Bids Are invited for Sitc And Camc Of 40 Kva N Plus 1 Modular Ups At Lucknow Airport
Tender Overview
Project Description
Bids Are invited for Sitc And Camc Of 40 Kva N Plus 1 Modular Ups At Lucknow Airport 40 Kva Modular Ups - Three Phase Input And Three Phase Output , Battery Bank - Battery Bank For Ups With 30 Mins Backup , Battery Rack - Battery Rack Of Standard Quality With Trolley And Top Cover , Battery Monitoring System - Supply Of Independent Battery Monitoring System As Per Technical Specifications , Isolation Transformer - 50Kva Or Better 3 Phase K 13 Isolation Transformer , Static Transfer Switch , Spd At Input - Surge Protection Device At Input Of Ups , Spd At Output - Surge Protection Device At Output Of Ups , 4 Core Power Cable , Mccb 100A - 4 Pole Mccb Rating 100A With Individual Db Boxes For Ups Input , Mccb 63A With D Boxes - Mcb Power Distribution Panel With 4 Pole Mcb 63A With Db Boxes , Cat 6 Network Copper Cable - Cat6 Network Copper Cable 04 Pair 23 Gauge Or Better For Monitoring Of Ups In Which One Bundle Of 305 Mtr Approx , Pvc Conduit - Pvc Conduit Pipe 1.6 Mm Thickness Or Better And 32 Mm Diameter Or Better With Tee And Jointer As Per Technical Specs , Cable Tray , Installation Testing And Commissioning - Including Complete Wiring I.E Wiring Of All Ups I.E From Input Db To Ups And Ups To Output Db And Output Db To Termination Db I.E At The Input Of Equipments Including All Required Accessories , Camc 1St Year - Camc Of 1St Year At The Rate Of 3.0 Percent Of Sitc Cost , Camc 2Nd Year - Camc Of 2Nd Year At The Rate Of 3.5 Percent Of Sitc Cost , Camc 3Rd Year - Camc Of 3Rd Year At The Rate Of 4.0 Percent Of Sitc Cost , Camc 4Th Year - Camc Of 4Th Year At The Rate Of 4.5 Percent Of Sitc Cost , Camc 5Th Year - Camc Of 5Th Year At The Rate Of 5.0 Percent Of Sitc Cost , Camc 6Th Year - Camc Of 6Th Year At The Rate Of 5.5 Percent Of Sitc Cost , Camc 7Th Year - Camc Of 7Th Year At The Rate Of 6.0 Percent Of Sitc Cost , Camc 8Th Year - Camc Of 8Th Year At The Rate Of 6.5 Percent Of Sitc Cost Total Quantity : 348
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | 40 KVA Modular UPS | Three phase Input and Three phase Output |
| 2 | Battery Bank | Battery Bank for UPS with 30 mins Backup |
| 3 | Battery Rack | Battery Rack of Standard Quality with trolley and Top Cover |
| 4 | Battery Monitoring System | Supply of Independent Battery Monitoring System as per Technical Specifications |
| 5 | Isolation Transformer | 50KVA or better 3 Phase K 13 Isolation Transformer |
| 6 | Static transfer Switch | Static transfer Switch as per Tech Specs |
| 7 | SPD at Input | Surge Protection Device at Input of UPS |
| 8 | SPD at Output | Surge Protection Device at Output of UPS |
| 9 | 4 Core Power Cable | 4 Core Power Cable with each core of 35 sq mm as per Technical Specs |
| 10 | MCCB 100A | 4 Pole MCCB rating 100A with individual DB boxes for UPS input |
| 11 | MCCB 63A with D boxes | MCB power distribution panel with 4 Pole MCB 63A with DB boxes |
| 12 | CAT 6 Network copper cable | CAT6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS in which One Bundle of 305 Mtr approx |
| 13 | PVC Conduit | PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer as per Technical Specs |
| 14 | Cable Tray | As per Technical Specs |
| 15 | Installation Testing and Commissioning | Including Complete Wiring i.e wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories |
| 16 | CAMC 1st Year | CAMC of 1st year at the rate of 3.0 percent of SITC Cost |
| 17 | CAMC 2nd Year | CAMC of 2nd year at the rate of 3.5 percent of SITC Cost |
| 18 | CAMC 3rd Year | CAMC of 3rd year at the rate of 4.0 percent of SITC Cost |
| 19 | CAMC 4th Year | CAMC of 4th year at the rate of 4.5 percent of SITC Cost |
| 20 | CAMC 5th Year | CAMC of 5th year at the rate of 5.0 percent of SITC Cost |
| 21 | CAMC 6th Year | CAMC of 6th year at the rate of 5.5 percent of SITC Cost |
| 22 | CAMC 7th Year | CAMC of 7th year at the rate of 6.0 percent of SITC Cost |
| 23 | CAMC 8th Year | CAMC of 8th year at the rate of 6.5 percent of SITC Cost |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender