Tender For Tender Execution Improvement Work In Vm Chathram In Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry.
Tender Value
2.53 Lakhs
Estimated cost
Bid Submission
29 Jul 2026
14 days left
EMD
2534
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Tirunelveli → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Tender Execution Improvement Work In Vm Chathram In Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry.
BOQ
| Sl. No. | Item Description |
| 1 | Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 2 | Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 3 | Rocky ground (Medium)- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 4 | Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 5 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 6 | Hard rock requiring Blasting and chisseling- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 7 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
| 8 | Normal ground- Erection of 9M & 9.14M poles |
| 9 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
| 10 | Rocky ground- Erection of 9M & 9.14M poles |
| 11 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 9M & 9.14M poles |
| 12 | Hard rock requiring Blasting and chisseling- Erection of 9M & 9.14M poles |
| 13 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists |
| 14 | Normal ground- Erection of above 9.14M poles & 36' length RS Joists |
| 15 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists |
| 16 | Rocky ground- Erection of above 9.14M poles & 36' length RS Joists |
| 17 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14M poles & 36' length RS Joists |
| 18 | Hard rock requiring Blasting and chisseling- Erection of above 9.14M poles & 36' length RS Joists |
| 19 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42' length RS Joists |
| 20 | Normal ground- Erection of 42' length RS Joists |
| 21 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42' length RS Joists |
| 22 | Rocky ground- Erection of 42' length RS Joists |
| 23 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 42' length RS Joists |
| 24 | Hard rock requiring Blasting and chisseling- Erection of 42' length RS Joists |
| 25 | Transporting of poles from road side to pole pit upto 2KM - 7.32m, 7.5m, 8m, 8.23m RCC pole |
| 26 | Transporting of poles from road side to pole pit upto 2KM- 9m, 9.14m RCC/PSC pole |
| 27 | Transporting of poles from road side to pole pit upto 2KM - RSJ 36' Pole |
| 28 | Transporting of poles from road side to pole pit - RSJ 42' and above |
| 29 | Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole |
| 30 | Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole |
| 31 | Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m) |
| 32 | Concreting of poles as per Board Standards (2'*2'*5'). The materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete) |
| 33 | Coping of pole (0.6m*0.6m*0.35m) |
| 34 | Concreting of stay (o.3m * 0.3m * 1.5m) including materials |
| 35 | Coil earthing per pole & pole earthing |
| 36 | Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 37 | Normal ground- Erection of stay set |
| 38 | Rocky ground (Medium)- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 39 | Rocky ground- Erection of stay set |
| 40 | Hard Rock requires blasting & chisseling- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 41 | Hard Rock requires blasting & chisseling- Erection of stay set |
| 42 | Loading and unloading charges of Oil drums (with oil) |
| 43 | Loading and unloading charges of Oil drums (without oil) |
| 44 | Loading and unloading charges of Conductor Drum, Cable Drum |
| 45 | Loading and unloading charges of Line Materials |
| 46 | Loading and unloading charges of Metering Set |
| 47 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site |
| 48 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site |
| 49 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site |
| 50 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site |
| 51 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site |
| 52 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site |
| 53 | 11KV Lines-Fixing of LT 3Phase cross arm including transporting of materials from road side to site |
| 54 | 11KV Lines-Fixing of LT 1Phase cross arm including transporting of materials from road side to site |
| 55 | 11KV Lines-Fixing of HT LT TI fitting including transporting of materials from road side to site |
| 56 | 11KV Lines-Erection of HT Side arm with stud including transporting of materials from road side to site |
| 57 | 11KV Lines-Erection of LT Side arm with stud including transporting of materials from road side to site |
| 58 | 11KV Lines-Fixing of insulator (per location) including transporting of materials from road side to site |
| 59 | 11KV Lines-Fixing of 11KV Disc including transporting of materials from road side to site |
| 60 | 11KV Lines-Fixing of Tapping channel Cross arm including transporting of materials from road side to site |
| 61 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For Dog conductor (1Span/Wire) |
| 62 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR conductor (1Span/Wire) |
| 63 | HT lines (33KV)- Line clear works-For Dog conductor (1Span/Wire) |
| 64 | HT lines (33KV)- Line clear works-For 7/4.09 ACSR conductor (1Span/Wire) |
| 65 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire) |
| 66 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) |
| 67 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) |
| 68 | 11KV Lines line clear works for For 7/2.59 ACSR (1Span/Wire) |
| 69 | 11KV Lines line clear works for For 7/3.35 ACSR (1Span/Wire) |
| 70 | 11KV Lines line clear works for For 7/4.09 ACSR (1Span/Wire) |
| 71 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR, 7/2.50AAAC |
| 72 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR, 7/3.15 AAAC |
| 73 | For LT line clear works for For7/2.59 ACSR, 7/2.50AAAC (1Span/Wire) |
| 74 | For LT line clear works for For 7/3.35 ACSR, 7/3.15 AAAC (1Span/Wire) |
| 75 | Guarding per span length- Spilt Neutral Guarding |
| 76 | Guarding per span length- Flat Guarding (2 wires) |
| 77 | Guarding per span length- Flat Guarding (4 wires) |
| 78 | Guarding per span length- Flat Guarding (6 wires) |
| 79 | Guarding per span length- Cradle Guarding (Fixing of ' X' arm Lacing ) |
| 80 | Guarding per span length- Fixing of one earthing device with stud |
| 81 | Erection of transformer/dismantling upto 200KVA |
| 82 | Erection of transformer/dismantling upto 250KVA |
| 83 | Erection of transformer/dismantling upto 500KVA |
| 84 | Erection of centre support (Including concrete) |
| 85 | Erection of Metering set |
| 86 | Erection of feeder cable with open type fuse unit per feeder |
| 87 | Erection of feeder cable with open type fuse unit - for each addl feeder |
| 88 | Erection of feeder cable -Bus bar arrangement with open type |
| 89 | Loading & unloading of Distribution transformer below 250KVA |
| 90 | Loading & unloading of Distribution transformer 250KVA |
| 91 | Loading & unloading of Distribution transformer 500KVA |
| 92 | Plinth work for 500KVA DT with construction material |
| 93 | Fabrication ,erection and excavation for centre support etc for 250 /500 DT including transporting |
| 94 | Tube light erection-1*40W tube light complete set (including transport) |
| 95 | Tube light erection-For SV lamp and mercury lamp complete set (including transport) |
| 96 | Tube light erection-For CFL lamp complete set (including transport) |
| 97 | Painting of Sc Number including Painting |
| 98 | Tube light 72W LED Erection |
| 99 | Manufacturing of clamps 50*8 mm |
| 100 | Manufacturing of clamps 65*10 mm |
| 101 | Alteration of clamps |
| 102 | Street light switching point arrangement |
| 103 | Drilling / Less than 23mm holes per hole /slotted holes |
| 104 | Cutting of channel |
| 105 | Cutting of Flat |
| 106 | Cutting of Angle |
| 107 | RSJ pole cutting |
| 108 | Tubular pole cutting |
| 109 | Rail pole cutting |
| 110 | Fabrication of lightning arrestor frame |
| 111 | LT-Changing of pin point to cut point |
| 112 | HT-Changing of pin point to cut point |
| 113 | Erection of service connection materials-1Ph service |
| 114 | Erection of service connection materials-3Ph service |
| 115 | Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., |
| 116 | Dismantling of poles without concrete in damaged condition including grill separation etc., |
| 117 | Providing jumpering at cut point |
| 118 | complete replacement of worn out earth wire per structure |
| 119 | Labour for manufacturing of open type fuse unit (Materials supplied by board) |
| 120 | Manufacturing of HG fuse stool incl. materials |
| 121 | Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees |
| 122 | Tree clearence in HT or LT location- For coconut trees |
| 123 | Tree clearence in HT or LT location- For Palmrah trees |
| 124 | Painting-Double pole Transformer structure materials (Double coat) (Including cost of paint) |
| 125 | Painting-Pole (Colour washing with distember) 2 Nos (Including cost of paint) |
| 126 | Painting-For transformer only (Double coat with paint) |
| 127 | Numbering of poles with backround colour paint |
| 128 | Numbering of Distribution Transformer (Painting and writing of name board size-1-1/4*1 incl cost of paint & board and MS sheet |
| 129 | Writing in seating channel (Paint to be supplied by contractor) |
| 130 | Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor |
| 131 | Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator |
| 132 | Set right of leaning HT pole/LT pole including x arms, TI fittings |
| 133 | Transformer structure erection-Excavation of structure pole pits ( 2Nos) |
| 134 | Transformer structure erection-Erection of structure poles ( 2Nos) |
| 135 | Transformer structure erection-Excavation of stay pits(4Nos) |
| 136 | Transformer structure erection-Erection of stay set (4Nos) |
| 137 | Transformer structure erection-Concreting of structure poles incl.materials Mass concrete with coping (2 poles) |
| 138 | Transformer structure erection-Concreting of stays (4Nos) incl.materials |
| 139 | Erection of Structure materials-Top Channel |
| 140 | Erection of Structure materials-Transformer seating channel and belting angle |
| 141 | Erection of Structure materials-AB switch (Complete) |
| 142 | Erection of Structure materials-HG fuse (Complete) |
| 143 | Erection of Structure materials-Jumpering |
| 144 | Erection of Structure materials-HT LAS |
| 145 | Erection of Structure materials-LT LAS |
| 146 | Erection of structure materials -Transformer LT cable wiring / LT Bus Bar |
| 147 | Erection of structure material-Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending ,fabrication etc |
| 148 | Earthing system-Excavation of 4 Nos. earth pits |
| 149 | Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection |
| 150 | Earthing system-Mason works with bricks for earth pits 4 nos (cement supplied by Contractor) |
| 151 | Earthing system-Painting of transformer structure 2 coats incl.paint |
| 152 | Earthing system-Painting with Distember paint on poles with paint cost |
| 153 | Earthing system-Spreading yard jelly and cut stone and bricks including material |
| 154 | Earthing system-Writing of name board and target board |
| 155 | Earthing system-Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole |
| 156 | Earthing system-Fixing of Danger Board ( labour only) |
| 157 | Erection of Tapping structure-Excavation of structure pole pit. (2Nos) |
| 158 | Erection of Tapping structure-Erection of structure pole. (2Nos) |
| 159 | Erection of Tapping structure-Excavation of stay pit (2Nos) |
| 160 | Erection of Tapping structure-Erection of stay set (2Nos) |
| 161 | Erection of Tapping structure- Concreting of structure poles including materials Mass Concrete with Copping (2Nos) |
| 162 | Erection of Tapping structure-Concreting of stay (2Nos) |
| 163 | Erection of Structure materials-Top channel |
| 164 | Erection of Structure materials-AB switch (complete) |
| 165 | Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing |
| 166 | Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure. |
| 167 | Earthing system-Mason works with Bricks for earth pit (including material) |
| 168 | Colour coating on poles with iron materials including paint and distember |
| 169 | Transporting of 42' twin RSJ pole from roadside pole pit |
| 170 | Fabrication of 42' Twin RSJ pole, Materials supplied by Board. |
| 171 | Excavation & Erection of Twin 42'2' fabricated RSJ pole |
| 172 | Concreting of 42' twin RSJ pole |
| 173 | Concreting of 42' twin RSJ pole |
| 174 | Resagging of various conductor (Please mention in percentage of respectie conductor) |
| 175 | Dismantling of 7.5m /8m pole with out damage |
| 176 | Dismantling of 9.14m pole/ RSJ with out damage |
| 177 | Dismantling of stay set complete |
| 178 | Replacement of detoriated stay rod |
| 179 | Replacement of RSJ/Tubular poles below 30 feet |
| 180 | Replacement Of RSJ/Tubular poles aove 30 feet |
| 181 | Dismantling of detoriated cables of various size(95,120,185 sq.mm) from DT,LT bushing to LT open type clamp and erection of suitable lug at both ends |
| 182 | Replacement of new 10' earth pipe replacing the corroded earth pipe and renewal of earthing including burying , looping and binding |
| 183 | Mass Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum) |
| 184 | Sleeve Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.202 ) (0.5*0.45*0.9M) |
| 185 | Providing of Spacers in LT Lines |
| 186 | Hiring of JCB |
| 187 | Hiring of Crane |
| 188 | Exceeding 1 Hour for every hour |
| 189 | Transporting of Charges of DT / Line materials using private vehicle upto 20 KM ( Up and Down) |
| 190 | Beyond 20 KM for every KM |
| 191 | Single pole structure erection- Excavation of structure pole pit 3’ x 6’ by using JCB or Manual |
| 192 | Single pole structure erection- Transportation of pole from road side to pole pit by using JCB or Manual |
| 193 | Single pole structure erection-Erection of poles by using JCB or Manual |
| 194 | Single pole structure erection Excavation of stay pit by JCB or Manual (2Nos) |
| 195 | Single pole structure erection- Erection of stay set complete (2Nos) |
| 196 | Single pole structure erection -Mass concreting for structure |
| 197 | Singple pole structure erection -Stay Concrete (2Nos) |
| 198 | Single pole structure erection -Erection of Structure materials- Tapping channel |
| 199 | Single pole structure erection -Erection of Structure materials- Transformer Bed Stucture |
| 200 | Single pole structure erection -Erection of AB switch |
| 201 | Single pole structure erection -Erection of H.G. Fuse (3Nos) |
| 202 | Structure earthing complete with 3 pits and earth loops |
| 203 | Singple pole structure erection-Fixing of MCD Box |
| 204 | Singple pole structure erection-HT-LAS fixing (3Nos) |
| 205 | Singple pole structure erection-LT-LAS fixing (3Nos) |
| 206 | Singple pole structure erection-HT jumpering complete |
| 207 | Singple pole structure erection-Painting of all clamps and other iron materials and painting of structure pole |
| 208 | Singple pole structure erection-LTCable arrangement |
| 209 | Singple pole structure erection-Fixing of Danger board |
| 210 | Dismantling of other line materials - (Please mention In percentage for respective line material errection works) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 14, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 29, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysJul 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender