Defence Statutory Bodies & Commissions/Committees Closing in 7 days TDR #56467161

Tender For Consultancy Services, Comprehensive Design And Project Management Upto Completion Of Entire Project For Provision Of 50 Mtr Water Work-Up Station For At installation Mandovi, Goa.

Issued by Statutory Bodies & Commissions/Committees · goa, Goa
Tender Value
14.95 Lakhs
Estimated cost
Bid Submission
04 Aug 2026
7 days left
EMD
30000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
goa → Goa
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Consultancy Services, Comprehensive Design And Project Management Upto Completion Of Entire Project For Provision Of 50 Mtr Water Work-Up Station For At installation Mandovi, Goa.

BOQ

Name of Work:- CONSULTANCY SERVICES, COMPREHENSIVE DESIGN AND PROJECT MANAGEMENT UPTO COMPLETION OF ENTIRE PROJECT FOR PROVISION OF 50 MTR WATER WORK-UP STATION FOR AT INS MANDOVI, GOA.
Sl. No. Item Description
1Providing comprehensive multidisciplinary consultancy services for planning, detailed engineering, surveying, design, preparation and submission of complete Architectural, Structural, Civil, Building & Roads (B/R), Electrical, Mechanical, Plumbing (MEP), Swimming Pool Hydraulic System, Filtration Plant, Fire Protection System, Detailed Estimates, Bills of Quantities (BOQs), Yardsticks, Market Rate Analysis, Draft Tender Documents and all other allied engineering services required for execution of the work \\"Provision of 50 MTR Water Work-Up Station for at INS Mandovi, Goa\\", complete in all respects, including obtaining approvals from User Authorities, MES, HQ CE (Navy) Mumbai and all concerned statutory authorities, all as specified and as directed by the Engineer-in-Charge.
2Providing comprehensive multidisciplinary consultancy services for planning, detailed engineering, surveying, design, preparation and submission of complete Architectural, Structural, Civil, Building & Roads (B/R), Electrical, Mechanical, Plumbing (MEP), Swimming Pool Hydraulic System, Filtration Plant, Fire Protection System, Detailed Estimates, Bills of Quantities (BOQs), Yardsticks, Market Rate Analysis, Draft Tender Documents and all other allied engineering services required for execution of the work \\"Provision of 50 MTR Water Work-Up Station for at INS Mandovi, Goa\\", complete in all respects, including obtaining approvals from User Authorities, MES, HQ CE (Navy) Mumbai and all concerned statutory authorities, all as specified and as directed by the Engineer-in-Charge.
3The consultancy shall include carrying out detailed Topographical Survey using Electronic Total Station (ETS), DGPS/RTK GPS and Drone Survey (where required), utility mapping, preparation of Digital Terrain Model (DTM), contour survey, benchmark establishment, existing utility survey, site grading, cross-sections, longitudinal sections and preparation of all survey drawings required for planning and detailed engineering.
4The existing Soil Investigation Report shall be provided by the GE Office for design purposes. The Consultant shall critically review, verify and assess the adequacy of the geotechnical investigation for all proposed structures. If, in the opinion of the Consultant, additional boreholes, field investigations, laboratory testing or confirmatory geotechnical investigations are required for safe, economical and code-compliant design, the Consultant shall recommend, plan, supervise, interpret and incorporate such investigations into the final design. The Consultant shall remain fully responsible for the adequacy and safety of the foundation design based on the verified geotechnical parameters.
5The consultancy shall include preparation of Design Basis Reports (DBR), detailed engineering calculations, Good for Construction (GFC) drawings, technical specifications, detailed estimates, BOQs, yardsticks, market rate analysis, draft tender documents and all associated engineering documents for the following buildings, structures and connected infrastructure:-
6(a) Carrying out detailed topographical survey of the entire project area including contour survey, benchmark establishment, existing utilities, roads, drainage, buildings, trees, electrical installations, underground services, spot levels, utility mapping and preparation of Digital Terrain Model (DTM), contour plans and survey drawings required for planning and design.( APPROX TOTAL AREA- 30000 Sqm)
7(b) Construction of 50 MTR Water Work-Up Station measuring 50.00 M × 6.00 M × 6.00 M, complete with permanent RCC structure, diving board, side walk, overflow gutter, pool deck, ladders, underwater lighting, lane markings, embedded fixtures, stainless steel accessories and all associated civil, structural, architectural, hydraulic, electrical and mechanical services.
8(c) Construction of Change Room Complex comprising Change Rooms, Shower Area, Toilets, Sanitary Annexe, Store Room, Reception, Entrance Hall, Administrative Room and associated facilities of permanent RCC construction (Approximate Plinth Area 352.15 Sqm).
9(d) Construction of Elevated RC Stepped Seating Gallery complete with staircases, ramps, accessibility provisions, handrails, guard rails and associated external works.
10(e) Construction of Filtration Plant Building including Pump House, Duty Room, Chemical Room, Electrical Control Room, equipment foundations and all associated Electro-Mechanical installations (Approximate Plinth Area 467.13 Sqm).
11(f) Construction of Substation Building complete with transformer yard, HT/LT distribution system, earthing and associated electrical infrastructure (Approximate Plinth Area 74.00 Sqm).
12(g) Construction of RCC Balancing Tank having a storage capacity of 4,00,000 Litres, complete with valve chambers, pipe galleries, access chambers, waterproofing system and all associated civil, structural and mechanical works.
13(h) Construction of RCC Underground Sump having a storage capacity of 3,75,000 Litres at the Station Main Pump House, including inlet and outlet chambers, valve chambers, suction pit, waterproofing treatment and associated civil, structural and plumbing works.
14(i) Preparation of Architectural Planning, Civil Foundation Interface Drawings, External Development Drawings and Tender Drawings Pre Engineered Building (PEB) Warehouse measuring 85.00 M × 50.00 M (4250 Sqm) having centre height 15.00 M and side wall height 3.00 M, complete with turbo ventilators, side ventilation, rolling shutters and associated external services. The detailed structural design, structural analysis, fabrication drawings, shop drawings, connection design, proof checking, supply, erection, testing, commissioning and structural stability certification of the PEB shall be carried out by the execution Contractor. The Consultant shall coordinate the architectural planning, DBR, foundation interface, external services and tender provisions with the EXECUTION design.
15(j) Planning, design and preparation of drawings for all external infrastructure including internal roads, pavements, parking areas, storm water drainage, sewerage network, water supply system, fire fighting network, electrical distribution system, street lighting, landscaping, rainwater harvesting, utility corridors, boundary wall, gates, signage and all connected civil infrastructure.
16The consultancy shall include complete Architectural, Structural, Building & Roads, Electrical, Mechanical, and Plumbing, Fire Protection, Swimming Pool Hydraulic, Filtration Plant and. The Consultant shall carry out complete hydraulic modelling of the swimming pool circulation and filtration system, including turnover period calculations, hydraulic network analysis, pump head calculations, pipe sizing, balancing tank sizing, filtration rate calculations, overflow gutter design, inlet and outlet design, backwash system, water balance calculations, equipment sizing, Piping & Instrumentation Diagrams (P&ID), PLC/SCADA-based automation and control philosophy, chemical dosing system, underwater lighting control, instrumentation and preparation of detailed drawings, BOQs and technical specifications.
17The Consultant shall prepare complete Electrical, Mechanical and Plumbing (MEP) designs including HT/LT distribution, substation, internal and external electrification, street lighting, earthing, lightning protection, power distribution, pump house, filtration plant, plumbing, water supply, drainage, instrumentation, automation, PLC-based control system, electrical load calculations, single line diagrams, equipment layouts, control panel drawings, technical specifications, BOQs, detailed estimates and construction-stage engineering support.
18The consultancy shall further include preparation of Design Basis Reports (DBR), structural design calculations, preparation of Good for Construction (GFC) drawings, detailed estimates based on the latest MES Schedule of Rates (SSR)/DSR and prevailing market rates, preparation of BOQs, yardsticks, market rate analysis, technical specifications, draft tender documents, approved makes list, quantity take-offs and value engineering recommendations. The consultancy shall further include preparation and Architectural Visualisation and Presentation Documents for the entire project. The Consultant shall prepare detailed 3D digital models, high-resolution photorealistic rendered views (interior and exterior), day and night perspectives, master plan bird's-eye views, and animated walkthrough presentations of minimum five (05) minutes duration covering all major buildings, structures and external development works. The Consultant shall also prepare and submit one physical 3D architectural model of the complete project at an appropriate scale (not exceeding 1:100) showing all proposed buildings, Water Work-Up Station, Change Room Complex, Filtration Plant Building, Substation Building, RCC Balancing Tank, RCC Underground Sump, PEB Warehouse, stepped seating gallery, internal roads, parking areas, landscaping, boundary wall, entrance gates, utility corridors and all major external infrastructure. The 3D models and presentation documents shall be used for concept approval, design review and technical presentations before the User, AGE, GE, CWE, HQ CE (Navy) Mumbai and other approving authorities.
19The Consultant shall revise the 3D models, rendered views, physical model and walkthrough presentations as required until final approval is obtained, without any additional financial implication to the Government. All designs shall conform to the latest BIS Codes, NBC-2026, MES Specifications, Engineer-in-Chief Technical Instructions, CPHEEO Manual, CFEES Guidelines and relevant statutory provisions. Design parameters such as Wind Speed, Seismic Zone, Importance Factor, Soil Parameters, Loading Criteria, Exposure Category, Fire Design Criteria, Hydraulic Criteria and Electrical Design Criteria shall be established through approved Design Basis Reports (DBR).
20The Consultant shall coordinate with the User, AGE, GE, CWE, CE, HQ CE (Navy) Mumbai, Director E2 (Planning), Director E2 (Design), Director E3, Director E4, Director E6, Director E8, IIT/NIT (where proof checking is required) and all statutory authorities. The Consultant shall attend all site visits, meetings, design presentations and technical discussions and shall revise drawings, reports, estimates and tender documents any number of times as required until final approval is obtained without any additional financial implication to the Government. Please Enable Macros to View BoQ information
21The Consultant shall coordinate with the User, AGE, GE, CWE, CE, HQ CE (Navy) Mumbai, Director E2 (Planning), Director E2 (Design), Director E3, Director E4, Director E6, Director E8, IIT/NIT (where proof checking is required) and all statutory authorities. The Consultant shall attend all site visits, meetings, design presentations and technical discussions and shall revise drawings, reports, estimates and tender documents any number of times as required until final approval is obtained without any additional financial implication to the Government. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56467161
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 14.95 Lakhs
LAST DATE 04-08-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Consultancy Services, Comprehensive Design And Project Management Upto Completion Of Entire Project For Provision Of 50 Mtr Water Work-Up Station For At installation Mandovi, Goa.
Basic Detail
Tender No 86135
Bidding Type Tender
Location
City goa
State Goa
Key Dates
Publish Date 14 Jul 2026
Submission Date 04 Aug 2026
Open Date 06 Aug 2026
Finance
Tender Value 14.95 Lakhs
Tender Fee 500
EMD 30000
Exemption Available
Document List
86135Tender.pdf
99fc06ef-e3b8-4075-a27e-9af48fd13588.html
BOQ_871924.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Aug 06, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
pdf

86135Tender.pdf

html

99fc06ef-e3b8-4075-a27e-9af48fd13588.html

xls

BOQ_871924.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders