Tender For Rmf-Construction Of Side Protection Wall On The Right Bank Of Chaliyar River Upstream Of Maithrakkadavu Bridge In Ward No.12 Of Urangattiri Panchayath In Malappuram District.-Side Protection Work-General Civil Work
Tender Overview
Project Description
Tender for Rmf-Construction Of Side Protection Wall On The Right Bank Of Chaliyar River Upstream Of Maithrakkadavu Bridge In Ward No.12 Of Urangattiri Panchayath In Malappuram District.-Side Protection Work-General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | Side protection work |
| 2 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 3 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 4 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 5 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 7 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 8 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 9 | OD21002/2025-2026:Planting herbs and shrubs species (medicinal plants) on the top of river bank in two rows at an average spacing of 2m c/c along the length of protection work including clearing light jungle along the river bank for an average width of 2m digging pits of size 30x30x30 cm in ordinary soil after rain transportation of seedling in gunny bags (size 35x24) to planting site covering pits digging plant holes and planting seedlings supplying and fitting temporary tree guards using bamboo for protection of seedling including cost of seedling etc. complete. |
| 10 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 11 | OD52298/2025-2026:Supplying and fixing boundary stone with RCC 1:1.5:3 pillar block having a size of30*30*75 cm, steel reinforcement for RCC work, etc complete, fixed in CC1:3:6 using 40 mmmetal 55*55*60 m etc complete and centering and shuttering including strutting , propping andremoval of form work for pillar and foundation |
| 12 | OD54669/2025-2026:Filling with Quarry Muck Filling up low lying andwater logged areas with quarry muck, spreading inlayers, leveling the top at site and consolidation bysmooth wheeled roller, etc complete for improving theCBR value of subgrade.Details of cost for 300 cum |
| 13 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 14 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes |
| 15 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender