Railways Government Departments Closing in 18 days TDR #56502270

Supply Of Traverser 80T Two Track.

Issued by Government Departments · Lucknow, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
10 Aug 2026
18 days left
EMD
14.52 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Lucknow → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply Of traverser 80t two track. , traverser 80t two track for carriage workshop alambagh (the cost of the basic traverser me eting the requirement of attached technical specification including preventive maintenance during warranty period). [ warranty period: 30 months after the date of delivery ] ] , surface traverser 80 ton two track for paint shop carriage workshop alambagh (the cost of t he basic traverser meeting the requirement of attached technical specification including preventive mainte nance during warranty period). [ warranty period: 30 months after the date of delivery ] ] , surface traverser 80 ton two track for lifting shop carriage workshop alambagh (the cost of the basic traverser meeting the requirement of attached technical specification including preventive mainte nance during warranty period). [ warranty period: 30 months after the date of delivery ] ] , post warranty amc for all three machines for a period of 05 years with spares as per clause 1 7.0 of section -ii of attached specifications. [ warranty period: 2 years, amc period: 5 years, rate of discounting: 10 % ] ] , cost of concomitant accessories which in the opinion of supplier are essentially required for m aking all three machines fully functional as per clause 4.2 of section-i of attached specification. [ warranty period: 30 months after the date of delivery ] ] , cost of installation & commissioning of traverser, dsl and support masts for all three machi nes (as per requirement specified in schedule-ia, ib, ic) of attached specification. ] , cost of additional spares/items as specified in schedule-ia as per attached specification. [ w arranty period: 30 months after the date of delivery ] ] , cost of additional spares/items as specified in schedule-ib as per attached specification. [ w arranty period: 30 months after the date of delivery ] ] , cost of additional spares/items as specified in schedule-ic as per attached specification. [ w arranty period: 30 months after the date of delivery ] ] , spares for two years normal operation and maintenance for all three machines as per clause- 5 of section-ii (it may please be noted that these spares are over and above additional spares mentioned u nder schedule-ia, ib, ic) as per attached specification. [ warranty period: 30 months after the date of deli very ] ] , optional accessories for all three machines (with breakup of individual items) as per clause 4. 3.2 of attached specification of bid document. [ warranty period: 30 months after the date of delivery ] ] , consumables for all three machines as per clause -6 of section-ii with breakup of individuals i tems as applicable. [ warranty period: 30 months after the date of delivery ] ]

BOQ

Sl. No.Item Description
1Traverser 80T Two Track for carriage workshop Alambagh (The cost of the basic traverser me eting the requirement of attached technical specification including preventive maintenance during warranty period). [ Warranty Period: 30 Months after the date of delivery ] ]
2Surface Traverser 80 Ton two track for paint shop carriage workshop Alambagh (The cost of t he basic traverser meeting the requirement of attached technical specification including preventive mainte nance during warranty period). [ Warranty Period: 30 Months after the date of delivery ] ]
3Surface Traverser 80 Ton two track for Lifting shop carriage workshop Alambagh (The cost of the basic traverser meeting the requirement of attached technical specification including preventive mainte nance during warranty period). [ Warranty Period: 30 Months after the date of delivery ] ]
4Post warranty AMC for all three machines for a period of 05 years with spares as per Clause 1 7.0 of Section -II of attached specifications. [ Warranty Period: 2 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]
5Cost of concomitant accessories which in the opinion of supplier are essentially required for m aking all three machines fully functional as per Clause 4.2 of Section-I of attached specification. [ Warranty Period: 30 Months after the date of delivery ] ]
6Cost of Installation & Commissioning of Traverser, DSL and Support masts for all three machi nes (as per requirement specified in Schedule-IA, IB, IC) of attached specification. ]
7Cost of additional spares/items as specified in Schedule-IA as per attached specification. [ W arranty Period: 30 Months after the date of delivery ] ]
8Cost of additional spares/items as specified in Schedule-IB as per attached specification. [ W arranty Period: 30 Months after the date of delivery ] ]
9Cost of additional spares/items as specified in Schedule-IC as per attached specification. [ W arranty Period: 30 Months after the date of delivery ] ]
10Spares for two years normal operation and maintenance for all three machines as per Clause- 5 of Section-II (it may please be noted that these spares are over and above additional spares mentioned u nder Schedule-IA, IB, IC) as per attached specification. [ Warranty Period: 30 Months after the date of deli very ] ]
11Optional accessories for all three machines (with breakup of individual items) as per Clause 4. 3.2 of attached specification of bid document. [ Warranty Period: 30 Months after the date of delivery ] ]
12Consumables for all three machines as per clause -6 of section-II with breakup of individuals i tems as applicable. [ Warranty Period: 30 Months after the date of delivery ] ]

AI Tender Summary

OUR REF NO 56502270
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 10-08-2026
Authority
Authority Name Northern Railway
Work Description Supply Of traverser 80t two track. , traverser 80t two track for carriage workshop alambagh (the cost of the basic traverser me eting the requirement of attached technical specification including preventive maintenance during warranty period). [ warranty period: 30 months after the date of delivery ] ] , surface traverser 80 ton two track for paint shop carriage workshop alambagh (the cost of t he basic traverser meeting the requirement of attached technical specification including preventive mainte nance during warranty period). [ warranty period: 30 months after the date of delivery ] ] , surface traverser 80 ton two track for lifting shop carriage workshop alambagh (the cost of the basic traverser meeting the requirement of attached technical specification including preventive mainte nance during warranty period). [ warranty period: 30 months after the date of delivery ] ] , post warranty amc for all three machines for a period of 05 years with spares as per clause 1 7.0 of section -ii of attached specifications. [ warranty period: 2 years, amc period: 5 years, rate of discounting: 10 % ] ] , cost of concomitant accessories which in the opinion of supplier are essentially required for m aking all three machines fully functional as per clause 4.2 of section-i of attached specification. [ warranty period: 30 months after the date of delivery ] ] , cost of installation & commissioning of traverser, dsl and support masts for all three machi nes (as per requirement specified in schedule-ia, ib, ic) of attached specification. ] , cost of additional spares/items as specified in schedule-ia as per attached specification. [ w arranty period: 30 months after the date of delivery ] ] , cost of additional spares/items as specified in schedule-ib as per attached specification. [ w arranty period: 30 months after the date of delivery ] ] , cost of additional spares/items as specified in schedule-ic as per attached specification. [ w arranty period: 30 months after the date of delivery ] ] , spares for two years normal operation and maintenance for all three machines as per clause- 5 of section-ii (it may please be noted that these spares are over and above additional spares mentioned u nder schedule-ia, ib, ic) as per attached specification. [ warranty period: 30 months after the date of deli very ] ] , optional accessories for all three machines (with breakup of individual items) as per clause 4. 3.2 of attached specification of bid document. [ warranty period: 30 months after the date of delivery ] ] , consumables for all three machines as per clause -6 of section-ii with breakup of individuals i tems as applicable. [ warranty period: 30 months after the date of delivery ] ]
Basic Detail
Tender No 51265186A
Bidding Type Tender
Location
City Lucknow
State Uttar Pradesh
Key Dates
Publish Date 14 Jul 2026
Submission Date 10 Aug 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 14.52 Lakhs
Exemption Not Available
Document List
5302137.pdf
5367834.pdf
5756149.pdf
5756157.pdf
5756160.pdf
5756169.pdf
5756172.pdf
5756768.pdf
9fca3d36-efa1-47ff-b985-99d58530c59f.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
pdf

5302137.pdf

pdf

5367834.pdf

pdf

5756149.pdf

pdf

5756157.pdf

pdf

5756160.pdf

pdf

5756169.pdf

pdf

5756172.pdf

pdf

5756768.pdf

pdf

9fca3d36-efa1-47ff-b985-99d58530c59f.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders