Power Boards / Undertakings / PSU Closing in 14 days TDR #56452691

Tender For Tender Execution Improvement Work In Vm Chathram In Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry.

Issued by Boards / Undertakings / PSU · Tirunelveli, Tamil Nadu
Tender Value
2.53 Lakhs
Estimated cost
Bid Submission
29 Jul 2026
14 days left
EMD
2534
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Tirunelveli → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Tender Execution Improvement Work In Vm Chathram In Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry.

BOQ

Name of Work:- tender Execution Improvement Work in VM Chathram in Urban Tirunelveli Division in respect of Tirunelveli EDC in respect of the Technical specification in the enquiry.
Sl. No. Item Description
1Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
2Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
3Rocky ground (Medium)- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
4Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
5Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
6Hard rock requiring Blasting and chisseling- Erection of 7.32m, 7.5m, 8m, 8.23m poles
7Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
8Normal ground- Erection of 9M & 9.14M poles
9Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
10Rocky ground- Erection of 9M & 9.14M poles
11Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 9M & 9.14M poles
12Hard rock requiring Blasting and chisseling- Erection of 9M & 9.14M poles
13Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
14Normal ground- Erection of above 9.14M poles & 36' length RS Joists
15Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
16Rocky ground- Erection of above 9.14M poles & 36' length RS Joists
17Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14M poles & 36' length RS Joists
18Hard rock requiring Blasting and chisseling- Erection of above 9.14M poles & 36' length RS Joists
19Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42' length RS Joists
20Normal ground- Erection of 42' length RS Joists
21Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42' length RS Joists
22Rocky ground- Erection of 42' length RS Joists
23Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 42' length RS Joists
24Hard rock requiring Blasting and chisseling- Erection of 42' length RS Joists
25Transporting of poles from road side to pole pit upto 2KM - 7.32m, 7.5m, 8m, 8.23m RCC pole
26Transporting of poles from road side to pole pit upto 2KM- 9m, 9.14m RCC/PSC pole
27Transporting of poles from road side to pole pit upto 2KM - RSJ 36' Pole
28Transporting of poles from road side to pole pit - RSJ 42' and above
29Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole
30Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole
31Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m)
32Concreting of poles as per Board Standards (2'*2'*5'). The materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete)
33Coping of pole (0.6m*0.6m*0.35m)
34Concreting of stay (o.3m * 0.3m * 1.5m) including materials
35Coil earthing per pole & pole earthing
36Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
37Normal ground- Erection of stay set
38Rocky ground (Medium)- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
39Rocky ground- Erection of stay set
40Hard Rock requires blasting & chisseling- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
41Hard Rock requires blasting & chisseling- Erection of stay set
42Loading and unloading charges of Oil drums (with oil)
43Loading and unloading charges of Oil drums (without oil)
44Loading and unloading charges of Conductor Drum, Cable Drum
45Loading and unloading charges of Line Materials
46Loading and unloading charges of Metering Set
4711KV Lines-(Pin point) Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site
4811KV Lines-(Cut Point) Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site
4911KV Lines-(Pin point) Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site
5011KV Lines-(Cut Point) Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site
5111KV Lines-(Pin point) Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site
5211KV Lines-(Cut Point) Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site
5311KV Lines-Fixing of LT 3Phase cross arm including transporting of materials from road side to site
5411KV Lines-Fixing of LT 1Phase cross arm including transporting of materials from road side to site
5511KV Lines-Fixing of HT LT TI fitting including transporting of materials from road side to site
5611KV Lines-Erection of HT Side arm with stud including transporting of materials from road side to site
5711KV Lines-Erection of LT Side arm with stud including transporting of materials from road side to site
5811KV Lines-Fixing of insulator (per location) including transporting of materials from road side to site
5911KV Lines-Fixing of 11KV Disc including transporting of materials from road side to site
6011KV Lines-Fixing of Tapping channel Cross arm including transporting of materials from road side to site
61HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For Dog conductor (1Span/Wire)
62HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR conductor (1Span/Wire)
63HT lines (33KV)- Line clear works-For Dog conductor (1Span/Wire)
64HT lines (33KV)- Line clear works-For 7/4.09 ACSR conductor (1Span/Wire)
6511KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)
6611KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire)
67HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire)
6811KV Lines line clear works for For 7/2.59 ACSR (1Span/Wire)
6911KV Lines line clear works for For 7/3.35 ACSR (1Span/Wire)
7011KV Lines line clear works for For 7/4.09 ACSR (1Span/Wire)
71LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR, 7/2.50AAAC
72LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR, 7/3.15 AAAC
73For LT line clear works for For7/2.59 ACSR, 7/2.50AAAC (1Span/Wire)
74For LT line clear works for For 7/3.35 ACSR, 7/3.15 AAAC (1Span/Wire)
75Guarding per span length- Spilt Neutral Guarding
76Guarding per span length- Flat Guarding (2 wires)
77Guarding per span length- Flat Guarding (4 wires)
78Guarding per span length- Flat Guarding (6 wires)
79Guarding per span length- Cradle Guarding (Fixing of ' X' arm Lacing )
80Guarding per span length- Fixing of one earthing device with stud
81Erection of transformer/dismantling upto 200KVA
82Erection of transformer/dismantling upto 250KVA
83Erection of transformer/dismantling upto 500KVA
84Erection of centre support (Including concrete)
85Erection of Metering set
86Erection of feeder cable with open type fuse unit per feeder
87Erection of feeder cable with open type fuse unit - for each addl feeder
88Erection of feeder cable -Bus bar arrangement with open type
89Loading & unloading of Distribution transformer below 250KVA
90Loading & unloading of Distribution transformer 250KVA
91Loading & unloading of Distribution transformer 500KVA
92Plinth work for 500KVA DT with construction material
93Fabrication ,erection and excavation for centre support etc for 250 /500 DT including transporting
94Tube light erection-1*40W tube light complete set (including transport)
95Tube light erection-For SV lamp and mercury lamp complete set (including transport)
96Tube light erection-For CFL lamp complete set (including transport)
97Painting of Sc Number including Painting
98Tube light 72W LED Erection
99Manufacturing of clamps 50*8 mm
100Manufacturing of clamps 65*10 mm
101Alteration of clamps
102Street light switching point arrangement
103Drilling / Less than 23mm holes per hole /slotted holes
104Cutting of channel
105Cutting of Flat
106Cutting of Angle
107RSJ pole cutting
108Tubular pole cutting
109Rail pole cutting
110Fabrication of lightning arrestor frame
111LT-Changing of pin point to cut point
112HT-Changing of pin point to cut point
113Erection of service connection materials-1Ph service
114Erection of service connection materials-3Ph service
115Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
116Dismantling of poles without concrete in damaged condition including grill separation etc.,
117Providing jumpering at cut point
118complete replacement of worn out earth wire per structure
119Labour for manufacturing of open type fuse unit (Materials supplied by board)
120Manufacturing of HG fuse stool incl. materials
121Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees
122Tree clearence in HT or LT location- For coconut trees
123Tree clearence in HT or LT location- For Palmrah trees
124Painting-Double pole Transformer structure materials (Double coat) (Including cost of paint)
125Painting-Pole (Colour washing with distember) 2 Nos (Including cost of paint)
126Painting-For transformer only (Double coat with paint)
127Numbering of poles with backround colour paint
128Numbering of Distribution Transformer (Painting and writing of name board size-1-1/4*1 incl cost of paint & board and MS sheet
129Writing in seating channel (Paint to be supplied by contractor)
130Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor
131Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator
132Set right of leaning HT pole/LT pole including x arms, TI fittings
133Transformer structure erection-Excavation of structure pole pits ( 2Nos)
134Transformer structure erection-Erection of structure poles ( 2Nos)
135Transformer structure erection-Excavation of stay pits(4Nos)
136Transformer structure erection-Erection of stay set (4Nos)
137Transformer structure erection-Concreting of structure poles incl.materials Mass concrete with coping (2 poles)
138Transformer structure erection-Concreting of stays (4Nos) incl.materials
139Erection of Structure materials-Top Channel
140Erection of Structure materials-Transformer seating channel and belting angle
141Erection of Structure materials-AB switch (Complete)
142Erection of Structure materials-HG fuse (Complete)
143Erection of Structure materials-Jumpering
144Erection of Structure materials-HT LAS
145Erection of Structure materials-LT LAS
146Erection of structure materials -Transformer LT cable wiring / LT Bus Bar
147Erection of structure material-Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending ,fabrication etc
148Earthing system-Excavation of 4 Nos. earth pits
149Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection
150Earthing system-Mason works with bricks for earth pits 4 nos (cement supplied by Contractor)
151Earthing system-Painting of transformer structure 2 coats incl.paint
152Earthing system-Painting with Distember paint on poles with paint cost
153Earthing system-Spreading yard jelly and cut stone and bricks including material
154Earthing system-Writing of name board and target board
155Earthing system-Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole
156Earthing system-Fixing of Danger Board ( labour only)
157Erection of Tapping structure-Excavation of structure pole pit. (2Nos)
158Erection of Tapping structure-Erection of structure pole. (2Nos)
159Erection of Tapping structure-Excavation of stay pit (2Nos)
160Erection of Tapping structure-Erection of stay set (2Nos)
161Erection of Tapping structure- Concreting of structure poles including materials Mass Concrete with Copping (2Nos)
162Erection of Tapping structure-Concreting of stay (2Nos)
163Erection of Structure materials-Top channel
164Erection of Structure materials-AB switch (complete)
165Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing
166Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.
167Earthing system-Mason works with Bricks for earth pit (including material)
168Colour coating on poles with iron materials including paint and distember
169Transporting of 42' twin RSJ pole from roadside pole pit
170Fabrication of 42' Twin RSJ pole, Materials supplied by Board.
171Excavation & Erection of Twin 42'2' fabricated RSJ pole
172Concreting of 42' twin RSJ pole
173Concreting of 42' twin RSJ pole
174Resagging of various conductor (Please mention in percentage of respectie conductor)
175Dismantling of 7.5m /8m pole with out damage
176Dismantling of 9.14m pole/ RSJ with out damage
177Dismantling of stay set complete
178Replacement of detoriated stay rod
179Replacement of RSJ/Tubular poles below 30 feet
180Replacement Of RSJ/Tubular poles aove 30 feet
181Dismantling of detoriated cables of various size(95,120,185 sq.mm) from DT,LT bushing to LT open type clamp and erection of suitable lug at both ends
182Replacement of new 10' earth pipe replacing the corroded earth pipe and renewal of earthing including burying , looping and binding
183Mass Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum)
184Sleeve Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.202 ) (0.5*0.45*0.9M)
185Providing of Spacers in LT Lines
186Hiring of JCB
187Hiring of Crane
188Exceeding 1 Hour for every hour
189Transporting of Charges of DT / Line materials using private vehicle upto 20 KM ( Up and Down)
190Beyond 20 KM for every KM
191Single pole structure erection- Excavation of structure pole pit 3’ x 6’ by using JCB or Manual
192Single pole structure erection- Transportation of pole from road side to pole pit by using JCB or Manual
193Single pole structure erection-Erection of poles by using JCB or Manual
194Single pole structure erection Excavation of stay pit by JCB or Manual (2Nos)
195Single pole structure erection- Erection of stay set complete (2Nos)
196Single pole structure erection -Mass concreting for structure
197Singple pole structure erection -Stay Concrete (2Nos)
198Single pole structure erection -Erection of Structure materials- Tapping channel
199Single pole structure erection -Erection of Structure materials- Transformer Bed Stucture
200Single pole structure erection -Erection of AB switch
201Single pole structure erection -Erection of H.G. Fuse (3Nos)
202Structure earthing complete with 3 pits and earth loops
203Singple pole structure erection-Fixing of MCD Box
204Singple pole structure erection-HT-LAS fixing (3Nos)
205Singple pole structure erection-LT-LAS fixing (3Nos)
206Singple pole structure erection-HT jumpering complete
207Singple pole structure erection-Painting of all clamps and other iron materials and painting of structure pole
208Singple pole structure erection-LTCable arrangement
209Singple pole structure erection-Fixing of Danger board
210Dismantling of other line materials - (Please mention In percentage for respective line material errection works) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56452691
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 2.53 Lakhs
LAST DATE 29-07-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Tender Execution Improvement Work In Vm Chathram In Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry.
Basic Detail
Tender No EE D U TIN ETWO03 2627 Dt 03.07.2026
Bidding Type Tender
Location
City Tirunelveli
State Tamil Nadu
Key Dates
Publish Date 14 Jul 2026
Submission Date 29 Jul 2026
Open Date 30 Jul 2026
Finance
Tender Value 2.53 Lakhs
Tender Fee Ref. Documents
EMD 2534
Exemption Available
Document List
182729ad-e923-48bf-8a18-bd88e0a127fc.html
BOQ_824143.xls
TECH.pdf
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 29, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 14 days
Jul 30, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
html

182729ad-e923-48bf-8a18-bd88e0a127fc.html

xls

BOQ_824143.xls

pdf

TECH.pdf

pdf

Tendernotice_1 (10).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders