Tender For Repair / Maintenance Of Central Ac Plant And Connected Items At Mil Stn Bhuj.
Tender Value
31.94 Lakhs
Estimated cost
Bid Submission
06 Aug 2026
16 days left
EMD
63880
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kachchh → Gujarat
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair / Maintenance Of Central Ac Plant And Connected Items At Mil Stn Bhuj.
BOQ
| Sl. No. | Item Description |
| 1 | M&L for comprehensive maintenance, periodical inspection, servicing / calibration of 01 Nos Air conditioning plants having 3X52 TR Air cooled chiller & 01 X AHUs of capacity , 30000 CFM including and calibration of all the sensor, gauges connected to the system, checking of refrigerant gas pressure, capillary tube, coils as per AC plant, checking functioning of all motorised actuator/ control valve in supply and return duct damper connected to AHU, LT panel installed at Bhuj Mil Stn, by OEM service professional for smooth and efficient functioning, complete all as specified and as directed. Note :- Contractor shall submit the serviceability report. |
| 2 | Material and labour for disconnecting condenser of capacity 52TR for descaling & plugging them & providing of 15 mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) pH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7 flush with fresh water mixed with sodium carbonate tubes and cleaning with nylon brush after closing the end covers, circulating diluted acid solution as specified above & pH value to be maintained as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure complete all as specified & directed. |
| 3 | Material and labour for disconnecting for Chiller of capacity 52TR descaling & Plugging them & providing of 15 mm tee outlet for local circulation of mild acid solution in the Chiller (separate container and small pump set to circulate diluted acid solution to be used) pH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7, flush with fresh water mixed with sodium carbonate tubes and cleaning with nylon brush after closing the end covers, circulating diluted acid solution as specified above & pH value to be maintained as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure complete all as specified & directed. |
| 4 | Pumping down the existing refrigerant from the condensor and carrying out the leak test of plant with the pressure of Nitrogen gas and monoitoring for 24hrs asses leakages by brazing & replacement of necessary gasket wherever required including copper tubes of suitable size vaccumizing of the plant by vaccum pump finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed. (Note: Refrigerant required for topping up will be measured and paid separately under relevant items) Please Enable Macros to View BoQ information |
| 5 | Pumping down the existing refrigerant from the condensor and carrying out the leak test of plant with the pressure of Nitrogen gas and monoitoring for 24hrs asses leakages by brazing & replacement of necessary gasket wherever required including copper tubes of suitable size vaccumizing of the plant by vaccum pump finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed. (Note: Refrigerant required for topping up will be measured and paid separately under relevant items) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 16, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysAug 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender