Tender For Supply, Installation, Integration, Testing And Commissioning Of Radioactive Liquid Waste Management System (Rlwms) Consisting Of Ss Pipelines, Valves, Flanges, Ss Storage Tanks, Pumps, Ion-Exchange Mixed Bed Column, Instrumentation & Jetty
Tender Overview
Project Description
Tender for Supply, Installation, Integration, Testing And Commissioning Of Radioactive Liquid Waste Management System (Rlwms) Consisting Of Ss Pipelines, Valves, Flanges, Ss Storage Tanks, Pumps, Ion-Exchange Mixed Bed Column, Instrumentation & Jetty Cope Points Under The Scope Of Wp-06 For The Project At Sbo Rambilli , Hiring And Deployment Of Tpia And Key Personnel At Site For Rlwms I.A.W Section 1 Of Rfp Part - Ii And Pre Bid Qualification Criteria Of Part I. , Submission Of Detailed Design, Working Level Drawings (Wdls) And Qap / Acceptance Test Procedure (Atp). For Rlwms I.A.W Section 2 And 4 Of Rfp Part - Ii And Pre Bid Qualification Criteria Of Part I. , Hiring And Deployment Of Site Engineer (01 Person) During Installation, Testing, Trials And Commissioning Of Rlwms I.A.W Pre Bid Qualification Criteria Rfp Part - I. , Working Level Design, Supply, Installation, Integration, Testing And Commissioning Of Rlwms Facility With-In A1, B1 And B2 Buildings, Primarily Consists Of Laying Of Ss Pipelines, Installations Of Ss Tanks, Transfer Pumps, Ion-Exchange Columns , Flanges, Control Valves ,Associated Instrumentations, Control Pannels And Scada System Etc. Including Associated Civil Works I.A.W Enclosed Schematic Drawings And Bill Of Material Mentioned At Para 2.1 (2.1.1 To 2.1.16) Of Section 2 Of Rfp Part - Ii , Design, Supply, Installation, Integration, Testing And Commissioning Of Ss Pipelins, Ss Pumps And Control Valves Etc. Including Associated Civil Work From B2 Building Upto The Jetty Cope Points Vise-A-Versa Passing Through The Handshake Point Located At Utility Bridge, I.A.W Enclosed Schematic Drawings And Bill Of Material Mentioned At Para 2.1 (2.1.17) Of Section 2 Of Rfp Part - Ii (I) Laying Of Ss Pipe Lines From M1, M2, M3 And M4 Cope Points On The Jetty To B2 Building Cat Ii Tanks For Transferring Cat Ii Liquid Waste (04 Pipelines) Approximate Total Length Of 1600 Mtrs. (Ii) Laying Of Ss Pipe Line From B2 Building Cat I Tank To Jetty Cope Point M5/Barge For Transferring Treated Cat I Radioactive Liquid Waste (02 Pipelines) Approximate Total Length Of 904 Mtrs. (Iii) Assosciated Equipment Like Pumps (04 Nos), Valves Etc For The Above System Pipe Lines. , Documentation - Maintenance Schedule, Oem Manuals Trouble Shoot Charts, Working Level Drawings (Wdls) As Fitted Drawings (Afds) Etc. Of Rlwms I.A.W Section 5 Of Rfp Part - Ii , Class Room Training For Ten Personnel For At Least Ten Days On Operation & Maintenance Of Rlwms I.A.W Section 6.6 Of Rfp Part - Ii , Testing, Trials And Final Commissioning Of Rlwms In Liaison With Tpia And In The Presence Of Ge/User. , Any Other Item Such As Transportation, Insurance, Freight, Packing Etc , Notes: 1. Cost Of Item Listed At Sl 1.01 To 1.09 Are To Be Quoted In The Respective Rows Of The Price Bid Sheet, All Inclusive, Comprehensive And Lumpsum Against Each Serial. 2. Bidder Required To Mandatorily Quote For Sl 1.01 To 1.09 Failing In Which Bid Shall Be Treated As Non Bonafied And Liable For Rejection. 3. The L1 Bidder Will Be Determined Based On The Total Quoted Cost For Serial 1.01 To 1.09. The Right To Execute / Cancel Scope Of Work At Serial 1.05 Of Boq Remains With Dgnp(V) Depending On Site Conditions On A Later Stage. However, All Bidders Are Mandatorily Requested To Quote For Same And This Cost Will Be Included In Determining L1 For The Project. 4. L1 Will Be Determined Based On All Elements Of Costs Including Taxes And Duties, Etc. 5. Any Clarifications Contact To So1(Gp-3) (Phone No. 9246036272 And Email [email protected]) 6. Bidders Are Mandatorily To Quote Gst/ Taxes As Applicable Against Each Serials, Falling Which Bid Shall Be Treated As Non Bonafied And Liable For Rejection.
BOQ
| Sl. No. | Item Description |
| 1 | Hiring and deployment of TPIA and key personnel at site for RLWMS i.a.w section 1 of RFP part – II and Pre bid qualification criteria of Part I. |
| 2 | Submission of detailed Design, Working Level Drawings (WDLs) and QAP / Acceptance Test Procedure (ATP). for RLWMS i.a.w section 2 and 4 of RFP part – II and Pre bid qualification criteria of Part I. |
| 3 | Hiring and deployment of Site Engineer (01 Person) during installation, testing, Trials and commissioning of RLWMS i.a.w Pre bid qualification criteria RFP part – I. |
| 4 | Working level Design, Supply, Installation, Integration, Testing and Commissioning of RLWMS facility with-in A1, B1 and B2 buildings, primarily consists of laying of SS Pipelines, installations of SS Tanks, Transfer Pumps, Ion-Exchange Columns , Flanges, control Valves ,associated instrumentations, control pannels and SCADA system etc. including associated Civil Works i.a.w enclosed schematic drawings and bill of material mentioned at para 2.1 (2.1.1 to 2.1.16) of Section 2 of RFP Part - II |
| 5 | Design, Supply, Installation, Integration, Testing and Commissioning of SS Pipelins, SS Pumps and control valves etc. including associated civil work from B2 building upto the jetty cope points vise-a-versa passing through the handshake point located at utility bridge, i.a.w enclosed schematic drawings and bill of material mentioned at para 2.1 (2.1.17) of Section 2 of RFP Part - II(i) Laying of SS pipe lines from M1, M2, M3 and M4 cope points on the jetty to B2 building Cat II tanks for transferring Cat II liquid waste (04 pipelines) approximate total length of 1600 mtrs. (ii) Laying of SS pipe line from B2 building Cat I tank to jetty cope point M5/Barge for transferring treated Cat I radioactive liquid waste (02 pipelines) approximate total length of 904 mtrs. (iii) Assosciated equipment like pumps (04 nos), valves etc for the above system pipe lines. |
| 6 | Documentation – Maintenance schedule, OEM manuals Trouble Shoot Charts, Working Level Drawings (WDLs) As fitted Drawings (AFDs) etc. of RLWMS i.a.w Section 5 of RFP Part - II |
| 7 | Class room training for ten personnel for at least ten days on Operation & Maintenance of RLWMS i.a.w Section 6.6 of RFP Part - II |
| 8 | Testing, Trials and final Commissioning of RLWMS in liaison with TPIA and in the presence of GE/User. |
| 9 | Any other item such as transportation, insurance, freight, packing etc |
| 10 | Notes:1. Cost of item listed at Sl 1.01 to 1.09 are to be quoted in the respective rows of the price bid sheet, all inclusive, comprehensive and lumpsum against each serial. 2. Bidder required to mandatorily quote for Sl 1.01 to 1.09 failing in which bid shall be treated as non bonafied and liable for rejection. 3. The L1 bidder will be determined based on the total quoted cost for serial 1.01 to 1.09. The right to execute / cancel scope of work at Serial 1.05 of BoQ remains with DGNP(V) depending on site conditions on a later stage. However, all bidders are mandatorily requested to quote for same and this cost will be included in determining L1 for the project.4. L1 will be determined based on all elements of costs including taxes and duties, etc.5. Any clarifications contact to SO1(GP-3) (Phone No. 9246036272 and Email [email protected])6. Bidders are mandatorily to quote GST/ Taxes as applicable against each serials, falling which bid shall be treated as non bonafied and liable for rejection. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 27 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 28 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender