Bids Are invited for Ocm Of Ems At Te Compound At Bhosari Pune Sh Attending Defects At Rnc
Tender Overview
Project Description
Bids Are invited for Ocm Of Ems At Te Compound At Bhosari Pune Sh Attending Defects At Rnc Repair Including Replacement Of 1 Set Of Led Indicators Red, Yellow, Blue Or Green - Repair Including Replacement Of 1 Set Of Led Indicators Comprising Red, Yellow, Blue Or Green Indicators On Mv Or Lt Or Dg Panel With Compatibility To Exisitng Available System, Testing Etc As Reqd. , Repair Including Replacement Of Ac Ammeter 0 To 200 A Class 1, Analog 96 Mm - Repair Including Replacement Of Ac Ammeter 0 To 200A Class 1, Analog 96 Mm Size On Mv Or Lt Or Dg Panel With Compatibility To Exisitng Available System, Testing Etc Complete As Reqd. , Repair Including Replacement Of Ac Voltmeter 0 To 500 V Class 1, Analog 96 Mm - Repair Including Replacement Of Ac Voltmeter 0 To 500V Class 1, Analog 96 Mm On Mv Or Lt Or Dg Panel With Compatibility To Exisitng Available System, Testing Etc Complete As Reqd. , Repair Including Replacement Of Hn Type 63 A Fuse Link - Repair Including Replacement Of Hn Type 63 A Fuse Link In Mv Or Lt Or Dg Panel With Compatibility To Exisitng Available System, Testing Etc Complete As Reqd. , Repair Including Replacement Of Voltmeter Selector Switch - Repair Including Replacement Of Voltmeter Selector Switch On Mv Or Lt Or Dg Panel With Compatibility To Exisitng Available System, Testing Etc Complete As Reqd. , Repair Including Replacement Of 3 Position Ammeter Selector Switch - Repair Including Replacement Of 3 Position Ammeter Selector Switch On Mv Or Lt Or Dg Panel With Compatibility To Exisitng Available System, Testing Etc Complete As Reqd. , Repair Including Replacement Of 100 A, 415 V, 4 Pole Isolator - Supplying And Fixing Of 100 A, 415 V, 4 Pole Isolator In Mv Or Lt Or Dg Panel With Compatibility To Exisitng Available System, Testing Etc Complete As Reqd. , Sitc Of 22 Kv Drop Out Fuse And Rod Assembly Without Insulators - Supply, Installation, Testing And Commissioning Of 22 Kv Drop Out Fuse And Rod Assembly Without Insulators Etc Complete As Required , Repairing And Calibration Of Existing Apfc Relay Of Syntron Make - Repairing And Calibration Of Existing Apfc Relay Of Syntron Make For 135 Kvar Capacitor Panel Including Auto Mode Operation And On Load Testing Etc Complete As Reqd. , Carrying Out Servicing, Chemical Descaling And High-Pressure Jet Cleaning Of The Radiator Of 250 Kva Dg Set - Carrying Out Servicing, Chemical Descaling And High-Pressure Jet Cleaning Of The Radiator Of 250 Kva Dg Set Incl. Dismantling Radiator, Replacement Of Rubber Hoses And Cl S, Coolant Top Up Etc. , Replacement Of Stop Solenoid Valve With Solenoid Switch Suitable For Existing 250 Kva Ea Set - Replacement Of Stop Solenoid Valve With Solenoid Switch Suitable For Existing 250 Kva Ea Set With Installation, Connection, Testing, Commissioning As Reqd. , Replacement Of Battery Terminal Socket Set For Dg Starting Battery For Existing 250 Kva Ea Set - Replacement Of Battery Terminal Socket Set For Dg Starting Battery For Existing 250 Kva Ea Set With Installation, Connection, Testing, Commissioning As Reqd. , Repairing, Rewinding Of 5 Hp Centrifugal Pump Set - Repairing, Rewinding Of 5 Hp Centrifugal Pump Set Incl. Greasing, Varnishing, Replacement Of Wornout Bearings And Gland Packing Incl. Dismantling, Handling, Transportation And Reinstallation Etc. , Replacement Of Faulty Foot Valve With A 40 Mm Dia Heavy Duty Brass Foot Valve - Replacement Of Faulty Foot Valve With A 40 Mm Dia Heavy Duty Brass Foot Valve, With All Accessories Including Testing Commissioning Etc Complete As Required , Replacement Of Faulty Pcb Of Indoor Unit Of 1.5 Tr Or 2.0 Tr Inverter Type Split Ac Unit - Replacement Of Faulty Pcb Of Indoor Unit Of 1.5 Tr Or 2.0 Tr Inverter Type Split Ac Unit Including Installation, Connection, Testing And Commissioning Etc Complete As Reqd. , Repairing Of 1.5 Or 2.0 Tr Window Or Split Or High Sensible Ac Units By Attending Of Leakage - Repairing Of 1.5 Or 2Tr W Or S Or Hs Ac Units By Attending Of Leakage Incl. Brazing Or Flaring Leak Points, Vacumising, Purging Flushing And Supplying And Charging Of R22orr32orr410orr134 Gas Etc , Replacement Of Faulty Batten Tube Light Fitting With Supplying And Fixing Of 20 To 28 Watt Led Type Tube Light Fitting - Replacement Of Faulty Batten Tube Light Fitting With Supplying And Fixing Of 20 To 28 Watt Led Type Tube Light Fitting Incl. Testing Commissioning Etc Complete As Required , Rewinding Of Ceiling Fan Motors With Sweep Up To 1400 Mm - Rewinding Of Ceiling Fan Motors With Sweep Up To 1400 Mm, Including Replacement Of Worn Out Bearings, Shaft, Bush, Capacitor, Greasing, Varnishing, Taping, Insulation, Testing, Commissioning As Reqd , Rewinding Of Exhaust Fan Motors With Sweep Up To 450 Mm - Rewinding Of Exhaust Fan Motors With Sweep Up To 450 Mm, Including Replacement Of Worn Out Bearings, Shaft, Bush, Capacitor, Greasing, Varnishing, Taping, Insulation, Testing, Commissioning As Reqd. , Replacement Of Faulty 100 Watt, Step Type Electronic Fan Regulator On The Existing Switchboard - Replacement Of Faulty 100 Watt, Step Type Electronic Fan Regulator On The Existing Switchboard Including Connections, Testing And Commissioning As Reqd. , Replacement Of Faulty Switch 5 Or 6 On The Existing Switchboard - Replacement Of Faulty Switch 5 Or 6 On The Existing Switchboard Including Connections, Testing And Commissioning As Reqd. , Replacement Of Faulty 3 Pin 5 Or 6 Socket Outlet On The Existing Switchboard - Replacement Of Faulty 3 Pin 5 Or 6 Socket Outlet On The Existing Switchboard Including Connections, Testing And Commissioning As Reqd. , Replacement Of Faulty 6 Pin 15 Or 16 Socket Outlet On The Existing Switchboard - Replacement Of Faulty 6 Pin 15 Or 16 Socket Outlet On The Existing Switchboard Including Connections, Testing And Commissioning As Reqd. , Replacement Of Faulty 5 To 32 A, C Curve Sp Mcb In The Existing Mcb Db - Replacement Of Faulty 5 To 32 A, C Curve Sp Mcb In The Existing Mcb Db Including Connections, Testing And Commissioning As Reqd. , Replacement Of Faulty 5 To 32 A, C Curve Dp Mcb In The Existing Mcb Db - Replacement Of Faulty 5 To 32 A, C Curve Dp Mcb In The Existing Mcb Db Including Connections, Testing And Commissioning As Reqd. , Repairing Of Faulty Compound Light With Provision Of High Performance Cool Daylight 40 Watt Led Bulb, And 2 X 1.5 Sq Mm Cu Cond. Cable - Repairing Of Faulty Compound Light With Provision Of High Performance Cool Daylight 40 Watt Led Bulb, And 2 X 1.5 Sq Mm Cu Cond. Cable From Pole Junction Box To Fitting Etc. Complete As Reqd. Total Quantity : 131
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Repair including replacement of 1 set of LED Indicators Red, Yellow, Blue or Green | Repair including replacement of 1 set of LED Indicators comprising Red, Yellow, Blue or Green indicators on MV or LT or DG panel with compatibility to exisitng available system, testing etc as reqd. |
| 2 | Repair including replacement of AC Ammeter 0 to 200 A Class 1, analog 96 mm | Repair including replacement of AC Ammeter 0 to 200A Class 1, analog 96 mm size on MV or LT or DG panel with compatibility to exisitng available system, testing etc complete as reqd. |
| 3 | Repair including replacement of AC Voltmeter 0 to 500 V Class 1, Analog 96 mm | Repair including replacement of AC Voltmeter 0 to 500V Class 1, Analog 96 mm on MV or LT or DG panel with compatibility to exisitng available system, testing etc complete as reqd. |
| 4 | Repair including replacement of HN type 63 A Fuse link | Repair including replacement of HN type 63 A Fuse link in MV or LT or DG panel with compatibility to exisitng available system, testing etc complete as reqd. |
| 5 | Repair including replacement of Voltmeter Selector switch | Repair including replacement of Voltmeter Selector switch on MV or LT or DG panel with compatibility to exisitng available system, testing etc complete as reqd. |
| 6 | Repair including replacement of 3 position Ammeter Selector switch | Repair including replacement of 3 position Ammeter Selector switch on MV or LT or DG panel with compatibility to exisitng available system, testing etc complete as reqd. |
| 7 | Repair including replacement of 100 A, 415 V, 4 Pole Isolator | Supplying and Fixing of 100 A, 415 V, 4 Pole Isolator in MV or LT or DG panel with compatibility to exisitng available system, testing etc complete as reqd. |
| 8 | SITC of 22 kV Drop out fuse and rod assembly without insulators | Supply, Installation, Testing and Commissioning of 22 kV Drop out fuse and rod assembly without insulators etc complete as required |
| 9 | Repairing and calibration of existing APFC Relay of Syntron make | Repairing and calibration of existing APFC Relay of Syntron make for 135 KVAR Capacitor Panel including auto mode operation and on load testing etc complete as reqd. |
| 10 | Carrying out servicing, chemical descaling and high-pressure jet cleaning of the radiator of 250 KVA DG set | Carrying out servicing, chemical descaling and high-pressure jet cleaning of the radiator of 250 KVA DG set incl. dismantling radiator, replacement of rubber hoses and clamps, coolant top up etc. |
| 11 | Replacement of Stop Solenoid Valve with solenoid switch suitable for existing 250 KVA EA set | Replacement of Stop Solenoid Valve with solenoid switch suitable for existing 250 KVA EA set with installation, connection, testing, commissioning as reqd. |
| 12 | Replacement of battery terminal socket set for DG starting battery for existing 250 KVA EA set | Replacement of battery terminal socket set for DG starting battery for existing 250 KVA EA set with installation, connection, testing, commissioning as reqd. |
| 13 | Repairing, rewinding of 5 HP centrifugal pump set | Repairing, rewinding of 5 HP centrifugal pump set incl. greasing, varnishing, replacement of wornout bearings and gland packing incl. dismantling, handling, transportation and reinstallation etc. |
| 14 | Replacement of faulty foot valve with a 40 mm dia heavy duty brass Foot valve | Replacement of faulty foot valve with a 40 mm dia heavy duty brass Foot valve, with all accessories including testing commissioning etc complete as required |
| 15 | Replacement of faulty PCB of indoor unit of 1.5 TR or 2.0 TR inverter type Split AC unit | Replacement of faulty PCB of indoor unit of 1.5 TR or 2.0 TR inverter type Split AC unit including installation, connection, testing and commissioning etc complete as reqd. |
| 16 | Repairing of 1.5 or 2.0 TR Window or Split or High Sensible AC units by attending of leakage | Repairing of 1.5 or 2TR W or S or HS AC units by attending of leakage incl. brazing or flaring leak points, vacumising, purging flushing and supplying and charging of R22orR32orR410orR134 gas etc |
| 17 | Replacement of faulty batten tube light fitting with supplying and fixing of 20 to 28 watt LED type Tube light fitting | Replacement of faulty batten tube light fitting with supplying and fixing of 20 to 28 watt LED type Tube light fitting incl. testing commissioning etc complete as required |
| 18 | Rewinding of ceiling fan motors with sweep up to 1400 mm | Rewinding of ceiling fan motors with sweep up to 1400 mm, including replacement of worn out bearings, Shaft, Bush, capacitor, greasing, varnishing, taping, insulation, testing, commissioning as reqd |
| 19 | Rewinding of exhaust fan motors with sweep up to 450 mm | Rewinding of exhaust fan motors with sweep up to 450 mm, including replacement of worn out bearings, Shaft, Bush, capacitor, greasing, varnishing, taping, insulation, testing, commissioning as reqd. |
| 20 | Replacement of faulty 100 watt, step type electronic fan regulator on the existing switchboard | Replacement of faulty 100 watt, step type electronic fan regulator on the existing switchboard including connections, testing and commissioning as reqd. |
| 21 | Replacement of faulty switch 5 or 6 amp on the existing switchboard | Replacement of faulty switch 5 or 6 amp on the existing switchboard including connections, testing and commissioning as reqd. |
| 22 | Replacement of faulty 3 pin 5 or 6 amp socket outlet on the existing switchboard | Replacement of faulty 3 pin 5 or 6 amp socket outlet on the existing switchboard including connections, testing and commissioning as reqd. |
| 23 | Replacement of faulty 6 pin 15 or 16 amp socket outlet on the existing switchboard | Replacement of faulty 6 pin 15 or 16 amp socket outlet on the existing switchboard including connections, testing and commissioning as reqd. |
| 24 | Replacement of faulty 5 to 32 A, C Curve SP MCB in the existing MCB DB | Replacement of faulty 5 to 32 A, C Curve SP MCB in the existing MCB DB including connections, testing and commissioning as reqd. |
| 25 | Replacement of faulty 5 to 32 A, C Curve DP MCB in the existing MCB DB | Replacement of faulty 5 to 32 A, C Curve DP MCB in the existing MCB DB including connections, testing and commissioning as reqd. |
| 26 | Repairing of faulty compound light with provision of high performance cool daylight 40 Watt LED Bulb, and 2 x 1.5 sq mm Cu cond. Cable | Repairing of faulty compound light with provision of high performance cool daylight 40 Watt LED Bulb, and 2 x 1.5 sq mm Cu cond. cable from pole junction box to fitting etc. complete as reqd. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender