Tender For Upgradation Of Firefighting System At Ssh By Way Of Providing Laying Of Over Ground Ms Pipes Allied Works
Tender Value
39.21 Lakhs
Estimated cost
Bid Submission
27 Jul 2026
5 days left
EMD
80000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jammu → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Upgradation Of Firefighting System At Ssh By Way Of Providing Laying Of Over Ground Ms Pipes Allied Works
BOQ
| Sl. No. | Item Description |
| 1 | Providing, laying, jointing, welding and fixing 150 mm diameter MS (Mild Steel) Class-C pipe ISI marked (IS 1239) including supply of pipes, cutting and beveling of pipe ends, alignment and welding of joints using electrodes, including Providing and fixing necessary MS fittings such as bends, tees, reducers and flanged joints with rubber insertion gaskets, nuts and bolts complete. The job also includes making suitable supports such as MS clamps, hangers or concrete pedestals as required, applying one coat of red oxide primer and two coats of synthetic enamel paint of approved shade after surface preparation. The job includes dismantling of old damaged pipeline wherever necessary.The Pipes shall be Seamless and shall comply with relevant standards for mild steel pipes used for water and utility services.The pipes shall be straight, smooth, round and uniform in thickness, free from cracks, laminations, surface defects, rust scale and other manufacturing defects. Pipe ends shall be prepared for welding by proper beveling where flanged joints are required, flanges shall be of matching bore and pressure rating, fixed by full penetration welding. Gaskets shall be rubber insertion or non-asbestos fiber type suitable for the service pressure, and bolts & nuts shall be of standard high-tensile grade.All welding shall be carried out using approved welding electrodes by qualified welders. Weld joints shall be uniform, continuous and free from porosity or undercut.The pipeline shall be laid on supports / hangers / clamps / pedestals. Suitable MS supports / saddles / clamps shall be provided at required intervals to avoid sagging and misalignment. After fabrication, the external surface of the pipe shall be cleaned thoroughly by wire brushing/emery, and one coat of red oxide anti-corrosive primer followed by two coats of synthetic enamel / epoxy protective paint of approved shade shall be applied to the exposed surfaces. The laying of pipeline will be done as per site condition /direction of Engineer-in-Charge.The pipeline shall be flushed and cleaned, and then hydrostatically tested for leakage and strength at a pressure not less than 1.5 times the working pressure for the required duration. Any leakage or defects observed during testing shall be rectified by the contractor at no extra cost. The job also includes dismantling walls or partitions to route overground piping inside the building and connecting with already existing sprinkler and hydrant pipeline inside the building and subsequent reinstatement of masonry, plaster, finishes, and backfilling. Work includes proper curing, painting, making good affected floors/walls, and provision of temporary supports during installation, ensuring neat restoration.Makes:• MS Pipe and Fittings - TATA Steel / TATA Pipes, Jindal (Hissar/ JSPL/Jindal India),Prakash Surya.• Synthetic Enamel Paint / Industrial Paint: Asian Paints, Berger,Nerolac • Welding Electrodes: Tata Agrico, Advani, ESAB, Ador Welding |
| 2 | Providing, laying, jointing, welding and fixing 80 mm diameter MS (Mild Steel) Class-C pipe ISI marked (IS 1239) including supply of pipes, cutting and beveling of pipe ends, alignment and welding of joints using electrodes, including Providing and fixing necessary MS fittings such as bends, tees, reducers and flanged joints with rubber insertion gaskets, nuts and bolts complete. The job also includes making suitable supports such as MS clamps, hangers or concrete pedestals as required, applying one coat of red oxide primer and two coats of synthetic enamel paint of approved shade after surface preparation. The job includes dismantling of old damaged pipeline wherever necessary.The Pipes shall be Seamless and shall comply with relevant standards for mild steel pipes used for water and utility services.The pipes shall be straight, smooth, round and uniform in thickness, free from cracks, laminations, surface defects, rust scale and other manufacturing defects. Pipe ends shall be prepared for welding by proper beveling where flanged joints are required, flanges shall be of matching bore and pressure rating, fixed by full penetration welding. Gaskets shall be rubber insertion or non-asbestos fiber type suitable for the service pressure, and bolts & nuts shall be of standard high-tensile grade.All welding shall be carried out using approved welding electrodes by qualified welders. Weld joints shall be uniform, continuous and free from porosity or undercut.The pipeline shall be laid on supports / hangers / clamps / pedestals. Suitable MS supports / saddles / clamps shall be provided at required intervals to avoid sagging and misalignment. After fabrication, the external surface of the pipe shall be cleaned thoroughly by wire brushing/emery, and one coat of red oxide anti-corrosive primer followed by two coats of synthetic enamel / epoxy protective paint of approved shade shall be applied to the exposed surfaces. The laying of pipeline will be done as per site condition /direction of Engineer-in-Charge.The pipeline shall be flushed and cleaned, and then hydrostatically tested for leakage and strength at a pressure not less than 1.5 times the working pressure for the required duration. Any leakage or defects observed during testing shall be rectified by the contractor at no extra cost. The job also includes dismantling walls or partitions to route overground piping inside the building and connecting with already existing sprinkler and hydrant pipeline inside the building and subsequent reinstatement of masonry, plaster, finishes, and backfilling. Work includes proper curing, painting, making good affected floors/walls, and provision of temporary supports during installation, ensuring neat restoration.Makes:• MS Pipe and Fittings - TATA Steel / TATA Pipes, Jindal (Hissar/ JSPL/Jindal India),Prakash Surya.• Synthetic Enamel Paint / Industrial Paint: Asian Paints, Berger,Nerolac • Welding Electrodes: Tata Agrico, Advani, ESAB, Ador Welding |
| 3 | Providing and fixing 150 mm diameter Cast Iron Butterfly Valve of PN 16 rating, complete with companion flanges, gaskets, nuts and bolts. The valve body shall be made of Cast Iron with fusion-bonded epoxy coating, and the disc shall be of stainless steel SS304 for corrosion resistance. The spindle/shaft shall be stainless steel SS304 with EPDM/NBR resilient seat ensuring zero leakage under rated pressure. The valve shall be of wafer-type/double-flanged type with bi-directional flow capability, low operating torque and lever/gear-operated mechanism as required. The scope includes cutting and preparing the pipe ends, cleaning, aligning and positioning the valve centrally between the flanges, inserting rubber insertion gaskets, and tightening bolts and nuts in a cross-pattern to ensure uniform pressure and leak-proof joints. All installation activities, including pipe alignment checking, ensuring unobstructed disc movement, proper support of pipeline to avoid stresses on the valve body, and operating the valve through its full open–close range, shall be carried out as per standard practice. The installed valve shall undergo hydrostatic pressure testing of the body and seat, leakage inspection, and functional operation testing to confirm smooth and satisfactory performance. The job shall include supply of valve, flanges, gasket, labour, tools and tackles, cutting/grinding equipment, transportation, testing and commissioning, and all incidental works required to complete the installation in all respects. Make: L&T / Kartar/Zoloto/ Audco / Kirloskar |
| 4 | Providing and fixing 80 mm diameter Cast Iron Butterfly Valve of PN 16 rating, complete with companion flanges, gaskets, nuts and bolts. The valve body shall be made of Cast Iron with fusion-bonded epoxy coating, and the disc shall be of stainless steel SS-304 for corrosion resistance. The spindle/shaft shall be stainless steel SS-304 with EPDM/NBR resilient seat ensuring zero leakage under rated pressure. The valve shall be of wafer-type/double-flanged type with bi-directional flow capability, low operating torque and lever/gear-operated mechanism as required. The scope includes cutting and preparing the pipe ends, cleaning, aligning and positioning the valve centrally between the flanges, inserting rubber insertion gaskets, and tightening bolts and nuts in a cross-pattern to ensure uniform pressure and leak-proof joints. All installation activities, including pipe alignment checking, ensuring unobstructed disc movement, proper support of pipeline to avoid stresses on the valve body, and operating the valve through its full open–close range, shall be carried out as per standard practice. The installed valve shall undergo hydrostatic pressure testing of the body and seat, leakage inspection, and functional operation testing to confirm smooth and satisfactory performance. The job shall include supply of valve, flanges, gasket, labour, tools and tackles, cutting/grinding equipment, transportation, testing and commissioning, and all incidental works required to complete the installation in all respects. Make: L&T / Kartar/Zoloto/ Audco / Kirloskar |
| 5 | Supply, installation, testing and commissioning of pressure gauges for the fire-fighting system to be installed in pump room, different floors/landings. The pressure gauges shall be industrial-grade Bourdon tube type with a minimum 150 mm dial size, stainless steel front casing, phosphor-bronze/SS bourdon tube, glycerin or silicone filled for vibration damping, and accuracy not less than ±2% of full scale. Each gauge shall be suitable for a working pressure of up to 16 bar (PN-16) and shall conform to relevant fire-fighting and instrumentation standards. The scope includes provision of gauge cock/isolation valve, extended trail pipe, adapters, reducers, T-fittings, and necessary accessories for connecting the gauge to the existing pipe network without leakage. Work includes cutting, threading/welding of pipe as required, fixing of gauge assembly, sealing of joints with approved sealing compounds, orientation check for proper visibility, and protection against mechanical damage. Gauges shall be installed at all required system locations including pump suction and discharge headers, sprinkler control valves, , landing valve manifolds, hydrant riser, Each floor on two sides, roof top and other critical points.After installation, the contractor shall perform hydrostatic pressure testing of the gauge connection line, functional verification of gauge movement from zero to maximum range, and calibration check. All materials, fittings, consumables, skilled/semi-skilled labour, tools, tackles, ladders/scaffolding, transportation, and all taxes are included to complete the work in all respects, leaving the system fully operational. (Complete Job)Make : H. Guru Instruments, Baumer India, Ashcroft, Fiebig, Wika |
| 6 | The job includes dismantling the existing yard hydrant-08 nos., Fire Brigade Inlets (FB Inlet) 2 way/4 way points connected to the damaged underground pipe and re-routing it to the newly installed overground fire-water piping. The scope covers careful cutting and removal of the hydrant from the existing line, preparation of the connection points on the new overground pipe, fabrication and installation of suitable flanged or spigot joints with gaskets, nuts, bolts, and washers to ensure leak-proof connections. Proper alignment of the hydrant with the overground pipe shall be ensured using clamps, supports, and pedestals as required for stability. Minor civil works, including construction of pedestals, anchor blocks, or trenches (if required) for proper positioning, shall be carried out. The hydrant shall be pressure-tested to ensure leak-tightness and verified for correct operation. The work also includes reinstatement of surrounding surfaces affected during installation, painting of exposed pipe and supports with anti-corrosive primer and finish coat, and making good of all civil and structural modifications. All labour (skilled and unskilled), materials, consumables, tools, tackles, transportation, testing, commissioning, and submission of as-built drawings and operation manuals are included in the scope to ensure the yard hydrant is fully functional and integrated into the overground piping system. |
| 7 | Supply, Installation, Testing and Commissioning (SITC) of fire pump motor set, comprising a heavy-duty horizontal centrifugal split-case pump 100 m head 2850 LPM Discharge along with matching squirrel-cage induction motor (415 V, 3-phase, 50 Hz, TEFC, IP55, Class-F insulation, IE3 efficiency).The job comprises safe isolation of the existing system, draining of lines, and careful dismantling and removal of the old pump, motor, base frame, coupling, and associated fittings without damage to adjacent installations. Repair and realignment of the existing pump foundation, re-grouting, provision of new vibration pads, and correction of centerline levels shall be carried out to match the dimensional requirements of the new pump set. Necessary modifications in suction and discharge pipelines, including cutting, welding, fabrication of new sections, installation of bends, reducers, flanges, gaskets and supports, shall be undertaken to ensure proper fitment and hydraulic performance as per prescribed norms. Electrical works include disconnection of old wiring, supply and termination of suitable-capacity armoured cable, provision of glands, lugs, earthing, switches, protections and all allied electrical works required to install new pump motor set along with auto operation.The job includes the cost of dismantling of old pump.After installation, the pump and motor shall be aligned precisely and grouted with non-shrink compound. The system shall then be tested for correct flow, head, pressure, vibration, and current draw in accordance with and relevant NBC requirements. All tools, tackles, consumables, testing equipment, labour, and incidental civil/electrical/mechanical works required for completion of the installation shall be included. The contractor shall hand over the system in fully operational condition along with test reports, warranty certificates, and compliance documentsThe job includes modification of the common fire-water header to integrate a higher-capacity main pump along with the existing lower-capacity sprinkler pump and jockey pump, including new flanged connections, NRVs, PRV on sprinkler line, isolation valves and strengthened supports. Control logic, pressure settings and interlocks shall be revised to prevent over-pressurisation. Work includes cutting/rewelding, testing pressure and full commissioning—complete in all respects. Testing and commissioning includes lubrication, no-load test, load test, discharge pressure measurement, current and voltage verification, checking of safety interlocks, and demonstration of rated flow and head in compliance with fire-fighting norms. All materials, consumables, tools and tackles, skilled and unskilled labour, lifting equipment, transportation, trial runs and all applicable taxes shall be included to deliver a fully functional pump-motor set.Make: Kirloskar, Crompton, Grundfos, KSB, Wilo, Mather and Platt. |
| 8 | Complete servicing and repair of the Sprinkler Pump-75 HP and Jockey Pump-15 HP installed in the fire-fighting pump room, along with full servicing of the associated electrical control panels. The scope of work covers thorough mechanical servicing of all pumps, including cleaning and flushing of pump casing, inspection and replacement of impellers, lubrication and replacement of bearings, checking and tightening of couplings, correction of pump–motor alignment, examination and replacement of mechanical seals, checking of shaft sleeves, suction/discharge flanges, strainers, pressure gauges, isolating valves, NRVs and foot valves. The job also includes Electrical panel servicing includes detailed inspection and testing of MCCBs, contactors, relays, thermal overload devices, timers, selector switches, indicator lamps, wiring terminations, control fuses, busbar insulation, and megger testing of pump motors and control wiring along with auto manual operation. All safety interlocks and control logics are to be checked, including pressure switch settings, auto–manual options, jockey pump cut-in/cut-out pressure settings, and auto-start response of main and sprinkler pumps during pressure drop. The work further includes carrying out trial runs of each pump to verify discharge pressure, flow performance, voltage/current readings, vibration levels, overheating issues and overall operational reliability. The job shall be executed using skilled manpower, appropriate tools, lifting devices, testing instruments, consumables and the contractor shall restore the fire-fighting pumping system to fully functional and reliable working condition with automatic operation, complete in all respects. |
| 9 | Complete servicing, overhauling and functional testing of the Diesel-Driven Fire Pump - 75 HP installed in the fire-fighting pump room. The job covers comprehensive mechanical and engine servicing, including cleaning of the pump casing and impeller, inspection of coupling, checking and correction of pump–engine alignment, lubrication of bearings, examination and replacement of mechanical seal/gland packing, and inspection of suction/discharge valves, strainers, gauges, NRVs and pipe connections. Engine servicing includes changing engine oil, replacement of oil filter, diesel filter and air filter, cleaning of fuel tank and fuel lines, checking of injectors, inspection of radiator/cooling system, coolant top-up, fan belt inspection and tightening/replacement, battery health check, battery terminals cleaning, checking of charging alternator, starter motor, solenoid, and inspection of all hoses and clamps. Electrical and control checks include testing of engine control panel, auto/manual mode, emergency stop, relay operations, safety cut-outs, low-lube pressure switch, high-water temperature switch and battery charger functionality. The work further includes trial run of the diesel pump, verification of starting performance, pressure and discharge parameters, vibration level, exhaust smoke condition, and overall operational reliability. All skilled labour, consumables, tools and testing instruments required to complete the servicing and restore the diesel fire pump to fully functional condition shall be included in the scope. Please Enable Macros to View BoQ information |
| 10 | Complete servicing, overhauling and functional testing of the Diesel-Driven Fire Pump - 75 HP installed in the fire-fighting pump room. The job covers comprehensive mechanical and engine servicing, including cleaning of the pump casing and impeller, inspection of coupling, checking and correction of pump–engine alignment, lubrication of bearings, examination and replacement of mechanical seal/gland packing, and inspection of suction/discharge valves, strainers, gauges, NRVs and pipe connections. Engine servicing includes changing engine oil, replacement of oil filter, diesel filter and air filter, cleaning of fuel tank and fuel lines, checking of injectors, inspection of radiator/cooling system, coolant top-up, fan belt inspection and tightening/replacement, battery health check, battery terminals cleaning, checking of charging alternator, starter motor, solenoid, and inspection of all hoses and clamps. Electrical and control checks include testing of engine control panel, auto/manual mode, emergency stop, relay operations, safety cut-outs, low-lube pressure switch, high-water temperature switch and battery charger functionality. The work further includes trial run of the diesel pump, verification of starting performance, pressure and discharge parameters, vibration level, exhaust smoke condition, and overall operational reliability. All skilled labour, consumables, tools and testing instruments required to complete the servicing and restore the diesel fire pump to fully functional condition shall be included in the scope. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 16, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 27, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysJul 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer