanent Restoration Of Vulnerable Points Of Temporarily Restored Dtr & Ht/Lt Line Due To Natural Calamity At Village Bhanjal, Sanoli, Karluhi, Matehar, Saunkali And Chowar Under Esd Mubarikpur. Ch. To. :- Ndrf Under Pdna (Bid No. Ged-37/2026-27)
BOQ
| Sl. No. | Item Description |
| 1 | Erection Part of R/M of 11 KV HT Line |
| 2 | Erection of new Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 3 | Re-Erection of Tilted PCC Pole/Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and erection of pole, filling of Pit, and ramming complete in all respect. |
| 4 | Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 5 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 6 | Re-Stringing and Re-sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81 (80 mm2) Conductor of 11 KV HT line complete in all respect. |
| 7 | Dismentalling of existing HT conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect |
| 8 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 9 | Erection Part R/M of 3-Phase LT Line |
| 10 | Erection of LT line:-Digging of pit of stay, Erection of Steel Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming, painting of Poles etc.complete in all respect. |
| 11 | Re-Erection of Tilted PCC Pole/Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and erection of pole, filling of Pit, and ramming complete in all respect. |
| 12 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 13 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 14 | Stringing and sagging conductor:- Laying of conductor AAAC 7/3.15 (55mm2) stringing and sagging, binding with insulator complete in all respect. |
| 15 | Dismentalling of existing L.T conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect |
| 16 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 17 | Supply Part Part of R/M of 11 KV HT Line |
| 18 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) (1 No. Supply by HPSEBL) |
| 19 | Prov. RCC Muff with concrete filling |
| 20 | Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) x 8 structure |
| 21 | Prov. Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures |
| 22 | Prov. Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] |
| 23 | Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure (21 Set Supply by HPSEBL) |
| 24 | Prov.Nuts and Bolts of Various Sizes |
| 25 | Prov.MS Half Clamp |
| 26 | Prov.MS Full Clamp/stay |
| 27 | Prov.Barbed Wire |
| 28 | Prov.Eye/Earth Hook |
| 29 | Prov.11kv Stay set complete in all respect |
| 30 | Prov. Stay Wire HT (10 kg. per Stay Set) |
| 31 | Prov.11kv Earthing set complete in all respect. |
| 32 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 33 | Prov.11kv Danger Plate (250x200x1.6 mm) ( 4 No. Supply by HPSEBL) |
| 34 | Prov. Aluminium Paint. |
| 35 | Prov. Red Oxide |
| 36 | Supply Part of R/M of 3-Phase LT Line |
| 37 | Prov. Steel Tubular Poles 9 Mtr Long along with base plate complete in all respect (8 Nos Supply by HPSEBL) |
| 38 | Prov. RCC Muff with concrete filling |
| 39 | Prov. Channel Iron (75x40x4.8) [Length- 1.50 Mtr + 0.2 Mtr]( 2 Nos for Height Piece) |
| 40 | Prov. Shackle Insulator (16 Kn) |
| 41 | Prov. D-Iron (U-Clamps) |
| 42 | Prov. Earth Knob |
| 43 | Prov. LT Stay Set (i/c Stay clamp) |
| 44 | Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set |
| 45 | Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set] |
| 46 | Prov. Earthing Set complete |
| 47 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 48 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 49 | Prov. Spiral PVC Spacer |
| 50 | Prov. Aluminium Paint. |
| 51 | Prov. Red Oxide |
| 52 | Loading of HT/LT Line materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage of HT Line and allied Material For Average Distance From Road To Site Of Work .(If required as per site). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender