Tender For Upkeepment Of Electrical And Allied Installation With Provision Of Materials And Manpower At The District Registrar Office With Allied Area, Barasat, North 24 Parganas----Annual Preventive, Corrective & Breakdown Maintenance (Non-Comprehen
Tender Overview
Project Description
Tender for Upkeepment Of Electrical And Allied Installation With Provision Of Materials And Manpower At The District Registrar Office With Allied Area, Barasat, North 24 Parganas----Annual Preventive, Corrective & Breakdown Maintenance (Non-Comprehensive) Of Fire Detection & Alarming System For The Period Of One Year.
BOQ
| Sl. No. | Item Description |
| 1 | Preventive and corrective Non-comprehensive annual maintance of Fire Detection system [(Fire Alarm Control Panel- 1 No; Addressable Intelligent multi-sensor detector- 57 Nos; Addressable Manual Call Point - 5 Nos; Addressable Loop Powered Hooter- 5 Nos; ) Make of the all item is- Honeywell Esseer] at District Register office, Barasat in the district of North 24 Pgs. considering two visit per month & as when required during trouble/fault condition as per terms and conditions satisfactorily. |
| 2 | S C O P E O F W O R KThe schedules and services to be rendered and detailed in the monthly report, furnished here to serve as a guide only and state the minimum requirements. MONTHLY CHECK:-1. Check the control panel to ascertain that it shows normal operation. Otherwise log the failure and ensure that any fault reported the previous day has received attention.2.Ensure that the system is capable of operating under fire emergency conditions by operating at least one detector or call point on one circuit (zone or loop). Visually inspect backup batteries.3. Checking of Battery charger of Fire Alarm Panel and set right for any abnormalities. |
| 3 | 4. Checking of Manual Test of Hooter and set right for any abnormalities.5. Checking of Battery of Fire Alarm Panel and set right for any abnormalities.6. Checking of individual zone by activation of Detector and set right for any abnormalities.7. Conducting Mock Drill in presence of the concerned AE, JE & the concerned Authority monthly.8. Checking the loop wiring of Fire Alarm System and set it right for any abnormalities.9.Check each detector for correct operation in accordance to manufacturer’s recommendation. Visually check all cable fittings and equipment are secure, undamaged and adequately protected. Record any defects in a logbook and upon completion, a certificate of testing is issued to the Engineer in Charge. |
| 4 | 10. The whole fire detection system should be checked by the authorized Engineer/ Technical Personnel of the OEM and issue a certificate in respect to the Health of the system and its performance.11. Vendor should visit for all the above mentioned system for physically inspect the health of the system minimum twice in monthly.12. Vendor should clean all the detectors/panels/MCP/Hooter etc. monthly once.13. Vendor should attend any call from Concerned AE/JE or any authority within 24 hrs time and resolve the issue within 72 hours time. If there is any hardware related fault then the same will be provided by Authority. |
| 5 | T E R M S & C O N D I T I O N S:-1. The agency will have to depute technically qualified & experienced personnel in fire detection system maintaining log book in English and noting down the signal at the Fire Panel room.2. The contractor shall do the preventive maintenance as per schedule of OEM and accordance to BS 5839 Part-1. No extra labour payment will be made for such works. The Agency will also be responsible for cover all inspection, mock fire drill, Re-Commissioning of the system by a Supervisor or himself, who will sign and comment on the log book to be maintained by the Agency. |
| 6 | 3. Periodical testing of all electrical connection of all smoke / heat detectors through the Main Fire Control Panel and to take corrective action immediately in order to keep the system working satisfactorily are within the purview of this contract also functional criterion of main fire panel as per existing OEM could be changed e.g location/ detector number etc4. Agency has to arrange for full operational test/mock fire drill of the entire system once in every month in presence of JE/AE and the authority concerned.5. Any major shut down or fault should be brought to the notice of EIC immediately in writing and over telephone for further course of action. The agency will also have to attend immediately emergency calls at the site with staff, tools etc. on demand. |
| 7 | 6. Cost of any spares if required will be supplied by the Department for which requisition of Materials, signed by the Supervisor/ authorized representative of the agency, should be submitted to the concerned JE (Electrical) well in advance except, other auxiliary items of negligible amount like fuse wires, screws, nuts, bolts, washers, insulating tape, dusters etc which will have to be supplied by the agency on its own expense.7. Separate Log books are to be maintained for fortnightly Check, for Preventive Maintenance and service as per direction of EIC. This logbook will remain the property of the Department and may not be removed from the master control station under any circumstances. The periodical records of the Log books are to be signed by the contractor and verified & signed by concerned Junior Engineer, PWD (Electrical) & Assistant Engineer, PWD (Electrical) and photocopy of the same should be sent to the Executive Engineer concerned through proper channel at the time of submission of bills. The Logbook should be available at site and should be produced on demand. |
| 8 | 8. The Staffs should be polite to all and should be withdrawn for any complaint of irregularities against him. However, in normal cases, frequent change of Maintenance Staffs will not be allowed. Contractor shall be solely responsible for the credential /acts of his staff/workers.9. The agency will issue the Staffs, a photo Identity Card, duly signed by the agency and countersigned by the concerned Assistant Engineer. They should always carry the said Photo Identity Card while on duty. The agency should also submit one copy of the said Identity Card to the JE.10. The Agency should be responsible for any damages to the fire detection system due to mishandling/mal-operation and the cost of thereof will be recovered from the bill as per direction of the Engineering-in-Charge and the accusedoperator should be immediately be replaced. |
| 9 | 11. The agency will maintain one attendance register at site to record the attendance of the staffs on duty which will be authenticated/ verified by the concerned Junior Engineer/ Officer-in-charge.12. The agency should have a close watch on the attendance of the Staffs, in case of absence of any Staffs, the agency shall have to arrange for suitable alternative within an Hour, failing which, the charges for that day will be deducted from the bill of the agency. The Executive Engineer, North 24 Parganas Electrical Division, PWDte, reserves the right to terminate the contract in case of absence of Staff for more than consecutive two fortnights, without showing further reason. |
| 10 | 13. Bills should be submitted quarterly with the certification of satisfactory performance of the concerned Departmental JE and AE. Photocopy of Logbook and Attendance Register should also accompany the Bill, if asked for by the EIC.14. The agency must have their office & Telephone contact with Mobile no. and the same should be intimated to this Department in writing. The telephone call should be responded without delay. The agency must have separate Mobile Nos. for his office and all staffs deputed at worksite so that the agency may be communicated in case of any urgency and the same should be intimated to the EIC, AE & JE concerned, in writing.15. Tecnically qualified & experienced personnels should attain the above said sites as & when required (On Call). |
| 11 | 16. The agency shall have to deposit all dismantled unserviceable materials to the concerned Section Office or any other locations within worksite premises by its own labour / arrangements / tools and tackles as per the direction of the Assistant Engineer/ JE concerned. Fresh materials will be issued against respective defective materials. No materials should be taken out of the maintenance site without the permission and necessary challan of the site-in-charge. Agency is required to submit a copy of Challan for permission of the Junior Engineer before taking any materials out of the premises.17. The contract may be terminated with two months’ notice on either side. |
| 12 | 18. In case of any Accident and/ or physical illness of the staffs of the agency, while on duty, no claim will be entertained by this department and all responsibilities thereof should be shouldered by the agency only.19. If any kind of incapability & negligence are noticed in observing all the above-said terms & conditions causing inconveniences to public service, is subject to unilateral penalty, be it detected on the spot or thereafter (even after payment). This Department also reserves the right to deduct the cost from the bills of the contractor on pro-rate basis as determined by the Engineer –In-Charge for any shortfall in observing above T&C. In that case, the above-said contract may be terminated without issuing any notice and Stringent & punishable action may be taken against the contractor.20. The philosophy of “Public Interest” would be the MOTTO of this maintenance contract. Any deviation may beviewed otherwise. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.