Bids Are invited for Primer Sp-70, Oem Make: Structural Adhesives Industries , Diluent For D-70 (For Primer Sp-70) , Oem Make: Structural Adhesives Industries - Primer Sp-70, Oem Make :Structural Adhesives Industries , Diluent For D-70 (For Primer Sp
Tender Overview
Project Description
Bids Are invited for Primer Sp-70, Oem Make: Structural Adhesives Industries , Diluent For D-70 (For Primer Sp-70) , Oem Make: Structural Adhesives Industries - Primer Sp-70, Oem Make :Structural Adhesives Industries , Diluent For D-70 (For Primer Sp-70), Oem Make :Structural Adhesives Industries , Bdl Approved Source For This Item Only Participate In The Bid , Specifiy The Packing Size Of The Item , Delivery Period:Material Supply Within One Year(I.E. 365 Days) From The Date Of Gem Contract.Material Supply On Staggered Delivery As And When Required Basis On Intimation Given By Bdl Supply Within 60 Days. , Provide Msds (Material Safety Data Sheet) Certificate. , Test Report To Be Submitted Along With Supply Total Quantity : 430
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | PRIMER SP-70, OEM MAKE :STRUCTURAL ADHESIVES INDUSTRIES | PRIMER SP-70, OEM MAKE :STRUCTURAL ADHESIVES INDUSTRIES |
| 2 | Diluent for D-70 (for PRIMER SP-70), OEM MAKE :STRUCTURAL ADHESIVES INDUSTRIES | Diluent for D-70 (for PRIMER SP-70), OEM MAKE :STRUCTURAL ADHESIVES INDUSTRIES |
| 3 | BDL approved source for this item only participate in the bid | BDL approved source for this item only participate in the bid |
| 4 | Specifiy the Packing size of the item | Specifiy the Packing size of the item |
| 5 | Delivery period:Material supply within One Year(i.e. 365 days) from the date of GEM contract.Material supply on “Staggered delivery as and when required basis” on intimation given by BDL supply within 60 days. | Delivery period:Material supply within One Year(i.e. 365 days) from the date of GEM contract.Material supply on “Staggered delivery as and when required basis” on intimation given by BDL supply within 60 days. |
| 6 | Provide MSDS (Material Safety Data Sheet) certificate. | Provide MSDS (Material Safety Data Sheet) certificate. |
| 7 | Test report to be submitted along with supply | Test report to be submitted along with supply |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender