Tender For Supply, Installation, Testing & Commissioning For Shifting / Raising The Height Of 400Kv D/C Transmission Lines Of Pgcil (Nr-1) & Dtl Infringing Near Mcds Wte Bawana Plant In Rithala - Kundli (Nathupur) Corridor Of Delhi Metro Phase-Iv Pro
Tender Overview
Project Description
Tender for Supply, Installation, Testing & Commissioning For Shifting / Raising The Height Of 400Kv D/C Transmission Lines Of Pgcil (Nr-1) & Dtl Infringing Near Mcds Wte Bawana Plant In Rithala - Kundli (Nathupur) Corridor Of Delhi Metro Phase-Iv Project)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-Jul-2026 | Addendum-01 | Technical Bid | 17-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | SCHEDULE-A SUPPLY |
| 2 | SCHEDULE-B MONOPOLE |
| 3 | SCHEDULE-C ERECTION & COMMISSIONING |
| 4 | SCHEDULE-D CREDIT AGAINST DISMANTLED MATERIAL Summary of Estimate Name of work:- D2EUD-05: Supply, Installation, Testing & Commissioning for shifting / raising the height of 400KV D/C Transmission Lines of PGCIL (NR-1) & DTL infringing near MCD's WtE Bawana Plant in Rithala - Kundli (Nathupur) Corridor of Delhi Metro Phase-IV Project). Description Amount A : Total of Part A : (Supply) 72580924.0 B : Total of Part B : (Monopole Section) 26250281.0 C : Total of Part C : (Erection, Testing & Commissioning) 70906831.0 D : Total of Part - D: Credit against dismantled Material / Scrap 8973000.0 E: Total Amount : (Part A + Part B + Part C - Part D)(without GST) 160765036.0 F: E x 18% GST 18 % on Total Amount 28937706.48 G: E + F Total Amount (Inclusive of GST) 189702742.48 |
| 5 | Supply of super structures for towers of PGCIL design / Approved by PGCIL for 400kV Transmission Lines to meet desired electrical clearances from DMRC network / system at site. Hot Dipped Galvanised (High Tensile) Steel for 400kV Lattice Structure (Tower & Stubs). Hot Dipped Galvanised (MS) Steel for 400kV Lattice Structure (Tower & Stubs). |
| 6 | Supply of Hot Dipped Galvanised steel Nuts & Bolts (High tensile) with washers of various sizes for the towers & stub. |
| 7 | Supply of Template for Lattice Towers of the various types . |
| 8 | Supply of ACSR Moose Conductor as per latest version of IS: 398 Part-2 or other equivalent Indian / International Standard. |
| 9 | Supply of HTLS (ACSS) Conductor equivalent to Twice ampicity of ACSR Bersimis Conductor as per latest relevent Indian / International Standard. |
| 10 | Supply of Tension hardware fitting (compression type) for ACSR Moose Conductor in TWIN formation for 400kV Transmission Lines, i/c Arcing Horns, Corona Ring etc, complete in all respect. |
| 11 | Supply of Tension hardware fitting (compression type) for ACSR Bersimis Conductor in Quad formation for 400kV Transmission Lines, i/c Arcing Horns, Corona Ring etc, complete in all respect. |
| 12 | Supply of Tension hardware fittings (compression type) for HTLS ACSS Conductor in TWIN formation for 400kV Transmission Lines, along with all hardware & accessories, i/c Arcing Horns, Corona Ring etc, complete in all respect. |
| 13 | Supply of Suspension Clamp suitable for suspension Pilot Insulator string for HTLS conductor for 400kV TL in Twin formation, complete in all respect. |
| 14 | Supply of Suspension Clamp suitable for suspension Pilot Insulator string for ACSR Moose conductor for 400kV TL in Twin formation, complete in all respect. |
| 15 | Supply of Vibration Damper for ACSR (Moose) Conductor complete in all respect. |
| 16 | Supply of Vibration Damper for ACSR (Bersimis) Conductor complete in all respect. |
| 17 | Supply of Vibration Damper for HTLS (ACSS) Conductor complete in all respect. |
| 18 | Supply of Spacers for Twin formation of ACSR (Moose) Conductor, complete in all respect. |
| 19 | Supply of Spacers for Quad formation of ACSRS (Bersimis) Conductor, complete in all respect. |
| 20 | Supply of Spacers for Twin formation of HTLS (ACSS) Conductor, complete in all respect. |
| 21 | Supply of Composite Polymeric Insulator 400 kV/ 160 kN |
| 22 | Supply of Composite Polymeric Insulator 400 kV/ 120 kN |
| 23 | Supply of Armour of ACSR (Moose) Conductor for Damper installation, Suspension String, etc, complete in all respect |
| 24 | Supply of Armour of ACSR (Bersimis) Conductor for Damper installation, Suspension String, etc, complete in all respect. |
| 25 | Supply of Armour of HTLS ACSS Conductor for Damper installation, Suspension String, etc, complete in all respect. |
| 26 | Supply of OPGW (24Fcore) as per PGCIL specifications. |
| 27 | Supply of Earth Wire as per PGCIL specifications. |
| 28 | Supply of OPGW Tension Assembly complete in all respect. |
| 29 | Supply of Earth Wire Tension Assembly complete in all respect. |
| 30 | Supply of Downlead Clamp complete in all respect. |
| 31 | Supply of Vibration Damper for OPGW & Earth Wire complete in all respect. Total of Part A : (Supply) |
| 32 | Designing of Foundation of 400kV Monopole Structure considering all possible mechanical loadings on the Monopole Structure under extreme conditions as per directions of Engineer-In-charge and obtaining the approval of the Foundation Design from Indian Institute of Technology (IIT). |
| 33 | Designing of 400kV D/C or M/C Steel Monopole Structure as per approved profile & as per directions of Engineer-In-charge and conforming to latest applicable Indian/International Standard and submission of its design duly approved by Indian Institute of Technology (IIT) & Utility Owning agencies. The necessary Liasoning for approval shall be done by contractor. |
| 34 | Supply of 400 kV D/C or M/C Galvanized Steel Monopole Structures along with all associated accessories such as cross-arms, Pilot arm, Anchor Bolts, Anchor Plate, Template, Nuts & Bolts, ladder, fall arrester etc. as per approved design of IIT & Utility owning agencies. |
| 35 | Setting of Monopole's Anchor Bolts & Template |
| 36 | Assembling of Monopole Sections and Erection of following Monopole Structure complete in all respects including fixing of cross-arms, ladder, step bolts, guard rail and all other monopole accessories as well as complete tightening of all nuts & bolts. This shall also include the cost of hiring of cranes, hydra and any other machinery to be used in erection process along with making necessary site preparations like levelling, compacting of soil etc. for placing of cranes and other required machineries. Further, included is the cost of tack welding of check nuts after completion of Monopole erection work and removing of surplus mulb, scrap, muck etc. upto 50m lead and 1.5m lift as per directions of Engineer-In-Charge. 400kV S/C, D/C or M/C Tension Type Monopole Structure of height from 45Mtrs. to 60Mtrs. (top/peak to bottom). 400kV S/C, D/C or M/C Tension Type Monopole Structure of height more than 60Mtrs. (top/peak to bottom). Total of Part B : (Monopole Section) |
| 37 | Check survey. |
| 38 | Installation of Stubs including bolts & nuts complete in all respect. |
| 39 | Supply & Installation of Earthing of Towers (Pipe Type) complete in all respect. |
| 40 | Erection of Double circuit towers, tower parts and its body / leg (equal/ unequal) extensions (complete) including bolts & nuts, step bolts, hangers, D Shackles etc.including tack welding & supply & Application of zinc rich primer & enamel paint. |
| 41 | Erection of Multi circuit towers, tower parts and its body / leg (equal/ unequal) extensions (complete) including bolts & nuts, step bolts, hangers, D Shackles etc.including tack welding & supply & Application of zinc rich primer & enamel paint. |
| 42 | Supply & Installation of the following tower accessories Danger Plate Number Plate Phase Plate (Set of three) Circuit plate (Set of two) Anti-Climbing Device (Including Galvanised Barbed Wire) |
| 43 | Installation of Insulator Strings complete with arcing horns & necessary hardware, installing & stringing of conductor including fixing of conductor accessories, installing & stringing of earthwire including fixing of earthwire accessories for Four circuits (2 Nos 400kV with twin HTLS conductor & 2 Nos 400kv with twin ACSR Moose conductor). |
| 44 | Installation of Insulator Strings complete with arcing horns & necessary hardware, installing & stringing of conductor including fixing of conductor accessories, installing & stringing of earthwire including fixing of earthwire accessories for 400 KV D/C line with Quad Conductor. |
| 45 | Installation of Insulator Strings complete with arcing horns & necessary hardware, installing & stringing of conductor including fixing of conductor accessories, installing & stringing of earthwire including fixing of earthwire accessories for 400 KV D/C line with Twin Conductor. |
| 46 | Supply & Installation of Joint Box for 24 / 48 Fibre |
| 47 | Applying specific, alternating bands of aviation orange and white paint to Tower structures over 45 Mtr |
| 48 | Dismantling of existing towers & transporation to designated store/ Place as decided by Engineer in Charge. |
| 49 | Destringing of 400 KV D/C existing line and transportation of material to store |
| 50 | Excavation work for Foundation by hydraulic excavator in various types of soils upto 1.5 mtr depth. Including dressing of sides and ramming of bottom, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50M. All kind of Soil (Dry/ Wet / Sandy) (Ordinary Rock / Rocky Soil) |
| 51 | Extra for every additional lift of 1.5 m or part thereof excavation / banking excavated or stacked materials All kind of Soil (Dry/ Wet / Sandy) (Ordinary Rock / Rocky Soil) |
| 52 | Boring / Drilling of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement & Concrete but including the cost of boring with polymer solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads.Note: (length of pile for payment shall be measured up to bottom of pile cap) 750 mm 1000 mm 1200 mm 2500 mm 3000 mm 3500 mm |
| 53 | Vertical load testing of Single pile upto 50 tonne Safe capacity in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & directions of Engineer in-charge. Initial test (Test Load 2.5 times the Safe capacity) Routine test (Test Load 1.5 times the Safe capacity) |
| 54 | Vertical load testing of Single pile above 50 tonne and upto 100 tonne Safe capacity in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & directions of Engineer in-charge. Initial test (Test Load 2.5 times the Safe capacity) Routine test (Test Load 1.5 times the Safe capacity) |
| 55 | Lateral load testing of single pile in accordance with IS Code of practice IS : 2911 (Part IV) for determining safe allowable lateral load on pile Upto 50 tonne capacity pile Above 50 tonne and upto 100 tonne capacity pile |
| 56 | Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. |
| 57 | Providing and laying in position ready mixed M-35 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, chipping of pile, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. |
| 58 | Supplying & Pouring M20 Concrete Nominal Mix 1:1.5:3 |
| 59 | Supplying & Pouring M10 Lean Concrete Nominal Mix 1:3:6 |
| 60 | Supply, Transportation and placement of reinforcement steel (Fe 500D Grade or More) |
| 61 | Supplying, stacking & spreading 6mm thick Red bajri, watering and rolling complete including preparation of the surface and rolling with Road roller / Hand roller. |
| 62 | Making bajri path including preparation of subgrade, supplying & laying brick aggregate of 50mm nominal size 7.5 cm deep with blinding material consisting of 12mm moorum and 12mm red bajri consolidated with road roller. |
| 63 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in cement mortar 1:4 ( 1 cement and 4 coarse sand). |
| 64 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead & upto 10kM, for all leads including all lifts involved. |
| 65 | Centering and shuttering including strutting, propping etc. and removal of form work and finishing for Foundations, footings, bases for columns as per directions of Engineer-In-charge. |
| 66 | Deploying of Hydraulic Excavator to make acess to the site for heavy cranes, Concrete Miller and as per site requirements ( 1Shift / Day = 8 Hours) |
| 67 | Supply & Fixing of 2.0 Meter high barricade and Making arrangement for traffic diversion such as traffic signals during construction at site, for day and night as per site requirements. During construction of foundation / other activities requiring traffic diversion, this arrangement has to be maintained till completion of such activities. Local shifting of barricading along with all associated accessories at a particular location may be required during execution and may require for traffic management. Nothing shall be paid extra for this local shifting. |
| 68 | Dismantling and re-erecting the above barricading and other arrangements at new location as per instruction of Engineer. |
| 69 | Providing, Fixing & Maintaining Traffic Cones & caution tape etc. as per site requirements. |
| 70 | De-watering of pits By Manual By Mechanical Pump minimum 5 H.P. Motor Total of Part C : (Erection, Testing & Commissioning) |
| 71 | Galvanised Tower / Iron / Steel Scrap |
| 72 | ACSR Bersimis / HTLS ACSS Conductor Scrap |
| 73 | ACSR Moose Conductor Scrap Total of Part - D: Credit against dismantled Material / Scrap Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 17 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysTender Documents