Bids Are invited for Operation And Maintenance Power House / Power Plant - Overhauling Work Of Repairing/Restoration Of Damaged Lighting Point And Its Wiring /Welding Points/Wbbs/Lbbs/Ldbs And To Provide Temporary Welding Supply/Temporary Lighting Ar
Tender Overview
Project Description
Bids Are invited for Operation And Maintenance Power House / Power Plant - Overhauling Work Of Repairing/Restoration Of Damaged Lighting Point And Its Wiring /Welding Points/Wbbs/Lbbs/Ldbs And To Provide Temporary Welding Supply/Temporary Lighting Arrangement During Over.. - Removal Of Old Burnt/ Damaged Cable & Wires Of Conduit Wiring From Conduit At Different Elevation Of Boiler House/Tg Hall And Rewiring Of Different Size Cable / Wires In Conduit As Per Site Requirement Including Re-Fixing Of Conduits Wherever It Is Hanging. , Dismantling Of Old/ Damaged And Unserviceable Triple Pole 63A/100A Main Switch Of Lbb And Installation And Commissioning Of New / Repaired Main Switch Of Different Elevation Of Boiler House, T.G Hall And Esp Area. , Dismantling And Removal Of Old, Damaged And Unserviceable Hanging Type Led Light Fitting Of Different Size And Installation And Commissioning Of New / Repaired 36/120/200/400W Led Hanging Type Light Fitting At Different Elevation Of Boiler House, Esp Area And At -4 M, 0M, 3.5 M, 5.5 M Elevation Of Tg Hall Area. , Removal Of Old Burnt / Damaged Cables & Wires Of Conduit Wiring From Conduit And Re Wiring Of Different Size Cables/ Wires In Conduit Including Re Fixing Of Conduit, Wherever It Is Hanging, At -4.0 M, 0.0 M, 3.5M And 5.5 M Elevation Of T.G Hall Area. , Repairing / Re Fixing Of Junction Boxes By Providing Appropriate Terminal Block And Their Covers, Wherever Missing. , Repairing And Re Commissioning Of Welding Of Door Hinge And Repairing Of Door Lock Wherever It Is Hanging Etc , Repairing Of W.B.B.S / Lbbs Located In Boiler Area / Esp Area / Mini Boiler Area / Turbine Hall Area Including Welding Of Hinges Of Doors, Repairing /Replacement Of Door Lock System, Replacement Of Burnt Aluminium / Copper Bus Bar ,Relugging And Termination Of Cables And Its Re Commissioning. , Repairing Of Ldbs Including Welding Of Hinges Of The Doors, Repairing / Replacement Of Door Lock System, Refixing Of Branch Boards Wherever Hanging, Replacement Of Burnt Fuse Base, Neutral Bus ,Relugging And Termination Of Cables And Its Re Commissioning.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Removal of old burnt/ damaged cable & wires of conduit wiring from conduit at different elevation of boiler house/TG hall and rewiring of different size cable / wires in conduit as per site requirement including re-fixing of conduits wherever it is hanging. | Removal of old burnt/ damaged cable & wires of conduit wiring from conduit at different elevation of boiler house/TG hall and rewiring of different size cable / wires in conduit as per site requirement including re-fixing of conduits wherever it is hanging. |
| 2 | Dismantling of old/ damaged and unserviceable Triple pole 63A/100A main switch of LBB and installation and commissioning of new / repaired main switch of different elevation of boiler house, T.G hall and ESP area. | Dismantling of old/ damaged and unserviceable Triple pole 63A/100A main switch of LBB and installation and commissioning of new / repaired main switch of different elevation of boiler house, T.G hall and ESP area. |
| 3 | Dismantling and removal of old, damaged and unserviceable hanging type LED light fitting of different size and installation and commissioning of new / repaired 36/120/200/400W LED hanging type light fitting at different elevation of boiler house, ESP area and at -4 M, 0M, 3.5 M, 5.5 M elevation of TG hall area. | Dismantling and removal of old, damaged and unserviceable hanging type LED light fitting of different size and installation and commissioning of new / repaired 36/120/200/400W LED hanging type light fitting at different elevation of boiler house, ESP area and at -4 M, 0M, 3.5 M, 5.5 M elevation of TG hall area. |
| 4 | Removal of old burnt / damaged cables & wires of conduit wiring from conduit and re wiring of different size cables/ wires in conduit including re fixing of conduit, wherever it is hanging, at -4.0 M, 0.0 M, 3.5M and 5.5 M elevation of T.G hall area. | Removal of old burnt / damaged cables & wires of conduit wiring from conduit and re wiring of different size cables/ wires in conduit including re fixing of conduit, wherever it is hanging, at -4.0 M, 0.0 M, 3.5M and 5.5 M elevation of T.G hall area. |
| 5 | Repairing / re fixing of Junction Boxes by providing appropriate Terminal Block and their covers, wherever missing. | Repairing / re fixing of Junction Boxes by providing appropriate Terminal Block and their covers, wherever missing. |
| 6 | Repairing and re commissioning of welding of door hinge and repairing of door lock wherever it is hanging etc | Repairing and re commissioning of welding of door hinge and repairing of door lock wherever it is hanging etc |
| 7 | Repairing of W.B.B.s / LBBs located in Boiler area / ESP area / Mini boiler area / Turbine Hall area including welding of hinges of doors, repairing /replacement of door lock system, replacement of burnt aluminium / copper bus bar ,relugging and termination of cables and its re commissioning. | Repairing of W.B.B.s / LBBs located in Boiler area / ESP area / Mini boiler area / Turbine Hall area including welding of hinges of doors, repairing /replacement of door lock system, replacement of burnt aluminium / copper bus bar ,relugging and termination of cables and its re commissioning. |
| 8 | Repairing of LDBs including welding of hinges of the doors, repairing / replacement of door lock system, refixing of branch boards wherever hanging, replacement of burnt fuse base, neutral bus ,relugging and termination of cables and its re commissioning. | Repairing of LDBs including welding of hinges of the doors, repairing / replacement of door lock system, refixing of branch boards wherever hanging, replacement of burnt fuse base, neutral bus ,relugging and termination of cables and its re commissioning. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender