Bids Are invited for Operation And Maintenance Power House / Power Plant - Overhauling Of Analog Control System And Other Allied Work As Per Atc Document, In Unit No 2 Of Atps Anpara - Secondary Air Flow Control Loops , Primary Air Header Pressure Co
Tender Overview
Project Description
Bids Are invited for Operation And Maintenance Power House / Power Plant - Overhauling Of Analog Control System And Other Allied Work As Per Atc Document, In Unit No 2 Of Atps Anpara - Secondary Air Flow Control Loops , Primary Air Header Pressure Control Loop , Furnace Draft Control Loop , Mill Air Flow Control Loop , Mill Temperature Control Loop , Feed Water Control Loop , Super Heater Steam Temperature Control Loop , Re-Heater Steam Temperature Control Loop , Hp Heater Drip Level Control Loop , Lp Heater Drip Level Control Loop , Deaerator Level Control Loop , Minimum Recirculation Control Loop , Deaerator Pressure Control Loop , Fuel Oil Minimum Pressure Control Loop , Boiler Feed Pump Scoop Tube Control Loop , Hot Well Level Control Loop , Burner Tilt Control Loop , Power Cylinder , Auto Loop Signal Conditioning & Simulation , Eddy Current Drive Speed Control System , Dismantling, Cutting And Complete Removal Of Old And Damaged Terminal Blocks, Channel End Plate, Lugs, Ferrule Etc. And Installation Of New Terminal Blocks, Channel End Plate, Lugging, Ferruling, Numbering And Proper Dressing And Lugging, Ferruling, Numbering & Proper Dressing In Remaining Undamaged Terminal Block Of Following Loops Of Acs System I.E. Furnace Draft Control Loop, Air Flow Control Loop, Pa Header Pressure Control Loop, Sh/Rh Spray Control Loop Etc.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Secondary Air flow control loops | Secondary Air flow control loops |
| 2 | Primary air header pressure control loop | Primary air header pressure control loop |
| 3 | Furnace draft control loop | Furnace draft control loop |
| 4 | Mill air flow control loop | Mill air flow control loop |
| 5 | Mill temperature control loop | Mill temperature control loop |
| 6 | Feed water control loop | Feed water control loop |
| 7 | Super heater steam temperature control loop | Super heater steam temperature control loop |
| 8 | Re-heater steam temperature control loop | Re-heater steam temperature control loop |
| 9 | HP heater drip level control loop | HP heater drip level control loop |
| 10 | LP heater drip level control loop | LP heater drip level control loop |
| 11 | Deaerator level control loop | Deaerator level control loop |
| 12 | Minimum recirculation control loop | Minimum recirculation control loop |
| 13 | Deaerator pressure control loop | Deaerator pressure control loop |
| 14 | Fuel oil minimum pressure control loop | Fuel oil minimum pressure control loop |
| 15 | Boiler feed pump scoop tube control loop | Boiler feed pump scoop tube control loop |
| 16 | Hot well level control loop | Hot well level control loop |
| 17 | Burner tilt control loop | Burner tilt control loop |
| 18 | Power cylinder | Power cylinder |
| 19 | Auto loop signal conditioning & simulation | Auto loop signal conditioning & simulation |
| 20 | Eddy current drive speed control system | Eddy current drive speed control system |
| 21 | Dismantling, Cutting and complete removal of old and damaged Terminal Blocks, Channel End Plate, Lugs, Ferrule etc. and installation of New Terminal Blocks, Channel End Plate, Lugging, Ferruling, numbering and proper dressing and lugging, Ferruling, numbering & proper dressing in Remaining undamaged Terminal Block of Following loops of ACS System i.e. furnace draft control loop, Air Flow control loop, PA Header pressure control loop, SH/RH spray control loop etc. | Dismantling, Cutting and complete removal of old and damaged Terminal Blocks, Channel End Plate, Lugs, Ferrule etc. and installation of New Terminal Blocks, Channel End Plate, Lugging, Ferruling, numbering and proper dressing and lugging, Ferruling, numbering & proper dressing in Remaining undamaged Terminal Block of Following loops of ACS System i.e. furnace draft control loop, Air Flow control loop, PA Header pressure control loop, SH/RH spray control loop etc. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender