Power Boards / Undertakings / PSU Closing in 20 days TDR #56493672

Bids Are invited for Operation And Maintenance Of Effluent/Sewage Treatment Plant - Complete System; As Per Tender Spacification; Functional But Outside Amc And Warranty - Operating The Sewage Treatment Plant Comprising 15 Equipments (Pump + Blowers

Issued by Boards / Undertakings / PSU · Tapi, Gujarat
Tender Value
83.02 Lakhs
Estimated cost
Bid Submission
06 Aug 2026
20 days left
EMD
1.66 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Tapi → Gujarat
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bids Are invited for Operation And Maintenance Of Effluent/Sewage Treatment Plant - Complete System; As Per Tender Spacification; Functional But Outside Amc And Warranty - Operating The Sewage Treatment Plant Comprising 15 Equipments (Pump + Blowers Etc.) At Stp In The Round The Clock Shift Including The Following Listed Activities (I) Removing & Disposing The Rags, Cotton Waste And Other Matter Covering The Bar Screen From Raw Sewage Inlet At Oil & Grease Tank (Ii) Removing & Disposing The Waste Matter From Aeration Tank And Mbr Tank (Iii) Removing & Stacking The Sludge Cakes From The Sludge Drying Beds And Filter Press. (Iv) Operation & Maintenance Of Sewage Lifting Stations. (V) Maintenance And Routine Checking Of All Equipments And Valves Of Stp Including Changing Gear Oil, Grease Gland Packing, Nut, Bolts, Leak Test Etc. And Cleaning Of Air Compressor Filters And Other Implants Of Stp With Necessary Tools And Tackles. All Inclusive As And When Required And As Directed By The Engineer In Charge..Note: (1) One Operation Means Operating The Sewage Treatment Plant In One Of The Round The Clock Shifts In A Day And One Pump Operator (Skilled) / One Unskilled Manpower Will Be Considered As One Operation Which Will Be Paid Under Respective Item(2) Pump Operator Should Have At Least 01 (One) Year Experience Of Pump Operation With Iti (Electrical) Qualification(3) Contractor Should Maintain Servicing Schedule Of All Equipment On Daily & Quarterly Basis.(4) In Each Round The Clock Shift Contractor Has To Provide 01 (One) Operator (Skilled Category) & 01 (One) Helper ( Unskilled Category) And 01 Helper ( Unskilled Category) In General Shift.(5) Contractor Shall Ensure To Maintain Sorrounding Inside Area Of Stp Neat And Clean (House Keeping, Gardening Etc) Including Cost Of Brooms, Cleaning Consumables, Required Toold & Tackels Etc. , Deployment Of One Operator (Skilled) , Deployment Of One Un-Skilled Manpower , Supply And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing Blowers (Ugrk-100 / 140 / 160) Compressor Installed At Stp (Kaps #3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Distance Bush , Lock Nut , Distance Ring , O-Ring , Oil Seal , Locking Washer , H.H. Bolt For Locking Washer , Spring Washer , Pressing Ring , H.H. Bolt For Pressing Ring , Intermediate Ring , Gear Wheel In Pair , Tensioning Elements , Pressure Flange , Allen Cap Screw For Gear Locking , Dowel Pin For Casing & Casing Cover A&B , Dowel Pin For Casing Cover-A & Outer Cover-A. , Hex Nut For Dowel Pin , Allen Cap Screw For Casing & Casing Cover , Oil Draining Plug , Breather , Oil Level Sight Glass , Gasket For Casing / Main Cover , Rotor In Pair , Pressing Bush, A&B , Piston Rings , Injection Ring, A&B , Spherical Roller Bearing , Deep Groove Ball Bearing , Angular Contact Ball Bearing , Splash Guard , Oil For Blower-Enklo-320 , Compressor Oil 220 , Grease Normal , Grease High Tempreture , A 34 V- Belt , B - 45 V-Belt , B - 49 V-Belt , Supply & Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing Pumps (Sp 3L+, Sp-0M) Installed At Stp (Kaps #3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , 1.0 Hp Sp-0M- Delivery Casing Ci , 1.0 Hp Sp-0M- Impeller , 1.0 Hp Sp-0M-Shaft Carbon Steel , 1.0 Hp Sp-0M-Mechanical Seal , 1.0 Hp Sp-0M-Mounting Casing Ci , 1.0 Hp Sp-0M-Paper Packing For Main , 1.0 Hp Sp-0M-Beraring De , 1.0 Hp Sp-0M-Gland , 1.0 Hp Sp-0M-Bearing For Motor , 1.0 Hp Sp-0- Key For Impeller , 1.0 Hp Sp-0- Nut For Impeller , 1.0 Hp Sp-0- Stud For Delivery , 1.0 Hp Sp-0- Stud For Mounting , 5.0 Hp Sp3l+ Delivery Casing Ci , 5.0 Sp3l+ Impeller , 5.0 Sp3l+Shaft Carbon Steel , 5.0 Sp3l+Mechanical Seal , 5.0 Sp3l+Mounting Casing Ci , 5.0 Sp3l+Paper Packing For Main , 5.0 Sp3l+Beraring De , 5.0 Sp3l+-Gland , 5.0 Sp3l+Bearing For Motor , 5.0 Sp3l+ Key For Impeller , 5.0 Sp3l+ Nut For Impeller , 5.0 Sp3l+ Stud For Delivery , 5.0 Sp3l+ Stud For Mounting , Rewinding Of Motors Of Following Categories/Capacity Installed At Stp So As To Achieve Design Speed And Parameters By Replacing Required Compatible Material/Spare With Fresh Material As Per Relevant Is And After Rewinding The Motor Shall Rotate As Per Design Speed And As Per Design Parameters. The Spare Parts Replaced Will Be Paid Under Relevant Item Including Cost Of Removing Of Motor, Transportation, Rewinding, Re-Fixing After Completion Of Rewinding Etc. Complete As Directed By The Engineer In Charge.Note :- Contractor Has To Inform And Take Prior Permission From Engineer In Charge Prior To Replace Any Spare /Material Etc. (If Require) While Rewinding Work. , 0.5 Hp , 1 Hp , 1.5 Hp , 2.0 Hp , 3 Hp , 5 Hp , 7.5 Hp , 10 Hp , 2 Hp (Submersible) , 3 Hp (Submersible) , 5 Hp (Submersible) , Supply, Transportation And Dosing Of Following Chemicals As Disinfectant Chemical Alongwith Test Certificates As Per Approved Rate To Get The Treated Water As Per Gpcb/Cpcb Stipulations. Note :- Treated Water Will Be Randomly Checked By Chemical Lab. Item Includes Bringing The Material At Site With Entry At Main Gate Preparing The Dosing Solution By Adding Clean Potable Water, Dosing At Approved Rate And Contractor Shall Bring Test Certificate Of Product Etc. Complete All As Approved By Engineer In Charge And As Per Manufacturers Specification. , Cytric Acid Powder , Sodium Hypo Chloride (Naocl2)10 To 12 % - As Disinfectant , Supply, Installation And Commissioning Of Required Spares/Materials As Per Specification, Including Transportation Of Following Spare/Material (I.E. Contactor , Mpcb, Plc Component) Etc. For Electric Panel Including fixing In Existing Panel Of Stp And Lifting Station As And When Required As Directed By The Engineer In Charge. , Simocode 2.4 A - 25A , Mpcb 7 A - 10 A , Mpcb 2.0 , Mpcb 9A - 12.50 , Mpcb 2.2 A - 3.2 A , Mpcb 12.5 , Mpcb 3.2 , Contactor 12 , Contactor 7 , Contactor 25 , Cpu 1214C (14Di 24V Dc 10Do 24 Vdc 2Ai) Ps 24 V Dc , Digital In Put Sm1221 8Di , 24 Vdc , Analog In Put Sm 1231, 8Ai , Vfd 7.5 Hp , Vfd 1.5 Hp , Supply And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing 2 Hp And 3 Hp Submersible Pumps Installed At Stp (Kaps#3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Mechanical Seal For 2.0 Hp/3.0 Hp, Ca/Ce/Nbr Pumps For Jdsk 5-20/5-30 , Oil Seal J Series 2.0/3.0 Hp, Nbr For Jdsk 2 Hp/3Hp , O Ring Set J Series2.0/3.0 Hp, Nbr For Jdsk 5-20/5-30 , Shaft With Rotor J Series 2.0 Hp/3 Hp , Impeller For Jdsk 5-20/5-30 , Casing For Jds/ Jkd/Ja 2.0 Hp , Bearing J Series 2.0 /3.0 Hp , Supply And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing 5 Hp Submersible Pumps Installed At Stp (Kaps#3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Mechanical Seal 5.0 Hp, Ca/Ce/Nbr For Jdsk 5-50 , Oil Seal J Series 5.0 Hp, Nbr For Jdsk 5 Hp , O Ring Set J Series5.0 Hp, Nbr For Jdsk 5-50 , Shaft With Rotor J Series 5.0 Hp , Impeller For Jdsk 5-50 , Casing Jds/Jkd/Ja 5.0 Hp , Lubricating Oil , Suppiy And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing Screw Pumps Already Installed At Stp (Kaps#3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Stuffing Box Gasket-Nam Gasket , Gland - Cast Iron Is:210 , Stub Shaft Hcp- Stainless Steel Aisi 316 , Startor - Ms Sleeve Nitrile Black , Stud (Gland) Stainless Steal Aisi 316 , Punched Washer , Spring Washer , Taper Plug , Hex. Nut , Suppiy And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing Installed Semi Auto Type filter Press (Size 800Mm X 800Mm) Cylinder Capacity 20 Tons Stp (Kaps#3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Filter Cloth Set Of 13 Plates (410Rs. X 24Cloth ) , Hydrolic Oil-68 , Supplying Ph-Meter Handy, Digital Having Range 0-14 As Per Relevant Is And As Approved By Gpcb/Cpcb To Check The Quality Of Treated Water On Daily Basis Including Supplying Consumables If Required Through Out The Contract Period.Note: In The Event Of Lost, Not Functioning, Damaged. Contractor Has To Replace It With New One Without Any Extra Cost. , Supplying Tds- Meter Handy, Digital Having Range 0-1999 Ppm As Per Relevant Is And As Approved By Gpcb/Cpcb To Check The Quality Of Treated Water On Daily Basis Including Supplying Consumables If Required Through Out The Contract Period.Note: In The Event Of Lost, Not Functioning, Damaged. Contractor Has To Replace It With New One Without Any Extra Cost. , Supplying Chlorine Measuring Kit As Per Relevant Is And As Approved By Gpcb/Cpcb To Check The Quality Of Treated Water On Daily Basis Including Supplying Consumables If Required Through Out The Contract Period.Note: In The Event Of Lost, Not Functioning, Damaged. Contractor Has To Replace It With New One Without Any Extra Cost. , Maintenance And Calibration Of Existing Electro Magnetic Flow Meter 300 Fr-Tl-Tx-B Series Output 4-20 Madc, Isolated, Power Display-128X64 Graphical Lcd Display. , Jointing / Repairing Of Existing Laid Hdpe Pipe Of 4 To 6 Dia. As Per Standard Practice Item Includes Cost Of Joint Equipment (Heater), Required Tools And Tackles, Labours Etc.As And When Required As Directed By Engineer In Charge. , Supply, Transportation And Fitting Of Mbr Modules As Per Relevant Is And As Approved By Engineer In Charge, Including Supplying Consumables If Required Through Out The Contract Period As Directed By Engineer In Charge. , Cleaning Of Mbr Tank Including Dewatering And Doing Recovery Cleaning Of Mbr Cassettes / Membrane, When Tmp Is High At -0.42 Psi Including Cost Of Labour Charges, Tools, Tackles Etc. Complete All As Directed By Engineer In Charge. Chemical Required For Rc Cleaning Will Be Paid Under Relavent Items And Normalizing The All Stp And Restarting The Plant In Apprroved Manner As And When Required As Directed By Engineer In Charge.Note:1. Contractor Or His Representative Who Is Wellknown About The Procedure Must Present During Rc Cleaning.2. Recovery Cleaning Procedure Attached In Section-V. , Collection, Testing And Submitting Report On Monthly Basis Of Sewage Waste Water S Les Each From Inlet And Outlet Of 250 Kld Stp At Kaps#3&4 As Per Is : 3025 (Part-11) Latest Edition And From Nabl Approved Laboratory As Per The Gpcb/Cpcb Requirements For The Parameter Like (1) Ph (2) Tds (3) Tss (4) Oil & Grease (As Per Apha) (5) Bod (3 Days 27 Deg. Cent.) (6) Chemical Oxygen Demand Etc. And Submitting.(One S Le Either Inlet Or Outlet Will Be Considered As One Operation For Payment)

BOQ

Sl. No. Item TitleItem Description
1Operating the sewage treatment plant comprising 15 equipments (Pump + blowers etc.) at STP in the round the clock shift including the following listed activities (i) Removing & disposing the rags, cotton waste and other matter covering the bar screen from raw sewage inlet at oil & grease tank (ii) Removing & disposing the waste matter from aeration tank and MBR tank (iii) Removing & stacking the sludge cakes from the sludge drying beds and Filter press. (iv) Operation & Maintenance of sewage lifting stations. (v) Maintenance and routine checking of all equipments and valves of STP including changing gear oil, grease gland packing, nut, bolts, leak test etc. and cleaning of air compressor filters and other implants of STP with necessary tools and tackles. All inclusive as and when required and as directed by the Engineer in Charge..Note: (1) One operation means operating the sewage treatment plant in one of the round the clock shifts in a day and one pump operator (Skilled) / One unskilled manpower will be considered as one Operation which will be paid under respective item(2) Pump operator should have at least 01 (One) year experience of pump operation with ITI (Electrical) qualification(3) Contractor should maintain servicing schedule of all equipment on daily & Quarterly basis.(4) In each round the clock shift contractor has to provide 01 (One) Operator (Skilled category) & 01 (One) Helper ( Unskilled category) and 01 Helper ( Unskilled category) in general shift.(5) Contractor shall ensure to maintain sorrounding inside area of STP neat and clean (House keeping, gardening etc) including cost of brooms, cleaning consumables, required toold & tackels etc.Operating the sewage treatment plant comprising 15 equipments (Pump + blowers etc.) at STP in the round the clock shift including the following listed activities (i) Removing & disposing the rags, cotton waste and other matter covering the bar screen from raw sewage inlet at oil & grease tank (ii) Removing & disposing the waste matter from aeration tank and MBR tank (iii) Removing & stacking the sludge cakes from the sludge drying beds and Filter press. (iv) Operation & Maintenance of sewage lifting stations. (v) Maintenance and routine checking of all equipments and valves of STP including changing gear oil, grease gland packing, nut, bolts, leak test etc. and cleaning of air compressor filters and other implants of STP with necessary tools and tackles. All inclusive as and when required and as directed by the Engineer in Charge..Note: (1) One operation means operating the sewage treatment plant in one of the round the clock shifts in a day and one pump operator (Skilled) / One unskilled manpower will be considered as one Operation which will be paid under respective item(2) Pump operator should have at least 01 (One) year experience of pump operation with ITI (Electrical) qualification(3) Contractor should maintain servicing schedule of all equipment on daily & Quarterly basis.(4) In each round the clock shift contractor has to provide 01 (One) Operator (Skilled category) & 01 (One) Helper ( Unskilled category) and 01 Helper ( Unskilled category) in general shift.(5) Contractor shall ensure to maintain sorrounding inside area of STP neat and clean (House keeping, gardening etc) including cost of brooms, cleaning consumables, required toold & tackels etc.
2Deployment of one Operator (Skilled)Deployment of one Operator (Skilled)
3Deployment of one Un-Skilled manpowerDeployment of one Un-Skilled manpower
4Supply and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing blowers (UGRK-100 / 140 / 160) compressor installed at STP (KAPS #3&4) including cost of transportation as and when required as directed by the Engineer in Charge.Supply and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing blowers (UGRK-100 / 140 / 160) compressor installed at STP (KAPS #3&4) including cost of transportation as and when required as directed by the Engineer in Charge.
5Distance BushDistance Bush
6Lock NutLock Nut
7Distance RingDistance Ring
8O-RingO-Ring
9Oil SealOil Seal
10Locking WasherLocking Washer
11H.H. Bolt for Locking WasherH.H. Bolt for Locking Washer
12Spring WasherSpring Washer
13Pressing RingPressing Ring
14H.H. Bolt for Pressing RingH.H. Bolt for Pressing Ring
15Intermediate RingIntermediate Ring
16Gear Wheel in PAIRGear Wheel in PAIR
17Tensioning ElementsTensioning Elements
18Pressure FlangePressure Flange
19Allen Cap Screw for Gear LockingAllen Cap Screw for Gear Locking
20Dowel Pin for Casing & Casing Cover A&BDowel Pin for Casing & Casing Cover A&B
21Dowel Pin for Casing Cover-A & Outer Cover-A.Dowel Pin for Casing Cover-A & Outer Cover-A.
22Hex Nut for Dowel PinHex Nut for Dowel Pin
23Allen Cap Screw for Casing & Casing CoverAllen Cap Screw for Casing & Casing Cover
24Oil Draining PlugOil Draining Plug
25BreatherBreather
26Oil Level Sight GlassOil Level Sight Glass
27Gasket for Casing / Main CoverGasket for Casing / Main Cover
28Rotor in PAIRRotor in PAIR
29Pressing Bush, A&BPressing Bush, A&B
30Piston RingsPiston Rings
31Injection Ring, A&BInjection Ring, A&B
32Spherical Roller BearingSpherical Roller Bearing
33Deep Groove Ball BearingDeep Groove Ball Bearing
34Angular Contact Ball BearingAngular Contact Ball Bearing
35Splash GuardSplash Guard
36Oil for Blower-ENKLO-320Oil for Blower-ENKLO-320
37Compressor Oil 220Compressor Oil 220
38Grease NormalGrease Normal
39Grease High tempretureGrease High tempreture
40A 34 V- BeltA 34 V- Belt
41B - 45 V-BeltB - 45 V-Belt
42B - 49 V-BeltB - 49 V-Belt
43Supply & Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing Pumps (SP 3L+, SP-0M) installed at STP (KAPS #3&4) including cost of transportation as and when required as directed by the Engineer in Charge.Supply & Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing Pumps (SP 3L+, SP-0M) installed at STP (KAPS #3&4) including cost of transportation as and when required as directed by the Engineer in Charge.
441.0 HP SP-0M- Delivery casing CI1.0 HP SP-0M- Delivery casing CI
451.0 HP SP-0M- Impeller1.0 HP SP-0M- Impeller
461.0 HP SP-0M-Shaft Carbon Steel1.0 HP SP-0M-Shaft Carbon Steel
471.0 HP SP-0M-Mechanical Seal1.0 HP SP-0M-Mechanical Seal
481.0 HP SP-0M-Mounting Casing CI1.0 HP SP-0M-Mounting Casing CI
491.0 HP SP-0M-Paper Packing for Main1.0 HP SP-0M-Paper Packing for Main
501.0 HP SP-0M-Beraring DE1.0 HP SP-0M-Beraring DE
511.0 HP SP-0M-Gland1.0 HP SP-0M-Gland
521.0 HP SP-0M-Bearing for motor1.0 HP SP-0M-Bearing for motor
531.0 HP SP-0- Key for impeller1.0 HP SP-0- Key for impeller
541.0 HP SP-0- Nut for impeller1.0 HP SP-0- Nut for impeller
551.0 HP SP-0- Stud for Delivery1.0 HP SP-0- Stud for Delivery
561.0 HP SP-0- Stud for Mounting1.0 HP SP-0- Stud for Mounting
575.0 HP SP3L+ Delivery casing CI5.0 HP SP3L+ Delivery casing CI
585.0 SP3L+ Impeller5.0 SP3L+ Impeller
595.0 SP3L+Shaft Carbon Steel5.0 SP3L+Shaft Carbon Steel
605.0 SP3L+Mechanical Seal5.0 SP3L+Mechanical Seal
615.0 SP3L+Mounting Casing CI5.0 SP3L+Mounting Casing CI
625.0 SP3L+Paper Packing for Main5.0 SP3L+Paper Packing for Main
635.0 SP3L+Beraring DE5.0 SP3L+Beraring DE
645.0 SP3L+-Gland5.0 SP3L+-Gland
655.0 SP3L+Bearing for motor5.0 SP3L+Bearing for motor
665.0 SP3L+ Key for impeller5.0 SP3L+ Key for impeller
675.0 SP3L+ Nut for impeller5.0 SP3L+ Nut for impeller
685.0 SP3L+ Stud for Delivery5.0 SP3L+ Stud for Delivery
695.0 SP3L+ Stud for Mounting5.0 SP3L+ Stud for Mounting
70Rewinding of Motors of following categories/capacity installed at STP so as to achieve design speed and parameters by replacing required compatible material/spare with fresh material as per relevant IS and after rewinding the motor shall rotate as per design speed and as per design parameters. The spare parts replaced will be paid under relevant item including cost of removing of motor, transportation, rewinding, re-fixing after completion of rewinding etc. complete as directed by the Engineer in charge.Note :- Contractor has to inform and take prior permission from Engineer in charge prior to replace any spare /material etc. (if require) while rewinding work.Rewinding of Motors of following categories/capacity installed at STP so as to achieve design speed and parameters by replacing required compatible material/spare with fresh material as per relevant IS and after rewinding the motor shall rotate as per design speed and as per design parameters. The spare parts replaced will be paid under relevant item including cost of removing of motor, transportation, rewinding, re-fixing after completion of rewinding etc. complete as directed by the Engineer in charge.Note :- Contractor has to inform and take prior permission from Engineer in charge prior to replace any spare /material etc. (if require) while rewinding work.
710.5 HP0.5 HP
721 HP1 HP
731.5 HP1.5 HP
742.0 HP2.0 HP
753 HP3 HP
765 HP5 HP
777.5 HP7.5 HP
7810 HP10 HP
792 HP (Submersible)2 HP (Submersible)
803 HP (Submersible)3 HP (Submersible)
815 HP (Submersible)5 HP (Submersible)
82Supply, Transportation and Dosing of following chemicals as disinfectant chemical alongwith Test certificates as per approved rate to get the treated water as per GPCB/CPCB stipulations. Note :- Treated water will be randomly checked by chemical lab. Item includes bringing the material at site with entry at main gate preparing the dosing solution by adding clean potable water, dosing at approved rate and contractor shall bring Test certificate of product etc. complete all as approved by Engineer In Charge and as per manufacturer's specification.Supply, Transportation and Dosing of following chemicals as disinfectant chemical alongwith Test certificates as per approved rate to get the treated water as per GPCB/CPCB stipulations. Note :- Treated water will be randomly checked by chemical lab. Item includes bringing the material at site with entry at main gate preparing the dosing solution by adding clean potable water, dosing at approved rate and contractor shall bring Test certificate of product etc. complete all as approved by Engineer In Charge and as per manufacturer's specification.
83Cytric Acid powderCytric Acid powder
84Sodium Hypo Chloride (NaOCl2)10 to 12 % - as disinfectantSodium Hypo Chloride (NaOCl2)10 to 12 % - as disinfectant
85Supply, Installation and Commissioning of required spares/materials as per specification, including transportation of following spare/material (i.e. contactor , mpcb, PLC component) etc. for electric panel including fixing in existing panel of STP and Lifting station as and when required as directed by the Engineer in charge.Supply, Installation and Commissioning of required spares/materials as per specification, including transportation of following spare/material (i.e. contactor , mpcb, PLC component) etc. for electric panel including fixing in existing panel of STP and Lifting station as and when required as directed by the Engineer in charge.
86simocode 2.4 a - 25asimocode 2.4 a - 25a
87mpcb 7 a - 10 ampcb 7 a - 10 a
88mpcb 2.0 ampmpcb 2.0 amp
89mpcb 9a - 12.50 ampmpcb 9a - 12.50 amp
90mpcb 2.2 a - 3.2 ampcb 2.2 a - 3.2 a
91mpcb 12.5 ampmpcb 12.5 amp
92mpcb 3.2 ampmpcb 3.2 amp
93contactor 12 ampcontactor 12 amp
94contactor 7 ampcontactor 7 amp
95contactor 25 ampcontactor 25 amp
96CPU 1214C (14DI 24v DC 10DO 24 vDC 2AI) PS 24 v DCCPU 1214C (14DI 24v DC 10DO 24 vDC 2AI) PS 24 v DC
97Digital in put SM1221 8Di , 24 vDCDigital in put SM1221 8Di , 24 vDC
98Analog in put SM 1231, 8AIAnalog in put SM 1231, 8AI
99VFD 7.5 HPVFD 7.5 HP
100VFD 1.5 HPVFD 1.5 HP
101Supply and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing 2 HP and 3 HP submersible pumps installed at STP (KAPS#3&4) including cost of transportation as and when required as directed by the Engineer In Charge.Supply and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing 2 HP and 3 HP submersible pumps installed at STP (KAPS#3&4) including cost of transportation as and when required as directed by the Engineer In Charge.
102Mechanical Seal for 2.0 HP/3.0 HP, CA/CE/NBR pumps for JDSK 5-20/5-30Mechanical Seal for 2.0 HP/3.0 HP, CA/CE/NBR pumps for JDSK 5-20/5-30
103Oil seal J Series 2.0/3.0 HP, NBR for JDSK 2 HP/3HPOil seal J Series 2.0/3.0 HP, NBR for JDSK 2 HP/3HP
104O Ring Set J series2.0/3.0 HP, NBR for JDSK 5-20/5-30O Ring Set J series2.0/3.0 HP, NBR for JDSK 5-20/5-30
105Shaft with Rotor J Series 2.0 HP/3 HPShaft with Rotor J Series 2.0 HP/3 HP
106Impeller for JDSK 5-20/5-30Impeller for JDSK 5-20/5-30
107Casing for JDS/ JKD/JA 2.0 HPCasing for JDS/ JKD/JA 2.0 HP
108Bearing J Series 2.0 /3.0 HPBearing J Series 2.0 /3.0 HP
109Supply and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing 5 HP submersible pumps installed at STP (KAPS#3&4) including cost of transportation as and when required as directed by the Engineer In Charge.Supply and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing 5 HP submersible pumps installed at STP (KAPS#3&4) including cost of transportation as and when required as directed by the Engineer In Charge.
110Mechanical Seal 5.0 HP, CA/CE/NBR for JDSK 5-50Mechanical Seal 5.0 HP, CA/CE/NBR for JDSK 5-50
111Oil seal J Series 5.0 HP, NBR for JDSK 5 HPOil seal J Series 5.0 HP, NBR for JDSK 5 HP
112O ring Set J series5.0 HP, NBR for JDSK 5-50O ring Set J series5.0 HP, NBR for JDSK 5-50
113Shaft with Rotor J Series 5.0 HPShaft with Rotor J Series 5.0 HP
114Impeller for JDSK 5-50Impeller for JDSK 5-50
115Casing JDS/JKD/JA 5.0 HPCasing JDS/JKD/JA 5.0 HP
116Lubricating oilLubricating oil
117SuppIy and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing Screw Pumps already installed at STP (KAPS#3&4) including cost of transportation as and when required as directed by the Engineer In Charge.SuppIy and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing Screw Pumps already installed at STP (KAPS#3&4) including cost of transportation as and when required as directed by the Engineer In Charge.
118Stuffing Box Gasket-NAM GasketStuffing Box Gasket-NAM Gasket
119Gland - Cast iron IS:210Gland - Cast iron IS:210
120Stub Shaft HCP- Stainless Steel AISI 316Stub Shaft HCP- Stainless Steel AISI 316
121Startor - MS Sleeve nitrile blackStartor - MS Sleeve nitrile black
122Stud (Gland) Stainless Steal AISI 316Stud (Gland) Stainless Steal AISI 316
123Punched WasherPunched Washer
124Spring WasherSpring Washer
125Taper PlugTaper Plug
126Hex. NutHex. Nut
127SuppIy and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing installed semi auto type filter press (size 800mm X 800mm) cylinder capacity 20 tons STP (KAPS#3&4) including cost of transportation as and when required as directed by the Engineer In Charge.SuppIy and Installation of required compatible sprares/materials as per specifications for the maintenance and overhauling of existing installed semi auto type filter press (size 800mm X 800mm) cylinder capacity 20 tons STP (KAPS#3&4) including cost of transportation as and when required as directed by the Engineer In Charge.
128Filter Cloth set of 13 plates (410Rs. X 24cloth )Filter Cloth set of 13 plates (410Rs. X 24cloth )
129Hydrolic Oil-68Hydrolic Oil-68
130Supplying pH-meter Handy, Digital having RANGE 0-14 as per relevant IS and as approved by GPCB/CPCB to check the quality of treated water on daily basis including supplying consumables if required through out the contract period.Note: In the event of lost, not functioning, damaged. Contractor has to replace it with new one without any extra cost.Supplying pH-meter Handy, Digital having RANGE 0-14 as per relevant IS and as approved by GPCB/CPCB to check the quality of treated water on daily basis including supplying consumables if required through out the contract period.Note: In the event of lost, not functioning, damaged. Contractor has to replace it with new one without any extra cost.
131Supplying TDS- meter Handy, Digital having RANGE 0-1999 ppm as per relevant IS and as approved by GPCB/CPCB to check the quality of treated water on daily basis including supplying consumables if required through out the contract period.Note: In the event of lost, not functioning, damaged. Contractor has to replace it with new one without any extra cost.Supplying TDS- meter Handy, Digital having RANGE 0-1999 ppm as per relevant IS and as approved by GPCB/CPCB to check the quality of treated water on daily basis including supplying consumables if required through out the contract period.Note: In the event of lost, not functioning, damaged. Contractor has to replace it with new one without any extra cost.
132Supplying Chlorine measuring kit as per relevant IS and as approved by GPCB/CPCB to check the quality of treated water on daily basis including supplying consumables if required through out the contract period.Note: In the event of lost, not functioning, damaged. Contractor has to replace it with new one without any extra cost.Supplying Chlorine measuring kit as per relevant IS and as approved by GPCB/CPCB to check the quality of treated water on daily basis including supplying consumables if required through out the contract period.Note: In the event of lost, not functioning, damaged. Contractor has to replace it with new one without any extra cost.
133Maintenance and calibration of existing Electro Magnetic Flow meter 300 FR-TL-TX-B Series output 4-20 mADC, Isolated, Power Display-128X64 graphical LCD display.Maintenance and calibration of existing Electro Magnetic Flow meter 300 FR-TL-TX-B Series output 4-20 mADC, Isolated, Power Display-128X64 graphical LCD display.
134Jointing / Repairing of existing laid HDPE pipe of 4\\" to 6\\" Dia. As per standard practice item includes cost of joint equipment (Heater), required tools and tackles, labours etc.as and when required as directed by Engineer In Charge.Jointing / Repairing of existing laid HDPE pipe of 4\\" to 6\\" Dia. As per standard practice item includes cost of joint equipment (Heater), required tools and tackles, labours etc.as and when required as directed by Engineer In Charge.
135Supply, transportation and Fitting of MBR Modules as per relevant IS and as approved by Engineer In Charge, including supplying consumables if required through out the contract period as directed by Engineer In Charge.Supply, transportation and Fitting of MBR Modules as per relevant IS and as approved by Engineer In Charge, including supplying consumables if required through out the contract period as directed by Engineer In Charge.
136Cleaning of MBR Tank including dewatering and doing recovery cleaning of MBR cassettes / membrane, when TMP is high at -0.42 psi including cost of labour charges, tools, tackles etc. complete all as directed by Engineer In Charge. Chemical required for RC Cleaning will be paid under relavent items and normalizing the all STP and restarting the plant in apprroved manner as and when required as directed by Engineer In Charge.Note:1. Contractor or his representative who is wellknown about the procedure must present during RC cleaning.2. Recovery cleaning procedure attached in Section-V.Cleaning of MBR Tank including dewatering and doing recovery cleaning of MBR cassettes / membrane, when TMP is high at -0.42 psi including cost of labour charges, tools, tackles etc. complete all as directed by Engineer In Charge. Chemical required for RC Cleaning will be paid under relavent items and normalizing the all STP and restarting the plant in apprroved manner as and when required as directed by Engineer In Charge.Note:1. Contractor or his representative who is wellknown about the procedure must present during RC cleaning.2. Recovery cleaning procedure attached in Section-V.
137Collection, Testing and submitting report on monthly basis of Sewage waste water samples each from Inlet and outlet of 250 KLD STP at KAPS#3&4 as per IS : 3025 (Part-11) latest edition and from NABL approved Laboratory as per the GPCB/CPCB requirements for the parameter like (1) pH (2) TDS (3) TSS (4) OIL & GREASE (as per APHA) (5) BOD (3 DAYS 27 deg. cent.) (6) Chemical Oxygen Demand etc. and submitting.(One sample either inlet or outlet will be considered as one operation for payment)Collection, Testing and submitting report on monthly basis of Sewage waste water samples each from Inlet and outlet of 250 KLD STP at KAPS#3&4 as per IS : 3025 (Part-11) latest edition and from NABL approved Laboratory as per the GPCB/CPCB requirements for the parameter like (1) pH (2) TDS (3) TSS (4) OIL & GREASE (as per APHA) (5) BOD (3 DAYS 27 deg. cent.) (6) Chemical Oxygen Demand etc. and submitting.(One sample either inlet or outlet will be considered as one operation for payment)

AI Tender Summary

OUR REF NO 56493672
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 83.02 Lakhs
LAST DATE 06-08-2026
Authority
Authority Name Nuclear Power Corporation Of India Limited
Work Description Bids Are invited for Operation And Maintenance Of Effluent/Sewage Treatment Plant - Complete System; As Per Tender Spacification; Functional But Outside Amc And Warranty - Operating The Sewage Treatment Plant Comprising 15 Equipments (Pump + Blowers Etc.) At Stp In The Round The Clock Shift Including The Following Listed Activities (I) Removing & Disposing The Rags, Cotton Waste And Other Matter Covering The Bar Screen From Raw Sewage Inlet At Oil & Grease Tank (Ii) Removing & Disposing The Waste Matter From Aeration Tank And Mbr Tank (Iii) Removing & Stacking The Sludge Cakes From The Sludge Drying Beds And Filter Press. (Iv) Operation & Maintenance Of Sewage Lifting Stations. (V) Maintenance And Routine Checking Of All Equipments And Valves Of Stp Including Changing Gear Oil, Grease Gland Packing, Nut, Bolts, Leak Test Etc. And Cleaning Of Air Compressor Filters And Other Implants Of Stp With Necessary Tools And Tackles. All Inclusive As And When Required And As Directed By The Engineer In Charge..Note: (1) One Operation Means Operating The Sewage Treatment Plant In One Of The Round The Clock Shifts In A Day And One Pump Operator (Skilled) / One Unskilled Manpower Will Be Considered As One Operation Which Will Be Paid Under Respective Item(2) Pump Operator Should Have At Least 01 (One) Year Experience Of Pump Operation With Iti (Electrical) Qualification(3) Contractor Should Maintain Servicing Schedule Of All Equipment On Daily & Quarterly Basis.(4) In Each Round The Clock Shift Contractor Has To Provide 01 (One) Operator (Skilled Category) & 01 (One) Helper ( Unskilled Category) And 01 Helper ( Unskilled Category) In General Shift.(5) Contractor Shall Ensure To Maintain Sorrounding Inside Area Of Stp Neat And Clean (House Keeping, Gardening Etc) Including Cost Of Brooms, Cleaning Consumables, Required Toold & Tackels Etc. , Deployment Of One Operator (Skilled) , Deployment Of One Un-Skilled Manpower , Supply And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing Blowers (Ugrk-100 / 140 / 160) Compressor Installed At Stp (Kaps #3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Distance Bush , Lock Nut , Distance Ring , O-Ring , Oil Seal , Locking Washer , H.H. Bolt For Locking Washer , Spring Washer , Pressing Ring , H.H. Bolt For Pressing Ring , Intermediate Ring , Gear Wheel In Pair , Tensioning Elements , Pressure Flange , Allen Cap Screw For Gear Locking , Dowel Pin For Casing & Casing Cover A&B , Dowel Pin For Casing Cover-A & Outer Cover-A. , Hex Nut For Dowel Pin , Allen Cap Screw For Casing & Casing Cover , Oil Draining Plug , Breather , Oil Level Sight Glass , Gasket For Casing / Main Cover , Rotor In Pair , Pressing Bush, A&B , Piston Rings , Injection Ring, A&B , Spherical Roller Bearing , Deep Groove Ball Bearing , Angular Contact Ball Bearing , Splash Guard , Oil For Blower-Enklo-320 , Compressor Oil 220 , Grease Normal , Grease High Tempreture , A 34 V- Belt , B - 45 V-Belt , B - 49 V-Belt , Supply & Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing Pumps (Sp 3L+, Sp-0M) Installed At Stp (Kaps #3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , 1.0 Hp Sp-0M- Delivery Casing Ci , 1.0 Hp Sp-0M- Impeller , 1.0 Hp Sp-0M-Shaft Carbon Steel , 1.0 Hp Sp-0M-Mechanical Seal , 1.0 Hp Sp-0M-Mounting Casing Ci , 1.0 Hp Sp-0M-Paper Packing For Main , 1.0 Hp Sp-0M-Beraring De , 1.0 Hp Sp-0M-Gland , 1.0 Hp Sp-0M-Bearing For Motor , 1.0 Hp Sp-0- Key For Impeller , 1.0 Hp Sp-0- Nut For Impeller , 1.0 Hp Sp-0- Stud For Delivery , 1.0 Hp Sp-0- Stud For Mounting , 5.0 Hp Sp3l+ Delivery Casing Ci , 5.0 Sp3l+ Impeller , 5.0 Sp3l+Shaft Carbon Steel , 5.0 Sp3l+Mechanical Seal , 5.0 Sp3l+Mounting Casing Ci , 5.0 Sp3l+Paper Packing For Main , 5.0 Sp3l+Beraring De , 5.0 Sp3l+-Gland , 5.0 Sp3l+Bearing For Motor , 5.0 Sp3l+ Key For Impeller , 5.0 Sp3l+ Nut For Impeller , 5.0 Sp3l+ Stud For Delivery , 5.0 Sp3l+ Stud For Mounting , Rewinding Of Motors Of Following Categories/Capacity Installed At Stp So As To Achieve Design Speed And Parameters By Replacing Required Compatible Material/Spare With Fresh Material As Per Relevant Is And After Rewinding The Motor Shall Rotate As Per Design Speed And As Per Design Parameters. The Spare Parts Replaced Will Be Paid Under Relevant Item Including Cost Of Removing Of Motor, Transportation, Rewinding, Re-Fixing After Completion Of Rewinding Etc. Complete As Directed By The Engineer In Charge.Note :- Contractor Has To Inform And Take Prior Permission From Engineer In Charge Prior To Replace Any Spare /Material Etc. (If Require) While Rewinding Work. , 0.5 Hp , 1 Hp , 1.5 Hp , 2.0 Hp , 3 Hp , 5 Hp , 7.5 Hp , 10 Hp , 2 Hp (Submersible) , 3 Hp (Submersible) , 5 Hp (Submersible) , Supply, Transportation And Dosing Of Following Chemicals As Disinfectant Chemical Alongwith Test Certificates As Per Approved Rate To Get The Treated Water As Per Gpcb/Cpcb Stipulations. Note :- Treated Water Will Be Randomly Checked By Chemical Lab. Item Includes Bringing The Material At Site With Entry At Main Gate Preparing The Dosing Solution By Adding Clean Potable Water, Dosing At Approved Rate And Contractor Shall Bring Test Certificate Of Product Etc. Complete All As Approved By Engineer In Charge And As Per Manufacturers Specification. , Cytric Acid Powder , Sodium Hypo Chloride (Naocl2)10 To 12 % - As Disinfectant , Supply, Installation And Commissioning Of Required Spares/Materials As Per Specification, Including Transportation Of Following Spare/Material (I.E. Contactor , Mpcb, Plc Component) Etc. For Electric Panel Including fixing In Existing Panel Of Stp And Lifting Station As And When Required As Directed By The Engineer In Charge. , Simocode 2.4 A - 25A , Mpcb 7 A - 10 A , Mpcb 2.0 , Mpcb 9A - 12.50 , Mpcb 2.2 A - 3.2 A , Mpcb 12.5 , Mpcb 3.2 , Contactor 12 , Contactor 7 , Contactor 25 , Cpu 1214C (14Di 24V Dc 10Do 24 Vdc 2Ai) Ps 24 V Dc , Digital In Put Sm1221 8Di , 24 Vdc , Analog In Put Sm 1231, 8Ai , Vfd 7.5 Hp , Vfd 1.5 Hp , Supply And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing 2 Hp And 3 Hp Submersible Pumps Installed At Stp (Kaps#3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Mechanical Seal For 2.0 Hp/3.0 Hp, Ca/Ce/Nbr Pumps For Jdsk 5-20/5-30 , Oil Seal J Series 2.0/3.0 Hp, Nbr For Jdsk 2 Hp/3Hp , O Ring Set J Series2.0/3.0 Hp, Nbr For Jdsk 5-20/5-30 , Shaft With Rotor J Series 2.0 Hp/3 Hp , Impeller For Jdsk 5-20/5-30 , Casing For Jds/ Jkd/Ja 2.0 Hp , Bearing J Series 2.0 /3.0 Hp , Supply And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing 5 Hp Submersible Pumps Installed At Stp (Kaps#3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Mechanical Seal 5.0 Hp, Ca/Ce/Nbr For Jdsk 5-50 , Oil Seal J Series 5.0 Hp, Nbr For Jdsk 5 Hp , O Ring Set J Series5.0 Hp, Nbr For Jdsk 5-50 , Shaft With Rotor J Series 5.0 Hp , Impeller For Jdsk 5-50 , Casing Jds/Jkd/Ja 5.0 Hp , Lubricating Oil , Suppiy And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing Screw Pumps Already Installed At Stp (Kaps#3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Stuffing Box Gasket-Nam Gasket , Gland - Cast Iron Is:210 , Stub Shaft Hcp- Stainless Steel Aisi 316 , Startor - Ms Sleeve Nitrile Black , Stud (Gland) Stainless Steal Aisi 316 , Punched Washer , Spring Washer , Taper Plug , Hex. Nut , Suppiy And Installation Of Required Compatible Sprares/Materials As Per Specifications For The Maintenance And Overhauling Of Existing Installed Semi Auto Type filter Press (Size 800Mm X 800Mm) Cylinder Capacity 20 Tons Stp (Kaps#3&4) Including Cost Of Transportation As And When Required As Directed By The Engineer In Charge. , Filter Cloth Set Of 13 Plates (410Rs. X 24Cloth ) , Hydrolic Oil-68 , Supplying Ph-Meter Handy, Digital Having Range 0-14 As Per Relevant Is And As Approved By Gpcb/Cpcb To Check The Quality Of Treated Water On Daily Basis Including Supplying Consumables If Required Through Out The Contract Period.Note: In The Event Of Lost, Not Functioning, Damaged. Contractor Has To Replace It With New One Without Any Extra Cost. , Supplying Tds- Meter Handy, Digital Having Range 0-1999 Ppm As Per Relevant Is And As Approved By Gpcb/Cpcb To Check The Quality Of Treated Water On Daily Basis Including Supplying Consumables If Required Through Out The Contract Period.Note: In The Event Of Lost, Not Functioning, Damaged. Contractor Has To Replace It With New One Without Any Extra Cost. , Supplying Chlorine Measuring Kit As Per Relevant Is And As Approved By Gpcb/Cpcb To Check The Quality Of Treated Water On Daily Basis Including Supplying Consumables If Required Through Out The Contract Period.Note: In The Event Of Lost, Not Functioning, Damaged. Contractor Has To Replace It With New One Without Any Extra Cost. , Maintenance And Calibration Of Existing Electro Magnetic Flow Meter 300 Fr-Tl-Tx-B Series Output 4-20 Madc, Isolated, Power Display-128X64 Graphical Lcd Display. , Jointing / Repairing Of Existing Laid Hdpe Pipe Of 4 To 6 Dia. As Per Standard Practice Item Includes Cost Of Joint Equipment (Heater), Required Tools And Tackles, Labours Etc.As And When Required As Directed By Engineer In Charge. , Supply, Transportation And Fitting Of Mbr Modules As Per Relevant Is And As Approved By Engineer In Charge, Including Supplying Consumables If Required Through Out The Contract Period As Directed By Engineer In Charge. , Cleaning Of Mbr Tank Including Dewatering And Doing Recovery Cleaning Of Mbr Cassettes / Membrane, When Tmp Is High At -0.42 Psi Including Cost Of Labour Charges, Tools, Tackles Etc. Complete All As Directed By Engineer In Charge. Chemical Required For Rc Cleaning Will Be Paid Under Relavent Items And Normalizing The All Stp And Restarting The Plant In Apprroved Manner As And When Required As Directed By Engineer In Charge.Note:1. Contractor Or His Representative Who Is Wellknown About The Procedure Must Present During Rc Cleaning.2. Recovery Cleaning Procedure Attached In Section-V. , Collection, Testing And Submitting Report On Monthly Basis Of Sewage Waste Water S Les Each From Inlet And Outlet Of 250 Kld Stp At Kaps#3&4 As Per Is : 3025 (Part-11) Latest Edition And From Nabl Approved Laboratory As Per The Gpcb/Cpcb Requirements For The Parameter Like (1) Ph (2) Tds (3) Tss (4) Oil & Grease (As Per Apha) (5) Bod (3 Days 27 Deg. Cent.) (6) Chemical Oxygen Demand Etc. And Submitting.(One S Le Either Inlet Or Outlet Will Be Considered As One Operation For Payment)
Basic Detail
Tender No GEM/2026/B/7794549
Bidding Type Tender
Location
City Tapi
State Gujarat
Key Dates
Publish Date 16 Jul 2026
Submission Date 06 Aug 2026
Open Date 06 Aug 2026
Finance
Tender Value 83.02 Lakhs
Tender Fee Ref. Documents
EMD 1.66 Lakhs
Exemption Not Available
Document List
ae98dc24-93b7-4daa-94cc-c77199a42e6d.pdf
1784183179.xlsx
1784183527.pdf
1784183533.pdf
1784183547.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 06, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Aug 06, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 20 days

Tender Documents

Download All (ZIP) ↓
pdf

ae98dc24-93b7-4daa-94cc-c77199a42e6d.pdf

xlsx

1784183179.xlsx

pdf

1784183527.pdf

pdf

1784183533.pdf

pdf

1784183547.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders