Tender For Repair/Renovation Along With Boundary Wall And Gate Of Panchayat Ghar Palnoo, Block Khoonunder Adp Capex During The Year 2026-27.
Tender Overview
Project Description
Tender for Repair/Renovation Along With Boundary Wall And Gate Of Panchayat Ghar Palnoo, Block Khoonunder Adp Capex During The Year 2026-27.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Jul-2026 | ext | Date | 05-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION Udhampur Name of Work:- Repair/renovation along with boundary wall and gate of Panchayat Ghar Palnoo, Block KhoonUnder ADP capex during the year 2026-27. Contract No: (Tender amount =1.46 lacs, Time for compeltion = 30 Days) r Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. REW Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Earh Work in Excavation by mechanical means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100% in All kinds of soil. (IN-STRETCHES) |
| 3 | Providing and lying in position crushed stone aggregates 40mm size. |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX with 30% stone filling. |
| 5 | Cetring and shuttering including strutting, propping etc and removal of the formwork. |
| 6 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Gate pillar |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) aboveplinth level. |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 10 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes |
| 11 | Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture |
| 12 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar above plinth level. F rate |
| 13 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar above plinth level. L Rate |
| 14 | 12mm thick cement plaster of 1 cement: 6 fine sand mix. |
| 15 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied. |
| 16 | Provision for Sign Board, writing and painting on school gate (To be paid as per actual) |
| 17 | Carriage of construction material(sand) |
| 18 | Carriage of construction material brick Total in Figures 146051.11 53166.32 INR Fifty Three Thousand One Hundred & Sixty Six and Paise Thirty Two Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents