Tender For Vindhayanagar Depot Job Work
Tender Overview
Project Description
Tender For Vindhayanagar Depot Job Work - 1 Maintenance Job Work 2 M-40 & M-80 Maintenance 3 General Checking 4 Greesing Per Bus 5 King Pin Work Per King Pin 6 Diesel Tank Dismantling, Cleaning Repairing & Mounting 7 After Trearnent (Ats) System Dismantling, Cleaning Repairing & Mounting 8 Urea Tank Dismantling, Cleaning 9 Engine Job Work 10 Change Of Engine Oil And Oil Filter 11 Engine Head Dismantling & Mounting 12 Radiator Opening & Washing & Fitting 13 Inter Cooler Opening & Cleaning 14 Air Compressor Opening & Fitting 15 Water Pump Opening & Fitting 16 Engine Oil Chamber Opening & Fitting 17 Air Dryer And System Protection Valve Opening & Fitting 18 Engine Oil Cooling Plate Opening & Fitting 19 Engine Change Uro-3 Bs-Iii,Bs-Iv& Bs-6 20 Engine Change Uro-4 21 Diesel Filter Change 22 Air Filter Change 23 Air Filter Assembly Change 24 Piston Ring Job Work 25 Change Of Radiator Assembly 26 Air Filter Assembly 27 Head Tighting 28 Tapid Matching 29 Change Of Accelarator Cable 30 Change Of Turbo Charger 31 Change Of Engine Main Oil Seal 32 Change Of Timing Cover Oil Seal 33 Change Of Fan Belt 34 Change Of Engine Flywheel 35 Change Of Engine Flywheel Cam Shaft 36 Change Of Engine Front Maunting Pad 37 Change Of Engine Rear Maunting Pad 38 Cross Member Dismantling & Fitting 39 Change Of Flywheel Bearing 40 F.I.P. & Injector Job Work 41 Dismantling & Fitting Of F.I. Pump 42 Air Lock Removal 43 Dismantling Of Injectors 44 Fitting Of Injectors 45 Change Of F.I.P. Lever & Bush 46 Transmisson Job Work 47 Accelerator Pedal Change 48 Gear Lever Wire Opening, Cleaning With Wd-40, & Refitting/ Chaing 49 Clutch Oil Pipe Replacement (Per Pipe) 50 Clutch Plate Setting 51 Gear Lever Setting 52 Clutch Plate 352 Dia Change 53 Pressure Plate 352 Dia Change 54 Clutch Plate 330 Dia Change 55 Pressure Plate 330 Dia Change 56 G.B. 40 Change 57 G.B. 60 Change 58 G.Box G.B. 40 Overhauling 59 G.Box G.B. 60 Ovehauling 60 Clutch Release Bearing Change 61 Clutch Sleeve Cylinder Change 62 Clutch Master Cylinder Change 63 P. Shaft Dismantling & Mounting 64 Rubber Cushion With Center Bearing Change 65 With Draawl Plate Dismantling & Fitting 66 Front Axle Job Work 67 Change Of Front Spring Per Nos 68 Change Of Front Chasis Bracket Per Nos 69 Change Of Front Brake Drum 70 Change Of Front Diaphram 71 Change Of Diaphram Washer 72 Repairing Of Kamani 73 Repair Of Tierod 74 Repair Of Push & Pull Rod 75 Wheel Alignment 76 Rear Axle Job Work 77 Change Of Rear Spring Per Nos 78 Change Of Rear Chasis Bracket Per Nos 79 Repairing Of Kamani 80 Change Of Crown Cage 81 Change Of Rear Diaphram 82 Change Of Hub Shaft 83 Change Of Tail Pinion Oil Seal 84 Change Of Rear Brake Drum 85 Change Of Brake Rachet Per Wheel 86 Steering Job Work 87 Change Of Steering Box 88 Change Of Steering Rod & Steering Wheel 89 Change Of Power Steering Pump 90 Steering Box Ovehauling 91 Change Of Steering Cross 92 Steering Oil Pipe Replacement (Per Pipe) 93 Power Steering Tank Cleaning (Per Job) 94 Brake Job Work 95 Repairing Of Air Pressure Head 96 Change Of Air Pressure Head 97 Fitting Of Air Governor 98 Change Of Pressure Pipe 99 Repair Of D.D. Unit 100 Change Of D.D. Unit 101 Brake Valve Repair & Fitting 102 Electric Job Work 103 Self Starter Repairing 104 Alternator Repairing 105 Change Of Self Starter 106 Change Of Alternator 107 Change Of Battery 108 Head Light Fitting 109 Fitting Of Roof Light 110 Fitting Of Indicator Light 111 Fitting Of Back Light 112 Fitting Of Head Light Bulb / All Weather Bulb 113 Fitting Of Roof Light Bulb 114 Fitting Of Back Light Bulb 115 Horn Fitting 116 Complete Repairing Of Wiring 117 Wiper Arm & Blade Fitting 118 Change Of Electric Switch 119 Change Of Meter Light Bulb 120 Horn Repairing 121 Wiper Machine Opening & Fitting Work 122 Body Job Work 123 Front Wind Screen Glass Fitting Per Glass 124 Side Window Glass Fitting Per Glass 125 Seat Fitting Per Seat 126 Upholstery Repair Per Inch 127 Electric Welding Per Inch 128 Tubular Straightehing & Fitting 129 Angle Straightehing & Fitting 130 Repairing & Fitting Of Battery Box 131 Straightening Of Chasis Per Inch 132 Change Of Seat Cushion & Rexine Per Seat 133 Change Of Mazda Rubber Per Window 134 Fitting Of Window Catcher Lock Per Window 135 Fitting & Tightening Of U Bolt 136 Fitting Of Wind Screen Per Glass 137 Front Show Repair 138 Front Show Grill Repair 139 Front Wind Screen Frame Repair 140 Side Window Frame Repair 141 Panel Fitting Per Sq. Feet 142 Floor Repair Per Sq. Feet 143 Frist Aid Box Fitting 144 Complaint Box Fitting 145 Seat Repairing (Welding Or Bolt) 146 Mud Guard Repairing 147 Passenger Gate Repairing 148 Floor Repairing 149 Painting Job Work 150 Painting Per Sq. Fit Plain 151 Letter Writing (1\ X 1) 152 Letter Writing (2\ X 1) 153 Letter Writing (3\ X 1) 154 Letter Writing (4\ X 1) 155 Letter Writing (5\ X 1) 156 Full Body Paint 157 Show Painting 158 Number Plate Writing Per Plate 159 Destination Board Writing 160 Miscllaneous Job Work 161 Tyre Dismantling & Mounting Per Tyre 162 Per Tyre Puncture Repair 163 Air Pressure Checking & Filling Per Bus 164 Wheel Alignment Per Bus 165 Turbo Packing Change 166 Exhaust Manifold Packing Change 167 Diesel P.V.C. Pipe Change 168 Scilencer Dismantling & Fitting 169 Fly Wheel Dismantling & Fitting 170 Dismantling & Fitting Of Bs-4 Injectors 171 Dismantling & Fitting Of Common Rail 172 B/D Per Person ( For More Then 40 K.M.) 173 Skilled Labour ( Per Person Per Day) 174 Letter Writing Per Fit 175 Engine & Pump Work Of Bs-6 Buses 176 Injector Fitting And Opening 177 Comman Rail Fitting And Opening 178 Gst (%) Please Enable Macros To View Boq Information
BOQ
| Sl. No. | Item Description |
| 1 | Maintenance Job Work |
| 2 | M-40 & M-80 Maintenance |
| 3 | General Checking |
| 4 | Greesing Per Bus |
| 5 | King Pin Work Per King Pin |
| 6 | Diesel Tank Dismantling, Cleaning Repairing & Mounting |
| 7 | After Trearnent (ATS) system Dismantling, Cleaning Repairing & Mounting |
| 8 | Urea tank Dismantling, Cleaning |
| 9 | Engine Job Work |
| 10 | Change Of Engine Oil And Oil Filter |
| 11 | Engine Head Dismantling & Mounting |
| 12 | Radiator opening & washing & fitting |
| 13 | Inter cooler opening & cleaning |
| 14 | Air compressor opening & fitting |
| 15 | Water pump opening & fitting |
| 16 | Engine oil chamber opening & fitting |
| 17 | Air dryer and system protection valve opening & fitting |
| 18 | Engine oil cooling plate opening & fitting |
| 19 | Engine Change Uro-3 BS-III,BS-IV& BS-6 |
| 20 | Engine Change Uro-4 |
| 21 | Diesel Filter Change |
| 22 | Air Filter Change |
| 23 | Air Filter Assembly Change |
| 24 | Piston Ring Job Work |
| 25 | Change Of Radiator Assembly |
| 26 | Air Filter Assembly |
| 27 | Head Tighting |
| 28 | Tapid Matching |
| 29 | Change Of Accelarator Cable |
| 30 | Change Of Turbo Charger |
| 31 | Change Of Engine Main Oil Seal |
| 32 | Change Of Timing Cover Oil Seal |
| 33 | Change Of Fan Belt |
| 34 | Change Of Engine Flywheel |
| 35 | Change Of Engine Flywheel cam Shaft |
| 36 | Change Of Engine Front Maunting Pad |
| 37 | Change Of Engine Rear Maunting Pad |
| 38 | Cross Member Dismantling & Fitting |
| 39 | Change Of Flywheel Bearing |
| 40 | F.I.P. & Injector Job Work |
| 41 | Dismantling & Fitting Of F.I. Pump |
| 42 | Air Lock Removal |
| 43 | Dismantling Of Injectors |
| 44 | Fitting Of Injectors |
| 45 | Change Of F.I.P. Lever & Bush |
| 46 | Transmisson Job Work |
| 47 | Accelerator pedal change |
| 48 | Gear lever wire opening, cleaning with WD-40, & refitting/ Chaing |
| 49 | Clutch oil pipe replacement (per pipe) |
| 50 | Clutch Plate Setting |
| 51 | Gear Lever Setting |
| 52 | Clutch Plate 352 Dia Change |
| 53 | Pressure Plate 352 Dia Change |
| 54 | Clutch Plate 330 Dia Change |
| 55 | Pressure Plate 330 Dia Change |
| 56 | G.B. 40 Change |
| 57 | G.B. 60 Change |
| 58 | G.Box G.B. 40 Overhauling |
| 59 | G.Box G.B. 60 Ovehauling |
| 60 | Clutch Release Bearing Change |
| 61 | Clutch Sleeve Cylinder Change |
| 62 | Clutch Master Cylinder Change |
| 63 | P. Shaft Dismantling & Mounting |
| 64 | Rubber Cushion With Center Bearing Change |
| 65 | With draawl Plate Dismantling & Fitting |
| 66 | Front Axle Job Work |
| 67 | Change Of Front Spring Per Nos |
| 68 | Change Of Front Chasis Bracket Per Nos |
| 69 | Change Of Front Brake Drum |
| 70 | Change Of Front Diaphram |
| 71 | Change Of Diaphram Washer |
| 72 | Repairing Of Kamani |
| 73 | Repair Of Tierod |
| 74 | Repair Of Push & Pull Rod |
| 75 | Wheel Alignment |
| 76 | Rear Axle Job Work |
| 77 | Change Of Rear Spring Per Nos |
| 78 | Change Of Rear Chasis Bracket Per Nos |
| 79 | Repairing Of Kamani |
| 80 | Change Of Crown Cage |
| 81 | Change Of Rear Diaphram |
| 82 | Change Of Hub Shaft |
| 83 | Change Of Tail Pinion Oil Seal |
| 84 | Change Of Rear Brake Drum |
| 85 | Change Of Brake Rachet Per Wheel |
| 86 | Steering Job Work |
| 87 | Change Of Steering Box |
| 88 | Change Of Steering Rod & Steering Wheel |
| 89 | Change Of Power Steering Pump |
| 90 | Steering Box Ovehauling |
| 91 | Change Of Steering Cross |
| 92 | Steering oil pipe replacement (per pipe) |
| 93 | Power steering tank cleaning (per job) |
| 94 | Brake Job Work |
| 95 | Repairing Of Air Pressure Head |
| 96 | Change Of Air Pressure Head |
| 97 | Fitting Of Air Governor |
| 98 | Change Of Pressure Pipe |
| 99 | Repair Of D.D. Unit |
| 100 | Change Of D.D. Unit |
| 101 | Brake Valve Repair & Fitting |
| 102 | Electric Job Work |
| 103 | Self Starter Repairing |
| 104 | Alternator Repairing |
| 105 | Change Of Self Starter |
| 106 | Change Of Alternator |
| 107 | Change Of Battery |
| 108 | Head Light Fitting |
| 109 | Fitting Of Roof Light |
| 110 | Fitting Of Indicator Light |
| 111 | Fitting Of Back Light |
| 112 | Fitting Of Head Light Bulb / All Weather Bulb |
| 113 | Fitting Of Roof Light Bulb |
| 114 | Fitting Of Back Light Bulb |
| 115 | Horn Fitting |
| 116 | Complete Repairing Of Wiring |
| 117 | Wiper Arm & Blade Fitting |
| 118 | Change Of Electric Switch |
| 119 | Change Of Meter Light Bulb |
| 120 | Horn Repairing |
| 121 | Wiper machine opening & fitting Work |
| 122 | Body Job Work |
| 123 | Front Wind Screen Glass Fitting Per Glass |
| 124 | Side Window Glass Fitting Per Glass |
| 125 | Seat Fitting Per Seat |
| 126 | Upholstery Repair Per Inch |
| 127 | Electric Welding Per Inch |
| 128 | Tubular Straightehing & Fitting |
| 129 | Angle Straightehing & Fitting |
| 130 | Repairing & Fitting Of Battery Box |
| 131 | Straightening Of Chasis Per Inch |
| 132 | Change Of Seat Cushion & Rexine Per Seat |
| 133 | Change Of Mazda Rubber Per Window |
| 134 | Fitting Of Window Catcher Lock Per Window |
| 135 | Fitting & Tightening Of U Bolt |
| 136 | Fitting Of Wind Screen Per Glass |
| 137 | Front Show Repair |
| 138 | Front Show Grill Repair |
| 139 | Front Wind Screen Frame Repair |
| 140 | Side Window Frame Repair |
| 141 | Panel Fitting Per Sq. Feet |
| 142 | Floor Repair Per Sq. Feet |
| 143 | Frist Aid Box Fitting |
| 144 | Complaint Box Fitting |
| 145 | Seat Repairing (Welding Or Bolt) |
| 146 | Mud Guard Repairing |
| 147 | Passenger Gate Repairing |
| 148 | Floor Repairing |
| 149 | Painting Job Work |
| 150 | Painting Per Sq. Fit Plain |
| 151 | Letter Writing (1\\" X 1') |
| 152 | Letter Writing (2\\" X 1') |
| 153 | Letter Writing (3\\" X 1') |
| 154 | Letter Writing (4\\" X 1') |
| 155 | Letter Writing (5\\" X 1') |
| 156 | Full Body Paint |
| 157 | Show Painting |
| 158 | Number Plate Writing Per Plate |
| 159 | Destination Board Writing |
| 160 | Miscllaneous Job Work |
| 161 | Tyre Dismantling & Mounting Per Tyre |
| 162 | Per Tyre Puncture Repair |
| 163 | Air Pressure Checking & Filling Per Bus |
| 164 | Wheel Alignment Per Bus |
| 165 | Turbo Packing Change |
| 166 | Exhaust Manifold Packing Change |
| 167 | Diesel P.V.C. Pipe Change |
| 168 | Scilencer Dismantling & Fitting |
| 169 | Fly Wheel Dismantling & Fitting |
| 170 | Dismantling & Fitting Of Bs-4 Injectors |
| 171 | Dismantling & Fitting Of Common Rail |
| 172 | B/D Per Person ( For More Then 40 K.M.) |
| 173 | Skilled Labour ( Per Person Per Day) |
| 174 | Letter Writing Per Fit |
| 175 | Engine & Pump Work Of Bs-6 Buses |
| 176 | Injector Fitting And Opening |
| 177 | Comman Rail Fitting And Opening |
| 178 | GST (%) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender