Bids Are invited for Facility Management Services - Lumpsum Based - Industrial; Biennial Rate Contract To Carry Out Miscellaneous Cleaning Jobs During Plant Shutdown In Various Plants Of Rcf Trombay Unit For The Period Of Two Years; Consumables To Be
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - Industrial; Biennial Rate Contract To Carry Out Miscellaneous Cleaning Jobs During Plant Shutdown In Various Plants Of Rcf Trombay Unit For The Period Of Two Years; Consumables To Be Provided By Service .. - Mp Nitric Acid Plant (Mpna) : Cleaning Of Turbo Compressor Lube Oil Console (K01). , Mpna Plant :Cleaning Of Turbo Compressor Lube Oil Over Head Tank (K01) , Mpna: Removal & Recharging Of Rashing Rings In R01 , Mpna Plant: Assisting In Removing Old And Installing New Of Catalyst Gauze And Catchment Gauze , Mpna Plant :Cleaning/Charging Of Sand From Filter In Cooling Water System , Mpna Plant :Inst. Air Dryer Alumina Adsorbent Replacement Into Absorbers. , Mpna Plant :Cleaning Or Washing Of Acid Storage Tank Walls With Dm Water For Internal Inspection Job , Mpna: Removal & Recharging Of Catalyst In R01 , Mpna Plant :Opening And Closing Of Vam Machine End Cover For Tube Cleaning Cooling Water Side (Scaffolding In Partys Scope) , Mpna Plant :Opening And Closing Of Vam Machine End Cover For Tube Cleaning Chilled Water Side (Scaffolding In Partys Scope) , Mpna Plant :Cleaning / Replacement Of 1St Stage Air Filter Segment Along With Bird Catcher , Mpna Plant :Cleaning / Replacement Of 2Nd Stage Air Filter Element , Mpna Plant :Replacement Of 3Rd Stage Air Suction Filter , Hp Nitric Acid Plant(Hpna):Cleaning Of 12K001 Lo Console , Hpna Plant:Cleaning / Replacement Of 1St Stage Air Filter Element , Hpna Plant:Cleaning / Replacement Of 2Nd Stage Air Filter Element , Hpna Plant:Replacment Of 3Rd Stage Air Suction Filters , Hpna Plant:Removal & Recharging Of Sand In Side Stream Filter , Removal & Recharging Of Rashing Rings In R002 , Hpna Plant: Assisting In Removing Old And Installing New Of Catalyst Gauze And Catchment Gauze , Hpna Plant :Cleaning Or Washing Of Acid Storage Tank Walls With Dm Water For Internal Inspection Job , Urea Plant:Cleaning Of Tanks Viz. V601 & Me621 (Capacity 50M3 And 10M3 Resp.) , Urea Plant:Cleaning Of Tanks Viz. V602 & V607 ( Capacity Each 200M3) , Urea Plant:Cleaning Of Tanks Viz. V603 & V606 ( Capacity Each 100M3 And 30M3 Resp.) , Urea Plant:Polymer Cleaning Job Of Second Vacum Spearator (Mv -605) , Shifting Of Abc Sweeping From Dryer Area Per Mt ( Rate To Be Qoutaed Per Mt) , Abc Plant: Cleaning Of Drain Tank (Sr-5) , Abc Plant: Cleaning Of Mother Liquor Tank (Sr-3A) , Abc Plant: Cleaning Of Effluent Recovery Tank (Sr-12) , Abc Plant: Cleaning Of Effluent Recovery Tank (Sr-13) , Abc Plant: Cleaning Of Drain Recovery Tank (Sr-14) , Abc Plant: Cleaning Of Drain Recovery Tank (Sr-15) , Ammonia-I Plant: Cleaning Of Primary Reformer Convection Zone Including Opening & Boxing Up 10 Nos. Of Manhole Covers (Cleaning Dust Deposits On Heat Recovery Coils). , Ammonia –I Plant Psa Unit Psa Tower Material Replacement (North & South) (02 Nos.) , Ammonia –I Plant Psa Unit Psa Tower Need Base Material Top Up (North & South) (02 Nos.) , Ammonia-I Plant: Cleaning Of Cooling Water Sand Filter (East /West) Material Replacement (Sand Qty = 9 Mt Each) , Ammonia-I Plant:Mdea A/C Filter Material Replacement , Ammonia-I: Instrument Air Dryer Silica Gel / Material Replacement: Gem Air Drier ( North & South) , Ammonia-I: Instrument Air Dryer Silica Gel / Material Replacement: Ammonia Storage Area Air Drier Material Replacement , Anp Plant: A N Storage Tranks (Dilute And Conc.) Cleaning , Anp Plant: Tail Gas Scrubber Sump Cleaning , Anp Plant: Molten Sulphur Tank (Rates Per Mt Of Sulphur Sludge) , Anp Plant:Pn-2 Tank , Anp Plant:Prescrubber Tank , Anp Plant:Cn Reactor Can Tanks , Anp Plant:Filler/Map Bins , Anp Plant:Instrument Air Adsorber Silica Gel Removal And Replacement , Nsgp Plant:Screening / Replacing Of Sillica Gel In Air Dryers , Nsgp Plant:Motor Driven Feed Pump Oil Tank Cleaning In Boiler Auxillary Section , Nsgp:98% Sulphuric Acid Tank Cleaning. , Cleaning Of Blowdown Pit Of Gtg-Hrsg , Ammonia-V Plant:Replacement Of Sand From Filters In Cooling Water System , Etp: Cleaning Of Milk Of Lime(Mol) Tank , Etp: Reaction Tank (Rt-1 & Rt-2) , Etp Plant:Clear Water Sump (Ws) , Etp Plant:Ph Correction Tank , Etp Plant:Polishing Tank , Etp Plant:Holding Tank (Ht) , Etp Plant:Nitrification Clarifier , Etp Plant:Clarifloculator-1 , Etp Plant:Clarifloculator-2
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | MP Nitric Acid Plant (MPNA) : Cleaning of Turbo Compressor Lube Oil Console (K01). | MP Nitric Acid Plant (MPNA) : Cleaning of Turbo Compressor Lube Oil Console (K01). |
| 2 | MPNA Plant :Cleaning of Turbo Compressor Lube Oil Over Head Tank (K01) | MPNA Plant :Cleaning of Turbo Compressor Lube Oil Over Head Tank (K01) |
| 3 | MPNA: Removal & Recharging of Rashing rings in R01 | MPNA: Removal & Recharging of Rashing rings in R01 |
| 4 | MPNA Plant: Assisting in removing old and installing new of catalyst gauze and catchment gauze | MPNA Plant: Assisting in removing old and installing new of catalyst gauze and catchment gauze |
| 5 | MPNA Plant :Cleaning/charging of sand from filter in cooling Water system | MPNA Plant :Cleaning/charging of sand from filter in cooling Water system |
| 6 | MPNA Plant :Inst. Air Dryer alumina adsorbent Replacement into Absorbers. | MPNA Plant :Inst. Air Dryer alumina adsorbent Replacement into Absorbers. |
| 7 | MPNA Plant :Cleaning or washing of acid storage tank walls with DM Water for internal inspection Job | MPNA Plant :Cleaning or washing of acid storage tank walls with DM Water for internal inspection Job |
| 8 | MPNA: Removal & Recharging of Catalyst in R01 | MPNA: Removal & Recharging of Catalyst in R01 |
| 9 | MPNA Plant :Opening and closing of VAM machine end cover for tube cleaning Cooling water side (Scaffolding in partys scope) | MPNA Plant :Opening and closing of VAM machine end cover for tube cleaning Cooling water side (Scaffolding in partys scope) |
| 10 | MPNA Plant :Opening and closing of VAM machine end cover for tube cleaning Chilled water side (Scaffolding in partys scope) | MPNA Plant :Opening and closing of VAM machine end cover for tube cleaning Chilled water side (Scaffolding in partys scope) |
| 11 | MPNA Plant :Cleaning / Replacement of 1st stage air filter segment along with bird catcher | MPNA Plant :Cleaning / Replacement of 1st stage air filter segment along with bird catcher |
| 12 | MPNA Plant :Cleaning / Replacement of 2nd stage air filter element | MPNA Plant :Cleaning / Replacement of 2nd stage air filter element |
| 13 | MPNA Plant :Replacement of 3rd Stage Air Suction Filter | MPNA Plant :Replacement of 3rd Stage Air Suction Filter |
| 14 | HP NITRIC ACID PLANT(HPNA):Cleaning of 12K001 LO Console | HP NITRIC ACID PLANT(HPNA):Cleaning of 12K001 LO Console |
| 15 | HPNA PLANT:Cleaning / Replacement of 1st stage air filter element | HPNA PLANT:Cleaning / Replacement of 1st stage air filter element |
| 16 | HPNA PLANT:Cleaning / Replacement of 2nd stage air filter element | HPNA PLANT:Cleaning / Replacement of 2nd stage air filter element |
| 17 | HPNA PLANT:Replacment of 3rd stage air suction filters | HPNA PLANT:Replacment of 3rd stage air suction filters |
| 18 | HPNA PLANT:Removal & recharging of sand in side stream filter | HPNA PLANT:Removal & recharging of sand in side stream filter |
| 19 | Removal & Recharging of Rashing rings in R002 | Removal & Recharging of Rashing rings in R002 |
| 20 | HPNA Plant: Assisting in removing old and installing new of catalyst gauze and catchment gauze | HPNA Plant: Assisting in removing old and installing new of catalyst gauze and catchment gauze |
| 21 | HPNA Plant :Cleaning or washing of acid storage tank walls with DM Water for internal inspection Job | HPNA Plant :Cleaning or washing of acid storage tank walls with DM Water for internal inspection Job |
| 22 | UREA PLANT:Cleaning of tanks viz. V601 & ME621 (Capacity 50m3 and 10m3 resp.) | UREA PLANT:Cleaning of tanks viz. V601 & ME621 (Capacity 50m3 and 10m3 resp.) |
| 23 | UREA PLANT:Cleaning of tanks viz. V602 & V607 ( Capacity each 200m3) | UREA PLANT:Cleaning of tanks viz. V602 & V607 ( Capacity each 200m3) |
| 24 | UREA PLANT:Cleaning of tanks viz. V603 & V606 ( Capacity each 100m3 and 30m3 resp.) | UREA PLANT:Cleaning of tanks viz. V603 & V606 ( Capacity each 100m3 and 30m3 resp.) |
| 25 | UREA PLANT:Polymer cleaning job of second vacum spearator (MV -605) | UREA PLANT:Polymer cleaning job of second vacum spearator (MV -605) |
| 26 | Shifting of ABC sweeping from dryer area per MT ( rate to be qoutaed per MT) | Shifting of ABC sweeping from dryer area per MT ( rate to be qoutaed per MT) |
| 27 | ABC Plant: Cleaning of drain tank (SR-5) | ABC Plant: Cleaning of drain tank (SR-5) |
| 28 | ABC Plant: Cleaning of Mother Liquor Tank (SR-3A) | ABC Plant: Cleaning of Mother Liquor Tank (SR-3A) |
| 29 | ABC Plant: Cleaning of Effluent recovery tank (SR-12) | ABC Plant: Cleaning of Effluent recovery tank (SR-12) |
| 30 | ABC Plant: Cleaning of Effluent recovery tank (SR-13) | ABC Plant: Cleaning of Effluent recovery tank (SR-13) |
| 31 | ABC Plant: Cleaning of drain recovery tank (SR-14) | ABC Plant: Cleaning of drain recovery tank (SR-14) |
| 32 | ABC Plant: Cleaning of drain recovery tank (SR-15) | ABC Plant: Cleaning of drain recovery tank (SR-15) |
| 33 | Ammonia-I plant: Cleaning of primary reformer convection zone including opening & boxing up 10 Nos. of manhole covers (cleaning dust deposits on heat recovery coils). | Ammonia-I plant: Cleaning of primary reformer convection zone including opening & boxing up 10 Nos. of manhole covers (cleaning dust deposits on heat recovery coils). |
| 34 | Ammonia –I plant PSA unit PSA TOWER MATERIAL REPLACEMENT (North & South) (02 nos.) | Ammonia –I plant PSA unit PSA TOWER MATERIAL REPLACEMENT (North & South) (02 nos.) |
| 35 | Ammonia –I plant PSA unit PSA TOWER need base material top up (North & South) (02 nos.) | Ammonia –I plant PSA unit PSA TOWER need base material top up (North & South) (02 nos.) |
| 36 | Ammonia-I plant: Cleaning of Cooling Water Sand Filter (East /West) material replacement (Sand Qty = 9 MT each) | Ammonia-I plant: Cleaning of Cooling Water Sand Filter (East /West) material replacement (Sand Qty = 9 MT each) |
| 37 | Ammonia-I plant:MDEA A/C Filter material Replacement | Ammonia-I plant:MDEA A/C Filter material Replacement |
| 38 | Ammonia-I: INSTRUMENT AIR DRYER SILICA GEL / MATERIAL REPLACEMENT: GEM AIR DRIER ( North & South) | Ammonia-I: INSTRUMENT AIR DRYER SILICA GEL / MATERIAL REPLACEMENT: GEM AIR DRIER ( North & South) |
| 39 | Ammonia-I: INSTRUMENT AIR DRYER SILICA GEL / MATERIAL REPLACEMENT: Ammonia Storage Area Air Drier material Replacement | Ammonia-I: INSTRUMENT AIR DRYER SILICA GEL / MATERIAL REPLACEMENT: Ammonia Storage Area Air Drier material Replacement |
| 40 | ANP PLANT: A N Storage tranks (dilute and conc.) Cleaning | ANP PLANT: A N Storage tranks (dilute and conc.) Cleaning |
| 41 | ANP PLANT: Tail gas scrubber sump cleaning | ANP PLANT: Tail gas scrubber sump cleaning |
| 42 | ANP PLANT: Molten sulphur Tank (rates per MT of Sulphur Sludge) | ANP PLANT: Molten sulphur Tank (rates per MT of Sulphur Sludge) |
| 43 | ANP PLANT:PN-2 Tank | ANP PLANT:PN-2 Tank |
| 44 | ANP PLANT:Prescrubber tank | ANP PLANT:Prescrubber tank |
| 45 | ANP PLANT:CN reactor CAN tanks | ANP PLANT:CN reactor CAN tanks |
| 46 | ANP PLANT:Filler/MAP bins | ANP PLANT:Filler/MAP bins |
| 47 | ANP PLANT:Instrument air adsorber silica gel removal and replacement | ANP PLANT:Instrument air adsorber silica gel removal and replacement |
| 48 | NSGP Plant:Screening / replacing of Sillica gel in air dryers | NSGP Plant:Screening / replacing of Sillica gel in air dryers |
| 49 | NSGP Plant:Motor driven feed pump oil tank cleaning in boiler auxillary section | NSGP Plant:Motor driven feed pump oil tank cleaning in boiler auxillary section |
| 50 | NSGP:98% sulphuric acid tank cleaning. | NSGP:98% sulphuric acid tank cleaning. |
| 51 | Cleaning of Blowdown Pit of GTG-HRSG | Cleaning of Blowdown Pit of GTG-HRSG |
| 52 | Ammonia-V plant:Replacement of Sand from Filters in Cooling Water System | Ammonia-V plant:Replacement of Sand from Filters in Cooling Water System |
| 53 | ETP: Cleaning of Milk of lime(MOL) tank | ETP: Cleaning of Milk of lime(MOL) tank |
| 54 | ETP: Reaction tank (RT-1 & RT-2) | ETP: Reaction tank (RT-1 & RT-2) |
| 55 | ETP Plant:Clear water sump (WS) | ETP Plant:Clear water sump (WS) |
| 56 | ETP Plant:PH correction tank | ETP Plant:PH correction tank |
| 57 | ETP Plant:Polishing tank | ETP Plant:Polishing tank |
| 58 | ETP Plant:Holding tank (HT) | ETP Plant:Holding tank (HT) |
| 59 | ETP Plant:Nitrification Clarifier | ETP Plant:Nitrification Clarifier |
| 60 | ETP Plant:Clarifloculator-1 | ETP Plant:Clarifloculator-1 |
| 61 | ETP Plant:Clarifloculator-2 | ETP Plant:Clarifloculator-2 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender