Housing Urban and Rular Development Government Departments Closing in 8 days TDR #56451844

Tender For Erection And Dismantling Of Pantoon Bridge On Sai River In Gram Sabha Poorab Nayan Block Deeh In Distt Raebareli

Issued by Government Departments · Rae Bareli, Uttar Pradesh
Tender Value
14 Lakhs
Estimated cost
Bid Submission
30 Jul 2026
8 days left
EMD
1.40 Lakhs
Bank guarantee accepted
Document Fee
860
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Rae Bareli → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Erection And Dismantling Of Pantoon Bridge On Sai River In Gram Sabha Poorab Nayan Block Deeh In Distt Raebareli

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 16-Jul-2026 Corrigendum Date 22-Jul-2026
2 20-Jul-2026 Corrigendum2 Date 30-Jul-2026
3 16-Jul-2026 Corrigendum Date 22-Jul-2026

BOQ

Name of Work:- Erection and Dismantling of Pantoon Bridge on Sai River in Gram Sabha Poorab Nayan Block Deeh in Distt Raebareli
Sl. No. Item Description
1Erection Work :-Laying of wooden anchors in the river on the up stream/ Down stream side of the pontoon bridge site including their weaving packing the sand filled bags (av 90 bags) properly before laying and ixing to pontoon with coir rope/ sisall rope excluding cost. (As per Kumbh Mela SOR SI No. 6, Page No. 5)
2Carrying of pantoon in pair from river bank in Baripur side up stream to bridge side 2 km. distance to the alignment of bridge in water and fixing the same with other pantoon pair and reflexing the same in bridge alignment.(up steem Poorab Nayan side to river bank in 2km.)(As per Kumbh Mela SOR SI No. 3, Page No. 5)
3Cartage and laying of chaquered plate including loading unloading cost of carriage from store and laying at site as per direction of Engineer in charge. (As per Kumbh Mela SOR SI No. 7, Page No.5)
4Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of gererator and drill machine over sleeper and all saf edging before fixing the railling post with hepl of 300x16 mm size nut and bolts at 1.25mtr. c/c including all labour, material T&P etc. (As per Kumbh Mela SOR SI No. 8, Page No. 5)
5Cartage of wooden anchor from store to bridge head including loading unloading cartage etc. as per direction of Engineer in Charge (only for Departmental work) (As per Kumbh Mela SOR SI No. 12, Page No. 5)
6Relaying of chaquered plate after making camber by spreading of local sand as per direction E/I (As per Kumbh Mela SOR SI No. 13, Page No. 5)
7Digging and cartage of local sand / earth from Poorab Nayan Side including loading unloading 2 km cartage and duly stacked along chequered plate road as per direction of Engineer incharge. (As per Kumbh Mela SOR SI No. 14, Page No. 5)
8Maintenance of pontoon bridge Length of bridge including pile on either side period : Start to end of Day Night. (As per Kumbh Mela SOR SI No. 17, Page No. 5)
9Boat with Mallah(i) Small Boat. (As per Kumbh Mela SOR SI No. 22(i), Page No. 3)
10Lattering and painting of sign board of size 4'x3' (As per Kumbh Mela SOR SI No. 24, Page No. 3)
11Making bariar on bothe site of pantoon bridge with ballies labour only (As per Kumbh Mela SOR SI No. 33, Page No. 4)
12Supply of Euquiliptis ballies 15cm.(6\\") Dia for making wooden anchers & piles(khuta) i/c of material, loading, unloading and cartage up to site. I/C all taxes but excluding trade tax. etc complete. (As per Kumbh Mela SOR SI No. 35(a), Page No. 4)
13Same as above but 10cm. (4\\")Dia Euquiliptis ballies (As per Kumbh Mela SOR SI No. 35(c), Page No. 4)
14Supply of Fallowing material I/C cost of material, loading, unloding and cartage up to site. I/C all taxes but excluding trade tax. Labour, T&P etc. complete.required for proper complition of the work. (a) 30x300 mm. Size (As per Kumbh Mela SOR SI No. 6, Page No. 3)
15(b) M.S. Nut-Bolt 30x150 mm. Size. (As per Kumbh Mela SOR SI No. 7, Page No. 3)
16(c) M.S. Nut-Bolt 16x300 mm. Size.(As per Kumbh Mela SOR SI No. 8, Page No. 3)
17(d) M.S. Mallahi nail of 15cm to 30cm. Long (As per Kumbh Mela SOR SI No. 15, Page No. 3)
18(e) Supply of M.S washar 30mm dia & 20mm. Dia (As per Kumbh Mela SOR SI No. 5, Page No. 3)
19(f) Supply of Kalkatta Sutali (As per Kumbh Mela SOR SI No. 4, Page No. 3)
20(g) Supply of Bagahi Bandh (As per Kumbh Mela SOR SI No. 3, Page No. 3)
21Supply E.C. bages ( Valume 1 cft) plastic I/C cost of bag,babour, Cartage up to the place of anchoring. (As per Kumbh Mela SOR SI No. 2, Page No. 3)
22Supply of 32mm. Dai Garmant graphil poly propelione Ist mark rope for making of pantoons including cost of material etc. loading unloading cartage up to Poorab Nayan store.(As per Kumbh Mela SOR SI No. 39, Page No. 4)
23Supply of Wire rope 10mm.dia Galvonised ( Grised) of approred quantity including cost of material, loading, unloding and cartage up to site etc. complete.both side railing wire. (As per Kumbh Mela SOR SI No. 40, Page No. 4)
24Supply of Wire rope 20mm.dia Galvonised ( Grised) of approred quantity including cost of material, loading, unloding and cartage up to site etc. complete. for anchoring of pantoon. (As per Kumbh Mela SOR SI No. 40, Page No. 4)
25Supply of mild steel iron ankar making bending, cartage including all complete work. (As per Kumbh Mela SOR SI No. 42, Page No. 4)
26Carring & Laying of Sal sleeper including loading & unloading cost of carriage from store and decking on the bridge as per direction of Engineer in charge. (As per Kumbh Mela SOR SI No. 9(i), Page No. 5)
27Carring & Laying of Sal edging including loading & unloading cost of carriage from store and decking on the bridge as per direction of Engineer in charge.(As per Kumbh Mela SOR SI No. 9(ii), Page No. 5)
28Carring & Laying of R.S. Joist including loading & unloading cost of carriage from store and decking on the bridge as per direction of Engineer in charge (As per Kumbh Mela SOR SI No. 10, Page No. 5)
29Carring & Laying of Chequred Steel Plate including loading & unloading cost of carriage from store and decking on the bridge as per direction of Engineer in charge (As per Kumbh Mela SOR SI No. 7, Page No. 5)
30Laying of Wooden anchor both side of pantoon with sand filling cement bags, ancring of both side of pantoon (As per Kumbh Mela SOR SI No. 6, Page No. 5)
31Cartage of wooden anchor from store to bridge head including loading unloading cartage etc. as per direction of Engineer in Charge (only for Departmental work) (As per Kumbh Mela SOR SI No. 12, Page No. 5)
32Earth work cutting/ filling in river & nala both bank side & leveling ,dresing, cutting for making approch.road.
33Leveling & Drassing (4cm. Deep) of Road (As per Kumbh Mela SOR SI No. 25, Page No. 3)
34Fixing of railing wire through hole of railing post and hole of vertical post and making wire stay of each rows and tightened with the help of stay clamps including making of hole in vertical ballies post (labour only) (As per Kumbh Mela SOR SI No. 16, Page No. 5)
35During carring the pantoon pair from place of anchoring (D/S side of bridge) in water and then to cross the dry bed/shallow water on the way up to th alignment, dsconnecting the pantoon pair and rolling the pantoon and fixing in the alignment after. (As per Kumbh Mela SOR SI No. 4, Page No. 5)
36Sinking of pantoon to obtain the proper grading as laid in dry bed/shallow water in the alignment of pantoon bridge as per direction of Engineer-in-charge. (As per Kumbh Mela SOR SI No. 5, Page No. 5)
37Making stay on both side of pontoon bridge with the help of 20mm/10mm wire rope(labour only) (As per Kumbh Mela SOR SI No. 36, Page No. 4)
38Dismantling Work :-Dismantaling of chequred plate and lifting of chequred plate for loading into truck including cost of cartage loading unloading T&P and duly stacked in Seetamarhi store. (As per Kumbh Mela SOR SI No. 4, Page No. 7)
39Dismantaling & carring of sal sleeper loading unloading caring & duly stacked in Poorab Nayan store.(As per Kumbh Mela SOR SI No. 6, Page No. 7)
40Dismantaling & caring of sal edging loading unloading caring & duly stacked in Poorab Nayan store.(As per Kumbh Mela SOR SI No. 8, Page No. 7)
41Cartage of R.S joist 5.2m long between to pnatoon after dismantling of pantoon pair including loading unloading caring & duly stacked in Poorab Nayan store.(As per Kumbh Mela SOR SI No. 9, Page No. 7)
42Dismantaling & caring of ralling post loading unloading caring & duly stacked in Poorab Nayan store.(As per Kumbh Mela SOR SI No. 12, Page No. 7)
43Opening out man hole covers including loading, unloading cartage % duly stacked in store at parade ground. (As per Kumbh Mela SOR SI No. 32, Page No. 4)
44Carrying of pantoon pair from the place of anchoring(down stream side of bridge) to the alignment of bridge in water and fixing the same with other pantoon pair and reflexing the same in bridge alignment.(up steemriver bank of Poorab Nayan side in 2km.)(As per Kumbh Mela SOR SI No. 3, Page No. 5) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56451844
AUTHORITY Government Departments
TENDER VALUE 14 Lakhs
LAST DATE 30-07-2026
Authority
Authority Name Public Works Department
Work Description Tender for Erection And Dismantling Of Pantoon Bridge On Sai River In Gram Sabha Poorab Nayan Block Deeh In Distt Raebareli
Basic Detail
Tender No 1140/8 Lekha/2026-27 Dt. 22-06-2026
Bidding Type Tender
Location
City Rae Bareli
State Uttar Pradesh
Key Dates
Publish Date 20 Jul 2026
Submission Date 30 Jul 2026
Open Date 30 Jul 2026
Finance
Tender Value 14 Lakhs
Tender Fee 860
EMD 1.40 Lakhs
Exemption Available
Document List
74a35550-d6a8-4888-a6e2-c8735e13de4d.html
BOQ_2193783.xls
T1cd1rbl.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 22, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Today
Jul 30, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Jul 22, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Today
Jul 30, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Jul 30, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
html

74a35550-d6a8-4888-a6e2-c8735e13de4d.html

xls

BOQ_2193783.xls

pdf

T1cd1rbl.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders