Defence Statutory Bodies & Commissions/Committees Closing in 5 days TDR #56455188

Tender For Repairs/Replacement Of Ht Ug Cables, Lt Ug Cables, Lt Panels, Etc Under Ge(I) R&D Rci, Hyderabad

Issued by Statutory Bodies & Commissions/Committees · Ranga Reddy, Telangana
Tender Value
48 Lakhs
Estimated cost
Bid Submission
04 Aug 2026
5 days left
EMD
96000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ranga Reddy → Telangana
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Repairs/Replacement Of Ht Ug Cables, Lt Ug Cables, Lt Panels, Etc Under Ge(I) R&D Rci, Hyderabad

BOQ

Name of Work:- REPAIRS/REPLACEMENT OF HT UG CABLES, LT UG CABLES, LT PANELS, ETC UNDER GE(I) R&D RCI, HYDERABAD
Sl. No. Item Description
1=B2& \\" BoQ\\" BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: GE(I) R&D RCI HYDERABAD Name of Work: REPAIRS/REPLACEMENT OF HT UG CABLES, LT UG CABLES, LT PANELS, ETC UNDER GE(I) R&D RCI, HYDERABAD Contract No: GE(I) RCI/HYD/ OF 2026-2027 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SlNo. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Basic Rate In Figures To be entered by the Bidder Rs. Ps. Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e. DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit, if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes Total Amount With Taxes Total Amount In Words
2Disconnecting and cutting down the existing unserviceable /burnt out HT cable end joints, outdoor type (Heat shrinkable) 11kV grade suitable for XLPE cables of size 120 Sqmm,3 core and supply and jointing new HT cable end joint of size 120 Sqmm, 3 core, outdoor type (Heat shrinkable) including testing complete all as specified and directed. Make : RAYCHEM/M-SEAL/3M/DENSON
3Disconnecting and cutting down the existing unserviceable /burnt out HT cable end joints, outdoor type (Heat shrinkable) 11kV grade suitable for XLPE cables of size 95 Sqmm,3 core and supply and jointing new HT cable end joint of size 95 Sqmm, 3 core, outdoor type (Heat shrinkable) including testing complete all as specified and directed. Make : RAYCHEM/M-SEAL/3M/DENSON
4Checking of APFC panels / capcitors bank panels, carrying out necessary servicing, cleaning of the switch gears, busbars with CTC and removing the carbon deposits, checking of the connections, functioning the components such as capacitors, contactors, switch gears etc ,disconnecting and removing burnt out cable end portions, crimping with new suitable lugs of the same size, removing burnt out thyristors, reconnecting and testing complete for maintaining efficient power factor at the Sub station all as directed.
5Taking down the unserviceable power factor capacitors of different capacities from the capacitor panel board after disconnecting the electric supply, Supply and fixing of power factor correction capacitors, All Poly Propelene (APP) Box type, rectangular in shape, heavy duty, with over current withstand capability 3 x In, operating losses 0.35 W/kVAr, peak inrush current withstand capability 500 x In, number of switching operations per year : 20000, maximum ambient temperature 70 degree celcious, minimum operating life 300000 hours, various KVAR rating, 440 V, with suitable fixing arrangement including connection with suitable copper cables and testing complete all as specified and directed.Note : (i) Capacitors shall conform to IEC 831-1, with total losses not more than 0.25W / KVAR.(ii) Copper cables, thimbles will be measured and paid for seperately under respective items.Make : Cat No LTXL (Box series : LTBCU) of make L&T or equivalent model
6All as per Sl Item No 4 above but cylindrical type (LT CCU).
7Dismantling unserviceable power factor control relay (APFC) 12 step, from the power factor capacitor panel boards, supply and fix power factor control relay (APFC) 12 step including necessary electric connections and testing complete all as specified and directed. Make : L&T/HPL/Neptune
8All as per Sl Item No 6 above but 8 step relay
9All as per Sl Item No 6 above but 4 step relay
10Supply and fix 4 pole 800 Amps, 50KA ruppturing capacity MCCBs with adjustable thermal and magnetic settings, 50 Hz at 415 volt, conforming to IEC -60947-II/ IS-13947-II including provision of copper cable / extended terminals of suitable ratings from MCCBs to busbar and connection of LT cables with MCCBs with suitable size aluminium lugs complete all as specified and directed for maintaining the APFC panels. Make : Havells / Schneider / Standard / GEC / Legrand / L&T
11All as per Sl Item No 9 above, but 250 Amps, 36 KA capacity
12All as per Sl Item No 9 above, but 125 Amps, 10 KA capacity
13All as per Sl Item No 9 above, but for 63 to 100 Amps, 10 KA capacity
14Supply and fix 3 pole 63 Amps, 10 KA ruppturing capacity MCBs, 50 Hz, conforming to IEC -60947-II/ IS/IEC-60898 complete all as specified and directed for maintaining the APFC panels. Make : Havell's / Schneider / Standard / GEC / Legrand / L&T
15All as per Sl Item No 13 above, but SP, 2 Amps capacity
16Disconnecting and removing of the unserviceable switch fuse unit (SFU) 63 Amps front operated from the existing position, supply and fixing new switch fuse unit (SFU) 63 Amps with HRC fuse links of 63 Amps all as directed . Make : Havell's / Schneider / Standard / GEC / Legrand / L&T
17Disconnecting and removing of the unserviceable CT, Ratio 150/5 A (ID 75 mm) from the existing position, supply and fixing new CT, Ratio 150/5 A (ID 75 mm) all as specified and directed by Engr-in-Charge. Make : Havell's / Schneider / Standard / GEC / Legrand / L&T
18Disconnecting and removing of the unserviceable 200 Amps HRC DIN type fuse link size 1 from the existing position, supply and fixing new 200 Amps HRC DIN type fuse link size 1 all as specified and directed by Engr-in-Charge. Make : Havell's / Schneider / Standard / GEC / Legrand / L&T
19All as per Sl Item No 17 above, but for 16 - 32 Amps HRC bolted fuse link size A 2
20All as per Sl Item No 17 above, but for 63 Amps HRC bolted fuse link size A 3
21All as per Sl Item No 17 above, but for 63 - 100 Amps fuse link size 00
22All as per Sl Item No 17 above, but for 125 Amps fuse link size 00
23All as per Sl Item No 17 above, but for 63 Amps cylindrical type fuse link size 14x51
24All as per Sl Item No 17 above, but for 20 Amps HRC fuse base
25Dismantling unserviceable/ burnt electric cables connected with capacitors, supply and replacement following size PVC insulated, unsheathed, single core industrial copper cable (flexible), 2.5 / 4.0 / 6.0 / 10 / 25 / 35 Sqmm, 1100 Volt grade, conforming to IS : 694, ISI marked, matching with the existing size, provision of suitable copper lugs, bolts, nuts, washers etc. complete including electric connections and testing complete all as specified and directed.Make : Havells / Plaza / Finolex / Legrand.
26Dismantling unserviceable push buttons (start/stop button) from the power factor capacitor panel boards after disconnecting the power supply, supply and fix push buttons with 1 No + 1 NC, screw type for operation of capacitors all as per sample available at sub stations including necessary electric connections and testing complete all as specified and directed.
27Opening of LT panel board, disconnecting and removing of the burnt out cable end terminations, cutting and reterminating of the cable end portions with proper size of lugs and decarbonising of panel busbar and cleaning with CTC, replacing of cable glands, connecting back cable end termination properly, opening of the busbar chambers, cutting removing of the cable connections, reterminating with proper size of lugs, tightening of the bus bar nuts, bolts including wrapping of the busbar with colour codes, checking of all switches, MCCBs all isolators, tightening of the loose connections replacing of burnt out fuse, cut out fuses with new ones complete all as directed by Engineer-in-Charge.
28Dismantling unserviceable/ burnt thyristors / power contactors from the power factor capacitor panel boards after disconnecting the electric supply, supply and fix capacitor duty contactors suitable for following ratings of capacitors including necessary electric connections and testing complete all as specified and directed. Make : L&T / HPL / Neptune / GE / ABB
29Supply MNX 185 power contactor
30Supply MNX 70 power contactor
31Supply MOC 50 power contactor
32Supply MNX 32 power contactor
33Supply MOC 25 power contactor
34Dismantling unserviceable add on block for MNX / MOC series (Right or Left) from the power factor capacitor panel boards after disconnecting the electric supply, supply and fix new Add on block for MNX / MOC series (Right or Left) including necessary electric connections and testing complete all as specified and directed. Make : L&T / HPL / Neptune / GE / ABB
35All as per Sl item No. 28 above but for 2 NO 2 NC
36Taking out unserviceable analoge / digital type single phase ammeter / voltmeter, square type from LT panel boards, supply and fixing single phase analog / digital type ammeter / voltmeter, square type suiitable for three phase supply with suitable capacity CTs including electric connection and testing complete all as specified and directed
37All as per Sl item No. 30 above but three phase
38Taking out unserviceable selector switches from the panel boards, supply and fixing selector switches, 4 position for volt meter and ammeter suitable for three phase supply including necessary electric connection and testing complete all as specified and directed. Make : AE / IMP / KAYCEE / C&S / L&T
39All as per Sl item No. 33 above but for three position selector switch
40All as per Sl item No. 33 above but for 10 Amps Auto Mannual Center Off selector switch
41Taking out unserviceable LED type indicator lamp unit from the panel boards, supply and fixing LED type indicator lamp unit of red/ yellow / blue / green / Amber with bulb including connection and testing complete all as specified and directed. Make : AE / IMP / KAYCEE / C&S / L&T Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56455188
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 48 Lakhs
LAST DATE 04-08-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Repairs/Replacement Of Ht Ug Cables, Lt Ug Cables, Lt Panels, Etc Under Ge(I) R&D Rci, Hyderabad
Basic Detail
Tender No 8444
Bidding Type Tender
Location
City Ranga Reddy
State Telangana
Key Dates
Publish Date 14 Jul 2026
Submission Date 04 Aug 2026
Open Date 06 Aug 2026
Finance
Tender Value 48 Lakhs
Tender Fee 500
EMD 96000
Exemption Available
Document List
8444ps.pdf
BOQ_871768.xls
dc4de4cd-dee1-4134-8693-460d1f6b895c.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Aug 06, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

8444ps.pdf

xls

BOQ_871768.xls

html

dc4de4cd-dee1-4134-8693-460d1f6b895c.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders