Tender For Construction Of Water Tanki At Baba Bansar Kandi At Dager Talab W. No. 03, Pyt Palnoo (Rs. 0.90 Lac) & Construction Of Pwork Nho Sh. Vikram Singh, Sh Sham Singh & Others At W.No.3 Dagair Pyt Palnoo Block Khoon (Rs. 0.90 Lac) , District Udh
Tender Overview
Project Description
Tender for Construction Of Water Tanki At Baba Bansar Kandi At Dager Talab W. No. 03, Pyt Palnoo (Rs. 0.90 Lac) & Construction Of Pwork Nho Sh. Vikram Singh, Sh Sham Singh & Others At W.No.3 Dagair Pyt Palnoo Block Khoon (Rs. 0.90 Lac) , District Udh Ur Under:- Pri Capex For The Year 2026-27
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Jul-2026 | ext | Date | 05-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | (PART 1) Provison for Citizen Information Board and GPS photograps |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, 100% Qty. in A.k.S. |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size. |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . |
| 7 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation,footing,coulmn base etc |
| 8 | Cetring and shuttering including strutting, propping etc and removal of the formwork suspended floor,roofs landings etc |
| 9 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Edges of slab |
| 10 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar. |
| 11 | 12mm thick cement plaster of 1 cement: 4 fine sand mix. |
| 12 | 15mm cement plaster on the rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1 : 4 ( 1 cement : 4 fine sand) |
| 13 | Providing and laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 14 | White washing with lime to give an even shade two or more coats. |
| 15 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 15mm niminal bore. |
| 16 | Providing and fixing 15 mm nominal bore C.P. brass bib cock of approved quality |
| 17 | Carriage of construction material sand |
| 18 | Carriage of construction material aggregate |
| 19 | Carriage of construction material brick |
| 20 | Add provision for main hole(To be paid as per actual) |
| 21 | PART 2 Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, 100% Qty. in A.k.S. |
| 22 | Providing and laying in position 1:5:10 mix of stone aggregates 40mm size. |
| 23 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX. (IN -STRETCHES) |
| 24 | Dry random rubble masonry with hard stone in walls Without bond stone. |
| 25 | Cetring and shuttering including strutting, propping etc and removal of the formwork. |
| 26 | Carriage of construction material sand and aggregate |
| 27 | Carriage of construction material stones Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender