Tender For Repair And Maintenance Of Various Types Of Pump Motors, Starter And Its Allied Works, Cleaning Of Overhead Tanks And Underground Sump At K Tee At Fort Area Under Ge K Tee And Repair/Replacement And Maintenance Of External Water Pipelines,
Tender Overview
Project Description
Tender for Repair And Maintenance Of Various Types Of Pump Motors, Starter And Its Allied Works, Cleaning Of Overhead Tanks And Underground Sump At K Tee At Fort Area Under Ge K Tee And Repair/Replacement And Maintenance Of External Water Pipelines, Main Raising Pipelines, Sluice Valve, Pump, Motor, Starter Panel At Certain Unit Under Ge K Tee.
BOQ
| Sl. No. | Item Description |
| 1 | Material and labour for taking up vertical turbine pump set spilt casing type 75 HP/55KW electric driven water cooled 87(LBS) column pipe with shaft 40mtr head from well after disconnection of electrical connection earthing lines and transportation to local workshop for repairs / overhaulling of pump including dismantling the assembly , cleaning all parts of pump assembly thoroughly and finding out the defects segregating the serviceable spare parts for reuse and including machine work, reassembling the pump set after successful repair and lowering to the existing position and refixing and testing complete all as specified and as directed.Note:- Spares as required shall be measure & paid seperately against the relevant items. |
| 2 | Supply and fix Suction pipe strainer for item no. 01 complete all as specified and directed. |
| 3 | Supply and fix suction case bearing for item no. 01 complete all as specified and directed. |
| 4 | Supply and fix suction case sand collar for item no. 01 complete all as specified and directed. |
| 5 | Supply and fix impellar seal ring for item no. 01 complete all as specified and directed. |
| 6 | Supply and fix Impeller holding split ring for item no. 82 complete all as specified and directed. |
| 7 | Supply and fix Impeller key for item no. 01 complete all as specified and directed. |
| 8 | Supply & fix bowl bearing for item no. 01 complete all as specified and directed. |
| 9 | Supply and fix impellar shaft coupling for item no. 01 complete all as specified and directed. |
| 10 | Supply and fix line shaft coupling for item no. 01 complete all as specified and directed. |
| 11 | Supply and fix rubber bearing for item no. 01 complete all as specified and directed. |
| 12 | Supply and fix gland packing - STD for item no. 01 complete all as specified and directed. |
| 13 | Supply and fix gland packing ring for item no. 01 complete all as specified and directed. |
| 14 | Supply and fix nut and bolts of various sizes for item no. 01 complete all as specified and directed. |
| 15 | Material and labour for polishing of existing shaft 9 feet long for item no. 01 complete all as specified and directed. |
| 16 | Taking out of centrifugal horizontal split casing type pump set 40HP from pump foundation (at Swimming pool) after disconnection from motor and transportation to workshop , dismantling the pump for repair/ overhauling including cleaning of all parts of pump assembly throughly, including machine work of pump shaft in order to obtain smooth finish including necessary polishing etc and installing back including helium gasket sheet not less than 1mm thick complete upto to the entire satisfaction of complete all as specified and as directed.(Note:- Spare parts as required shall be measure & paid seperately against the relevant items. |
| 17 | Supply and fix Casing Wear Ring for item no. 16 complete all as specified and directed. |
| 18 | Supply and fix shaft sleeve for item no. 16 complete all as specified and directed. |
| 19 | Supply and fix Inter Stage Ring for item no. 16 complete all as specified and directed. |
| 20 | Supply and fix Ball bearing SKF for item no. 16 complete all as specified and directed. |
| 21 | Supply and fix suitable Ball bearing SKF for item no. 16 complete all as specified and directed. |
| 22 | Supply and fix suitable Bearing cartridge DE for item no. 16 complete all as specified and directed. |
| 23 | Supply and fix suitable Bearing cartridge NDE for item no. 16 complete all as specified and directed. |
| 24 | Supply and fix shaft sleeve Nuts for item no. 16 complete all as specified and directed. |
| 25 | Supply and fix Split Gland for item no. 16 complete all as specified and directed. |
| 26 | Supply and fix Impeller made of brass for item no. 16 complete as per existing size complete all as specified and directed. |
| 27 | Disconnecting non clogging sewage monoblock submersible pumps of 5.0 HP Capacity from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary machine work, assembling, including helium gasket sheet not less than 1mm thick complete, testing in commissoning all as specified and directed.Note:- Spare parts as required shall be measure and paid seperately against the relevant items. |
| 28 | Supply and fix Impeller key for item no. 27 complete all as specified and directed. |
| 29 | Supply and fix Gland Bush Split type for item no. 27 complete all as specified and directed. |
| 30 | Supply and fix Impeller CI complete all as specified and directed. |
| 31 | Supply and fix Ball bearing SKF for item no. 27 complete all as specified and directed. |
| 32 | Supply and fix shaft sleeve for item no. 27 complete all as specified and directed. |
| 33 | Taking out of centrifugal pump set 40HP ( at R line and NCC) pump house from pump foundation after disconnection from motor and transportation to workshop ,dismantling the pump for repair/ overhauling including cleaning of all parts of pump assembly throughly, including machine work of pump shaft inorder to obtain smooth finish including necessary polishing etc and installing back including helium gasket sheet not less than 1mm thick complete upto to the entire satisfaction of Engineer-in -charge complete all as specified and directed Note:- Spares parts as required shall be measure & paid seperately against the relevant items). |
| 34 | Supply and fix Casing Wear Ring for item no. 33 complete all as specified and directed. |
| 35 | Supply and fix shaft sleeve for item no. 33 complete all as specified and directed. |
| 36 | Supply and fix Inter Stage Ring for item no. 33 complete all as specified and directed. |
| 37 | Supply and fix suitable Ball bearing DE for item no. 33 complete all as specified and directed. |
| 38 | Supply and fix suitable Ball bearing NDE for item no. 33 complete all as specified and directed. |
| 39 | Supply and fix suitable Bearing cartridge DE for item no. 33 complete all as specified and directed. |
| 40 | Supply and fix shaft sleeve nuts for item no. 33 complete all as specified and directed. |
| 41 | Supply and fix Split Gland for item no. 33 complete all as specified and directed. |
| 42 | Taking down old unserviceable three pole power contactors from the motor panel board, sypply and fix three pole power contacor of series MNX 70 with NO,NC and add on aux contact block, coils complete all as specified and as directed . |
| 43 | All as per item no 42 herein-before but MNX 50 complete all as specified and as directed . |
| 44 | All as per item no 42 herein-before but MNX 40 complete all as specified and as directed . |
| 45 | All as per item no 42 herein-before but MNX 32 complete all as specified and as directed. |
| 46 | All as per item no 42 herein-before but MNX 25 complete all as specified and as directed. |
| 47 | All as per item no 42 herein-before but MNX 18 complete all as specified and as directed. |
| 48 | Taking down unserviceable power contactor and supply and fix in repair Power Contactor ,250Amps , 3 pole, 230/415V, 50 Hz suitable for 120 HP motors complete all as specified and as directed. |
| 49 | Disconnecting electrically and disengaging the AC Squarrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 120 HP for repair purpose including complete cleaning,rewinding with existing size copper winding wire ,varnishing ,reinsulation and greasing and including shifting back to location as directed, installing, testing and commissioning after repair complete all as specified and directed Note- Rewinding will be measure & paid seperately under relavant item of BOQ |
| 50 | Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 50 HP for repair purpose including complete cleaning,rewinding with existing size copper windind wire,varnishing ,insulation and greasing and including shifting back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. Note- Rewinding will be measure & paid seperately under relavant item of BOQ. |
| 51 | Disconnecting electrically and disengaging the AC induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 20 HP for repair purpose including complete cleaning,rewinding with existing size copper windind wire,varnishing ,insulation and greasing and including shifitng back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. Note- Rewinding will be measure & paid seperately under relavant item of BOQ |
| 52 | Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, 5/7.5HP, capacity motors from respective non clogging centrifugal pumps/open well submersible pumps, other rotating mechanism etc, removing from foundations, dismantling rotor and stator, bearings, cleaning the dust/dirt, overhauling thoroughly including complete, rewinding with existing size copper windind wire, varnishing and reinsulation,greasing, reassembling the motor, mounting on the foundations, coupling with non clogging centrifugal pumps/respective mechanism, making the electrical connections, testing and commissioning complete all as specified and directed.. Note- Rewinding will be measure & paid seperately under relavant item of BOQ |
| 53 | Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, 3HP, 2840 RPM capacity motors from respective non clogging centrifugal pumps/open well submersible pumps, other rotating mechanism etc, removing from foundations, dismantling rotor and stator, bearings, cleaning the dust/dirt, overhauling thoroughly including complete,rewinding with existing size copper windind wire, varnishing and reinsulation,greasing, reassembling the motor, mounting on the foundations, coupling with non clogging centrifugal pumps/respective mechanism, making the electrical connections, testing and commissioning complete all as specified and directed.Note- Rewinding will be measure & paid seperately under relavant item of BOQ |
| 54 | Material and labour for Rewinding the motor of capacity 120hp, 75hp,50 hp, 40hp, 20hp, 15hp, 7.5hp, 5hp, & 3hp with super enamelled copper winding wire with appropriate same gauge of existing coil with similar class of existing insulation as recommended by manufacturer with high quality nomenclature insulating paper applying best quality insulating varnish on stator / rotor windings drying them completely, testing the insulations complete all as specified and directed. |
| 55 | Supply and fix including taking down voltmeter Class-1, digital panel mounting type 96mm x 96mm complete all as specified and directed. |
| 56 | Supply and fix including taking down ammeter Class-1,digital panel mounting type 96mmx96mm complete all as specified and directed. |
| 57 | Supply and fix including taking down SELECTOR SWITCH 10 AMPS for voltmeter/ammeter complete all as specified and directed. |
| 58 | Supply and fix including taking down CT 400/5 amps complete all as specified and directed. |
| 59 | Supply and fix including taking down CT 300/5 amps complete all as specified and directed. |
| 60 | Supply and fix including taking down CT 200/5 amps complete all as specified and directed. |
| 61 | Taking down unservicable existing indicating lamp and supply & fix INDICATING LAMP led type complete all as specified and directed. |
| 62 | Supply and fix in repair pressure gauge dial type 0 to 20 Kg/ square centimeter including taking down complete all as specified and directed. |
| 63 | Taking out unserviceable air break contactor fully automatic, auto transformer starter installed in LT panel board of 120HP centrifugal pump at Independent pump house and supply and fix new air break contactor fully automatic, auto transformer starter with air cooled having 50, 60 & 70% tappings installed in LT panel board of Independent pump house 120HP centrifugal pump as suitable to exising size & capacity complete all as directed and specified. |
| 64 | Material and labour for replacement of unservicable Motor protection circuit breaker Auxiliary contact Top , 1NO + 1NC complete all as specified and directed. |
| 65 | Material and labour for replacement of unservicable Motor protection circuit breaker Auxiliary contact side frame-1 , 1NO + 1NC complete all as specified and directed. |
| 66 | Taking out old unserviceable rubber coupling of 20HP motor / 40 HP / 50 HP / 120 HP motor and supply and fix new rubber coupling of size 110/150mm complete all as specified and directed. |
| 67 | Taking out unserviceable submerssible pump and motor 1.5HP from bore well with the help of chain pully carefully dismantling HDPE pipe and repair and maintenance of pump and rewinding of motor as required and again droping in well after connecting HDPE pipe complete testing all as specified and directed. |
| 68 | Material and labour for replacement of worn out flat PVC insulated 3 core copper conductor of 2.5 Sqmm 1100V grade, 50 Hz for submersible complete all as specified and directed. |
| 69 | Material and labour for replacement of worn out / defective contactor of starter ML-3, 40 Amps, 415 V, 50 Hz, suitable for 120 HP star-delta starter complete all as specified and directed. |
| 70 | Material and labour for replacement of worn out / defective contactor of starter ML-2, 40 Amps, 415 V, 50 Hz, suitable for 120 HP star-delta starter complete all as specified and directed. |
| 71 | Material and labour for replacement of worn out / defective Electronic timer 800 SQ-A ,suitable for 120 HP star -delta starter complete all as specified and directed. |
| 72 | Material and labour for replacement of unserviceable phase sequencer for three phase centrifugal pump of capacity 120H P complete all as specified and directed. |
| 73 | S & Fixing Pressure pump 1 HP, 1.5 KW , 220 V AC 50 Hz complete all as specified and directed. |
| 74 | Supply & Fix in repair cutting of MS pipe mechanical joint collar ,adapter ,socket type complete with jointing materials such as rubber gaskets, nut bolts, & washers but for the MS pipe of 300 mm bore including welding work complete all as specified and directed. |
| 75 | Material and labour for uprooting vegetation, bushes,creepers, weeds ,including trimming of branches of trees touching inside sub stations/pumping station /over head reservoir area, under ground sump area with the help of spade,crowbar,axes or any other tools mannually complete clean all as directed. |
| 76 | Dismantling of valve pit chamber and M&L for Construction of valve pit chamber of size 1200 x 1200 x 1200 mm with 15 Cm thick PCC foundation 1 : 4 : 8 type D2 ( using 40 mm graded stone aggregate) and 15 cm thick hard core 20cm PCC solid block grade D - 5 masonary work built in CM (1:6) 15 mm thick internal & external plastering in CM (1:4), MS sheet cover 6 mm thick including 50 x 50 x 5 mm MS angle frame fixed in coping of PCC 1 : 2:4 type B-1 ( using 20 mm stone aggregate) making hole in valve chamber cover as per sluice valve location in side the valve chamber for insurtion of MS rod of 12 mm dia of 1.5m long along with valve spindle cap properly welded to ms rod with locking arrangement & painting with one coat of red oxide & two coats of black bituminous paint & all as specified & directed including removing of extra soil from site for the following sizes complete all as specified and as directed. |
| 77 | All as per item No 76 but of size 1000 x 1000 x 1000 mm complete all as specified and as directed. |
| 78 | M&L for framed work such as grills, gratings, etc. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165 all as specified and as directed including painting with two coats of synthetic enamel paint/ lead free black bituminous paint as directed over a coat of zinc chrome primer. Complete all as specified and directed. |
| 79 | Materials and labour as in replacement for earthing complete with galvanized steel earth plate electrode 600x600x6mm thick buried directly in ground vertically to a depth not less than 2.25m below ground level with top edge of earth plate not less than 1.5m below ground level connected to galvanized iron earth strip 32 x 6 mm by means of bolts, nuts, check nuts, washers of galvanized iron and connected to main switch/control board upto 7.5m away from the earth electrode including excavation earth work, PCC chamber, RCC cover slab char coal, watering pipe, wire mesh lugs, earth lead protection pipe 40 mm bore, light grade 7.5m long as applicable and as per plate No. 3 of SSR 2009 and all as specified. (a) Excavation and earth work in any type of soil. (b) Drilling of holes in electrode (c) PCC pit in cement concrete (1:2:4) type B-1 (d) 40 mm thick Pre-cast RCC cover with suitable handle. (e) Funnel with watering pipe of GI 20 mm nominal bore ,medium grade & copper lug etc. (f) 40 mm nominal bore medium grade GI protection pipe 7.50 m long for protection of earthing lead. (g) Requisite quantity of charcoal and common salt. (h) Connection to earthing test point and testing on completion. |
| 80 | Supply & Fixing of DOL pump starter suitable for upto 7.5 HP pumpset complete mounting on wall / Panel complete all as specified & directed |
| 81 | Supply & Fixing of star delta starter suitable for 12.5 HP pumpset complete mounting on wall / Panel complete all as specified & directed |
| 82 | Excavation in trenches not exceeding 1.5 Mtr wide and not exceeding 1.5 Mtr deep in soft/loose soil and getting out for taking down/laying Pipe lines of any description and in any position, complete all as specified and as directed. |
| 83 | Returning, filling in, excavated soil including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and as directed. |
| 84 | Removing of surplus soil to a distance not exceeding 50 M and depositing where directed at a level not exceeding 1.5M above the starting point complete all as specified and as directed. |
| 85 | Taking out from trenches, 100 mm bore dia DI pipe lines (including all fittings) with spigot & socket ends with lead joints etc. including taking out from joints complete all as specified and as directed. Note: Earth work & excavation shall be measured & paid for separately |
| 86 | Taking out from trenches, 80 mm bore dia DI pipe lines (including all fittings) with spigot & socket ends with lead joints etc. including taking out from joints complete all as specified and as directed. Note: Earth work & excavation shall be measured & paid for separately |
| 87 | M&L for relaying of old DI pipe 100mm bore dia after clearing and removing all the accumulated sediments from the pipe, jointing the pipe and testing complete including joints, complete all as specified and as directed. [Note: Excavation and earth work shall be measured and paid separately] |
| 88 | M&L for relaying of old DI pipe 80mm bore dia after clearing and removing all the accumulated sediments from the pipe, jointing the pipe and testing complete including joints, complete all as specified and as directed. [Note: Excavation and earth work shall be measured and paid separately] Please Enable Macros to View BoQ information |
| 89 | M&L for relaying of old DI pipe 80mm bore dia after clearing and removing all the accumulated sediments from the pipe, jointing the pipe and testing complete including joints, complete all as specified and as directed. [Note: Excavation and earth work shall be measured and paid separately] Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 22 daysTender Documents