Defence Government Departments Closing in 34 days TDR #56449359

Tender For Short Refit (Sr 27) Of Installation Sudarshini (O/L)

Issued by Government Departments · Ernakulam, Kerala
Tender Value
Ref. Documents
Estimated cost
Bid Submission
18 Aug 2026
34 days left
EMD
1.40 Crore
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ernakulam → Kerala
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Short Refit (Sr 27) Of Installation Sudarshini (O/L)

BOQ

Name of Work:- SHORT REFIT (SR 27) OF INS SUDARSHINI (O/L)
Sl. No. Item Description
1SUMMARY OF QUOTATION
2ServicesTotal Cost of Dry Dock Hire Charges and other Admin & General Services quoted in the BoQ
3Cost of repair part :-(a) Total cost of Hull & Rigging Work Package
4(b) Total cost of Engineering Work Package
5(c) Total cost of Electrical Work Package
6GST on serial 1.01 to 1.04
7Total Budgeary Cost of Spares
8GST applicable for 1.06
9Any other Taxes & Duties
10Miscellaneous (not included in any of the serial above)
11GST if any on serial 1.09
12HULL - PART I
13SHIPYARD TO UNDERTAKE STEEL RENEWAL/BUILD UP AS INDICATED BY NSRY(KOC) TO REPAIR CORROSSION / UNDULATION / PITTING ETC AT ALL LOCATIONS INCLUDING TANKS / SEA TUBE / SEA CHEST / HULL PLATES/RUDDER / BRIDGE TOP SOFT PATCH / MACHINERY FOUNDATION PLATES/HAWSE PIPE / FIAR LEAD / BOLLARD ETC SHIPYARD TO QUOTE FOR NECESSARY DE-GUTTING / RE-GUTTING INCLUDING COST OF SPARES LIKE LAGGING ETC. COATING / PAINTING TO BE RESOTRED POST STEEL RENEWAL. PAYMENT BASED ON THE ACTUAL QUANTITY OF SOW UNDERTAKEN AS PER WCC ON NOT EXCEEDING BASIS. APPROX 20 TONS OF STEEL RENEWAL ENVISAGED. ALL HOT WORK ARE TO BE UNDERTAKEN INCLUDING ALL SAFETY REQUIRMENT INCLUDING HOT WORK SENTRIES
14SR 4 - ALL TANKS, COFFERDAMS AND SEA TUBES WHICH ARE REPAIRED BY BUILD-UP/RENEWAL ARE TO BE AIR PRESSURE TESTED IAW PARA 47 OF NO 01/15. THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QUALITY CONTROL INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.
15SR 2 - SURVEY THE FOLLOWING STRUCTURE IN ACCORDANCE WITH NO 01/15 AND IHQ MOD (N)/ DNA LETTER NC/7631 DATED 01 NOV 22 AS MENTIONED BELOW :-EXTERNAL UW HULL1. CARRY OUT 100% ROBOTIC SURVEY OF EXTERNAL UW HULL INCLUDING BOOT TOP AND USG IN WAY OF MACHINERY COMPARTMENT (SURVEY TO BE UNDERTAKEN BY SHIPYARD)NOTE:- EYE HOOKS IF USED FOR PROPELLER OR SHAFT REMOVAL/ FITMENT ARE TO BE REMOVED BEFORE UNDOCKING AND GROUND FLUSHED. PAD PIECES WITH FAIR EDGES MAY BE RETAINED EXCEPT THOSE WITH WATERJETS AND SURFACE DRIVES.
16SR2 - INTERNAL UW HULL STRUCTURE & ABOVE WATER STRUCTURENOTES: -1. PAINT SCHEME IS TO BE RESTORED POST SURVEY/ RENEWAL IAW NO 53/16/ NCDS/ POLICY DIRECTIVES.2. FOR THE AREAS WHEREIN SAMPLE USG IS TO BE UNDERTAKEN, IT IS ESSENTIAL THAT THE SAMPLE AREA BE CHOSEN SUCH THAT IT TRULY REPRESENTS THE SUSPECT AREAS UNDER CHECK. SUCH AREA TO BE IDENTIFIED JOINTLY BY THE SHIP STAFF AND REFITTING AUTHORITY.
17SR 3 CARRY OUT SURVEY AND INSPECTION OF ALL BOLLARDS/FAIRLEADS/ CLEATS/ DECK EYES/ STAGHORN AND OTHER DECK FITTINGS STRUCTURE INCLUDING STIFFENING MEMBERS IN THE VICINITY WITH NON-DESTRUCTIVE TECHNIQUES, IF REQUIRED AND INCLUDE IN THE SURVEY REPORT. FOR TOWING AND CABLE CLENCH, CHECK THE EFFICACY OF THE ATTACHMENT USING NON-DESTRUCTIVE TESTING.
18SR 1 -REMOVE MARINE FOULING FROM ENTIRE UW EXTERNAL HULL AREA USING WOODEN SCRAPPER OR HYDRO JETTING WITH MAXIMUM PRESSURE NOT EXCEEDING 3000 PSI.
19SR2 - SCRAPE AND CLEAN UNDER WATER AND BOOT TOPPING AREA (INCLUDING WIND AND WATER AREAS) TO REMOVE ALL LOOSE PAINT FILM, RUST ETC. PAINT SCHEME REPAIR/ RENEWAL IS TO BE UNDERTAKEN IAW IHQ, MOD POLICY LETTER NC/0528/LLPS DATED 20 JUL 11 AND NCD 1491 ISSUE 1 OF MAY 11 AND SURFACE PREPARATION TO BE UNDERTAKEN IAW WITH NO 53/16.NOTE :- WIND AND WATER AREAS TO BE CONSIDERED UP TO 500MM ABOVE BOOT TOP.
20SR 3- SURVEY THE FOLLOWING STRUCTURE IN ACCORDANCE WITH NO 01/15 AND IHQ MOD (N)/ DNA LETTER NC/7631 DATED 01 NOV 22 AND REPAIR AS PER SURVEY REPORT AS MENTIONED BELOW :-EXTERNAL UW HULL (A) 100% VISUAL SURVEY OF COMPLETE UNDERWATER HULL ANDBOOT TOP INCLUDING WIND AND WATER AREAS I.E. AREA UP TO500MM ABOVE BOOT TOP AREA (FOR GROUP A, B, C SHIPS)
21SR5 - APPLICATION OF ONE COAT OF A/F PAINT ON UNDER WATER HULL AND BOOT TOP AREA TO BE CARRIED OUT POST ADEQUATE SURFACE PREPARATION BASED ON THE FINDINGS OF JOINT INSPECTION WITH OEM. PAINT TOUCH UP/ MAINTENANCE PAINTING TO BE CARRIED OUT IAW NO 53/16/ POLICIES/ NCD IN VOGUE. PAYMENT AS PER ACTUALS.
22SR2 - EXAMINE RUDDER STRUCTURE IN ACCORDANCE WITH NO 01/15, PAYING PARTICULAR ATTENTION TO HULL PLATING IN THE VICINITY OF RUDDER(S) AND FITTINGS UP TO THE RUDDER HEAD, FOR ANY SIGNS OF CORROSION AND ANY OTHER DEFECTS/ DAMAGE.
23SR3 - EXAMINE AND CHECK CLEARANCES OF LOWER AND UPPER BEARINGS OR BUSHES, WHICHEVER IS FITTED, OF RUDDER. RENEW/ REPACK RUDDER BEARINGS/ GLAND BUSHES, IF REQUIRED (BR 3000 ART. 2811 & BR 3001 ART. 2805 REFERS) . SS TO RECORD IN EMAP.
24SR4 - EXAMINE RUDDER PINTLE BEARINGS TO ENSURE THAT THEY ARE FULLY LUBRICATED BEFORE UNDOCKING.
25SR 1 CARRY OUT ABRASIVE BLASTING/SCRAPING TO BARE METAL OF AREAS OF CORROSION/ PAINT DAMAGE. RESTORE THE PAINT SCHEME AS PER SHIPS UW PAINT SCHEME IN ACCORDANCE WITH NO 53/16.
26SR 1 INSPECT SACRIFICIAL ANODES FITTED TO UNDERWATER HULL, RUDDERS,ROPE GAURD, SHAFT TUNNEL, STERN TUBES, INLETS AND OUTLETS, SEATUBES, BILGES AND COFFER DAMS. RENEW THOSE CONSUMED 50%OR MORE.NOTE:- FOR SACRIFICIAL ANODES, A MINIMUM OF 4 MM GAPBETWEEN THE HULL AND THE ANODE IS TO BE MAINTAINED. OLDANODE LEGS/ WELD METAL IS TO BE FLUSH GROUND, POST REMOVALAND RESTORED WITH THESR 2 CLEAN REMAINING SACRIFICIAL ANODES WITH STEEL WIRE BRUSH.NOTE:- ENSURE SACRIFICIAL ANODES ARE NOT PAINTED. ANY PAINTOR COATING OVER THE ANODES IS TO BE SCRAPPED CLEAN BEFOREUN-DOCKING.
27SR1 - REMOVE, CLEAN AND EXAMINE GRATING OF ALL UNDER WATER INLETS AND DISCHARGES. EXAMINE ALL PLATING, COATING AND ZINCS OF INLETS AND DIACHARGES AND AREAS ADJASCENT TO THEM. REPLACE GRATING POST COMPLETION OF REPAIR AND RECOAT WORK ON INLETS DISCHARGES GRATINGS. NOTE: - VAVES ARE REQUIRED TO BE OPENED BY SS/YARD(>100MM)
28SR2 - CARRY OUT 100% VISUAL SURVEY AND ENDOSCOPY OF ALL SEA CHEST/SEA TUBE/ UW INLETS/ OUTLETS AND OBD FOR INTERNAL CORROSSION, PITTING AND CRACKS ETC. SEA TUBE GRADED CRITICAL DURING THE PRECEEDING REFITS ARE TO BE ULTRASINICALLY SURVEYED AND REPAIRED AS PER INSTRUCTION CONTAINED IN THE NAVY ORDER 01/15. UNDERTAKE AIR PRESSURE TEST OF ALL REPAIRED/ RENEWED SEA TUBES/ SEA CHEST OF OBD POST STRUCTURAL REPAIR/ RENEWAL. NOTE - 1. ALL SEATUBES ARE TO BE SURVEYED IRRESPECTIVE OF THEIR MATERIAL. DURING SURVEY OF SEATUBE, SPECIFIC ATTENTION IS TO BE PAID TO TNE NECK REGION. ALL BRANCH PIPE/ FLUSH THROUGH LIiNE WELDED TO SEACHEST/ SEATUBE ARE TO BE SURVEYED AS PART OF SEATUBE.2. CONDITIONAL ASSESSMENT OF BIMETALIC JOINT IS TO BE CARRIED OUT WHILST UNDERTAKING SURVEY OF THE SEA TUBE. 100%ENDOSCOPY OF SEATUBES IS TO BE CARRIED OUT POST REPAIRS AND APPLICATION OF COATING PRIOR TO UNDOCKING OF THE SHIP 3. SEA TUBE NOT ACCESSIBLE FOR SURVEY AND PAINTING ARE TO BE RENEWED.
29SR3 - ALL SEA CHEST/ SEA TUBE AND OBDS WHICH ARE REPAIRED BY BUILD-UP/ RENEWAL ARE TO BE AIR PRESSURE TESTED IAW PARA 47 OF NO 01/15. PRESSURE TESTING ARE TO BE CARRIED OUT BY REFITTING AUTHORITES IN PRESENCE OF SHIP'S STAFF AND QUALITY CONTROL INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THEASE SPACES.
30SR4 -RESTORE/RENEW PAINT SCHEME OF ALL UNDERWATER SEA CHEST/SEA TUBES/OBDS WITH APPORIATE PAINT SCHEME POST COMPLETION OF SURVEY AND REPAIR AS PER NO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA TIME TO TIME SEA TUBES REMOVED FOR REPAIR TO BE ABRASIVE BLASTED AND COATED WITH PAINT SCHEME PRIOR TO FITMENT. PLATE LAPS,WELDS ETC TO BE FAIRED WITH EPOXY PUTTY BEFORE APPLICATION OF PAINT.
31SR3 - APPLY A MIXTURE OF LINSEED OIL AND PARAFFIN (1:4 OR 5) TO THE ENTIRE DECK
323M2: CHECK FOR CRACKS/ LOSS OF INTEGRITY IN BOWSPIRIT USING VISUAL TECHNIQUES.
33A1: INSPECT HALYARDS FOR ANY DEFECT/ DAMAGE AND REPLACE DEFECTIVE COMPONENTS
34A2: INSPECT STANDING RIGGING, CLEVIS PINS BY SLACKING THE RIGGING AND PULLING THE PINS FOR WEAR AND DISTORSION. UPON REINSERTION TURN THE PINS 180 DEGREES. IN CASE OF ANY WEAR AND TEAR, REPLACE AS NECESSARY.
35A3: INSPECT SLINGS, NETS BASKETS, CHAINS, LINKS, RINGS, SHACKELS EYE PLATES, BOTTLE SCREWSLIP, BLOCKS AND ALL OTHER RIGGING ACCESSORIES IN CASE OF ANY WEAR AND TEAR, RENEW/ REPLACE AS NECESSARY.
3624M1: CARRY OUT LOAD TESTING OF EYE PLATES, BOTTLE SCREWS AND OTHER RIGGING ACCESSORIES AS PER INBR 1552. IN CASE OF ANY REPAIRS CARRIED OUT ON ANY LOAD BEARING MEMBER, THE APPLIANCE IS TO BE LOAD TESTED IRRESPECTIVE OF WHETHER THE LOAD TESTING IS DUE.
37SR1 - EXAMINE ALL RUNNING RIGGING AND RENEW AS PER RUNNING RIGGING SCHEDULE SERIALS ( EXCEPT YARDS, GAFFS, BOOMS AND ASSOCIATED FITTINGS)
38SR2 - UNDERTAKE INSPECTION OF BOWSPRIT, RUNNING, RIGGING,YARDARMS, STANDING RIGGING AND ASSOCIATED ACCESSORIES THROUGH OEM. NOTE: - OEM INSPECTION TO INCLUDE INSPECTION OF MAST AND MAST STEP (WITHOUT REMOVAL) IN PRECEDING SHORT REFIT TOWARDS UNDERTAKING WORK AS PER MR1 ROUTINE IN FORTHCOMING MEDIUM REFIT.
39SR7 - UNDERTAKE IN-SITU VISUAL SURVEY AND EXAMINATION OF LIFTING AND ASSOCIATED CONNECTING HOOK/ FASTENING INCLUDING DIMENSIONAL CHECKS.NOTE:- LIMITS FOR WEAR DOWN TO BE RESTRICTED IAW 2.13 OF INBR 1552.
40SR6 - EXAMINE ASSOCIATED EYE PLATES AND STRUCTURE TO WHICH THEY ARE ATTACHED AND RENEW EYE PLATES IF DEFECTIVE.NOTE:-1. EXAMINE DAVIT FOR DEFECT BEFORE AND AFTER HANDLING THEIR NORMAL LOAD. WHEN DAVITS ARE USED FOR HANDLING AMMUNITION, EXAMINE ALSO AT INTERVALS DURING OPERATION.2. IF ANY PART EFFECTING THE STRENGTH OF LIFTING AND HANDLING EQUIPMENT BECOMES DEFECTIVE AND IS REPAIRED OR RENEWED, SHIP STAFF INSPECT BEFORE FURTHER USE AND ARRANGE FOR FURTHER STANDARD TEST AT FIRST OPPORTUNITY.3. INSPECT THE BRAKE LININGS, PINS, BUSHES, AND GEARS FOR WEAR AND TEAR.
41SR1 - ENSURE ANCHOR WINDLASS FOUNDATION BOLTS FOR TIGHTNESS. EXAMINE CONDITION OF HULL STRUCTURE AT WINDLASS MOUNTING AND ENSURE WATERTIGHT INTEGRITY.
42SR2- REMOVE, EXAMINE AND REASSEMBLE THE FOLLOWING AS PER INSTRUCTION AND MAINTENANCE MANUAL:(A) CLUTCH SHIFTING ARRANGEMENT.(B) SPOOLING GEAR ASSEMBLY.
43SR3 - OPEN UP GEAR BOX AND EXAMINE GEAR TEETH AND BEARINGS FOR DAMAGE/WEAR. RENEW AS NECESSARY.
44SR1 - SURFACE PREPARATION BY HYDRO BLASTING OF THE ANCHOR, CHAIN CABLE AND ASSOCIATED ACCESSORIES IS TO BE CARRIED OUT PRIOR UNDERTAKING VISUAL SURVEY. QTY 16 SHACKLES AND 02 ANCHOR AND 02 SWIWEL PIECE
45SR5 UNSCREW BOTTLE SLIP/COMPRESSOR WHEREAS FITTED TO ITS FULLEST EXTENT AND THOROUGHLY CLEAN AND GREASE THREADS BEFORE ASSEMBLY.
46SR6 - UNDERTAKE SURVEY OF ADAPTER PIECE FOR CRECKS OR WEAR AND UNDERTAKE REPAIR AS PER NO 02/21.
47SURVEY ALL DECK FITTINGS ASSOCIATED WITH ANCHOR CHAIN CABLEARRANGEMENT IE DECK EYES/ EYE PLATES INCLUDING GULLETINE/GULLETINE ROLLER, COMPRESSOR WITH COMPLETE STRUCTURE WHEREASFITTED PAYING PARTICULAR ATTENTION EYE PLATES/ EYE BOLTS ETC FORWEAR, CORROSION/ DETERIORATION AND OVALITY OF HOLE. UNDERTAKEREPAIR/ RENEWAL IAW NO 02/21.
48SR9 - SURVEY ANCHOR, CHAIN CABLE SWIVEL ADAPTER, SHACKLES AND ALL ASSOCIATED FITTINGS. BREAK, CLEAN AND GREASE ALL JOINING SHACKLES. (AN EXPERIENCED DOCKYARD BLACKSMITH IS TO ASSIST THE SURVEY). QTY - 18 SHACKLESBREAK, CLEAN AND GREASE ALL JOINING SHACKLES. UNDERTAKE REPAIR/ RENEWAL AS APPLICABLE IAW NO 02/21. FORWARD A REPORT ON IN 305/ NSO 269(B) TO AUTHORITIES AS MENTIONED IN PARA 15 OF NO 02/21.
49SR12 - UNDERTAKE PRESERVATION OF THE ANCHORS, CHAIN CABLES AND ACCESSORIES HELD ONBOARD AS PER NO 53/16. QTY - 18 SHACKLES
50UNDERTAKE AIR PRESSURE TESTING OF ALL SLUDGE AND BILGE TANKS WHICH ARE REPAIRED BY BUILD-UP/RENEWAL IAW PARA 47 OF NO 01/15.NOTE: - THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QC INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.
51SR1 - WEIGH THE RIB AND COMPARE WITH IDEAL WEIGHT. RECORD THE SAME IN BOAT LOG BOOK. UNDUE INCREASE OF WEIGHT, IF ANY BE REPORTED FOR DETAILED EXAMINATION.(NOTE: - FOR AFLOAT UNITS DURING EVERY REFITS.)
52SR3 - EXAMINE DOOR SURFACES, SEALING WEDGE AND BLOCKING CONES ETC FOR DAMAGE AND CARRY OUT REPAIRS AS NECESSARY.
53SR6 REPLACE/RENEW DEFECTIVE/ BROKEN/ CORRODED EARTHING CONNECTIONS AS PROJECTED BY SS.
54SR1 BROWS ARE TO BE EXAMINED, REPAIRED AS NECESSARY. DOCKYARD TESTING NOT MORE THAN 16 MONTHS.NOTE: BROWS ARE TO BE TESTED AT THE FIRST OPPORTUNITY AFTER ANY REPAIRS CARRIED OUT BY SHIPS STAFF.
55RIGGING
56UNDERTAKE THOROUGH CHECK OF THE STRUCTURESR1 EXAMINE MAST STRUCTURE, WHIP AERIAL PLATFORMS AND THESURROUNDING STRUCTURE ON DECK, EYE PLATES, LOAD CARRYINGMEMBERS FOR SIGNS OF CORROSION. EXAMINE BOLTED, RIVETED ANDINTERMITTENT WELDED STRUCTURE CONNECTIONS FOR SIGNS OFFRACTURE. PORTABLE AND SEMI PORTABLE FITTINGS TO BE REMOVEDFOR CLOSER EXAMINATION OF STRUCTURE UNDERNEATH. ANY KNOWNDEFECTS TO BE RAISED TO DOCKYARD FOR RECTIFICATION.SR2 CARRY OUT LOAD TESTING OF EYE PLATES, BOTTLE SCREWS ETC IF DUE(NOT TO EXCEED 27 MONTHS).
57RENEW COMPLETE THE FOLLOWING RUNNING RIGGING.
58FORE MASTHEAD JIB HALLIARD
59FORE MASTHEAD JIB DOWNHAUL
60FORE MASTHEAD JIB TACK PURCHASE
61FORE MASTHEAD JIB SHEETS
62FORE TOPGALLANT OUTER JIB HALLIARD
63FORE TOPGALLANT OUTER JIB DOWNHAUL
64FORE TOPGALLANT OUTER JIB TACK PURCHASE
65FORE TOPGALLANT OUTER JIB SHEETS
66FORE TOPGALLANT INNER JIB HALLIARD
67FORE TOPGALLANT INNER JIB DOWNHAUL
68FORE TOPGALLANT INNER JIB TACK PURCHASE
69FORE TOPGALLANT INNER JIB SHEETS
70FORE STAYSAIL HALLIARD
71FORE STAYSAIL DOWNHAUL
72FORE STAYSAIL TACK PURCHASE
73FORE STAYSAIL SHEETS
74MAIN STAYSAIL HALLIARD, PURCHASE & TACK PENDANT
75MAIN STAYSAIL DOWNHAUL
76MAIN STAYSAIL SHEETS
77MAIN TOPMAST STAYSAIL HALLIARD
78MAIN TOPMAST STAYSAIL DOWNHAUL
79MAIN TOPMAST STAYSAIL SHEETS
80MIZZEN STAYSAIL HALLIARD & TACK PURCHASE
81MIZZEN STAYSAIL DOWNHAUL
82MIZZEN STAYSAIL SHEETS
83MIZZEN TOPMAST STAYSAIL HALLIARD, PURCHASE & TACK PENDANT
84MIZZEN TOPMAST STAYSAIL DOWNHAUL
85MIZZEN TOPMAST STAYSAIL SHEETS
86LOWER SPANKER PEAK HALLIARD
87LOWER SPANKER THROAT HALLIARD
88LOWER SPANKER GAFF VANGS
89SPANKER TOPPING LIFT
90LOWER SPANKER HEAD INHAUL & OUTHAUL
91LOWER SPANKER BRAILS
92LOWER SPANKER FOOT INHAUL
93LOWER SPANKER FOOT OUTHAUL
94SPANKER SHEETS
95MIZZEN BOOM PREVENTER
96UPPER SPANKER TOPPING LIFT
97UPPER SPANKER THROAT HALLIARD
98UPPER SPANKER GAFF VANGS
99UPPER SPANKER HEAD OUTHAUL
100UPPER SPANKER HEAD INHAUL
101UPPER SPANKER BRAILS
102UPPER SPANKER FOOT OUTHAUL
103UPPER SPANKER FOOT INHAUL
104SPANKER TOPSAIL HALLIARD
105SPANKER TOPSAIL OUTHAUL
106SPANKER TOPSAIL DOWNHAUL
107TRISAIL HALLIARD
108TRISAIL TACK PURCHASE
109TRISAIL SHEET
110FORE COURSE LIFTS
111FORE COURSE BRACES
112FORE COURSE SHEETS
113FORE COURSE TACKS AND BOWLINES
114FORE COURSE BUNTLINES
115FORE COURSE CLEW LINES
116FORE COURSE REEF PURCHASES
117FORE TOPSAIL HALLIARD
118FORE TOPSAIL LIFTS
119FORE TOPSAIL BRACES
120FORE TOPSAIL SHEETS
121FORE TOPSAIL BUNTLINES
122FORE TOPSAIL CLEWLINES
123FORE TOPSAIL REEF PURCHASES
124FORE TOPGALLANT HALLIARD
125FORE TOPSAIL LIFTS
126FORE TOPGALLANT BRACES
127FORE TOPGALLANT SHEETS
128FORE TOPGALLANT BUNTLINES
129FORE TOPGALLANT CLEWLINES
130FORE ROYAL HALLIARD
131FORE ROYAL LIFTS
132FORE ROYAL BRACES
133FORE ROYAL SHEETS
134FORE ROYAL BUNTLINES
135FORE ROYAL CLEWLINES
136MAIN COURSE LIFTS
137MAIN COURSE BRACES
138MAIN COURSE SHEETS
139MAIN COURSE TACKS AND BOWLINES
140MAIN COURSE BUNTLINES
141MAIN COURSE CLEW LINES
142MAIN COURSE REEF PURCHASES
143MAIN TOPSAIL HALLIARD
144MAN TOPSAIL LIFTS
145MAIN TOPSAIL BRACES
146MAIN TOPSAIL SHEETS
147MAIN TOPSAIL BUNTLINES
148MAIN TOPSAIL CLEWLINES
149MAIN TOPSAIL REEF PURCHASES
150MAIN TOPGALLANT HALLIARD
151MAIN TOPSAIL LIFTS
152MAIN TOPGALLANT BRACES
153MAIN TOPGALLANT SHEETS
154MAIN TOPGALLANT BUNTLINES
155FORE TOPGALLANT CLEWLINES
156MAIN ROYAL HALLIARD
157MAIN ROYAL LIFTS
158MAIN ROYAL BRACES
159MAIN ROYAL SHEETS
160MAIN ROYAL BUNTLINES
161FORE ROYAL CLEWLINES
162FORE, MAIN AND MIZZEN GANTLINES
163HANDY BILLIES
164ENSIGN HALLIARD
165COURTESY FLAG HALLIARDS
166BOAT DAVIT MIDSHIP TACKLES
167BOAT DAVIT VEERING TACKLES
168FOOTROPES
169FLEMISH HORSES
170STURRUPS
171GASKETS
172CLEW LASHINGS
173FOREMAST CANELINES
174MAINMAST CRANELINES
175MIZZEN CRANELINES
176SAFETY LINE ON ALL YARDS
177SAFETY LINE ON BOWSPRIT
178SAFETY LINE ON ALL TOPS
179DETAILED INSPECTION OF MASTS, YARDS, GAFFS, BOOM AND ASSOCIATED FITTINGS INSITU
180REMOVAL AND REFITMENT OF YARD CHAIN SLINGS
181SUPPLY OF ONE FULL SETS OF SAILS AND FITEMNT ON BOARD. SAILS TO BE SUPPLIED THROUGH OEM NORTH SAILS
182SUPPLY OF FULL SET OF SAIL COVERS AND SAIL BAGS AS PER SPECIFICATION RECEIVED FROM INDIAN NAVY
183SUPPLY OF SQUARE SAIL GASKETS
184PAINTING OF MASTS, YARDS, GAFFS, BOOM AS PER ORIGINAL PAINT SPECIFICATION. M/S AKZO NOBEL MAKE AWLGRIP YACHT PAINT SCHEME TO BE USED. PAINT AND SERVICES FOR APPLICATION OF MAST PAINT TO BE SOURCED THROUGH M/S WEST COAST MARINE YACHT SERVICES AUTHORISED REP OF M/S AKZO NOBEL
185INSPECTION AND REPAIRS / REPLACEMENT OF DOLPHIN STRIKER
186MANUFACTURE AND FITMENT OF NEW SAFETY NET UNDER BOWSPRIT
187INSPECTION AND REPAIRS TO ALL METAL LUGS, DECK CLENCHES, EYES, CLEATS AND PLATES WHERE STANDING AND RUNNING RIGGING SYSTENS ARE FITTED
188REPLACEMENT OF WOODEN RATLINE BARS ALONG WITH SUPPORTING ALUMINIUM ANGLES, SS 316 NUTS BOLTS ETC
189BOSUN CHAIRS TO BE RENEWED AS PER SAMPLE, QTY - 05 NOS.
190WOODEN LADDER TO BE REMOVED/ RENEWED AND REFITTED POST VARNISHED, QTY - 05, MAT - TEAK WOOD.
19150 IN NOS BELAY PINS DAMAGED AT VARIOUS LOCATIONS. SAME TO BE MANUFACTURED AS PER SAMPLE, MAT - SS, QTY - 50 NOS.
192RA FOR SERVICEABILITY CHECKS/ LOAD TEST OF SHROUDS BASE PLATE. QTY -15.
193RENEWAL OF ALL CRANE LINE OF CROSS TREE (TYPE - 3-STRAND, SIZE- 10MM, MAT - UV PROTECTIVE POLYESTER, COLOUR- BEIGE), QTY -100 RMT
194REMOVE FIFE RAILS FROM DECK. REPAIR/ RENEW AND REFIT. CHECK CONDITIONS OF DECK PLATES. SS, TEAK WOOD. AS PER SAMPLE POST FITMENT OF MAST. QTY - 03, MAT - SS, TEAK WOOD, BRASS CAP FOR BELAY PIN PROVIDED BY THE SHIPYARD.
195REMOVAL OF BOWSPRIT. INSPECTION AND RECOMMENDATIONS ON REPAIRS OF BOWSPRIT
196SUPPLY OF 2 FULL SETS OF SAILS AND FITEMNT ON BOARD. SAILS TO BE SUPPLIED THROUGH OEM NORTH SAILS
197SUPPLY OF FULL SET OF SAIL COVERS AND SAIL BAGS AS PER SPECIFICATION RECEIVED FROM INDIAN NAVY
198SUPPLY OF SQUARE SAIL GASKETS
199SUPPLY OF RIGGING HARNESS
200MANUFACTURE AND FITMENT OF NEW SAFETY NET UNDER BOWSPRIT
201REPLACEMENT OF WOODEN RATLINE BARS ALONG WITH SUPPORTING ALUMINIUM ANGLES, SS 316 NUTS BOLTS ETC
202MAINTENANCE OF ALL POWERED WINCHES ON UPPER DECK (THESE ARE REQUIRED BY RIGGEERS TO GO ALOFT)
203150 IN NOS BELAY PINS DAMAGED AT VARIOUS LOCATIONS. SAME TO BE MANUFACTURED AS PER SAMPLE, MAT - SS, QTY - 150 NOS.
204RA FOR SERVICEABILITY CHECKS/ LOAD TEST OF SHROUDS BASE PLATE. QTY -15.
205RENEWAL OF ALL CRANE LINE OF CROSS TREE (TYPE - 3-STRAND, SIZE- 10MM, MAT - UV PROTECTIVE POLYESTER, COLOUR- BEIGE), QTY -100 RMT
206HULL - PART III
207ABER REPLACEMENT OF ANCHOR WINDLASS IS TO BE UNDERTAKEN VIEW PERFORMANCE WINDLASS IS SUBOPTIMAL. QTY - 01. SOW IS AS FOLLOWS: - (I) REMOVAL OF EXISTING ANCHOR WINDLASS INCLUDING FITTINGS. (II) REMOCAL OF OLD FOUNDATION. (III) FITMENT OF NEW FOUNDATION.(IV) FITMENT OF NEW ANCHOR WINDLASS. (IV) FUNCTIONAL TRIALS AND LOAD TESTING OF THE WINDLASS IS TO BE PROOVED POST COMPLETION OF REPLACEMENT. APPROVAL FOR ABER REPLACEMENT IS UNDER PROCESS. (ALL JOB RELATED TO FITMENT OF ANCHOR WINDLASS INCLUDING DEGUTTING, REGUTTING, TO BE UNDERTAKEN BY YARD)
208HULL - PART II
209WATER LEAKAGE OBSERVED FROM FOLLOWING LOCATION IN WEATHER DECK: - (I) FORE MAST AND FIFRAIL. (II) MAIN MAST AND FIFRAIL. (III) PORT AND STBD FIFRAIL ON FOXLE. (IV) MIZZEN MAST AND FIFRAIL. (V) 14 NUMBERS SKYLIGHTS, (VI) SOFT PATCHES ON BRIDGE DECK. RA FOR REPAIR OF THE SAME. JOB INVOLVE: - REMOVAL OF WOODEN DECK, SEALING OF ALL DECK PENETRATING NUTS, BOLTS AND FITTINGS USING SEALING COMPOUND AND RESTORING OF WOODEN DECK. APPROX AREA FOR WOOD REMOVAL 40 SQMT.
210ALL THE HULL STRUCTURE BENEATH STANDING RIGGING LIKE SHROUDS BASE PLATE, MASTS ETC TO BE SURVEYED AND RENEWED AS PER SURVEY REPORT.
211RUST MARK OBSERVED AT INDICATED LOCATION IN THE FOLLOWING COMPARTMENT. PAINT TOUCH-UP TO BE UNDERTAKEN AT RUSTED AREA AS PER PAINT SCHEME: -(I) STP COMPARTMENT(II) REF COMPARTMENT(III) ELECTRICAL STORE(IV) AFT PUMP ROOM(V) CABLE LOCKERS PORT AND STBD(VI) BOSUN STORE(VII) ENG. STORE(VIII) ENGINE ROOM(IX) STEERING BILGE. NOTE: - PAINT TO BE PROVIDED BY YARD
212PAINTING OF ABOVE WATER SHIPSIDE AND SUPERSTRUCTURE DETERIORATED/PLEED OFF AT SCATTERED LOCATION. PAINT TOUCH UP OF THE SAME TO BE CARRIED OUT, QTY- 250 SQMT. PAINT TO BE PROVIDED BY YARD.
213ADVANCE INTERNAL FINISH COATING OF INTERNAL COMPARTMENT'S EXPOSED DECKS, BULKHEADS AND DECKHEAD TO BE CARRIED OUT AS PER IHQ MoD(N) LETTER PP-144/2021/MB/NC/PAINT-NCD 1485 DATED 18 OCT 21 VIEW PAINT DETERIORATED, PLEED OFF. QTY - 400 SQMT. PAINT TO BE PROVIDED BY THE YARD.
214CLEANING OF THE FOLLOWING TANKS TO BE UNDERTAKEN FOLLOWED BY CONDITION BASED TOUCH UP PAINTING: - (I) FRESH WATER TANKS , QTY - 06, (II) GREY WATER TANKS - QTY - 04, (III) DIRTY OIL TANK AND (IV) LUB OIL TANKS. APPROX AREA - 1200 SQMT
215DEGUTTING AND RE-GUTTING OF LAGGING OF HOT WORK AFFECTED AREA TO BE UNDERTAKEN, QTY 300 SQMT. NOTE:- FAT INSULATION LAGGING TO BE USED DURING REGUTTING OF LAGGING.
216TWO IN NUMBERS MARLIN SPIKES DEFORMED/ DAMAGED. SAME TO BE MANUFACTURED AS PER SAMPLE, QTY - 02. LENTGH - 6 INCH, DIA- ONE INCH.
21702 IN NUMBERS SWIVEL PIECE JAMMED TO BE EASE OUT. HEATING ASSISTANCE REQUIRED FOR 02 SWIVEL PIECE, 02 IN NUMBER ANCHOR RING (02+02)
218TWO IN NUMBER CHAIN HOOKS DAMAGED TO BE RENEWED AS PER SAMPLE, QTY - 02 , MAT - MS ,SIZE- 20MMX60MM
219TWO IN NUMBERS GUILLOTINE HEAVILY CORRODED. SAME TO BE RENEWED ALONG WITH SECURING PINS. MAT - MS SIZE- 2X2X7 INCH
220ANCHOR STROP (P & S) DETERIORATED. TO BE MANUFACTURED AS PER SAMPLE. QTY - 02, MAT- 10 MM SWR WITH THIMBLE EYE. LENGTH - 830MM
221COMPLETE OVERHAULING OF ANCHOR WINDLASS IS TO BE UNDERTAKEN VIEW OBNORMAL NOISE OBSERVED FROM ANCHOR WINDLASS. SOW IS AS FOLLOWS: - (I) OPENING OF GEAR BOX AND OVERHAULING. (II) OPENING OF GIPSSY/ CABLE HOLDER AND OVERHAULING. (III) REPLACEMENT OF MECHANICAL BRAKE SHOE LINBER (IV) TEST AND TRIALS TO BE PROOVED POST OVERHAULING.
222BOAT DAVIT ( P & S) ROLLER DETERIORATED TO BE RENEWED. QTY - 02 MAT - PVC. DIA - 40MM, LENGTH- 60MM
223BOAT DAVIT (P & S) STRUCTURE AND FOUNDATION CORRODED AND PITTED. RA FOR SURVEY AND REPAIR AS PER SURVEY REPORT. DIA - 1 FEET, LENGTH- 6 MTR
224ABNORMAL NOISE OBSERVED FROM BOAT DAVITS ( P & S). OVERHAULING OF BOTH BOAT DAVIT TO BE CARRIED OUT . JOB INVOLVE DISMANTLING OF BOAT DAVITS, OVERHAULING OF DAVITS AND FITMENT OF THE SAME. NEW SS BOLTS TO BE USED WHILE FITMENT. QTY - 02.
225TOP COAT OF EPOXY DECK COVERING PERISHED. THE SAME TO BE RENEWED, AREA - 70 SQMT.
226FRESHWATER PIPE DEFECTIVE IN 05 WC. RA FOR REPAIR/ RENEWAL OF THE SAME. MAT - CU-NI, QTY 10 RMT. DIA - 1/2 INCH
227WATER LEAKAGE OBSERVED IN HOT WATER LINE IN SENIOR SAILOR BATHROOM AND OFFICER'S BATHROOM. THE SAME TO BE RENEWED WITH END FITTING. REMOVAL AND FITMENT OF PANELING TO BE UNDERTAKEN PRE AND POST COMPLETION OF WORK RESPECTIVELY. MAT- CU-NI, DIA - 1/2 INCH.
228WATER LEAKAGE OBSERVED IN FRESH WATER LINE IN JUNIOR SAILOR BATH, SS BATH AND OFFICER'S BATHROOM, QTY 70 RMT, MAT - CU-NI, DIA - 1/2 INCH. THE SAME TO BE RENEWED ALONG WITH END FITTINGS. JOB INVOLVE: - (I) REMOVAL OF OLD LINES AND FITMENT OF NEW LINES. (II)REMOVAL AND FITMENT OF ASSOCIATED PANELING.
22912 IN NUMBERS HEALTH FAUCET DAMAGED TO BE RENEWED ALONG WITH STAND. MAKE - JAGUAR
23020 IN NUMBERS GUARDRAILS DAMAGED. SAME TO BE RENEWED ALONG WITH END FITTING, QTY - 100 MTR MAT - PVC
231FIXED GUARD ON CHART-HOUSE TOP DETERIORATED. RA FOR RENEWAL OF THE SAME, QTY - 20 RMT
23215 IN NUMBERS GUARDRAILS STANCHION DETERIORATED TO BE RENEWED WITH IT'S SHOE. MAT - AL
233LOAD TESTING OF FOLLOWING TO BE CARRIED OUT.(A) DECK EYE PORT FOR BOTTLE SCREW SLIP-01
234(B) DECK EYE STBD FOR BOTTLE SCREW SLIP-01
235(C) BOTTLE SCREW SLIP PORT (FOXLE) - 01
236(D) BOTTLE SCREW SLIP STBD (FOXLE) - 01
237(E) ANCHOR STROP - 02
238(F) CABLE CLENCH PORT - 01
239(G) CABLE CLENCH STBD - 01
240(H) BOAT DAVIT PORT - 01
241(J) BOAT DAVIT STBD - 01
242(K) FOOD SERVICE LIFT - 01
243(L) BOLLARDS - 20
244(M) FAIR LEADS - 10
245(N) MOORING WINCHES - 04
246(P) SHIPS BROW - 02
247(Q) BOAT FALLS - 02
248(R) BOAT SLINGS - 02
249(S) AFT ANCHOR WITH WIRE ROPE - 01
250(T) CATTING DAVITS (P&S)- 02
251(U) SAFETY PREVENTER (P&S) – 02
252(V) BOAT ARH – 02 NOS
253(W) DECK EYE FOR ANCHOR STROP (P&S) – 4 NOS
254(X) GUARDRAILS – 30 NOS
255CARRY OUT CLEANING / SURVEY OF V1 AND V2 TANKS AND REPAIR AS NECESSARY. INSPECT THE INTERNAL AND EXTERNAL PAINT COATING AND RECOAT WITH APPROPRIATE PAINT SCHEME AFTER COMPLETION OF REPAIRS AND SURFACE PREPARATION.
256CHECK FUNCTION OF CONTROL PANEL AND CARRYOUT OUT CALIBRATION OF LEVEL SWITCHES OF V1 AND V2 TANKS. REPLACE IF NECESSARY.
257OVERHAUL / REPAIR THE FOLLOWING :(A) OVERBOARD PUMP(B) DISCHARGE PUMP(C) MACERATOR PUMP(D) IMO PUMP (IF FITTED)(E) ROTARY AIR COMPRESSOR
258INSPECT FREENESS OF VENT LINE OF V1 AND V2 TANKS BY BLOWING THROUGH WITH AIR.
259OVERHAULING OF TWO IN NOS GREY WATER DISCHARGE VALVE TO BE CARRIED OUT VIEW VALVE NOT HOLDING. QTY - 02. DIA - 65 MM
26004 IN NUMBERS GREY WATER TANK CONNECTING VALVE JAMMED. OVERHAULING OF THE SAME TO BE CARRIED OUT. DIA - 65 MM
261THREE IN NUMBER DECK DRAIN SHIP'S GALLEY CHOCKED. TO BE RENEWED. QTY - 18 RMT , MAT- CU-NI, DIA - 50MM, SOW INVOLVE: - (I)DEGUTTING OF DECK COVERING APPROX AREA - 05 SQMT. (II) REMOVAL OF OLD DRAIN LINES AND FITMENT OF NEW DRAIN LINES. (III) EPOXY DECK COVERING IS TO BE RESTORED POST COMPLETION OF WORK.
262UNDERTAKE CHEMICAL CLEANING OF ALL SYSTEM/SEWAGE PIPELINE VIEW CLOGGED AND REPAIR/RENEWAL AS NECESSARY, QTY- 80 RMT, DIA - 50MM.
263GREY WATER PIPE LINE DETERIORATED AT FWD AND AFT PUMP ROOM TO BE RENEWED. QTY - 15 RMT, MAT - CU-NI, DIA - 50MM
264THREE IN NUMBER DRAIN LINE CHOCKED IN SENIOR SAILOR'S BATHROOM, TO BE RENEWED. SOW INVOLVE : - (I) DEGUTTING OF DECK COVERING AND DECK , APPROX AREA 4 SQMT, (II) REMOVAL OF OLD DRAIN LINE AND FITMENT OF NEW DRAIN LINES, QTY - 20 RMT, MAT - CU-NI, DIA 50MM (III) EPOXY DECK COVERING AND DECK PLATE ARE TO BE RESTORED POST COMPLETION OF WORK.
265SIX IN NUMBER DRAIN LINES CHOCKED IN JUNIOR SAILOR'S BATHROOM AND CADET'S BATHROOM. SAME TO BE RENEWED. MAT - MS. SOW INVOLVE: - (I) DEGUTTING OF DECKCOVERING , APPROX AREA 5 SQMT, (II) REMOVAL OF OLD DRAIN LINES AND FITMENT OF NEW DRAIN LINES, QTY - 20 RMT, MAT - CU-NI, DIA 50MM. (III) EPOXY DECK COVERING AND DECK PLATE IS TO BE RESTORED POST COMPLETION OF WORK.
266WATER LEAKAGE OBSERVED FROM 20 IN NUMBERS SHIP SIDE SCUTTLES. ALL SIDE SCUTTLE TO BE REPLACED. WATER HOSE TEST IS TO BE CARRIED OUT POST REPAIR/ RENEWAL.
267RETAINING HOOK OF OFFICER'S BATHROOM AFT SIDE SCUTTLE DETERIORATED TO BE REPAIRED IN SITU.
268RUBBER BEADING OF 20 IN NUMBERS SIDE SCUTTLES DETERIORATED TO BE REPLACED.
26910 IN NUMBERS TUMBLER BOLTS JAMMED/ DEFECTIVE. SAME TO BE RENEWED.
270OIL LEAKAGE OBSERVED FROM 10 IN NOS 4/2 PILOT VALVES. RA FOR REPLACEMENT OF THE SAME. QTY - 10. DIA - 12MM
271LEAKAGE OBSERVED FROM HYDRAULIC HAND PUMP AND PIPE CONNECTIONS. REQUEST ASSISTANCE FOR REPAIR. QTY-05
27210 IN NUMBER HYDRAULIC DOOR OPENING LEVER CORRODED/ BROKEN. TO BE RENEWED AS PER SAMPLE. MAT - MS/ GI PIPE. DIA- 3/4 INCH APPROX
273OVERHAULING OF 10 IN NUMBER HYDRAULIC HAND PUMPS JAMMED/ NOT WORKING PROPERLY. REPLACE DEFECTIVE
274RUBBER BEADING OF 10 IN NUMBER HYDRAULIC SLIDING DOOR DETERIORATED. RA FOR RENEWAL OF THE SAME. MAT- SILICON RUBBER. DIA 12MM
27510 IN NUMBER HYDRAULIC SLIDING DOORS NOT CLOSING PROPERLY VIEW MISALIGNMENT. RA FOR OVERHAULING AND PROVING OF FEELER GAUGE TEST.
276OIL LEAKAGE OBSERVED FROM HYDRAULIC CYLINDERS OF SLIDING DOORS. RA FOR OVERHAULING OF THE SAME, QTY - 5
277RUBBER BEADING OF 10 IN NUMBER WT DOOR AND 03 IN NUMBER HATCHES DETERIORATED/ PERISHED TO BE RENEWED AND ULD TEST TO BE PROVED. MAT- SILICONE RUBBER BEADING. QTY - 80RMT, SIZE - 30X20MM APPROX
27810 IN NUMBERS WT DOORS OPENING/CLOSING MECHANISM NOT WORKING SATISFACTORY. OVERHAULING OF DOORS TO BE CARRIED OUT AND CHALK TEST/ ULD TEST TO BE PROVED.
279HINGES OF THREE IN NUMBER WT DOORS CRACKED/ DAMAGED. SAME TO BE RENEWED. JOB INVOLVE DEGUTTING OF LAGGING/ PANELING, REPAIR RENEWAL RENEWAL OF HINGES. POST REPAIR LAGGING/PANELING AND ASSOCIATED FITTINGS ARE TO BE RESTORED. QTY - 06 HINGES, MAT -SS
280DOOR RETAINING HOOK/CLIP OF TEN IN NUMBER WT DOOR BROKEN. RA FOR RENEWAL OF THE SAME. MAT - MS/ AL
281ULTRASONIC LEAK DETECTION TEST OF 15 DOOR AND 2 HATCHES FAILED. ULD TEST IS TP BE PROOVED FOR THE SAME
282WIRE MESH OF VENT OF ENGINE ROOM EXHAUST DETERIORATED TO BE RENEWED, QTY - 04 SQMTR. MAT - SS
283WIRE MESH OF 12 IN NUMBER MUSHROOM HEAD ON UPPER CORRODED AND BROKEN TO BE RENEWED, MAT - SS, QTY - 12 SQMT
284HATCH COAMING AND HINGES OF FWD AND AFT HATCH CORRODED THINNED TO BE RENEWED. QTY - 02, MAT - MS, HATCH SIZE- 600X900 APPROX
285HATCHES SUPPORTING HYDRAULIC CYLINDERS NOT WORKING. RA FOR RENEWAL/ REPLACEMENT OF THE SAME, QTY - 4
286FWD AND AFT HATCH MUSHROOM HEAD COVER CORRODED THINNED AND HOLED. TO BE RENEWED IN SITU, QTY - 02 MAT - MS DIA - 8 INCH, LENGTH - 01 FEET
287RUBBER BEADING OF 03 HATCHES DEDERIORATED TO BE REPLACED. QTY - 12 QMT, MAT- SILICON RUBBER
288MANUAL RUDDER LEVER DETERIORATED. TO BE REPAIRED IN SITU, QTY 02.
289CARRY OUT CLEANING AND APPLICATION OF OM 750 IN FUEL TANKS FOR PRESERVATION. QTY- 100 SQMT
2906 IN NUMBER NWT DOORS DAMAGED/ DEFECTIVE. SAME TO BE REPAIRED. SIZE - 177X 47 CM . (A) PO'S MESS (B) HOD'S MESS (C ) REF COMPT LOBBY (D) ENGINE ROOM, (F) CLASSROOM-01 (G) CADET'S MESS,
29120 IN NUMBERS MORTISE LOCKS OF NWT DOORS DEFECTIVE. THE SAME TO BE REPLACED. MAT - SS
29220 IN NUMBERS HYDRAULIC DOOR CLOSER DEFECTIVE TO BE REPAIRED/REPLACED. MAT SS
293OPERATING HANDLE OF RIGGING LOCKER AND AMMUNITION LOCKER DOOR DETERIORATED. RA FOR REPAIR OF THE SAME. QTY - 02. MAT - MS
29404 IN NUMBERS BOAT SLING DAMAGED. NEW BOAT SLINGS TO BE MANUFACTURED AS PER SAMPLE. MAT - POLISTER
295LIFTING HANDLE OF BOTH RIB BROKEN. SAME TO BE REPAIRED/ RENEWED. QTY -08, MAT - POLISTER
2964 IN NUMBERS BOAT HOOK DAMAGED. SAME TO BE RENEWED, MAT - SS
297WOODEN DECK OF STERN PLATFORM PERISHED/ DETERIORATED TO BE RENEWED. APPROX AREA - 16 SQMTR, MAT - TEAK WOOD
298SEALING/CAULKING COMPOUND BETWEEN WOOD ON UPPER AND LOWER DECKS COMPARTMENTS DETERIORATED TO BE REPAIRED IN SITU, QTY - 100 RMT
299POLISHING AND VARNISHING OF WOODEN FLOORING OF WEATHER DECKS TO BE CARRIED OUT VIEW POLISHING DETERIORATED .JOB INVOLVE SCRUBBING OF DECK, REMOVAL OF DIRT/ OIL/ GREASE / PAINT FROM DECK WITH BUFFING MACHINE AND APPLICATION OF VARNISH IN FOLLOWING STEPS; _ (I) APPLY TWO COAT OF SEALER, (II) TWO COAT OF COLOUR, (III) ONE COAT OF VARNISH. TOTAL AREA - 400 SQMT
300POLISHING AND VARNISHING OF WOODEN DECK OF FOLLOWING COMPARTMENT TO BE CARRIED OUT VIEW DETERIORATED: - (A) CAPTAIN'S CABIN (B) EXO'S CABIN (C ) WARDROOM (D) OFFICER'S CABIN (E) WARDROOM LOBBY (F) PO'S MESSSQMT, (G) DINING HALL (H) HOD MESS (J) GUNWALE (K) PO MESS LOBBY (L) PIN RAIL (M) WOODEN GRATINGS (N) COCK PIT STORE (P) CHART HOUSE (Q) SHIP'S OFFICE, (R) BOW SPRIT SQMT, (S) SICKBAY (T) CADET'S MESS . JOB INVOLVE SCRUBBING OF DECK, REMOVAL OF DIRT/ OIL/ GREASE / PAINT FROM DECK WITH BUFFING MACHINE AND APPLICATION OF VARNISH IN FOLLOWING STEPS; _ (I) APPLY TWO COAT OF SEALER, (II) TWO COAT OF COLOUR, (III) ONE COAT OF VARNISH. TOTAL AREA - 200 SQMT.
301BULKHEAD PANELING IN SHIP'S GALLEY DAMAGED TO BE REPAIRED AND RE-FITTED INSITU, QTY - 40 SQMT. MAT SS
302PERPLEX SHEET IN BRIDGE BROKEN/ DAMAGED. TO BE RENEWED INSITU. OPENING CLOSING ARRANGEMENT TO BE PROVIDED. APPROX AREA - 20 SQMT.
303CARRYOUT WELDING OF BONDING STRAPS ON DOORS, HATCHES, STANCHION AND FLAPS VIEW UPROOTED. QTY - 70
304THREE IN NUMBER PILOT LADDER STEPS BROKEN/ DAMAGE TO BE RENEWED. QTY - 15 STEPS, SIZE 600MMX100MM, MAT - TEAK WOOD
30515 IN NUMBER WOODEN GRATING DAMAGED TO BE RENEWED AS PER SAMPLE. SIZE 4X3X1/4 FEET FOLLOWED BY VARNISHING
306PIPE SECURING CLAMPS DAMAGED BROKEN AT VARIOUS LOCATIONS. SAME TO BE RENEWED QTY - 14, MAT- MS. DIA 50MM
30730 IN NUMBERS BUTTERFLY NUTS OF WTC CORRODED. TO BE RENEWED AS PER SAMPLE, MAT - SS, SIZE- M8
308RA FOR MANUFACTURING OF FOXLE AWNING AS PER SAMPLE, QTY - 2, MAT CANVAS, SIZE 8X6 MTR APPROX.
309BUNK LEGS AND SHOE CORRODED/BROKEN IN CADET'S MESS, JUNIOR SAILOR MESS, SENIOR MESS AND PO MESS. TO BE RENEWED QTY 24. MAT - GI PIPE WITH MS BRACKET. POST COMPLETION OF WORK DEGUTTED AREA TO BE RESTORED.
310EOT COVER IN BRIDGE DETERIORATED. SAME TO BE REPLACED. QTY -01. SIZE 2X2 FEET, MAT - PERSPECT SHEET.
311WOODEN LOCKERS OF FLAG HEAVILY DAMAGED TO BE MANUFACTURED AS PER SAMPLE , QTY - 02. SIZE- 3X2X2 FEET APPROX
312RA FOR REPAIR/RENEWAL OF PANELING QTY- 150 SQM MAT- CRCA
313MANUFACTURING AND FITMENT OF SECURING CLAMPS OF OXYGEN CYLINDERS VIEW DETERIOTRATED. QTY - 4, MAT - MS, DIA - 200 MM
31415 IN NUMBERS SHOE LOCKERS BROKEN. TO BE REPAIRED INCLUDING LOCKS. MAT - CRCA, SIZE 2X2X1/2 FEET.
315LOCKS OF STORAGE LOCKERS IN CLASSROOM DAMAGED TO BE REPLACED. QTY - 17, MAT - SS
31602 IN NUMBER LOCKERS IN SICKBAY DETERIORATED/ DAMAGED TO BE REPLACED. MAT CRCA, SIZE 2.5X1.5X3 FEET APPROX
317WARD ROOM TABLE AND DRAWER SECURING ARRANGEMENT BROKEN . SAME TO BE REPAIRED. MAT - WOOD. SIZE - 6X4 FEET APPROX
318RA FOR MANUFACTURING AND FITMENT OF 300 METALLIC TALLIES VIEW DAMAGED/DETERIORATED. LIST OF TALLIES WILL BE PROVIDED BY SS. SIZE- 15X50MM MAT - SS
319BILGE PLATE IN ENGINE ROOM DETERIORATED. RA FOR RENEWAL OF THE SAME, QTY 20 SQMT, MAT - AL.
32015 IN NUMBERS WOODEN CLEATS DAMAGED TO BE RENEWED INSITU. DIA- 25MM, LENGTH - 200MM
321RUBBER BEADING AND HINGES OF FF AND DC LOCKERS DAMAGED. SAME TO BE RENEWED. QTY - 6RMT, SIZE 25MMX20MM
322GUNWALE AND PINWALE DAMAGED AT VARIOUS LOCATIONS TO BE RENEWED. QTY - 20 RMT, MAT - TEAK WOOD
323BILGE PLATES IN REF AND STP COMPARTMENT DETERIORATED/DAMAGED. RA FOR RENEWAL OF THE SAME , QTY - 20 SQMT, MAT - AL
324QUARTER MASTER CHAIR IN BRIDGE DETERIORATED TO BE REPLACED. QTY - 01
325SUDARSHINI TAIL BOARD CRACKED/ DAMAGED. TO BE REPAIRED RENEWED AND PAINTED. QTY - 02. MAT - TEAK WOOD. SIZE - 8X2.5 FEET
326SUDARSHINI TAIL BOARD SUPPORTING BRACKETS BROKEN AT SHIP SIDE (PORT AND STBD) TO BE WELDED. Mat - MS. JOB INVOLVE (I) REMOVAL OF SUDARSHINI TAIL BOARD QTY - 02. (II) REMOVAL OF WOODEN FIRNITURE AND PANELLING FROM CAPTAIN'S AND EXO'S CABIN AND FITMENT OF THE SAME POST WELDING. (III) WELDING OF BRACKETS. (IV) FITMENT OF TARANGNI TAIL BOARD. BRACKET SIZE - 2X3 INCH X 5MM
327SECURING BRACKET ON 02 IN NUMBER CO2 EXTINGUISHER BROKEN. TO BE RENEWED. MAT - MS DIA - 100MM APPROX
328RENEWAL OF 40 IN NUMBER SECURING BELTS OF ELSA STOWAGE BOXES TO BE CARRIED OUT. MAT - POLOSTER BELT WITH LOCKING ARRANGEMENT. QTY- 35 MTR
329RUBBER SEAL OF SPLINTER BOX AROUND ITS EDGE DAMAGED TO BE RENEWED. QTY - 02 SIZE- 5X15X600 MM
33020 IN NUMBER BUNK LEE-RAILS IN MESSES BROKEN TO BE REPLACED AS PER SAMPLE. MAT - CRCA, SIZE - 1/2X2 FEET APPROX
331SLIDING RAIL OF BUNK CURTAINS IN LIVING SPACES DAMAGED TO BE RENEWED , QTY 35., MAT - CRCA, SIZE - 10X10X2000MM
332CAM LOCK OF LOCKERS IN LIVING SPACES DEFECTIVE TO BE RENEWED , QTY - 45, DIA- 15MM, MAT - SS
333CABLE GLANDS OF SPLIT AC PIPES AT WEATHER DECKS DETERIORATED DAMAGED TO BE RENEWED, QTY - 20 , MAT - MS PIPE. JOB INVOLVE REMOVAL AND FITMENT OF WOODEN DECK. DEGUTTING OF OLD PIPES AND FITMENT OF NEW PIPE. DIA -25MM, LENGTH - 1 FEET.
334HINGES OF FILE/ BOOKS WOODEN LOCKERS DOOR UPROOTED. RA FOR REPAIRING OF THE SAME. QTY - 15
33520 IN NUMBERS COMMODE COVERS DEFECTIVE. SAME TO BE RENEWED AS PER SAMPLE.
3368 IN NUMBERS SHOWER MIXER DEFECTIVE/ DAMAGED IN BATHROOMS TO BE REPLACED . MAKE - JAGUAR.
33715 IN NUMBERS WATER MIXING TAP OF WASH BASIN DEFECTIVE TO BE RENEWED . MAKE - JAGUAR
338WASH BASIN AND HYGIENE LOCKER NEAR MAIN MAST DETERIORATED TO BE REPLACED. QTY - 01 MAT - SS SIZE- 2X2X3 FEET.
339WOODEN DECK OF COCKPIT STORE PERISHED/ DETERIORATED. TO BE RENEWED. POLISHING TO DONE POST RENEWAL. AREA APPROX - 20 SQMTR, MAT-TEAK WOOD
340SEEPAGE OF WATER OBSERVED FROM ANGLE SKY LIGHT BELOW THE DECK TO BE REPAIR/RENEWED Qty -15
341BOWSPRIT MAJOR WEATHERING CRACKS AT SCATTERED LOCATIONS TO BE REPAIRED. SCOPE OF WORK AS FOLLOWS : -(I) BUFFING OF THE AREA.(II) REPAIRS TO BE CARRIED OUT USING MARINE EPOXY RESIN.
342VARNISH OF BOWSPRIT IS TO BE UNDERTAKEN WITH SATURATED COATS OF DECK OLJE D1 SATURATING WOOD OIL WITH CLEAR MATT FINISH AND SIX COATS OF DECK OLJE D2 FLEXIBLE HIGH GLOSS OIL VARNISH. QTY - 20 SQMT.
343BOW SPRIT BASE BOLTS TO BE RENEWED VIEW NUT & BOLTS DETERIORATED( SIZE- M20 , MAT - SS), QTY - 30 NOS
344BOWSPRIT HANDRAIL REPAIRS AT SCATTERED LOCATIONS( TYPE - TEAK WOOD, MAT AND DIMENSION- AS PER SAMPLE).SCOPE OF WORK AS FOLLOWS : -(I) CUTTING OF HANDRAIL OF DESIGNATED AREA AND RENEWAL OF THE SAME AS PER THE PIECE CUT. QTY - 04
345BOW SPRIT BASE DETERIORATED. BOW SPRIT BASE TO BE REMOVED/ RENEWED AND REFITTED, QTY - 01 NOS, MAT - MS, TEAK WOOD.
346BOW SPRIT FOUND TO BE DETERIORATED. RENEWAL OF BOW SPRIT TO BE UNDERTAKEN. THE SoW INCLUDES THE FOLLOWING: - (a) REMOVAL OF EXISTING BOW SPIRIT (TO BE UNDERTAKEN BY SHIPYARD)(b) FITMENT OF NEW BOW SPIRIT (TO BE UNDERTAKEN BY SHIPYARD) (QTY - 01 NOS, MAT-DOUGLAS FIR. (BOW SPIRIT WILL BE SUPPLIED BY IN )
347NUTS AND BOLTS OF VARIOUS SIZE TO BEREPLACED,AS PER SAMPLE. QTY - 100
348CLEAN AND WASH DOWN ALL GREY WATER TANKS INCLUDING SOUNDING LINE TO BE REMOVE ALL DIRT/SLUDGE AND PREPARE FOR SURVEY. ALL MANHOLES TO BE REMOVED, RENEWED, REFITTED AND RENEW RUBBER PACKING MATERIAL. ALL STUDS AND NUT TO BE RENEWED WITH SS FOR WATERTIGHT INTEGRITY. QTY – 04 NOS,
349ENGINEERING - PART I
350CARRY OUT 6000 HRLY ROUTINES.SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED BY SHIPYARD AND RE OFFERED FOR TRIALS.
3516000H2-FUEL SYSTEM:1. CLEAN AND CALIBRATE INJECTORS AND RECORD TEST PRESSURES IN SERVICE LOG. ALSO CHANGE INJECTOR INLET SCREEN (Qty - 6).2. REPLACE ROCKER COVER GASKETS (Qty -3).3. ADJUST VALVE TAPPET CLEARANCES WITHIN LIMITS AND RECORD IN SERVICE LOG (Qty -12).4. REPLACE FUEL PUMP FILTER (SCREEN AND MAGNET) (Qty -1)5. CALIBRATE PT FUEL PUMP AND RECORD IN SERVICE LOG.(Qty -1)6. ADJUST INJECTOR TRAVEL AND TORQUE (Qty -1)
3526000H3 -AIR SYSTEM1. OVERHAULING TURBOCHARGERS OF BOTH BANKS WITH NEW REPAIR KIT. Qty -12. CHECK TURBO CHARGER RADIAL/END BEARING CLEARANCE IN-SITU. RENEW 'O' RING AND TEFLON GASKET WHEN TURBOCHERGER IS OPENED FOR CHECKING CLEARANCES. Qty -13. TORQUE MANIFOLD NUTS OR CAP SCREWS AS PER SPECIFICATIONS. Qty -1
3536000H4- CHARGE AIR COOLER & FRESH WATER COOLER: Qty - 21. CLEAN THE INTERNAL PASSAGES OF CHARGE AIR COOLER AND FRESH WATER COOLER COOLANT SIDE USING RADIWASH PLUS Qty - 22. RENEW COOLANT IN THE SYSTEM Qty - 13. INSPECT CHARGE AIR COOLER AIR SIDE AND IF REQUIRED CLEAN USING HOT WATER AND PRESSURE TEST UP TO 2KG/CM2. Qty - 1
3546000H6- CHECK THICKNESS OF VIBRATION DAMPER AT 0, 90, 180 AND 270 DEGREE POSITIONS. REPLACE DAMPER IF VARIATION OF THE 4 READINGS EXCEEDS 0.010 INCH (0.25MM) OR EXCEEDS MAX ALLOWABLE THICKNESS. CHECKS TO BE UNDERTAKEN IN COUPLED CONDITION.
3556000H8- CHECK CRANK END CLEARANCES WITH A DIAL INDICATOR, ATTACHINGAGAINST DAMPER MIN- 0.13 MM, MAX-0.51 MM.CHECK CRANK END CLEARANCES WITH A DIAL INDICATOR, ATTACHINGAGAINST DAMPER MIN- 0.13 MM, MAX-0.51 MM.
3566000H10- ALIGNMENT CHECKS:UNDERTAKE ALIGNMENT CHECKS BETWEEN THE GENERATOR AND ENGINE AND RESTORE RADIAL/AXIAL INITIAL ALIGNMENT TO 25% OF THEMAX LIMIT.
3576000H13- INSPECT HOLSET/VULCAN/CENTAMAX FLEXIBLE COUPLING AND TORQUE TIGHTEN INNER/OUTER MEMBERS. CHECK RUBBER BLOCKS/DISC FORDETERIORATION. RENEW IF BEYOND PERMISSIBLE LIMIT.
3586000H14- CHECK FOR CRACKS ON RUBBER AND IF WEAR MARK DOES NOT EXCEED LIMITS. CHECK TIGHTNESS OF ADAPTOR PLATE BOLTS (COUPLING BOLTS).
3596000H15- CHECK THICKNESS OF VIBRATION DAMPER AT 0, 90, 180 AND 270 DEGREE POSITIONS. REPLACE DAMPER IF VARIATION OF THE 4 READINGS EXCEEDS 0.010 INCH (0.25MM) OR EXCEEDS MAX ALLOWABLE THICKNESS. CHECKS TO BE UNDERTAKEN IN COUPLED CONDITION.
3606000H16- CHECK TURBO CHARGER RADIAL/END BEARING CLEARANCE IN-SITU ON REMOVAL OF INLET/EXHAUST PIPES. NOTE: RENEW ‘O’ RING AND TEFLON GASKET WHENEVER T/C ISOPENED FOR CHECKING CLEARANCES.
3616000H18- CLEAN THE LCP BACK UP BATTERY TERMINALS AND REPLACE CABLES AND LUGS.
362CARRY OUT 6000 HRLY ROUTINES.SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
3636000H2-FUEL SYSTEM:1. CLEAN AND CALIBRATE INJECTORS AND RECORD TEST PRESSURES IN SERVICE LOG. ALSO CHANGE INJECTOR INLET SCREEN (Qty - 6).2. REPLACE ROCKER COVER GASKETS (Qty -3).3. ADJUST VALVE TAPPET CLEARANCES WITHIN LIMITS AND RECORD IN SERVICE LOG (Qty -12).4. REPLACE FUEL PUMP FILTER (SCREEN AND MAGNET) (Qty -1)5. CALIBRATE PT FUEL PUMP AND RECORD IN SERVICE LOG.(Qty -1)6. ADJUST INJECTOR TRAVEL AND TORQUE (Qty -1)
3646000H3 -AIR SYSTEM1. OVERHAULING TURBOCHARGERS OF BOTH BANKS WITH NEW REPAIR KIT. Qty -12. CHECK TURBO CHARGER RADIAL/END BEARING CLEARANCE IN-SITU. RENEW 'O' RING AND TEFLON GASKET WHEN TURBOCHERGER IS OPENED FOR CHECKING CLEARANCES. Qty -13. TORQUE MANIFOLD NUTS OR CAP SCREWS AS PER SPECIFICATIONS. Qty -1
3656000H4- CHARGE AIR COOLER & FRESH WATER COOLER: Qty - 21. CLEAN THE INTERNAL PASSAGES OF CHARGE AIR COOLER AND FRESH WATER COOLER COOLANT SIDE USING RADIWASH PLUS Qty - 22. RENEW COOLANT IN THE SYSTEM Qty - 13. INSPECT CHARGE AIR COOLER AIR SIDE AND IF REQUIRED CLEAN USING HOT WATER AND PRESSURE TEST UP TO 2KG/CM2. Qty - 1
3666000H6- CHECK THICKNESS OF VIBRATION DAMPER AT 0, 90, 180 AND 270 DEGREE POSITIONS. REPLACE DAMPER IF VARIATION OF THE 4 READINGS EXCEEDS 0.010 INCH (0.25MM) OR EXCEEDS MAX ALLOWABLE THICKNESS. CHECKS TO BE UNDERTAKEN IN COUPLED CONDITION.
3676000H8- CHECK CRANK END CLEARANCES WITH A DIAL INDICATOR, ATTACHINGAGAINST DAMPER MIN- 0.13 MM, MAX-0.51 MM.CHECK CRANK END CLEARANCES WITH A DIAL INDICATOR, ATTACHINGAGAINST DAMPER MIN- 0.13 MM, MAX-0.51 MM.
3686000H10- ALIGNMENT CHECKS:UNDERTAKE ALIGNMENT CHECKS BETWEEN THE GENERATOR AND ENGINE AND RESTORE RADIAL/AXIAL INITIAL ALIGNMENT TO 25% OF THEMAX LIMIT.
3696000H13- INSPECT HOLSET/VULCAN/CENTAMAX FLEXIBLE COUPLING AND TORQUE TIGHTEN INNER/OUTER MEMBERS. CHECK RUBBER BLOCKS/DISC FORDETERIORATION. RENEW IF NECESSARY.
3706000H14- CHECK FOR CRACKS ON RUBBER AND IF WEAR MARK DOES NOT EXCEED LIMITS. CHECK TIGHTNESS OF ADAPTOR PLATE BOLTS (COUPLING BOLTS).
3716000H15- CHECK THICKNESS OF VIBRATION DAMPER AT 0, 90, 180 AND 270 DEGREE POSITIONS. REPLACE DAMPER IF VARIATION OF THE 4 READINGS EXCEEDS 0.010 INCH (0.25MM) OR EXCEEDS MAX ALLOWABLE THICKNESS. CHECKS TO BE UNDERTAKEN IN COUPLED CONDITION.
3726000H16- CHECK TURBO CHARGER RADIAL/END BEARING CLEARANCE IN-SITU ON REMOVAL OF INLET/EXHAUST PIPES. NOTE: RENEW ‘O’ RING AND TEFLON GASKET WHENEVER T/C ISOPENED FOR CHECKING CLEARANCES.
3736000H18- CLEAN THE LCP BACK UP BATTERY TERMINALS AND REPLACE CABLES AND LUGS.
374CARRY OUT SR ROUTINES.SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
375SR1- UNDERTAKE SAMPLE INSPECTION OF PLUMMER BEARINGS ON EACH SHAFT LINE FOR SCORING/CORROSION. IN CASE ANY ABNORMALITY IS OBSERVED,
376SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.4000H1-OVERHAUL GEAR BOX. REPLACE ALL OIL SEALS, GASKETS, LOCK PLATES, PISTON RINGS,'O' RINGS AND ALL PARTS SHOWING SIGNS OF WEAR FATIGUE ETC.
377A1- CALIBRATE ALL RELIEF VALVES.
378SR1- CHECK WIRING/CONTACTS OF THE PANEL FOR WEAR/DETERIORATION. REPLACE IF NECESSARY.
379SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.4000H1-OVERHAUL GEAR BOX. REPLACE ALL OIL SEALS, GASKETS, LOCK PLATES, PISTON RINGS,'O' RINGS AND ALL PARTS SHOWING SIGNS OF WEAR FATIGUE ETC.
380A1- CALIBRATE ALL RELIEF VALVES.
381SR1- CHECK WIRING/CONTACTS OF THE PANEL FOR WEAR/DETERIORATION. REPLACE IF NECESSARY.
382CARRY OUT 6000 HRLY ROUTINES.SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
3836000H1- REMOVE INTAKE MANIFOLD. CLEAN & PRESSURE TEST.
3846000H2- REMOVE EXHAUST MANIFOLD. CLEAN & PRESSURE TEST.
3856000H3- REMOVE TURBOCHARGER. CLEAN, INSPECT & REPAIR WITH NEW SPARES.
3866000H4- REMOVE FUEL INJECTION PUMP. CLEAN, INSPECT, CALIBRATE & REPAIR WITH NEW SPARES PARTS.
3876000H5- REMOVE ROCKER LEVER & SHAFT. CLEAN, INSPECT & REPAIR WITH NEW SPARES.
3886000H6- REMOVE INJECTORS, CLEAN, INSPECT, REPAIR & CALIBRATE WITH NEW SPARES.
3896000H7- REMOVE FUEL CONNECTIONS (HIGH PRESSURE PIPE LINES). CLEAN, INSPECT & REPAIR WITH NEW SPARES.
3906000H8- REMOVE PUSH RODS. CLEAN, INSPECT. REPLACE IF REQUIRED.
3916000H9- DISMANTLE CYLINDER HEAD.CLEAN, INSPECT & REPAIR WITH NEW SPARES.
3926000H10- DISMANTLE ONE PISTON & ONE CON ROD ASSEMBLY. REPLACE IF REQUIRED. BASED ON INSPECTION, UNDERTAKE INSPECTION OF BALANCE PISTON/ CONNECTING RODS ACCORDINGLY.
3936000H11- DISMANTLE ONE LINER FOR INSPECTION OF LINER OUTER SURFACE PITTING. REPLACE IF REQUIRED.
3946000H12- REMOVE & REPLACE WATER PUMP.
3956000H13- REMOVE BELT TENSIONER. CLEAN, INSPECT & REPAIR WITH NEW SPARE PARTS.
3966000H14- REMOVE & REPLACE FUEL FEED PUMP.
3976000H15- CHECK VIBRATION DAMPER.
3986000H16-REMOVE SEA WATER PUMP. CLEAN, INSPECT & REPAIR WITH NEW SPARE PARTS.
3996000H17- REMOVE STARTER MOTOR. CLEAN, INSPECT & REPAIR WITH NEW SPARE PARTS.
4006000H21- CLEAN ALL DISMANTELED PARTS AND CYLINDER BLOCKS TOP POSITION. ASSEMBLE ENGINE WITH ALL NEW GASKETS 'O' RINGS, SEALS AND ABOVE DISMANTLE SUB- ASSEMBLIES.
4016000H22- CARRY OUT TAPPET SETTINGS. VALVE SETTING INTAKE VALVE CLEARANCE IS 0.012\\" & EXHAUST VALVE CLEARANCE IS 0.024\\"
4026000H23- POST COMPLETION OF ROUTINES, START THE ENGINE AND CHECK ALL GAUGES, REPLACE IF REQUIRED, CHECK FOR ANY OIL/WATER LEAKAGE, STOP THE ENGINE AND RECHECK ENGINE OIL LEVEL, TOP UP IF REQUIRE. RUN UNDER SHIPS LOAD FOR TWO HOURS AND OBSERVE PARAMETERS.
4036000H24- UNDERTAKE INSPECTION AND CLEANING OF CHARGE AIR COOLER FOLLOWED BY PRESSURE TESTING.
404CARRY OUT 6000 HRLY ROUTINES.SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
4056000H1- REMOVE INTAKE MANIFOLD. CLEAN & PRESSURE TEST.
4066000H2- REMOVE EXHAUST MANIFOLD. CLEAN & PRESSURE TEST.
4076000H3- REMOVE TURBOCHARGER. CLEAN, INSPECT & REPAIR WITH NEW SPARES.
4086000H4- REMOVE FUEL INJECTION PUMP. CLEAN, INSPECT, CALIBRATE & REPAIR WITH NEW SPARES PARTS.
4096000H5- REMOVE ROCKER LEVER & SHAFT. CLEAN, INSPECT & REPAIR WITH NEW SPARES.
4106000H6- REMOVE INJECTORS, CLEAN, INSPECT, REPAIR & CALIBRATEWITH NEW SPARES.
4116000H7- REMOVE FUEL CONNECTIONS ( HIGH PRESSURE PIPE LINES). CLEAN, INSPECT & REPAIR WITH NEW SPARES.
4126000H8- REMOVE PUSH RODS. CLEAN, INSPECT. REPLACE IF REQUIRED.
4136000H9- DISMANTLE CYLINDER HEAD.CLEAN, INSPECT & REPAIR WITH NEW SPARES.
4146000H10- DISMANTLE ONE PISTON & ONE CON ROD ASSEMBLY. REPLACE IF REQUIRED. BASED ON INSPECTION, UNDERTAKE INSPECTION OF BALANCE PISTON/ CONNECTING RODS ACCORDINGLY.
4156000H11- DISMANTLE ONE LINER FOR INSPECTION OF LINER OUTER SURFACE PITTING. REPLACE IF REQUIRED.
4166000H12- REMOVE & REPLACE WATER PUMP.
4176000H13- REMOVE BELT TENSIONER. CLEAN, INSPECT & REPAIR WITH NEW SPARE PARTS.
4186000H14- REMOVE & REPLACE FUEL FEED PUMP.
4196000H15- CHECK VIBRATION DAMPER.
4206000H16- REMOVE SEA WATER PUMP. CLEAN, INSPECT & REPAIR WITH NEW SPARE PARTS.
4216000H17- REMOVE STARTER MOTOR. CLEAN, INSPECT & REPAIR WITH NEW SPARE PARTS.
4226000H21- CLEAN ALL DISMANTELED PARTS AND CYLINDER BLOCKS TOP POSITION. ASSEMBLE ENGINE WITH ALL NEW GASKETS 'O' RINGS, SEALS AND ABOVE DISMANTLE SUB- ASSEMBLIES.
4236000H22- CARRY OUT TAPPET SETTINGS. VALVE SETTING INTAKE VALVE CLEARANCE IS 0.012\\" & EXHAUST VALVE CLEARANCE IS 0.024\\"
4246000H23- POST COMPLETION OF ROUTINES, START THE ENGINE AND CHECK ALL GAUGES, REPLACE IF REQUIRED, CHECK FOR ANY OIL/WATER LEAKAGE, STOP THE ENGINE AND RECHECK ENGINE OIL LEVEL, TOP UP IF REQUIRE. RUN UNDER SHIPS LOAD FOR TWO HOURS AND OBSERVE PARAMETERS.
4256000H24- UNDERTAKE INSPECTION AND CLEANING OF CHARGE AIR COOLER FOLLOWED BY PRESSURE TESTING.
426CARRY OUT SR AND BIENNIAL ROUTINES.SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
427SR1-EXAMINE SHAFT BRACKET BUSHES (RUBBER BEARING) CLEARANCE.
428SR2 - EXAMINE THE LINING BETWEEN THE SHAFT BEARING FOR ANY DAMAGE AND REPAIR, IF WATER GETS TO THE STEEL SHAFT TO FORM RUST. (REFER BR 3000 ART 0802, PARA 2 & 3 WHICH EVER IS APPLICABLE.
429SR3-EXAMINE THE PROPELLER FOR ANY DAMAGE, REPAIR AS NECESSARY.
430SR5-EXAMINE CATHODIC PROTECTION/ZINC PROTECTION CAP , RENEW IF CONSIDERED NECESSARY.
431SR6-EXAMINE THE STERN TUBE SEAL FOR WEAR. REPAIR/RENEW AS NECESSARY.
432SR7- INSPECT SHAFT BRAKE PADS FOR SERVICEABILITY IF FOUND WORN OUT, RENEW IT.
433SR8- CHECK TIGHTNESS OF PROPELLER LOCK NUT.
434SR9- CARRY OUT CALIBRATION OF TORSION METER.
4352A1- INSPECTED BULKHEAD SEAL ND TYPE. INSPECTION WILL BE CARRIED OUT WITH THE SHAFT SURVEY. CLEAN AND REFIT. RENEW 'O' CORD WHILE SEAL IS DISMANTLED
4362A2- CARRY OUT PERFORMANCE CHECKS OF HYDRAULIC BREAKS AND REPAIR AS NECESSARY.
437CARRY OUT ANNUAL, BIENNIAL AND SR ROUTINES.SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
438A5-CARRYOUT TOP OVERHAUL OF HP PUMP PP 60. REPLACE ALL LP AND HP MANIFOLD SEALS, O RINGS AND BACK UP TEFLON WASHERS.CHECK SUCTION/ DELIVERY VALVES AND MANIFOLD FOR SEALING AREA. IF CORRODED REPLACE AS NECESSARY.(REFER JIC : 42902/A5 ANDCHAPTER 5&7 OF OEM MANUAL).
439A7-CALIBRATE ALL GAUGES, PANEL MODULES AND ALARM /TRIP CUTOUTS
440A8- CHECK WIRING/ CONTACTS OF THE PANEL FOR WEAR/ DETERIROTATION.
441A9- CLEAN AND CALIBRATE CONDUCTIVITY METER PROBE.
442A13- REPLACE ALL VICTAULIC COUPLERS. CHECK COUPLING AND REPLACE AS NECESSARY.
443A14- RENEW DA FILTERS MEDIA.
444A15- REPLACE PULSATION DAMPER CHARGING PLUG SEAL RING. RECHARGE WITH NITROGEN TO 39 BAR.
445A16- CHECK CONTROL PANEL FITTINGS/ FUSE FOR PROPER FUNCTIONING.
446A17- CHECK CONTROL EQUIPMENTS - SERVO MOTOR VALVE/ PRESSURE TRANSMITTER/ SOLENOID VALVES/ FLOW AND LEVEL SWITCHES AND PLC FOR OPERATION. REPAIR/ REPLACE AS NECESSARY.
447A18- CHECK HP RELIEF VALVE FOR OPERATION. CALIBRATE/ REPAIR AS REQUIRED.
448A19- CHECK ANTI VIBRATION MOUNTS OF THE HP PUMP MOUNTING PLATE FOR BULGING/ DETERIORATION. REPLACE AS REQUIRED.
449A20- CHECK AIR REGULATOR FOR OPERATION. CALIBRATE/ REPAIR AS NECESSARY.
450A21- CHECK NON RETURN VALVES OF SAND FILTER BACK WASH AND MODULE PERMEATE LINE.
451A22- CALIBRATE TORQUE WRENCH USED FOR TIGHTENING OF DT MODULE END NUT.
452A23- CALIBRATE HAND CONDUCTIVITY METER AND PANEL MOUNTED CONDUCTIVITY METER. REPLACE IF DEFECTIVE.
453A24- REMOVE CIS-80 (CONDUCTIVITY ELECTRODE) TIP. CLEAN AND CALIBRATE WITH ANOTHER CONDUCTIVITY METER.
4542A1- INSPECT FRICTION PADS FITTED ON THE MOTOR OF 'SERVO MOTORCONTROL VALVE' FOR CONDITION OF WORKING SURFACE (CLEARANCESHOULD NOT BE MORE THAN 2 MM).
455SR1-CALIBRATION THROUGH CIT FOR ALL OLR/ MPU MECHANISM INSTALLED IN THE SYSTEM.
456SR2-OVERHAULING OF CONTROL PANEL AND STARTERS FOR INDIVIDUAL MOTORS.
457CARRY OUT ANNUAL, BIENNIAL AND SR ROUTINES. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.SPARES : SPARES TO BE PROVIDED BY SHIPYARD
458SR1- EXAMINE SEA WATER SIDE OF CONDENSER FOR CORROSION AND FOULING.SIGHT TUBES AND CARRY OUT MECHANICAL CLEANING AND WATER ETS AS NECESSARY.RENEW CORROSION PLUGS AND CARRY OUT PRESSURE TESTING OF THE ASSEMBLED CONDENSER
459SR2- REFIT ALL ISOLATING VALVES ON GAS SYSTEM AND COOLING WATER SYSTEM
460SR5- CHECK FUNCTION OF PRESSURE RELIEF VALVE. REPAIR/ REPLACE IF DEFECTIVE.
461TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. SR1-OPERATE ALL SYSTEM VALVES AND PHYSICALLY VERIFY THE STATE OF THE SYSTEM. IF ANY DEFECTS, TO BE LIQUIDATED.
462CARRY OUT ANNUAL AND THREE ANNUAL ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
463A1- CHECK THREADS OF INLET PIPE AND OIL PAIRING DISC FOR DAMAGE AND WEAR.
464A2- INLET DEVICE: 1. CHECK THE FLOW INDICATOR IF CLOGGED. CLEAN THE SIGHT GLASS.2. CHECK THE REDUCING VALVE CONE FOR SCRATCHES AND PLAY.3. CHECK THE NON RETURN VALVE CONE FOR SCRATCHES AND PLAY.
465A3- DISMANTEL AND EXAMINE SEPERATOR BOWL ASSEMBLY THROUGHLY. CLEAN ALL COMPONENTS AND CHECK FOLLOWING:-1. CHECK DISC STACK PRESSURE.2. CHECK FOR CORROSION, EROSION AND CRACKS3. GALLING OF GUIDE SURFACE
466A4- RENEW OIL IN GEAR HOUSING. CHECK THE TEETH OF WORM WHEEL AND WORM FOR WEAR.
4673A1- RENEW FRAME FEET RUBBER CUSHIONS/ VIBRATION DAMPERS.
4683A2-CHECK HEIGHT POSITION FOR PAIRING DISC FOR MAB 103 TYPESEPARATORS
4693A3-HORIZONTAL DRIVE1. CHECK AXIAL PLAY OF COUPLING DISC.2. RENEW BEARINGS OF WORM WHEEL SHAFT.
4703A4-VERTICAL DRIVE1. CLEAN AND CHECK BOWL SPINDLE AND NAVE FOR IMPACT MARKS.2. CHECK RADIAL WOBBLE OF BOWL SPINDLE.3. CLEAN AND CHECK BUFFER AND BALL BEARING HOUSING. RENEW IFREQUIRED.4. RENEW BALL BEARINGS AND TOP BEARING SPRINGS.
4713A5-CLEAN AND CHECK SPRING AND BRAKE SHOE. RENEW FRICTIONPAD/BRAKE PLUG.
4723A6-CLEAN AND CHECK FRICTION COUPLING. RENEW FRICTION PADS ANDLIPSEAL RING.
4733A7-DISMANTLE PUMP ASSEMBLY. CLEAN AND CHECK BUSHINGS, WEARGASKETS, FLEXIBLE COUPLING, RELIEF/SAFETY VALVE AND IMPELLERSHAFT. RENEW LIPSEAL RING.
474A1- WEIGH THE CO2 CYLINDER USING BEAM SCALE/ ULTRASONIC LEVEL DETECTOR. IF THE WEIGHT FALLSBELOW 10% OF INITIAL WEIGHT, RECHARGE THE CYLINDERS.MAINTAIN RECORD IN LOG BOOK.NOTE:- ALTERNATELY USE OF APPROVED PORTABLE ULTRASONIC LEVELDETECTORS IS PERMITTED FOR UNDERTAKING THIS ROUTINE. (IHQ MOD(N) LETTER EG/4726/04/NBCD DATED 30 JAN 09 REGARDING USEOF \\"PORTABLE ULTRASONIC LIQUID LEVEL INDICATOR\\" RELEVANT)
475A4 - CARRY OUT CALIBRATION OF CO2 CONCENTRATION SENSORS
476CARRY OUT SR ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
477SR1-DISMANTLE PUMP AND EXAMINE PARTS FOR WEAR. RENEW WORN PARTS AS NECESSARY.
478SR2-GAUGE CLEARANCE BETWEEN BUSH AND SHAFT. RENEW BUSH IFCLEARANCE EXEEDS 0.4 MM.
479SR3-CARRY OUT PERFORMANCE TRIALS ON COMPLETION OF OVERHAUL.
480CARRY OUT SR ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
4812Y1- AIR RECEIVER: CHEMICALLY CLEAN INSIDE OF AIR RECEIVER.
4822Y2- HYDRAULICALLY TEST RECEIVER FOR SPECIFIED PRESSURE.
483CARRY OUT SR ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
484SR1- EXAMINE AIR RESERVIOR EXTERNALLY FOR CORROSION.
485SR2- STRIPE AND EXAMINE ALL REDUCING VALVES AND RELIEF VALVES.
486SR3- CALIBRATE ALL PRESSURE GAUGE.
487SR4- REFIT ALL AIR STOP VALVES.
488CARRY OUT ANNUAL AND SR ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
489A2- CHECK LEVEL AND CONDITION OF OIL IN SEAL PACKAGE. RENEW SEAL PACKAGE IF OIL IS EMULSIFIED.
490SR1- THE LUBRICANT MIGHT GET CONTAMINATED WITH FOREIGN MATERIAL OR GET BLACKENED DUE TO OVERHEATING. IN SUCH CASES, OIL CHAMBER SHOULD BE FLUSHED AND FILLED WITH FRESH OIL. BEFORE FILLING, HEAT THE OIL TO 140 DEGREES C AND COOL IT TO 60 DEGREES C FOR REMOVAL OF MOISTURE IN OIL
491CARRY OUT SR ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
492SR1-SURVEY AND RENEWAL OF UNDERWATER EXHAUST PIPES WELDED TO THE HULL ( WHERE APPLICABLE)
493SR2- CHECK NON METALLIC PARTS, PIPES, MUFFLER AND EXHAUST LINE FOR CRACKS AND DISTORTION.
494SR3- CHECK ALIGNMENT OF COMPENSATOR. ADJUST AS NECESSARY ( DURING FITMENT)
495SR6- CHECK AND GREASE ALL SUPPORTING HANGERS OF AIR INDUCTION AND EXHAUST SYSTEM.
496SR7- CALIBRATE THERMO COUPLES AND TEMP INDICATORS
497SR8- INSPECT FOR CONDITION AND OVERHAUL COCKS/ FITTINGS FOR MEASUREMENT OF AIR INTAKE DEPRESSION AND EXHAUST BACK PRESSURE MEASUREMENT IN EXHAUST TRUNKINGS AT APPROPIATE LOCATION.
498SR9- APPLICATION AND RESTORATION OF RECOMMENDED PAINT SCHEME ON ALL COMPONENTS OF THE AIR INTAKE SYSTEM.
499SR10- INSPECT AND CLEAN ALL COMPONENTS OF AIR INDUCTION SYSTEM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW.
500CARRY OUT ANNUAL AND SR ROUTINES.SPARES :- SPARES TO BE SUPPLIED BY SHIPYARD. HARBOUR AND SEA TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED BY SHIPYARD AND RE OFFERED FOR TRIALS.
501A1- CALIBRATE ALL RELIEF VALVES.
502A2- CALIBRATE ALL GAUGES, PANEL MODULES AND ALARMS /TRIPS CUTOUTS.
503SR3- CHECK SAFETY VALVES AND VALVE CEST DK-200 FOR CORRECT FUNCTIONING.REFIT AND RESET IF NECESSARY
504SR4- CALIBRATE ALL PRESSURE GAUGE.
505SR5- RENEW RUDDER STOCK GLAND PACKINGS.
506SR6- REPACK RUDDER GLANDS WITH HEMP PACKING AND GREASE THE GLANDS.
507SR9- CHECK RUDDER STUFFING BOX MOUNTING PLATE AND SECURING STUDS FOR CORROSION AND LOOSENING. RENEW /REPLACE IF NECESSARY.
508SR10- COMPLETELY REMOVE FAIRING EPOXY COMPUND TO INSPECT THE STATE OF FASTENERS ON THE RUDDER. RENEW THE FASTERNERS IF DETERIORATED. RE-APPLY FAIRING EPOXY COMPOUND POST INSPECTION/DR.
509SR12- RENEW COMPLETE LOCAL WIRING IN CASE OF ANY MAJOR ROUTINES FALLING DUE ON STEERING GEAR SYSTEM.
510SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS. SR2- EXAMINE PROPELLER FOR DAMAGE AND DETERMINE FITNESS FOR FURTHER USE. REPLACE/ REPAIR AS NECESSARY.
511CARRY OUT SR ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
512SR1-SURVEY ALL UNDER WATER APPENDAGES/ FITTINGS FOR PITTING, CORROSION OR ANY DAMAGE PAYING PARTICULAR ATTENTION TO PAINTFAILURE/ DAMAGE AREA TO STERN SHAFT BRACKET, ROPEGUARD, EDDY PLATES, EDDY CONES, STERN TUBE, SKEG, BILGE KEEL PLATE,STABILIZERS FIN ETC. IAW NO 01/15. UNDERTAKE REPAIR AS NECESSARY.
513SR2-CLEAN TO BARE METAL ALL CORRODED AREA AND AREA OF PAINT FAILURE OF U/W APPENDAGES AND PRESERVED IN ACCORDANCE WITH NO 53/16 AND POLICY DIRECTIVES ISSUED BY NHQ/IHQ TIMETO TIME.
514SR3-CHECK DRAUGHT MARKS ARE IN POSITION AND INTACT WITH SHIP STRUCTURE. (NES-164/DEFSTAN 02-164 & BR 3001 CHAPTER 28 ARTICLE 2811). UNDERTAKE PAINTING OF DRAFT MARKS AS PERNO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA FROM TIME TO TIME.
515SR4-EXAMINE FAIRING OF UNDERWATER APPENDAGES FOR ROUGHNESSAND UNFAIRNESS OR ANY DAMAGE PAYING PARTICULAR ATTENTION TOTHE SHAFT BRACKETS, ROPEGUARDS AND EDDY PLATES ETC.RENEW/REPAIR THE UNFAIRED/DAMAGED FAIRING FOR THEIRSMOOTHNESS.
516SR7-RECOAT SHAFT BRACKETS IN ACCORDANCE WITH NO 53/16.
517CARRY OUT SR ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
518SR1-CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/ DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/ SPM CHECKS ON MOTOR, MOTOR STARTING/RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IT ANY. OVERHAUL PUMP IF PERFORMANCE IS SUBOPTIMAL.
519SR2-INSPECT CONDITION OF SUCTION/ DISCHARGE COMPENSATORS.RENEW AS NECESSARY.
520SR3-CALIBRATE ALL INSTRUMENTATION.
521SR4-CARRY OUT FUNCTIONAL TEST OF RELIEF VALVE. RESET TO SPECIFIED LIFTING PRESSURE.
522SR5-INSPECT THE SUCTION STRAINER. RENEW IF REQUIRED.
523SR7-REFIT SUCTION AND DISCHARGE VALVES.
524SR8-CHECK CONDITION OF COUPLING GUARDS. REPAIR/ REPLACE IF REQUIRED.
525CARRY OUT SR ROUTINES.SPARES : SPARES TO BE PROVIDED BY SHIPYARD. TRIALS TO BE OFFERED TO NAVAL TRIAL AGENCY. DEFECTS OBSERVED BY NAVAL TRIAL AGENCY TO BE LIQUIDATED AND RE OFFERED FOR TRIALS.
526SR6-CHECK AND CALIBRATE ALL INSTRUMENTATION IN THE SYSTEM.
527SR7-CHECK OPERATION OF HAND PUMPS IN THE SYSTEM AND OVERHAUL ,IF REQUIRED.
528ENGINEERING - PART III
529ABER CAT-II- ABER REPLACEMENT OF FIREMAIN PUMP OF MAKE BE PUMPS PVT LTD WITH MAKE- SPX FLOW (KGEC 16-6) AS PER APPROVED BPS. ENVISAGED SCOPE OF WORK INCLUDES: 1. REMOVAL/DEGUTTING OF OLD EQUIPMENT AND SUB-EQUIPMENT. 2. REMOVAL OF EXISTING CABLE AND STARTING PANEL. 3. MODIFICATION ON FOUNDATION FRAMES. 4. FITMENT OF NEW EQUIPMENT. 5. MANUFACTURING OF BRASS TALLIES FOR ALL SUB UNIT AND EQUIPMENT PANEL. 6. POWERING UP, STW, TESTING, COMMISSIONING, TRAINING OF CREW AND TRIALS. QTY- 02
530ABER CAT-II- ABER REPLACEMENT OF BILGE PUMP OF MAKE BE PUMPS PVT LTD WITH MAKE- SPX FLOW (KGEC 16-6) AS PER APPROVED BPS. ENVISAGED SCOPE OF WORK INCLUDES: 1. REMOVAL/DEGUTTING OF OLD EQUIPMENT AND SUB-EQUIPMENT. 2. REMOVAL OF EXISTING CABLE AND STARTING PANEL. 3. MODIFICATION ON FOUNDATION FRAMES. 4. FITMENT OF NEW EQUIPMENT. 5. MANUFACTURING OF BRASS TALLIES FOR ALL SUB UNIT AND EQUIPMENT PANEL. 6. POWERING UP, STW, TESTING, COMMISSIONING, TRAINING OF CREW AND TRIALS. QTY- 02
531ABER CAT-II- ABER REPLACEMENT OF HOT WATER CIRCULATING PUMP WITH MAKE- SPX FLOW (KGEC 11-3) AS PER APPROVED BPS. ENVISAGED SCOPE OF WORK INCLUDES: 1. REMOVAL/DEGUTTING OF OLD EQUIPMENT AND SUB-EQUIPMENT. 2. REMOVAL OF EXISTING CABLE AND STARTING PANEL. 3. MODIFICATION ON FOUNDATION FRAMES. 4. FITMENT OF NEW EQUIPMENT. 5. MANUFACTURING OF BRASS TALLIES FOR ALL SUB UNIT AND EQUIPMENT PANEL. 6. POWERING UP, STW, TESTING, COMMISSIONING, TRAINING OF CREW AND TRIALS. QTY- 01
532ABER CAT I- REPLACEMENT OF DIESEL ALTERNATOR, MAKE- M/S CUMMINS, 6CTA 8.3D(M), . ENVISAGED SCOPE OF WORK INCLUDES: 1. REMOVAL/DEGUTTING OF OLD EQUIPMENT AND SUB-EQUIPMENT. 2. REMOVAL OF EXISTING CABLE AND STARTING PANEL. 3. MODIFICATION ON FOUNDATION FRAMES. 4. FITMENT OF NEW EQUIPMENT. 5. MANUFACTURING OF BRASS TALLIES FOR ALL SUB UNIT AND EQUIPMENT PANEL. 6. POWERING UP, STW, TESTING, COMMISSIONING, TRAINING OF CREW AND TRIALS. QTY- 02
533MAJOR A’S & A’S- FITMENT OF MARINE ACs IN LIEU OF SPLIT AC MAKE- AEROEQUIP 2 TONS AS PER APPROVED BPS . MAJOR SCOPE OF WORK INCLUDES: 1. REMOVAL/DEGUTTING OF OLD EQUIPMENT AND SUB-EQUIPMENT. 2. REMOVAL OF EXISTING CABLE AND STARTING PANEL.3. FITMENT OF TRUNKING WITH BLOWERS.4. FITMENT OF SEA WATER PIPELINES WITH VALVES. 5. MODIFICATION ON FOUNDATION FRAMES. 6. FITMENT OF NEW EQUIPMENT. 7. MANUFACTURING OF BRASS TALLIES FOR ALL SUB UNIT AND EQUIPMENT PANEL. 8. POWERING UP, STW, TESTING, COMMISSIONING, TRAINING OF CREW AND TRIALS. QTY- 01
534MANUFACTURING AND FITMENT OF EDA EXHAUST LINE FROM COCKPIT STORE TO CATWALK. LENGTH - 10 MTRS
535ENGINEERING - PART II
536SAFETY DEVICE CHECKS OF BOTH MAIN ENGINES TO BE CARRIED OUT IN COLD AS WELL AS HOT CONDITION POST 06K ROUTINES. CERTIFICATE TO BE ISSUED POST COMPLETION.
537CALIBRATION OF MAIN ENGINE LOCAL AND REMOTE STARTING PANEL TO BE UNDERTAKEN VIEW MALFUNCTIONING. REPLACEMENT OF ALL CONTRACTORS AND LAMPS. STARTING OF ENGINE TO BE PROVED FROM LOCAL AND REMOTE POSITIONS. QTY-02
538REPLACEMENT OF DEFECTIVE GAUGES OF BOTH MAIN ENGINES AT LOCAL AND REMOTE PANEL TO BE CARRIED OUT VIEW MALFUNCTIONING, CALIBRATION TO BE UNDERTAKEN AND CERTIFICATE TO BE ISSUED:- 1. LUB OIL PRESSURE GAUGE- 02 2. LUB OIL TEMP GAUGES- 023. FRESH WATER TEMP GAUGES- 024. SEA WATER PRESSURE GAUGE- 02 5. FRESH WATER PRESSURE GAUGE- 02 . CERTIFICATE TO BE ISSUED POST COMPLETION.
539SAFETY DEVICE CHECKS OF BOTH GEAR BOXES TO BE CARRIED OUT. DEFECT TO BE RECTIFIED (IF NOT SATISFACTORY). CERTIFICATE TO BE ISSUED POST COMPLETION
540CALIBRATION OF 06 IN NO. PRESSURE GAUGES OF BOTH GEAR BOXES TO BE CARRIED OUT. DEFECTIVE GAUGES TO BE REPLACED.
541SAFETY DEVICE CHECKS OF BOTH DIESEL ALTERNATORS TO BE CARRIED OUT IN COLD AS WELL AS HOT CONDITION POST 6000 HRLY ROUTINES. DEFECT TO BE RECTIFIED (IF NOT SATISFACTORY). CERTIFICATE TO BE ISSUED POST COMPLETION
542CALIBRATION OF LOCAL ANALOG GAUGES OF BOTH DA'S AT LOCAL POSITION TO BE CARRIED OUT VIEW MALFUNCTIONING:- 1. LUB OIL PRESSURE GAUGE- 01 2. LUB OIL TEMP GAUGES- 013. FRESH WATER TEMP GAUGES- 01 4. EXHAUST TEMP GAUGES- 01 . CERTIFICATE TO BE ISSUED POST COMPLETION.
543SAFETY DEVICE CHECKS OF BOTH REF PLANTS TO BE CARRIED OUT POST SR ROUTINES. DEFECT TO BE RECTIFIED, IF NOT SATISFACTORY. CERTIFICATE TO BE ISSUED POST COMPLETION.
544SAFETY DEVICE CHECKS OF RO PLANTS TO BE CARRIED OUT POST SR ROUTINES. DEFECT TO BE RECTIFIED, IF NOT SATISFACTORY. CERTIFICATE TO BE ISSUED POST COMPLETION.
545CALIBRATION OF GOVERNOR CARDS TO BE UNDERTAKEN VIEW MALFUNCTIONING. QTY- 02. RENEW IF FOUND DEFECTIVE.
546DA ONLOAD INDICATION NOT WORKING ON BOTH DA. DEFECT TO BE RECTIFIED. QTY-02
547INSPECTION, PERFORMANCE CHECKS AND LOAD TRIALS TO BE CARRIED OUT. RECTIFY DEFECTS OBSERVED DURING TRIALS.
548REPLACE FUEL FILTER, OIL FILTER, LUB OIL AND CLEAN AIR FILTER.
549CALIBRATION OF GAUGES OF LP AIR COMPRESSOR. QTY - 02. RENEW IF FOUND DEFECTIVE. CERTIFICATE TO BE ISSUED POST COMPLETION.
550OVERHAULING OF 5 VALVES OUT OF 25 AIR SYSTEM VALVES TO BE UNDERTAKEN VIEW VALVE NOT HOLDING. AND PRESSURE TESTING UP TO 09 BAR. PAINTING TO BE UNDERTAKEN. DIA- 20 NB, MAT- MS TYPE GLOBE, QTY-5. RENEW IF FOUND DEFECTIVE.
55130 MTRS OUT OF 250 MTRS RENEWAL OF LP AIR SYSTEM PIPE LINES AND PRESSURE TESTING UP TO 07 BAR VIEW CRACKED/ PERISHED. PAINTING OF PIPES TO BE UNDERTAKEN, PRIMER AND TWO COAT WHITE PAINT. MAT- MS, LENGTH-10 MTR , DIA-15MM
552OVERHAULING OF 10 OVERBOARD VALVES OUT OF 22 VALVES TO BE UNDERTAKEN VIEW VALVE NOT HOLDING AND PRESSURE TESTING UP TO 05 BAR VIEW LEAKAGE. DIA - VARIOUS(32,55,65 MM), MAT- GUNMETAL, TYPE - NRV, QTY-10
553SECURING CLAMPS/ FRAMES TO BE MANUFACTURED VIEW RUSTED AND BROKEN FOR VARIOUS SYSTEM PIPELINES AS PER REQUIREMENTS.QTY-10 MAT-MS
554CALIBRATION OF ACTUATOR OF DA VIEW MALFUNCTIONING. QTY - 02.
555CHEMICAL CLEANING AND PRESSURE TESTING OF SEA WATER PIPELINES TO BE UNDERTAKEN. PRESSURE TESTING UPTO 07 BAR. PAINTING iaw PAINTING SCHEME TO BE UNDERTAKEN POST PRESSURE TESTING. LENGTH - 50M, MAT-CUNI DIA- 32,55,65,75 MM
556CALIBRATION OF TORQUE WRENCH TO BE CARRIED OUT AND CERTIFICATE TO BE ISSUED. QTY-01
557SERVICING OF SPILT ACS TO BE UNDERTAKEN. QTY - 19.
558CHECK FOR LEAKAGE OF REFRIGERANT BY APPLYING SOAP SOLUTION ON PIPE JOINTS AND RUNNING LENGTH. RENEW IF FOUND DEFECTIVE AND RECHARGE REF IF FOUND LOW.
559SEA TUBE CHEMICAL CLEANING VIEW CLOGGED AND PRESSURE TESTING UP TO 5 BAR. QTY-02
560MANUFACTURING/ RENEWAL OF SPRINKLING SYSTEM PIPE LINE AND PRESSURE TESTING UP TO 05 BAR IN VIEW OF CRACKED/ PERISHED. . PAINTING OF PIPELINES TO BE UNDERTAKEN. PRIMER, TWO COAT RED PAINT. LENGTH-10 MTR MAT- CUNI, DIA-32MM
561DEFECTIVE QUARTZ BULB NOZZLES TO BE REPLACED
562OVERHAULING OF REF SEA WATER PUMP VIEW LOW DISCHARGE PRESSURE. CAPACITY - 20TPH, MAKE- JOHNSON QTY-02
563OVERHAULING OF OUT BOARD MOTOR VIEW NOT GETTING STARTED. QTY-02
564OVERHAULING OF TWO SEA CHEST VALVE VIEW LEAKAGE FROM GLAND. PRESSURE TESTING UPTO 07 BAR AND PAINTING TO BE UNDERTAKEN. DIA- 125 MM, MAT- GUNMETAL, TYPE- GLOBE, QTY-02
565OVERHAULING OF TWO SEA CHEST VALVE VIEW LEAKAGE FROM GLAND. PRESSURE TESTING UPTO 07 BAR AND PAINTING TO BE UNDERTAKEN. DIA- 80 MM, MAT- GUNMETAL, TYPE- GLOBE, QTY-02
56675 MTR OUT OF 300 MTR REPAIR OF SEA WATER LINE AND PRESSURE TESTING UP TO 07 BAR VIEW PERISHED AND CRACKED. PAINTING OF PIPES TO BE UNDERTAKEN, PRIMER AND TWO COAT WHITE PAINT. MAT- CUNI, LENGTH-35 MTR ,DIA-50 MM
567OVERHAULING OF 07 VALVES OUT OF OF 28 SEA WATER SYSTEM VALVES TO BE UNDERTAKEN. PRESSURE TESTING UP TO 07 BAR VIEW NOT HOLDING AND PAINTING TO BE UNDERTAKEN. DIA- 65 MM, MAT- GUN METAL, TYPE- GLOBE/GATE, QTY-07
568OVERHAULING OF 07 HYDRANT VALVES AND PRESSURE TESTING UP TO 07 BAR VIEW LEAKAGE FROM GLAND. DIA - 65NB, MAT- GUNMETAL, TYPE - HYDRANT VALVE QTY-07
569OVERHAULING OF TWO BILGE PUMP VIEW LOW DISCHARGE PRESSURE. CAPACITY - 25TPH, MAKE- JOHNSON QTY-02
570OVERHAULING OF 5 VALVES OUT OF 25 BILGE WATER SYSTEM VALVES TO BE UNDERTAKEN VIEW VALVE NOT HOLDING. PRESSURE TESTING UP TO 07 BAR VIEW AND PAINTING TO BE UNDERTAKEN. DIA- 50 MM, MAT- GUN METAL, TYPE- GLOBE, QTY-5
571MANUFACTURING AND FITMENT OF 70 MTR BILGE WATER PIPE LINE AND PRESSURE TESTING UP TO 07 BAR VIEW CRACKED/ PERISHED. PAINTING OF PIPES TO BE UNDERTAKEN, PRIMER AND TWO COAT WHITE PAINT. MAT- CUNI, LENGTH-20 MTR ,DIA-50 MM
572OVERHAULING OF TWO FIRE PUMP VIEW LOW DISCHARGE PRESSURE. CAPACITY - 25TPH, MAKE- BE PUMPS QTY-02
573MANUFACTURING AND FITMENT OF 60 MTR OUT OF 250 MTRS FIREMAIN SYSTEM SEA WATER PIPE LINE AND PRESSURE TESTING UP TO 07 BAR VIEW CRACKED/ PERISHED. PAINTING OF PIPES TO BE UNDERTAKEN, PRIMER AND TWO COAT WHITE PAINT. MAT- CUNI, LENGTH-30 MTR ,DIA-65 MM
57460 MTRS OUT OF 250 MTRS REPAIR OF SEA WATER PIPE LINES AND PRESSURE TESTING UP TO 07 BAR VIEW CRACKED/ PERISHED. PAINTING OF PIPES TO BE UNDERTAKEN, PRIMER AND TWO COAT WHITE PAINT. MAT- CUNI, LENGTH-60 MTR ,DIA-65 MM
575REPLACEMENT OF 5 VALVES OF 25 FIREMAIN SEA WATER SYSTEM VALVES TO BE UNDERTAKEN VIEW NOT HOLDING. PRESSURE TESTING UP TO 07 BAR AND PAINTING TO BE UNDERTAKEN. DIA- 50 MM, MAT- GUN METAL, TYPE- GLOBE, QTY-5
576FLOW RATE CHECKS TO BE UNDERTAKEN VIEW LOW RATE. CERTIFICATE TO BE ISSUED. QTY-01, CAPACITY- 37 TPH
577PNEUMATIC VALVES MALFUNCTIONING.OVERHAULING OF PNEUMATIC VALVES TO BE UNDERTAKEN VIEW NOT HOLDING. QTY-03
578REPLACEMENT OF HEATER TO BE UNDERTAKEN VIEW NOT WORKING. QTY - 01
579REPLACEMENT OF DEFECTIVE DRY PROTECTION UNIT VIEW MALFUNCTIONING. QTY-01
580MANUFACTURING AND PAINTING OF MACHINERY GUARD AS PER SAMPLE. QTY-05, MAT- MS
581OVERHAULING OF TWO GRAY WATER PUMP VIEW LOW DISCHARGE PRESSURE. CAPACITY - 25TPH, QTY-02
582OVERHAULING OF 7 VALVES OUT OF 30 FRESH WATER SYSTEM VALVES TO BE UNDERTAKEN VIEW VALVE NOT HOLDING. PRESSURE TESTING UP TO 07 BAR AND PAINTING TO BE UNDERTAKEN. DIA-32MM MAT- GUNMETAL, TYPE- GLOBE, QTY-7
583OVERHAULING OF TWO FRESH WATER PUMP VIEW LOW DISCHARGE PRESSURE. CAPACITY - 2.5TPH, MAKE- JOHNSON QTY-02
584REPLACEMENT OF 7 VALVES OUT OF 30 FRESH WATER SYSTEM VALVES TO BE UNDERTAKEN VIEW VALVE NOT HOLDING. DIA- 32 MM, MAT- GUNMETAL, QTY-7
58560 MTRS OUT OF 250 MTRS REPAIR/ RENEWAL OF FRESHWATER SYSTEM PIPE LINES AND PRESSURE TESTING UP TO 07 BAR VIEW CRACKED/ PERISHED. PAINTING OF PIPES TO BE UNDERTAKEN, PRIMER AND TWO COAT WHITE PAINT. MAT- MS, LENGTH-25 MTR ,DIA-25,50MM
586CALIBRATION OF FOLLOWING EQUIPMENT OF HYDROPHORE TANK VIEW MALFUNCTIONING:-1. PRESSURE GAUGE-012. CUTIN/ CUT OUT SWITCH-01CERTIFICATE TO BE ISSUED POST COMPLETION.
587CLEANING AND PRESSURE TESTING OF HYDROPHORE TANK TO BE CARRIED OUT VIEW CLOGGED. CERTIFICATE TO BE ISSUED POST COMPLETION.
588PNEUMATIC VALVES MALFUNCTIONING.OVERHAULING OF PNEUMATIC VALVES TO BE UNDERTAKEN VIEW NOT HOLDING. QTY-02. RENEW IF FOUND DEFECTIVE.
589OVERHAULING OF HOT WATER CIRCULATING PUMP VIEW LOW DISCHARGE PRESSURE.CAPACITY-2.5 TPH MAKE- JOHNSON QTY-01
590OVERHAULING OF 7 VALVES OUT OF 30 HOT WATER SYSTEM VALVES TO BE UNDERTAKEN VIEW VALVE NOT HOLDING. PRESSURE TESTING UP TO 07 BAR AND PAINTING TO BE UNDERTAKEN. DIA-32MM MAT- GUNMETAL, TYPE- GLOBE, QTY-7
59150 MTRS OUT OF 250 MTRS REPAIR/ RENEWAL OF HOTWATER SYSTEM PIPE LINES AND PRESSURE TESTING UP TO 07 BAR VIEW CRACKED/ PERISHED. PAINTING OF PIPES TO BE UNDERTAKEN, PRIMER AND TWO COAT WHITE PAINT. MAT- MS, LENGTH-30 MTR ,DIA-25MM
592OVERHAULING 5 OUT OF 20 FUEL SYSTEM VALVES TO BE UNDERTAKEN AND PRESSURE TESTING UP TO 05 BAR. PAINTING TO BE UNDERTAKEN VIEW VALVE NOT HOLDING. DIA- 20 NB, MAT- MS TYPE GLOBE, QTY-05
593OVERHAULING OF QUICK SHUT OFF VALVE TO BE UNDERTAKEN VIEW VALVE NOT HOLDING. QTY-03
59450 MTRS OUT OF 250 MTRS REPAIR OF FUEL SYSTEM PIPE LINES AND PRESSURE TESTING UP TO 07 BAR VIEW CRACKED/ PERISHED. PAINTING OF PIPES TO BE UNDERTAKEN, PRIMER AND TWO COAT WHITE PAINT. MAT- MS, LENGTH-20 MTR ,DIA-25,50 MM
595OVERHAULING OF FUEL SUCTION VALVES FROM STORAGE TANKS TO RU TANKS TO BE UNDERTAKEN AND PRESSURE TESTING UP TO 05 BAR VIEW NOT HOLDING. PAINTING TO BE UNDERTAKEN. JOB INVOLVED DE-GUTTING AND RE-FITMENT OF FRAMES AND PIPELINES IN VICINITY. DIA- 60 NB, MAT- MS TYPE GLOBE, QTY-06
596TESTING AND TUNING OF THROTTLE LEVER MECHANISM FOR SMOOTH OPERATION VIEW MALFUNCTIONING. QTY-02. WIRE TO BE RENEWED IF FOUND DEFECTIVE.
59750 MTRS OUT OF 300 MTRS COPPER TUBE REPLACEMENT OF SYSTEM GAUGE LINE AT VARIOUS LOCATIONS VIEW PERSHIED AND CRACKED. QTY-50 MTR
598BOTH ENGINES AND BOTH DA MIXING UNIT CHEMICAL CLEANING AND PRESSURE TESTING UP TO 4 BAR VIEW CLOGGED. QTY-04
599RENEWAL OF COLD LAGGING OF REF PLANT GAS LINES TO BE UNDERTAKEN VIEW PERISHED . QTY-50 MTR
600CHEMICAL CLEANING OF REF PLANT CONDENSER TO BE UNDERTAKEN VIEW CLOGGED. POST CLEANING, PRESSURE TESTING UP TO 03 BAR. Qty - 02.
601SERVICEABILITY CHECKS OF SAFETY DEVICE CHECKS OF BOTH REF PLANT TO BE CARRIED OUT. PROVE SYSTEM OPERATION TO TRIAL TEAMS. CERTIFICATE TO BE ISSUED POST COMPLETION. QTY-02
602OVERHAUL STEERING PUMPS AND MOTORS TO BE UNDERTAKEN VIEW SUB OPTIMAL PERFORMANCE. CHECK ALIGNMENT BETWEEN PUMP AND MOTOR AFTER FITMENT.
603OVERHAULING OF REMOTE STARTING PANELS IN CHART HOUSE TO BE UNDERTAKEN VIEW MALFUNCTIONING.
604OVERHAUL FEEDBACK UNIT AND REPLACE DEFECTIVE POTENTIOMETER VIEW MALFUNCTIONING.
605REPLACE DEFECTIVE RAI AND ROI
606CALIBRATION OF FOLLOWING EQUIPMENT OF CO2 MAJOR FIRE FIGHTING SYSTEM TO BE UNDERTAKEN AND CERTIFICATE TO BE ISSUED:- BOURDAN PRESSURE GAUGE-05, MANUAL RELIEF VALVE-05 SAFETY RELIEF VALVE-05
607REPLACEMENT OF 15 MTR CO2 MAJOR FIRE FIGHTING SYSTEM PIPELINES WITH ADAPTER/ UNION AND SYSTEM PRESSURE TESTING UP TO 100 BAR VIEW PERISHED AND CRACKED. LENGTH-15 MTR MAT-SS
608WEIGHING AND INSPECTION OF N2 PILOT CYLINDER TO BE UNDERTAKEN AND CHARGE IF REQUIRED. QTY-02
609MANUFACTURING, FITMENT AND PRESSURE TESTING UP TO 150 BAR CO2 MAJOR FIRE FIGHTING SYSTEM N2 BOTTLE PIPE LINE VIEW CRACKED. LENGTH-15 MTR, MAT-CUNI
610OVERHAULING OF FOLLOWING PUMPS TO BE CARRIED OUT VIEW NOT TAKING SUCTION. 1. MAIN ENGINE AND DA LUB OIL HAND PRIMING PUMP - 04 2. DIRTY LUB OIL PUMP - 01 3. LUB OIL HAND PUMP - 01 4. HAND BILGE PUMP - 015. FUEL TRANSFER HAND PUMP - 01
611MANUFACTURING OF DD PUMP SUCTION STRAINER AND SEA CHEST AND SEA TUBE STRAINER VIEW RUSTED AS PER SAMPLE. QTY-10(2+4+4) MAT - BRASS, DIA-30MM
612BOTH SEA CHEST AND SEA TUBE STRAINER TO BE MANUFACTURED AS PER SAMPLE. QTY-04, MAT- BRASS, DIA-40MM
613PAINTING OF VARIOUS SYSTEM PIPE LINES TO BE UNDERTAKEN AS PER COLOUR CODING. ONE COAT WHITE PAINT TO BE APPLIED. QTY-150 MTR
614PAINTING OF TANK MANHOLES TO BE UNDERTAKEN AS PER COLOUR CODING. QTY - 16
615MANUFACTURING OF CONICAL NUTS OF TANK MAHOLES TO BE UNDERTAKEN AS PER SAMPLE. QTY - 300.
616RENEWAL OF ALL FLEXIBLE METALLIC CABLE CONDUIT OF DA AND MAIN ENGINE CONTROL WIRING VIEW PERISHED AND BROKEN. QTY-50 MTR
617REPLACEMENT OF RUBBER COMING OF ENGINE ROOM, AFT PUMP ROOM, STP COMPARTMENT BILGE PLATE. PROPER SECURING OF BILGE PLATES TO BE UNDERTAKEN BY APPLICATION OF RUBBER BEADING AND FASTENERS. LENGTH - 150 SQ MTR
618SPRAY PAINTING OF BOTH ENGINE AND BOTH DA TO BE UNDERTAKEN WITH FIRE RETARDANT MACHINERY PAINT VIEW PAINT DETERIORATED. QTY-04
619MANUFACTURING OF SOUNDING CAP AS PER SAMPLE. QTY-15, MAT- BRASS
620REPAIRS TO BE UNDERTAKEN OF SOUNDING POINTS. MAT- BRASS, QTY - 05
621MANUFACTURING OF 200 IN NO. NAME TALLIES TO BE CARRIED OUT. (MAT - BRASS, SIZE - 100 MM X 25 MM, QTY - 190 ; SIZE - 180 MM X 120 MM, QTY - 10).
622PIPE BLANKS TO BE MADE AS PER SAMPLE. DIA-50MM QTY-05,DIA-65MM QTY-05, DIA-80MM QTY-05,DIA-125MM QTY-10.MAT-MS.
623MANUFACTURING OF MACHINERY GUARD AS PER SAMPLE. QTY - 08, MAT- MS
624HYDROPHORE TANK GAUGE GLASS SAFETY SHIELD TO BE MANUFACTURED AS PER SAMPLE VIEW BROKEN. MAT - BRASS
625CALIBRATION OF RELIEF VALVE OF RO PLANT TO BE UNDERTAKEN
626CALIBRATION OF RELIEF VALVE OF BOTH REF PLANT TO BE UNDERTAKEN
627FUEL RU TANK OVERFLOW SIGHT GLASS TO BE RENEWED AS APER SAMPLE
628DIRTY LUB OIL TANK GAUGE GLASS SAFETY SHIELD TO BE MANUFACTURED AS PER SAMPLE VIEW DAMGED. MAT - BRASS
629MANUFACTURING OF RUBBER BELLOW OF MAIN ENGINE AND REF SEA WATER SYSTEM AS PER SAMPLE. QTY - 15
630CALORIFIER LEVEL SIGHT GLASS TO BE RENEWED AS PER SAMPLE. QTY - 01.
631RENEWAL OF PORTABLE SUCTION PIPES OF BILGE SYSTEM. MAT - PVC, LENGTH 25
632RENEWAL OF HOT LAGGING OF MAIN ENGINE AND HOT WATER SYSTEM TO BE UNDERTAKEN VIEW PERISHED . QTY-100 MTR
633PROPELLER COATING TO BE UNDERTAKEN AS PER HQSNC DIRECTIVE EG/3000/NHQ DT 22 JAN 24. QTY - 02 NOS
634ELECTRICAL - PART I
635SR 1 - REPLACEMENT OF METERS/INSTRUMENTS.CALIBRATION CERTIFICATES TO BE PROVIDED.
636SR 3 - SERVICIBILITY CHECKS AND CALIBRATION OF BREAKERS OF DIFFERENT RATINGS, GSK RELAY AND OTHER PROTECTION CIRCUITS. REPLACE DEFECTIVE.
637SR 5 - CARRY OUT FOLLOWING ROUTINES ON SWITCHBOARD AND BUSBARS:-(A) INSPECT LUGS/ CONNECTORS/ CT/ PT AND OTHER COMPONENTSAND UNDERTAKE REPAIR DETERIORATION/ DAMAGE OF MSB CABLES/WIRING AS NECESSARY.(B) REPLACE BUSBARS INSULATORS - QTY - 03(C) CLEAN AND DECARBONIZE THE BUSBARS. - QTY - 02(D) CARRYOUT FUNCTIONAL CHECKS OF MSB AND PARALLELING TRIALSWITH ALL COMBINATIONS OF GENERATOR SUPPLY.
638SR 1 -OVERHAUL NAVIGATIONAL LIGHTS, CONTROL PANELS. (A) REPLACE DEFECTIVE ROTARY SWITCHES QTY - 04 (B) REPLACE DEFECTIVE INDICATION LAMPS. QTY- 06 (C ) REPLACE 11 PIN RELAY - 04 (D) CONTROL CARD - 04
639SR 2 - CHECK THE SUPPLY CABLES OF SIGNALLING PROJECTORS, RENEW/REWIRE 2 CORE POWER CABLE LENGTH 15 MTR
640SR 3 - CHECK BELL CIRCUITS AND CHECK ALL THE LIGHT FOR CORRECT BRILLIANCY. REPLACE LAMPS QTY - 05
641OVERHAUL THE RECTIFIER AS NECESSARY.LOAD TRIALS OF RECTIFIER TO BE CARRIED OUT.
642LAND THE BATTERIES TO THE BATTERY SHOP FOR MAINTENANCE AND CAPACITY TEST AND REPAIR AS NECESSARY
643CALIBRATE ALL INSTRUMENTS. REPLACE THE FOLLOWING :- REPLACE THE FOLLOWING :- (A) HEATING ELEMENT - 01 (B) CONTACTOR - 02 (C ) MCB - 02
644SR 1 - CARRY OUT ADJUSTMENT OF FUNDAMENTAL FREQUENCY AS PER PAGE 3 OF EQUIPMENT MANUAL (FUNDAMENTAL FREQUENCY = 305 HZ +/- 03%), BY ADJUSTING THE POTENTIOMETER R12.
645SR 1 - CARRYOUT OVERHAULING OF MAGNETIC COMPASS AND RENEW SUPPORITNG LIQUID.
646SR 2 - CARROUT SWING CHECK AND CALIBRATE THE COMPASS.
647SR 1 - CARRYOUT THE PRINTER AND SPEED CONTROL CHECKS.
648SR 3 - CARRY OUT VISUAL EXAMINATION OF PCBs. CARRY OUT SYSTEM HEALTH CHECKS AS PER RESPECTIVE MANUALS. CARRY OUT FOLLOWING CHECKS: - 1. SWITCH OFF THE EQUIPMENT AND CHECK THAT ALL CABLE CONNECTORS ARE INTACT AND CONNECTED PROPERLY. 2. TIGHTEN ALL SCREWS LOOSENED DUE TO VIBRATION. 3. CLEAN THE TRANSDUCER OF ECHOSOUNDER WHEN IN DRY DOCK. EXAMIN THE TRANSDUCER AND CASINGS. PRESERVE THE TRANSDUCER SURFACE DURING DRY DOCKING. CARRY OUT VISUAL EXAMINATION OF TRANSDUCER CABLES, CHECK CONTINUITY AND INSULATION. 4. CARRY OUT TRIALS ON COMPLETION OF ROUTINES/REPAIRS.
649RENEWAL OF TRANSDUCER PCB - QTY - 04
650SR 1 - CARRYOUT PERFORMANCE CHECKS OF THE TRANS-RECEIVER AS PER TECH. MANUAL.
651SR 2 - IN CASE PERFORMANCE PARAMETERS DO NOT MEASURE UP TO THE FACTORY TEST SHEET PARAMETERS, CARRY OUT ADJUSTMENT OF THE SET.
652SR 1 - CARRY OUT PHYSICAL INSPECTION OF ALL THE RACKS/ CABINETS FOR DAMAGE AND REPAIR IF REQUIRED.
653SR 2 - CARRY OUT VISUAL INSPECTION OF ALL THE SWITCHES/ METERS/ HANDSETS/ CABLES FOR DEFECT AND REPLACE/ REPAIR IF REQUIRED.
654SR 1 - REMOVE AND EXAMINE SEA-WATER SIDE OF ALTERNATOR AIR COOLER (WHERE FITTED) FOR CORROSION, EROSION AND FOULING. CLEAN TUBE PLATE AND TUBES WITH WATER JET. CARRY OUT CHEMICAL CLEANING AND PRESSURE TEST ON COMPLETION.
655SR 5 - CHECK AVR FOR SERVICEABILITY. CARRY OUT CALIBRATION AS NEECSSARY. IN CASE OF ANY TUNING/ CALIBRATION UNDERTAKEN ON AVR, THE VOLTAGE CONTROL TEST AND PARALLELING TRIALS TO BE UNDERTAKEN.
656SR 9 - CHECK SECURING ARRANGEMENTS OF POWER AND CONTROL CABLES TO BUS BAR/ AVR. ALL LOOSE SCREWS TO BE TIGHTENED. DEFECTIVE SCREWS TO BE REPLACED.
657SR 11 - CARRY OUT SPM CHECKS, PHASE BALANCING, INSULATION MEASUREMENT. OVERHAUL GENERATOR AND REPLACE NEARINGS. CARRY OUT LOAD TRIALS AND RECORD RESULTS IN LOG BOOK. REPLACE BEARINGS IF FOUND IN RED ZONE.
658SR1 CARRYOUT SERVICEABILITY CHECKS OF ALL UNITS AND OVERALL CHECK UP OF THE SYSTEM INCLUDING PCBS,MANUAL CALL POINTS,DETECTORS AND HOOTERS.UNDERTAKE REPLACEMENT OF DEFECTIVE PART.
659OVERHAUL THE EQUIPMENT COPMPLETELY AND UNDERTAKE THE FOLLOWING:- 1. CHANGE THE ELEMENT IF DEFECTIVE 2. RENEW THE INTERNAL WIRING IF PERISHED 3. CHECK THE ROTARY SWITCHES,CHANGE WITH NEW ONE IF REQUIRED
660CARRYOUT PARAMETER CHECKS OF THE RADAR
661SR 4 - CLEAN AND APPLY RF PAINT ON THE ANTENNA..
662SR 5 - INSPECT THE SHOCK MOUNTS AND CHECK THAT FASTENING UNITS ARE PROPERLY TIGHTENED. RE-COAT WITH NECOL LACQUER
663SR 6 - CHANGE THE OIL IN COMBINED ANTENNA PEDESTAL. CHECK THE SYSTEM FOR PROPER OPERATION.
664SR 7 - CARRY OUT VSWR, SENSITIVITY AND POWER OUTPUT CHECKS.
665SR 10 - MEASURE CHARACTERISTIC IMPEDANCE OF THE ANTENNA FEEDER.
666SR 11 - CARRY OUT COMPLETE OVERHAULING OF THE EQUIPMENT AND TEST FOR OPTIMUM PERFORMANCE.
667SR 2 CARRY OUT SERVICEABILITY CHECKS OF UPS,PCBS IN INTERFACE UNIT AND PROCESSOR.REPAIR/REPLACE IF ANY.
668RENEW SUPPORTING LIQUID,DISTILLED WATER AND CARRY OUT THE FOLLOWING CHECKS:-1. SWITCH ON GYRO COMPASS AND CHECK ITS PERFORMANCE.2. CHECK FOLLOW UP SYSTEM WITH GYRO COMPASS.3. CHECK SENSITIVITY OF FOLLOW UP SYSTEM, IT SHOULD NOT BE LESS THAN 70 DEGREES/ SECOND
669SR 1 - CARRY OUT SERVICEABILITY CHECKS OF ALL UNITS AND OVERALL CHECK UP OF SYSTEM INCLUDING ACOS, PCBs, MANUAL CALL POINTS, DETECTORS & HOOTERS (WHERE APPLICABLE). UNDERTAKE REPLACEMENT OFFOLLOWING :- (A) SENSORS - 10 NOS (B) MANUAL CALL POINT - 01 NOS
670SR 1 - CHECK LIMIT SWITCH FOR PROPER OPERATION. RENEW DEFECTIVE LIMIT SWITCHES.
671SR 1 - OVERHAUL THE MOTOR AND STARTERS. RENEW BEARINGS SUBJECT TO QC CHECKS.
672SR 2 - CALIBRATE OVER-LOAD MECHANISM OF THE STARTER.
673SR 1 - LUBRICATE/ REPLACE BEARING. (DE: 6205, NDE: 6205)
674SR 2 - CARRY OUT CALIBRATION OF OVERLOAD RELAY (OLR)/THERMAL PROTECTION (TP) OF STATER.
675SR 1 - OVERHAUL THE MOTOR (1.5KW-03, 3.7KW-02) AND STARTER. RENEW BEARINGS.
676SR 2 - CALIBRATE OVER-LOAD MECHANISM OF THE STARTER.
677SR2 CARRY OUT INTERNAL CLEANING AND CHECK FEEDER CABLE CONNECTORS
678SR 3 - CHECK ALL PCBs AND THEIR COMPONENTS FITTED IN THE ANTENNA. REPAIR IF REQUIRED.
679SR 5 - CHECK ALL PCBs, PRINTING HEAD AND OTHER COMPONENTS FOR DAMAGE/ DEFECT.
680SR 6 - CARRYOUT NECESSARY CHECKS AND ADJUSTMENTS AFTER REPAIR AS PER PARA 3.3 OF TECHNICAL MANUAL.
681SR 7 - CARRYOUT INTERNAL CLEANING OF THE EQUIPMENT.
682SR 1 - INSPECT THE SET FOR ANY MECHANICAL DAMAGE/ DEFECT. CARRYOUT REPAIR/ REPLACEMENT IF REQUIRED.
683SR 1 - CARRYOUT SENSITIVITY AND SELECTIVITY CHECKS AS PER INSTRUCTIONAL MANUAL.
684SR 2 - CHECK COMPLETE OPERATION IN ALL OPTIONS FOR ANY DEFECT AND CARRYOUT REPAIRS IF ANY.
685SR 1 - CHECK SENSOR FOR CONTAMINATION DUE TO EXHAUST GASES, WASH IT WITH FRESH WATER AND MILD SOAP SOLUTION AS NECESSARY.
686SR 2 - CHECK THE SHOCK/ VIBRATION MOUNTS, RENEW IF NECESSARY.
687SR 1 - OVERHAUL THE MOTOR & STARTERS. REPLACE BEARING
688SR-2 CALIBRATE OVER-LOADING MECHANISM OF FIRE MAIN STARTER
689SR 1 - OVERHAUL THE MOTOR & STARTERS. REPLACE BEARING
690SR-2 CALIBRATE OVER-LOADING MECHANISM OF BILGE PUMP STARTER
691SR 1 - OVERHAUL THE MOTOR & STARTERS. REPLACE BEARING
692SR-2 CALIBRATE OVER-LOADING MECHANISM OF GREY WATER PUMP STARTER
693SR 4 - CLEAN AND APPLY RF PAINT ON THE ANTENNA..
694SR 5 - INSPECT THE SHOCK MOUNTS AND CHECK THAT FASTENING UNITS ARE PROPERLY TIGHTENED. RE-COAT WITH NECOL LACQUER
695SR 6 - CHANGE THE OIL IN COMBINED ANTENNA PEDESTAL. CHECK THE SYSTEM FOR PROPER OPERTION.
696SR 7 - CARRY OUT VSWR, SENSITIVITY AND POWER OUTPUT CHECKS.
697SR 10 - MEASURE CHARACTERISTIC IMPEDANCE OF THE ANTENNA FEEDER.
698SR 12 - CARRY OUT COMPLETE OVERHAULING OF THE EQUIPMENT AND TEST FOR OPTIMUM PERFORMANCE.
699MAJOR AS AND AS INSTALLATION OF DMR 16A AS PER APPROVED BPS. MAJOR WORK ENVISAGED:-1. MANUFACTURING OF REQUIRED BRACKET/ FRAME FOR INSTALLATION OF DMR 16A AND UPS 2. FITMENT OF DEVICES AT DESIGNATED PLACE. 3. LAYING OF POWER SUPPLY CABLE 4. FITMENT OF AMPLIFIERS AND ONE MIC 5. LAYING OF POWER CABLES AND CO-AXIAL CABLE 6. OPENING OF RESPECTIVE GLAND AND SEALING POST CABLE LAYING. 7. GROUNDING OF ALL DEVICES TO AVOID EMI/EMC 8. CONNECTORISATION OF VARIOUS CABLES AND INTERCONNECTION OF DEVICES AS REQUIRED 9. INSTALLATION OF COMPLETE SYSTEM, STW/TT. 10. HATs/SATs
700ABER REPLACEMENT OF RAYMARINE RADAR WITH VISION MASTER RADAR. INSTALLATION OF NAV RADAR ENVISAGED FOLLOWING SOW:-1. REMOVAL OF EXISTING RAYMARINE ANTENNA UNIT ALONG WITH FOUNDATION AND DISPLAY UNIT.2. SHIFITING OF ANTENNA SUPPORTING MAST 3. FABRICATION FOR BASE PLATES AND NECESSARY FOUNDATIONS FOR INSTALLATION OF NEW RADAR UNITS IN CHART HOUSE AND POOP DECK 4. SHIFTING OF LRAD TO POOP DECK AND MANUFACTURING A NEW FOUNDATION 5.INSTALLATION OF FOLLOWING UNITS :-5.1. DISPLAY UNI, UPS AND PROCESSOR 5.2. ANTENNA UNIT WITH UPMAST 5.3. INTER-SWITCH 6. OPENING OF EXISTING VABLE GLANDS 6. LAYING OF ALL INTER-SYTEM CABLES AS PER CABLE SCHEDULE 7. LAYING OF ALL POWER SUPPLY CABLES FROM DB TO ANTENNA, DISPLAY UNITS AND SUB UNITS 8. SEALING OF CABLE GLANDS POST CABLING 9. FABRICATION AND FITMENT OF CABLE TALLIES 10. COMMISSIONING, STW AND TT OF EQUIPMENT 11. HATs/ SATs/SEA OP CHECKS OF EQUIPMENT 12.OPENING/CLOSING OF CABLE GLANDS. ULD TEST TO BE CARRIED OUT POST CLOSING OF GLANDS 13. COVERING OF ALL UPPER DECK COVERINGS WITH METALLIC CONDUITS 14. SECUING OF ALL THE CABLES THROUGHOUT THE LENGTH OF THE SHIP/ PASSING THROUGH VARIOUS COMPARTMENTS WITH METTALLIC CABLE-TIES.
701ABER CAT I REPLACEMENT 1. REMOVAL AND REPLACEMENT OF FOLLOWING GALLEY EQUIPMENT VIEW VINAGE AND SUB OBTIMAL PERFORMANCE. RENEW CABLE AS PER REQUIREMENT :- 1.1. 15KW COOKING RANGE 1.2. COOKING STOVE
702ABER CAT II REPLACEMENT OF EXISTING FITTED EM LOG OF MAKE LILLEY AND GILLEY WITH EM LOG OF MAKE KELTRON AS PER APPROVED BPS. ENVISAGED SOW INCLUDES:-1. REMOVAL/DEGUTTING OF OLD EQUIPMENT AND SUB-EQUIPMENT. 2. REMOVAL OF EXISTING CABLE AND STARTING PANEL. 3. MODIFICATION ON FOUNDATION FRAMES. 4. FITMENT OF NEW EQUIPMENT. 5. MANUFACTURING OF BRASS TALLIES FOR ALL SUB UNIT AND EQUIPMENT PANEL. 6. POWERING UP, STW, TESTING, COMMISSIONING, TRAINING OF CREW AND TRIALS.7. IIS/HATS/SATS QTY- 02
703ABER CAT II REPLACEMENT OF EXISTING FBB 500 OF MAKE FURUNO WITH FBB 500 OF MAKE SAILOR AS PER APPROVED BPS. ENVISAGED SOW INCLUDES:-1. REMOVAL/DEGUTTING OF OLD EQUIPMENT AND SUB-EQUIPMENT. 2. REMOVAL OF EXISTING CABLE AND STARTING PANEL.3. CABLING FOR NEW EQUIPMENT AND STARTER PANEL. 3. MODIFICATION ON FOUNDATION FRAMES. 4. FITMENT OF NEW EQUIPMENT. 5. MANUFACTURING OF BRASS TALLIES FOR ALL SUB UNIT AND EQUIPMENT PANEL. 6. POWERING UP, STW, TESTING, COMMISSIONING, TRAINING OF CREW AND TRIALS.7. COMPLETE OP CHECKSQTY- 01
704ELECTRICAL - PART II
705RENEWAL OF 2 CORE CABLE FROM HCOS TO STARTING MOTORS OF BOTH DA
706RENEWAL OF 2 CORE CABLE FROM HCOS TO STARTING MOTORS OF BOTH ENGINES
707CARRY OUT OVERHAULING OF COMPLETE SET AND CHECK IT FOR COMPLETE OPERATION WITH ALL OPTIONS.REPLACE THE FOLLOWING :- (A) PUSH BUTTONS-02 (B) CONTACTOR - 01 (C ) BELL - 01 (D) INDICATION LAMP - 01
708CARRY OUT INSPECTION OF ALL UNITS FOR PROPER EARTHING AND BONDING,RENEW IF DEFECTIVE
709UNDERTAKE INSPECTION OF ALL ASSEMBLIES AND RENEW DEFECTIVE PARTS
710REPLACEMENT OF CONTROL PANEL OF ALDIS LANTERN IN BRIDGE VIEW CORROSION
711REPLACEMENT OF RELAYS OF MAIN ENGINE
712SERVICEABILITY CHECKS OF PCBs OF STEERING CONTROL SYSTEM
713REPLACEMENT OF RELAYS OF STEERING CONTROL SYSTEM
714REPLACEMENT OF CONTACTORS OF WINCHES
715INTERNAL CABLING REPLACEMENT OF GALLEY RANGE EQUIPMENT
716OVERHAULING OF QTY - 08 NOS (3.5 Kw) VENTILATION MOTORS
717CABLING FROM DA CONTROL PANEL TO BATTERY TERMINAL OF BOTH DAS PERISHED TO BE RENEWED. (CABLE SPECIFICATION: 2*1.5 SQ. MM). QTY - 30 MTR
718STBD DA PERCENTAGE PEAK FREQUQNCY VARIATION UNSAT AT 75-100% (LOAD). STBD DA CLEARED FOR EXPLOITATION UPTO 75% LOAD VIDE HQSNC LETTER EE/3090/100 DATED 23 JAN 25. DEFECT TO BE RECTIFIED AND TRIALS TO BE UNDERTAKEN.
719NAV AIDS NOT GETTING CONTINUOUS SUPPLY FROM EDA. EDA ONLOAD BREAKER GETTING TRIP INTERMITTENTLY. DI/DR TO BE UNDERTAKEN. QTY - 01. REPLACE DEFECTIVE PARTS.
720OVERHAULING OF EDA ALTERNATOR VIEW BEARING DEFECTIVE
721REPLACE ALL BROKEN LOCKS OF SWITCHBOARD COVER.
722REPLACEMENT OF DEFECTIVE BREAKERS OF DIFFERENT RATINGS, GSK RELAY AND OTHER PROTECTION CIRCUITS. REPLACE DEFECTIVE.
723FOLLOWING METERS ARE SHOWING ERRATIC READING. CARRY OUT CALIBRATION OF THE SAME. REPLACE DEFECTIVE METERS. CALIBRATION CERTIFICATE TO BE PROVIDED. 1. DOUBLE VOLTMETER - 012. DOUBLE FREQUENCY METER - 013. VOLTMETER - 024. POWER FACTOR METER - 02
724RUBBER BEADING OF SWITCHBOARD COVERS TO BE REPLACED VIEW PERISHED. QTY - 20 MTR
725CALIBRATION OF FOLLOWING MCBs OF SWITCHBOARDTO BE CARRIED OUT. REPLACE DEFECTIVE MCBS.1. SIEMENS SIRIUS 3 POLE 63 AMPS - 022. SIEMENS SIRIUS 3 POLE 32 AMPS - 023. SIEMENS SIRIUS 3 POLE 25 AMPS - 034. SIEMENS SIRIUS 3 POLE 16 AMPS - 035. SIEMENS SIRIUS 3 POLE 10 AMPS - 02
726REPLACEMENT OF FOLLOWING DFECTIVE MCBs OF SWITCHBOARD TO BE CARRIED OUT1. SIEMENS SIRIUS 3 POLE 63 AMPS - 012. SIEMENS SIRIUS 3 POLE 32 AMPS - 013. SIEMENS SIRIUS 3 POLE 25 AMPS - 014. SIEMENS SIRIUS 3 POLE 16 AMPS - 015. SIEMENS SIRIUS 3 POLE 10 AMPS - 01
727REPLACEMENT OF ALL OLD DEFECTIVE DOUBLE POLE SWITCHES AND SOCKETS (230 V SOCKETS) QTY - 100 NOS
728COMPLETE CALIBRATION AND SERVICEABILITY CHECKS OF PARALLELING AND PROTECTION UNIT ( PPU-3) AND CALIBRATION CERTIFICATE IS TO BE ISSUED AFTER COMPLETION. RENEW IF DEFECTIVE. QTY - 02
729PAINTING OF MSB TO BE CARRIED OUT WITH MACHINERY COLOR SPRAY PAINT VIEW PAINT DETERIORATED. ALL THE SWITCHBOARD TALLIES TO BE PASTED POST PAINTING. COLOR CODING OF BREAKERS TO BE DONE WITH FLUORESCENT STICKERS.
730OVERHAULING ,CLEANING AND DECARBONISATION OF DBs TO BE UNDERTAKEN VIEW POOR CONDITION. QTY - 03
731REPLACE DEFECTIVE MCBS OF DBs. (SPECIFICATION OF MCBS - 3 POLE 16 AMPS) QTY - 20 NOS
732ENGINE ROOM 415 DB WORN OUT. MANUFACTURING OF DB TO BE UNDERTAKEN AS PER SAMPLE. MAT - MS, QTY - 5 Nos
733CLEANING AND DECARBONISATION OF DBs TO BE UNDERTAKEN.QTY - 07 NOS
734REPLACE DEFECTIVE MCBs.1. 2 POLE 20 AMPS - 05 NOS2. 2 POLE 16 AMPS - 15 NOS3. 2 POLE 10 AMPS - 10 NOS
735REPLACE THE FOLLOWING MCBS.1. 2 POLE 32 AMPS - 03 NOS2. 2 POLE 20 AMPS - 04 NOS3. 2 POLE 16 AMPS - 05 NOS4. 2 POLE 10 AMPS - 05 NOS
736MAIN DC PANEL 24V E/R -CLEANING AND DECARBONISATION OF HCOS IN MAIN DC PANEL TO BE UNDERTAKEN VIEW POOR CONDITION. HCOS HANDLE BROKEN.HANDLE TO BE REPLACED. QTY - 02
737MAIN DC PANEL 24V E/R -OVERHAULING, CLEANING AND DECARBONISATION OF DBS TO BE UNDERTAKEN VIEW POOR CONDITION. QTY - 01 NOS
738MAIN DC PANEL 24V E/R - CALIBRATION OF FOLLOWING METERS-1. VOLTMETER - 012. AMMETER - 01
739MAIN DC PANEL 24V E/R -CARRY OUT CALIBRATION OF THE MCBs. REPLACE THE MCBS IF FOUND DEFECTIVE. QTY - 10 NOS
740CLEANING AND DECARBONISATION OF HCOS IN ENGINE ROOM.
741REPLACEMENT OF DEFECTIVE OF HCOS
742HCOS HANDLE BROKEN. HANDLE TO BE REPLACEDQTY - 02 NOS
743MAIN CONTROL PANEL TO BE RENEWED VIEW FAULTY
744REPLACE 25 FIRE SENSORS
745REPLACEMENT OF FOLLOWING:PCBS (MAIN CONTROL PANEL), MANUAL CALL POINTS (QTY-05), HOOTERS(QTY-03), ISOLATOR(QTY-02)
746REPLACE DEFECTIVE FLOOD SENSORS.
747STERN LIGHT CABLE IN QUARTERDECK DETERIORATED. RENEWAL OF CABLE ALONG WITH METALLIC CONDUIT TO BE UNDERTAKEN.CABLE SPECIFICATION: - 2 CORE CABLE, 2*1.5 SQ MM. QTY - 20 MTR
748REPLACE NAVIGATION LIGHTS - 25
749CONTINUITY CHECKS OF SYSTEM TO BE UNDERTAKEN. RENEW FAULTY CABLES AND WIRES.
750RENEW CONTROL PANEL VIEW FAULTY AND WORKING SUB OPTIMALLY
751RENEWAL OF SOCKETS (BRASS MADE) OF RIGGING LIGHTS TO BE UNDERTAKEN VIEW MATERIAL FAILURE AND CONTACT WORN OUT.QTY- 25
752REPLACE ALL WEATHER DECK METALLIC CONDUIT WITH RUBBER COVERING VIEW RUSTED. SECURING AND EARTHING OF METALLIC CONDUIT TO BE UNDERTAKEN. QTY - 200 MTR
753WIRING FROM MSB TO JR. SAILOR BATHROOM TO BE UNDERTAKEN FOR SUPPLY TO WASHING MACHINE VIEW CABLE DETERIORATED.CABLE SPECIFICATIONS:- 3 CORE CABLE, 3*2.5 SQ MM. QTY - 100 MTR
754MARINE TYPE 230V, 50HZ SWITCHES IN ENGINE ROOM NOT WORKING, REPLACEMENT TO BE UNDERTAKEN. QTY - 12 NOS
755UNIT LAN: -1. WIRING FOR LAN (SCREENED CAT 6 CABLES) TO BE LAID OUT TO THE FOLLOWING LOCATIONS FROM DUTY WATCH LOBBY VIEW CABLE DETERIORATED: -1. CO CABIN2. EXO CABIN3. SHIPS OFFICE4. CLASSROOM5. DUTY WATCH LOBBY6. CHART HOUSE
756REPLACEMENT OF DEFECTIVE BUNK LIGHTS AT VARIOUS MESS. QTY - 25
757WIRING OF MARINE AC SUPPLY FROM COCKPIT STORE TO OFFICERS CABIN DETERIORATED. REPLACEMENT OF CABLE TO BE UNDERTAKEN AND OLD CABLE TO BE REMOVED. CABLE SPECIFICATION:- 3 CORE CABLE, 3*4 SQ MMQTY - 50 MTR
758CABLE FROM 230V AC DB IN ENGINE ROOM TO THEIR DOMESTIC SUPPLY SOCKETS DETERIORATED. RENEWAL OF CABLE TO UNDERTAKEN AND OLD CABLE TO BE REMOVED.CABLE SPECIFICATION: - 2 CORE CABLE, 2*2.55 SQ MM. QTY - 150 MTR
759CABLES FROM 24V DC MAIN PANEL TO SHIPS OFFICE DB DETERIORATED. RENEWAL OF CABLE TO BE UNDERTAKEN AND OLD CABLE TO BE REMOVED.CABLE SPECIFICATIONS: - 2 CORE CABLE, 2*2.55 SQ MM. QTY - 80 MTR
760REPLACEMENT OF DFECTIVE WARDROOM & OFFICERS' CABIN PANEL LIGHTS (LED). QTY - 10 NOS
761CABLE SECURING TO BE CARRIED OUT USING METALLIC TIES. LENGTH - 500 MTR
762MANUFACTURING AND FITMENT OF CABLE TRAYS TO IMPROVE ELECTRICAL HYGIENE LENGTH - 50 MTR. MAT - GI SHEET
763WIRING OF GREY WATER PUMP NO 02 IN AFT PUMP ROOM PERISHED, TO BE RENEWED AND OLD CABLE TO BE REMOVED.CABLE SPECIFICATIONS: - 3 CORE CABLE, 3*2.55 SQ MM. QTY - 25 MTR
764RENEWAL OF DTH CABLE FROM QUARTER DECK TO FOLLOWING LOCATION VIEW PERISHED- 1. CO CABIN 2. EXO CABIN3. WARD ROOM 4. CLASSROOM QTY-120 MTR.
765RENEWAL OF HEATING ELEMENTS OF 15KW (QTY-04) AND 7.5KW (QTY-02) COOKING RANGE AND OVEN (QTY-01) TO BE UNDERTAKEN VIEW LOW INSULATION. QTY - 07
76615KW AND 7.5KW COOKING RANGE CONTROL PANEL BODY DETERIORATED AND RUSTED. RENEWAL OF PANEL TO BE UNDERTAKEN. QTY - 02
767RENEWAL OF GALLEY INDICATION PANEL VIEW DEFECTIVE COMPONENTS AND POOR MATERIAL CONDITION WITH NEW INDICATION PANEL BOX WHICH INCLUDES FOLLOWING INDICATIONS (AMBER, RED AND GREEN), (TOTAL: 15): -1. GALLEY ISOLATION SWITCH NO. 1 AND 2 SUPPLY AVAILABLE, BREAKER OFF AND BREAKER ON. (QTY-06). 2. 15 KW COOKING RANGE SUPPLY AVAILABLE, HOT PLATE OFF AND HOTPLATE ON. (QTY-03)3. 7.5 KW COOKING RANGE SUPPLY AVAILABLE, HOT PLATE OFF AND HOTPLATE ON. (QTY-03)4. 12 KW DEEP FAT FRYER SUPPLY AVAILABLE, FRYER OFF AND FRYER ON.(QTY-03)5. TALLES TO BE PLACED FOR EACH INDICATION
768CABLING TO BE CARRIED OUT FROM MAIN INCOMER BREAKERS/ ROTARY SWITCHES OF 15 KW COOKING RANGE, 7.5 KW COOKING RANGE AND FROM GALLEY ISOLATION PANEL TO GALLEY INDICATION PANEL. (CABLE SPECIFICATION: 2X1SQ.MM, 70MTRS). ADDITIONALLY REMOVAL AND REFIT OF PANELLING TO BE UNDERTAKEN AS REQUIRED.
769ATTA KNEEDING MACHINE CONTROL PANEL DETERIORATED AND RUSTED. REPLACEMENT OF PANEL TO BE UNDERTAKEN. QTY -01
770OVERHAULING OF ATTA KNEEDING MACHINE MOTOR TO BE UNDERTAKEN VIEW ABNORMAL NOISE. REPLACE BEARING.
771OPERATING PANEL OF ANCHOR WINDLASS (QTY-01) AND MOORING WINCH (QTY-04) IS PERISHED TO BE RENEWED WITH NEW IP-65 COMPATIBLE BOX. DETAILED SOW INCLUDE THE FOLLOWING: -1. RENEWAL OF THE BOX (IP 65 COMPATIBLE) (QTY-05)2. RENEW THE PANEL WITH NEW NO/NC PUSH BUTTONS AND INDICATION LAMPS AS PER DIAGRAM. (QTY-05)3. CALIBRATE THE AMPERE METER. REPLACE IF DEFECTIVE (QTY-05)
772OVERHAULING OF ANCHOR WINDLASS MOTOR TO BE UNDERTAKEN VIEW HIGH CURRENT. TRIALS OF MOTOR AND BRAKE ASSEMBLY TO BE CARRIED OUT.
773RENEWAL OF BATTERY CONNECTIONS WITH NEW LUGS AND PROTECTION COVERS. QTY - 20 NOS
77424V DC CABLES FROM PORT AND STBD BATTERY BANK TO BOTH HCOS IN ENGINE ROOM ARE PERISHED TO BE RENEWED.CABLE SPECIFICATION : 2 CORE CABLE, 2*2.55 SQ MM. QTY - 30 MTR
775REPLACEMENT OF BOTH RPM SENSORS AND PCB UNIT TO BE UNDERTAKEN VIEW MALFUNCTIONING. QTY - 02 NOS
776MOTOR MONITORING SYSTEM NOT WORKING. FOLLOWING TO BE UNDERTAKEN:MAKE - E3 TECH. COMPLETE REPLACEMENT OF SYSTEM INCLUDING SOFTWARE
777TRIALS AND TESTING OF ENTIRE SYSTEM TO BE UNDERTAKEN
778ABNORMAL NOISE OBSERVED FROM SUPPLY/EXHAUST MOTORS FROM VARIOUS LOCATION. OVERHAULING OF 14 MOTORS OUT OF 42 TO BE CARRIED OUT. JOB INCLUDES REMOVAL OF MOTORS FROM TRUNKING AND FITMENT POST OVERHAULING. CARRY OUT PERFORMANCE TRIALS POST OVERHAUL.QTY - 14 NOS. MOTOR SPECIFICATION :- 0.75 KW
779RENEWAL OF GALLEY VENTILATION MOTORS SUPPLY CABLE VIEW CABLE DAMAGED FROM MULTIPLE LOCATIONS. QTY- 30 MTRCABLE SPECIFICATION: 3 CORE CABLE, 3*6 SQ MM
780CABLE FROM 415V DB IN ENGINE ROOM TO VENTILATION MOTOR GROUP STARTERS DETERIORATED AND SHOWING LOW INSULATION. NEW CABLES TO BE RENEWED AND OLD CABLES TO BE REMOVED.SPECIFICATION:- 3 CORE CABLE, 3*6 SQ MM. QTY - 300 MTR
781OVERHAULING OF VENTILATION MOTOR STARTER PANEL VIEW DEFECTIVE PUSH BUTTONS QTY - 06
782OVERHAULING OF STARTER CONTROL PANEL - 5.5kW (05) AND 3.75kW(05)
783CALIBRATE OVER-LOAD MECHANISM OF THE STARTERS :-1) FIRE MAIN MOTOR - 02 2) BILGE PUMP MOTOR - 023) MOTOR FRESH WATER HYDROPHORE PUMP - 02 4) F.O. TRANSFER PUMP MOTOR - 01 5) HOT WATER CIRCULATION PUMP - 01 6) GREY WATER PUMP SYSTEM - 02 7) F.O. PURIFIER PUMP - 01
784GPS FEED TO NAVTEX RECEIVER FOR FITMENT OF NEW BUFFER UNIT OF MAXIMUM OUTPUT IS NOT AVAILABLE. DEFECT RECTIFICATION TO BE UNDERTAKEN. QTY - 01
785BRIDGE GPS FEED NOT AVAILABLE IN ECDIS. SUSPECTED NMEA POWER CABLE FAULTY. RENEWAL OF THE SAME. QTY - 50 MTRCABLE SPECIFICATION:- NMEA CABLE
786RENEWAL OF ANTENNA POWER SUPPLY CABLE AND DATA CABLE VIEW CABLE DAMAGE(SHIPS OFFICE TO BRIDGE AND POOP DECK)SPECIFICATION - POWER CABLE CABLE 2 CORE (0.5 SQ MM)QTY - 50 MTR
787RENEWAL OF DATA CABLE VIEW CABLE DAMAGE(SHIPS OFFICE TO BRIDGE AND POOP DECK) SPECIFICATION - CAT 5/6 cable. QTY - 50 MTR
788FITMENT OF FOOT IN MIC FOR QUARTER MASTER IN BRIDGE VIEW HAND MIC NOT WORKING. QTY - 01
7895 IN NOS INTERPHONE SYSTEM IS NOT WORKING.POINT TO POINT CALL NOT HAPPENING FROM INTERPHONE SYSTEM. MB ANNOUNCEMENT NOT WORKING FROM IP PHONE TO BE REPAIRED AND PROVED. QTY - 01 LOT
790ABNORMAL NOISE OBSERVED FROM RADAR ANTENNA ROTATION. BEARING REPLACEMENT OF RADAR ANTENNA. QTY-01
791LAYOUT OF HDMI CABLE FROM ECDIS PROCESSOR UNIT IN CHART HOUSE TO ECDIS SLAVE DISPLAY ON BRIDGE DAMAGED. RENEWAL TO BE UNDERTAKEN.QTY - 50 MTR. CABLE SPECIFICATION:- HDMI CABLE
792SERVICEABILITY CHECKS OF WSDS SYSTEM TO BE CARRIED OUT VIEW SENSOR DATA NOT GETTING IN THE DISPLAY AND ERROR BUZZER INTERMITENDLY COMING FROM MIU UNIT. MIU UNIT IS TO BE REPAIRED/ RENEWED.
793SERVICEABILITY CHECKS OF WSDI SYSTEM TO BE CARRIED OUT VIEW SENSOR DATA NOT GETTING IN THE DISPLAY AND ERROR BUZZER INTERMITENDLY COMING FROM MIU UNIT. MIU UNIT IS TO BE REPAIRED/ RENEWED.
794MARINE TYPE 230V, 50HZ, DOUBLE POLE SOCKETS TO BE REPLACE WITH METAL BASE
795MULTIPLE DEFECTS OBSERVED ON MAGAZINE SECURITY ALARM IN DUTY WATCH LOBBY. DETAILED SOW INCLUDES THE FOLLOWING: -1. REPLACEMENT OF DEFECTIVE INDICATION ALARM PANEL WHICH INCLUDES SUPPLY AVAILABLE (AMBER), DOOR CLOSE (GREEN), DOOR OPEN (RED) AND ACKNOWLEDGE (BLUE) INDICATIONS, ACKNOWLEDGE AND RESET PUSH BUTTONS AND CONTROL RELAYS/ CONTACTORS.
7962. REPLACEMENT OF DEFECTIVE LIMIT SWITCH INSIDE MAGAZINE LOCKER. QTY- 03
7973. FITMENT OF RED BEAKON AND BELL IN DUTY WATCH LOBBY. QTY- 15
798OVERHAULING OF SUBMERSIBLE PUMP STARTERS ARE TO BE CARRIED OUT VIEW NON OPERATIONAL
79905 TELEPHONE NOT WORKING. OVERHAULING OF TELEHONE EXCHANGE TO BE UNDERTAKEN
800ONE NOS RECTIFIER FLATPACK MODULE IS MALFUNCTIONING TO BE RENEWED.
801PRESSURE TESTING OF CALORIFIER TO BE UNDERTAKEN VIEW LEAKAGE FROM BODY. REFURBISH THE DAMAGED AREA AND PRESSURE TESTING TO BE UNDERTAKEN.
802HEATING ELEMENT IS SHOWING LOW INSULATION, TO BE REPAIRED/ RENEWED.
803WIRING FROM JUNCTION BOX TO OPERATING PANEL OF ALL THE FOUR WINCHES PERISHED TO BE RENEWED. MARKING OF CABLES TO BE MADE. POST RENEWAL, CABLE GLANDS TO BE SEALED USING GLAND PACKING MATERIAL. CARRY OUT TRIALS ON COMPLETION OF REPAIRS. (CABLE SPECIFICATION: 15X1.5SQ.MM)
80405 ALARM DEFECTIVE TO BE RENEWED.
80515 DEFECTIVE UNIT SWITCH TO BE REPLACED OF HYDRAULIC DOOR INDICATION.
806REPLACEMENT OF ELECTRIC HORN TO BE CARRIED OUT VIEW OVERHEATING. QTY - 01
807SIGNAL PROJECTOR FRAME CORRODED AND LIGHT INTENSITY REDUCED. REPAIRS TO BE UNDERTAKEN. QTY - 01
808OVERHAULING OF 415V 3 PHASE 50 HZ TRANSFORMER BE CARRIED OUT VIEW OVERHEATING. QTY - 05
809PACKING OF CABLE GLAND TO IMPROVE ELECTRICAL HYGIENE ONBOARD.
810UNDERTAKE CONTINUITY CHECKS OF COMPLETE SYSTEM AND RENEW CABLING AS PER REQUIREMENT.
811REPLACE 20 DEFECTIVE RIGGING LIGHT. (24V DC, 50W)
812UNDERTAKE CONTINUITY CHECKS OF COMPLETE SYSTEM AND RENEW CABLING IF FOUND DEFECTIVE
813REPLACE DEFECTIVE MAST LIGHTS.
814REPLACEMENT OF DEFECTIVE FLUSH LIGHTS AT VARIOUS LOCATIONS. QTY - 15
815RENEWAL CABLING OF WEATHER DECK LIGHTS
816REPLACEMENT OF DEFECTIVE WEATHER DECK LIGHTS AT VATIOUS LOCATIONS. QTY - 05
817REPLACEMENT OF DEFECTIVE LED TUBE LIGHTS AT VARIOUS LOCATIONS. QTY 20
818REPLACEMENT OF DEFECTIVE TWO-IN-ONE LIGHTS AT BRIDGE AND CANTEEN LOBBY. QTY - 03
819REPLACEMENT OF DEFECTIVE REFLECTOR LIGHTS AT CHART HOUSE TOP AND ENGINE ROOM. QTY - 03
820REPLACEMENT OF DEFECTIVE TWO-IN-ONE PENDENT LIGHTS AT VARIOUS LOCATIONS. QTY - 10
821FITMENT OF 20 I/O BOX WITH RJ 45 CONNECTORS ON ABOVE LOCATIONS VIEW EXITING POINTS MALFUNCTIONING.
822OVERHAULING OF 7.5 KW MOTORS
823FABRICATION OF CABLE TALLIES AS PER SAMPLE . MAT- BRASS QTY - 150
824FABRICATION OF EQUIPMENT TALLIES AS PER SAMPLE.MAT- SS QTY - 150
825FABRICATION OF RACKS FOR NCN EQUIPMENT VIZ. UPS AND NETWORK SWITCHES . QTY- 03
826INSTRUCTIONS ON SECURITY, SAFETY AND MOVEMENT
827(A) SHIPYARD TO QUOTE FOR ALL SERIALS. BULK/LUMPSUM COSTING IS NOT ALLOWED. ALL PAYMENTS WILL BE ON ACTUALS ON NOT EXCEEDING BASIS. (B) ALL SPARES ARE TO BE SOURCED THROUGH OEM AND OEM SUPERVISION IS TO BE ENSURED FOR ROUTINE/REPAIRS OF ALL EQUIPMENT.(C) IF SHIP REFIT AT SHIPYARD CONTINUES BEYOND 150 DAYS FOR ANY REASON INCLUDING FORCE MAJEURE, ALL ADMIN/GENERAL SERVICES ARE TO BE EXTENDED WITHOUT ADDITIONAL COST.
828PASSES OF ALL SUDARSHINI PERSONNEL TO BE MADE AND PRIORITY CLEARANCE FOR ALL PERSONNEL OF THE SHIP DURING ENTIRE DURATION OF REFIT
829SHIPYARD IS REPONSIBLE FOR THE SAFETY OF THE VESSEL AND THE VESSEL'S PROPERTY FROM INCLEMENT AND ADVERSE WEATHER, FOR SAFETY AND SECURITY OF ALL ITEMS/ MATERIAL/EQUIPMENT THAT IS DEGUTTED/REMOVED FROM ONBOARD THE SHIP AND THE SAME ITEM IS TO BE FITTED ONBOARD. SHIPYARD IS TO ESTABLISH A SECURITY PERIMETER AROUND THE VESSEL WITH 2 SENTRIES ROUND THE CLOCK. SHIPYARD EXECUTIVES/STAFF/WORKERS/CONTRACTORS SHALL STRICTLY ABIDE BY ALL NAVAL PROCEDURES / INSTRUCTIONS INTIMATED VERBALLY OR IN WRITING BY SHIP'S OFFICERS AND PROJECT MONITORING OFFICERS. ALL SHIPYARD WORKERS /CONTRACTORS /STAFF ENTERING ONBOARD FOR WORK SHALL BE IN POSSESSION OF VALID ID CARDS AND SHALL SHOW THE SAME WHILE ENTERING/LEAVING OR AS DIRECTED. THE PASSES FOR OFFICERS, PMT AND SAILORS (INCLUDING CAR & BIKE) TO BE ISSUED WITHIN 5 DAYS OF THE ARRIVAL OF THE VESSEL WITH VALIDITY TILL COMPLETEION OF REFIT. THE ENTRY/ EXIT TO SHIP YARD WILL CONTINUE EVEN IN ABSENCE OF SHIP YARD PASSES. PRIORITY CLEARANCE TO ALL NAVAL OFFICERS FOR ENTRY/EXIT TO SHIPYARD, SAILORS OF THE SHIP AND PROJECT MONITORING TEAM TO BE GIVEN SPECIAL CHANNEL FOR UNINTERRUPTED MOVEMENT).
830SHIPYARD TO PERMIT UNRESTRICTED ENTRY /EXIT OF MATERIAL/ SPARES/ ITEMS/ EQUIPMENTS ON SHIP'S AND PROJECT MONITORING OFFICER'S LETTER AT ANY HOUR OF THE DAY. IMMEDIATE CLEARANCE (WITHIN 05 MIN) TO BE GIVEN BY SHIPYARD ON VERBAL INTIMATION/EMAIL/LETTER FROM SHIP AND PROJECT MONITORING TEAM.SHIPYARD TO PERMIT ENTRY/EXIT OF INDIVIDUALS OF ANY FIRM /COMPANY/ORGANIZATION /GUESTS ONBOARD THE VESSEL ON SHIPS AND PROJECT MONITORING OFFICERS LETTER. PREFERRENTIAL /IMMEDIATE CLEARANCE(WITHIN 05 MIN) TO BE GIVEN BY SHPYARD BY VERBAL INTIMATION /EMAIL/LETTER FROMN SHIP OR PROJCT MONITORING TEAM. ALL SHIPYARD WORKERS/SUBCONTRACTORS ETC TO BE CHECKED/SCANNED PRIOR ENTRY ONBOARD THE SHIP AND ALSO ALL ITEMS/BAGS TO BE X-RAYED. CCTV RECORD (WITH NIGHT VISION) OF THE ENTIRE SHIP'S PERIMETER TO BE MAINTAINED FOR THE DURATION OF REFIT AND BACK UP OF ATLEAST 30 DAYS TO BE MAINTAINED.
831INSTRUCTIONS ON DD & WHARFAGE
832PD1 - THE REFITTING AUTHORITY IS TO TAKE ALL ACTIONS TO ENSURE THAT THE DOCKING IS CARRIED OUT IN ACCORDANCE WITH THE LATEST ISSUE OF THE DOCKING PLAN FOR THE PLANNED VERSION OF THE DOCKING WHICH IS SPECIFIC TO THE VESSEL (AND NOT GENERIC TO A CLASS OF VESSELS) AND FOR A PARTICULAR DOCKING PROCEDURE. THE REFITTING AUTHORITIES ARE TO FORWARD DOCKING PLAN, ALONG WITH THE CHECK OFF LIST PROMULGATED VIDE NC/POLICY/H-134/REFIT DATED 11 MAY 18, TO IHQ(N)/DNA THROUGH COMMAND HQS FOR APPROVAL. THE DOCKING FACILITY IS TO BE PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF THE DOCKING PLAN AND DOCKING PROCEDURES. SR- 26
833PD2 - A DOCK MASTER IS TO BE APPOINTED BY THE REFITTING AUTHORITY FOR EACH DOCKING EVOLUTION AND THE SAME IS TO THE INTIMATED TO COMMANDING OFFICER/ MASTER OF THE VESSEL AS PER FORMAT OF NO STR 01/11, PREFERABLY 72 HOURS IN ADVANCE OF THE COMMENCEMENT OF DOCKING EVOLUTION.SR- 26
834PD4 - REFITTING AUTHORITY (DOCK MASTER AND PLANNER) ARE TO REVIEW THE CALCULATION SUBMITTED BY THE SHIP. THE DOCKING/ UNDOCKING CONFERENCES ARE TO BE ORGANISED BY THE REFITTING AUTHORITY (DOCK MASTER AND REFIT PLANNER) TO REVIEW READINESS FOR DOCKING/ UNDOCKING OPERATIONS, AT LEAST 24 HOURS PRIOR DOCKING/ UNDOCKING. FURTHER, IN ORDER TO UNDERSTAND CRITICALITY OF EACH OPERATION, AND DEMARCATION OF RESPONSIBILITIES OF THE STAKEHOLDERS, THE DOCK MASTER IS TO CONDUCT A CENTRALISED BRIEFING FOR ALL THE STAKEHOLDERS 24 HOURS PRIOR EVERY DOCKING/ UNDOCKING OPERATION.SR- 26
835DRY DOCKING & WHARFAGE
836DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - II, BOTH CENTER LINE AND SIDE BLOCKS. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
837DOCKING AND UNDOCKING OF THE VESSEL IN VERSION- I. (DURATION 30 DAYS). SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME. ELSE SHIPYARD TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT
838DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
839SUBSEQUENT DAYS IN DOCK.
840ARRANGE TUG AND PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO THE DOCK, DOCKING, UNDOCKING & DELIVERY OF VESSEL BACK AT NAVAL JETTY. PAYMENT BASED ON THE ACTUAL TIMES AS PER WCC ON NOT EXCEEDING BASIS.
841MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION
842PROVIDE WHARFAGE / WET BASIN FACILITIES (WITH 6M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. DREDGING AS REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OF REFIT AT SHIPYARD'S COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD IN THE CONTRACT
843ON DOCKING OF SHIP, ALL MARINE GROWTH ON PROPELLER TO BE SCRAPPED OF USING SUITABLE METHOD BY SHIPYARD. PROPELLER TO BE PRESERVED AND ALSO CLEANING TO BE UNDERTAKEN AS PER IN STANDARDS
844TECHNICAL SUPPORT SERVICES
845SHIPYARD IS REPONSIBLE FOR THE SAFETY OF THE VESSEL AND THE VESSEL'S PROPERTY FROM INCLEMENT AND ADVERSE WEATHER
846SHIPYARD IS RESPONSIBLE FOR SAFETY AND SECURITY OF ALL ITEMS/ MATERIAL/EQUIPMENT THAT IS DEGUTTED/REMOVED FROM ONBOARD THE SHIP AND THE SAME ITEM IS TO BE FITTED ONBOARD
847SHIPYARD EXECUTIVES/ STAFF/ WORKERS/CONTRACTORS SHALL STRICTLY ABIDE BY ALL NAVAL PROCEDURES / INSTRUCTIONS INTIMATED VERBALLY OR IN WRITING BY SHIP'S OFFICERS AND PROJECT MONITORING OFFICERS.
848ALL SHIPYARD WORKERS /CONTRACTORS /STAFF ENTERING ONBOARD FOR WORK SHALL BE IN POSSESSION OF VALID ID CARDS AND SHALL SHOW THE SAME WHILE ENTERING/LEAVING OR AS DIRECTED
849THE PASSES FOR OFFICERS, PMT AND SAILORS TO BE ISSUED WITHIN 02 DAYS OF THE ARRIVAL OF THE VESSEL WITH VALIDITY TILL COMPLETION OF REFIT. THE ENTRY/ EXIT TO SHIP YARD WILL CONTINUE EVEN IN ABSENCE OF SHIP YARD PASSES
850PRIORITY CLEARANCE TO ALL NAVAL OFFICERS FOR ENTRY/EXIT TO SHIPYARD, SAILORS OF THE SHIP AND PROJECT MONITORING TEAM TO BE GIVEN SPECIAL CHANNEL FOR EASE OF MOVEMENT.
851SHIPYARD TO PERMIT UNRESTRICTED ENTRY /EXIT OF MATERIAL/ SPARES/ ITEMS/ EQUIPMENTS ON SHIP'S AND PROJECT MONITORING OFFICER'S LETTER AT ANY HOUR OF THE DAY. IMMEDIATE CLEARANCE (WITHIN 05 MIN) TO BE GIVEN BY SHIPYARD ON VERBAL INTIMATION/EMAIL/LETTER FROM SHIP AND PROJECT MONITORING TEAM
852SHIPYARD TO PERMIT ENTRY/EXIT OF INDIVIDUALS OF ANY FIRM /COMPANY/ORGANIZATION /GUESTS ONBOARD THE VESSEL ON SHIPS AND PROJECT MONITORING OFFICERS LETTER. PREFERRENTIAL /IMMEDIATE CLEARANCE(WITHIN 05 MIN) TO BE GIVEN BY SHIPYARD BY VERBAL INTIMATION /EMAIL/LETTER FROMN SHIP OR PROJECT MONITORING TEAM
853ALL SHIPYARD WORKERS/SUBCONTRACTORS ETC TO BE CHECKED/SCANNED PRIOR ENTRY ONBOARD THE SHIP AND ALSO ALL ITEMS/BAGS TO BE X-RAYED.
854CCTV RECORD (WITH NIGHT VISION) OF THE ENTIRE SHIP'S PERIMETER TO BE KEPT FOR LAST THIRTY DAYS
855PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY A REGISTERED THIRD PARTY INSPECTING AGENCIES EX - LRS, IRS, ABS ETC. SHIPYARD TO ENSURE QA/QC COVER BY OEMs, FOR WORK BEING UNDERTAKEN THROUGH OEM REPS / OEM AUTHORISED THIRD PARTY FIRMS.
856SHIPYARD TO SUBMIT QAP AND QIP WITH IN 2 WEEKS OF SIGNING OF CONTRACT
857A DETAILED PERT /GANTT CHART TO BE SUMITTED TO NSRY AND SHIP (IN HARD AND SOFT MEDIA) ON TWO WEEKS PRIOR COMMENCEMENT OF REFIT. THE PERT/GANT CHART TO BE UPDATED TWICE EVERY MONTH AS PER THE PROGRESS OF REFIT.
858PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 20 DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REFIT INCLUDING NECESSARY CONNECTION / DISCONNECTION (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD. QUOTE FOR 1000 KWH/DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. SHIPYARDS TO INSTALL POWER METER . SHIP SHOULD BE EARTHED AT 04POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY SHIPYARD. PROPER EARTHING AND ELECTRICAL SAFETY TO BE ENSURED
859PROVIDE 03 SEA WATER FIRE MAINS WITH 08 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES, MANIFOLDS AND INCLUDE NECESSARY CONNECTION / DISCONNECTION. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT ALL MANIFOLDS DISCHARGE LINE. CALIBERATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED ON COMMENCEMENT OF REFIT. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
860SHIPYARD TO PROVIDE 02 PORTABLE AC UNITS (TOTAL 80 TR CAPACITY) WITH AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES (MINIMUM)TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD
861PROVIDE FRESH WATER 04 TONS PER DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. QUOTE TO INCLUDE NECESSARY CONNECTION / DISCONNECTION
862PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (15 KG EACH) TWICE PER DAY FROM SHIP PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
863PROVIDE CRANE 10-15 TON CAPACITY DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
864PROVIDE SERVICES OF ONE LISTERS DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL HOURS AS PER WCC ON NOT EXCEEDING BASIS.
865PROVIDE SERVICES OF ONE FORK-LIFT DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL HOURS AS PER WCC ON NOT EXCEEDING BASIS.
866PROVIDE MOBILE CRANE 40 TON CAPACITY DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY). PAYMENT BASED ON THE ACTUAL HOURS AS PER WCC ON NOT EXCEEDING BASIS.
867CLEANING OF ALL TANKS, VENTILLATION AND OBTAINING GAS FREE CERTIFICATE IS THE RESPONSIBILITY OF SHIPYARD. SHIPYARD TO PROVIDE FACILITY TO DUMP DIRTY FUEL, SLUDGE AND LUB OIL. QTY- 15 TANKS. PAYMENT BASED ON THE ACTUALS AS PER WCC ON NOT EXCEEDING BASIS.
868PROVIDE 15 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT.NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
869TEMPORARY LIGHTING AND VENTILLATION ONBOARD FOR THE ENTIRE DURATION OF REFIT TO BE PROVIDED IN ALL MACHINERY COMPARTMENTS, COMPARTMENTS WITHIN SUPERSTRUCTURE, ALL ALLEYWAYS/ PASSAGE WAYS, CARGO SPACE, BALLAST TANKS MUST BE WELL LIT WITH 24 VDC LAMPS. PROVISION OF MAXIMUM 20 LIGHT POINTS PER DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
870PROVIDE LOAD BANK 100 KW FOR LOAD TRIALS OF DAS WITH M-LOAD TRIALS CAPACITY INCLUDING HIRE CHARGES WITH OPERATOR CREW AND NECESSARY CONNECTION/SHIFTING. (FOR NAVY'S ADDITIONAL REQUIREMENT,IF ANY ONLY. SHIPYARD REQUIREMENTS VIZ. MANDATORY TRIALS POST ROUTINES ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
871PROVIDE PORTABLE 100 KW DA INCLUDING HIRE CHARGES WITH OPERATOR CREW AND NECESSARY CONNECTION/SHIFTING. (FOR NAVY'S ADDITIONAL REQUIREMENT,IF ANY ONLY. SHIPYARD REQUIREMENTS VIZ. DA REQUIREMENT VIEW NON AVAILABILITY OF SHORE SUPPLY TO BE CATERED SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
87210 NOS PORTABLE VENTILATION BLOWERS NEED TO BE SUPPLIED FOR THE DURATION OF REFIT FOR VENTILATION OF THE COMPARTMENTS AND TANKS (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY) PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
87302 NOS LP AIR COMPRESSOR NEED TO BE SUPPLIED FOR THE DURATION OF REFIT FOR LP AIR SUPPLY. (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
874SHIPYARD TO ENSURE MOVEMENT OF STEEL FROM MO (KOC) / NSRY (KOC) TO SHIPYARD INCLUDING LOADING / UNLOADING, MANPOWER (04 MEN), TRAILOR, MOBILE CRANE (02 NOS, 5 TONNE EACH), FORK LIFT AND OTHER REQUIRED ACCESSORIES. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
875ANALYSIS OF LUB OIL, COOLENT, HYDRAULIC OIL AND PORTABLE WATER. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. ANALYSIS OF LUB OIL, COOLENT AND PORTABLE WATER OF ALL MAIN ENGINES, DIESEL ALTERNATORS, GEAR BOXES AND AUXILARY MACHINERIES TO BE CARRIED THROUGH NABL CERTIFIED LABORATRY AND TWO COPIES OF THE EACH REPORT TO BE SUBMITTED WITHIN 24 HOURS OF TEST UNDERTAKEN.
876(1.2) ADVANCE TEST :- THE ADVANCE TEST OF LUB OIL SHOULD COVERS THE FOLLOWING BY USING ASTM D5185 METHOD:- (1.1.1) WEAR METALIC PARTICALS OF FE, CR, NI, AL, CU, SN, PB AND AG TO BE ANALISED IN TERMS OF PPM IN THE GIVEN SAMPLES OF LUB OIL. (1.1.2) CONTAMINANTS OF SI, NA AND MG TO BE ANALISED IN TERMS OF PPM IN THE GIVEN SAMPLES OF LUB OIL. PAYMENT BASED ON THE ACTUALS AS PER WCC ON NOT EXCEEDING BASIS.
877(2)COOLANT TEST / FRESH WATER ADDITIVE TEST - THE FOLLOWING PARAMETERS TO BE ANALYSIS FOR GIVEN SAMPLE: -(2.1) PH VALUE (2.2) CHLORIDE CONTENT (2.3) PERCENTAGE OF INHIBITOR (2.4) HARDNESS (2.5) ANY OTHER TEST REQUIRED. PAYMENT BASED ON THE ACTUALS AS PER WCC ON NOT EXCEEDING BASIS.
878(4) HYDRAULIC TEST:-(4.1) BASIC TEST SHOULD COVERS THE FOLLOWING :- (4.1.1) VISCOSITY @ 20% IN TERMS OF CST BY USING METHOD OF ASTM D445(4.1.2) VISCOSITY @ 50% IN TERMS OF CST BY USING METHOD OF ASTM D446(4.1.3) VISCOSITY INDEX RESULTS BY CALICULATIONS BY USING METHOD OF ASTM D447(4.1.4) TESTING BY VISUAL / APPREARANCE(4.1.5) WATER CONTENT TEST BY CRACKLE (4.1.6) WATER CONTENT TEST IN TERMS % VOL BY USING METHOD OF ASTM D95(4.1.7) PENTANE INSOLUBLE TEST IN TERMS OF % WT BY USING METHOD OF ASTM D893(4.1.8) TOLUENE INSOLUBLE TEST IN TERMS OF % WT BY USING METHOD OF ASTM D893(4.1.9) TAN TEST IN TERMS OF MG KOH/G BY USING METHOD OF ASTM D644(4.1.10) SALT CONTENT TEST IN TERMS OF PPM BY USING METHOD OF IP 77(4.1.11) FLASH POINT TEST IN TERMS OF DEGREE CENTIGRADE BY USING METHOD OF ASTM D92/ 93PAYMENT BASED ON THE ACTUALS AS PER WCC ON NOT EXCEEDING BASIS.
879(4.3) PROVISION OF CONTAINERS/ SAMPLE BOTTLES:- STANDARD CONTAINERS/ SAMPLE BOTTLES (CAPACITY OF 250 ML) TO BE PROVIDED BY SHIPYARDS FOR LANDING THE SAMPLES OF LUB OILS, COOLANTS, HYDRAULIC OILS ETC FOR ANALYSIS. PAYMENT BASED ON THE ACTUALS AS PER WCC ON NOT EXCEEDING BASIS.
880COMPRESSION TESTING FOLLOWED BY GROUPING OF VIBRATION MOUNTS, REPLACE T DAs,BMEs Of ABER ABER REPLACEMENT / ROUTINE ALL REQUIRED TO BE CARRIED OUT AS PER NAVAL STANDARDS
881PROVISION OF ONE MINI LORRY OF FOUR TONNE CAPACITY FOR TRANSPORTING SHIP'S MATERIALS/ITEMS/ SPARES.(15 HRS/150 KMS PER DAY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
882TWO BATTERY OPERATED TROLLEY FOR MAN / MATERIAL SHIFTING WITHIN THE SHIPYARD PREMISIS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
883ADMIN SERVICES
884SEPARATE SHORE TOILETS AND WASHROOMS FOR SHIP'S OFFICERS AND CREW SUITABLE FOR 20 OFFICERS AND 150 SAILORS NEAR TO SHIPS BERTH / DOCK (WITHIN 100 MTRS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
88501 AC DINING HALL WITH LEATHER SOFA SET, DINING TABLE TV WITH DTH CONNECTION,MUSIC SYSTEM AND ADEQUATE CUTLERY AND CHAIRS, CLOSE TO CO'S OFFICE. DINING OF 07 OFFICERS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
88601 AC DINING HALL SUITABLE FOR DINING TABLE AND CHAIRS FOR DINING OF 50 JUNIOR SAILORS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
887PROVISION OF SHORE GALLEY WITH 04 LPG BURNERS/ELECTRIC HOT PLATES, INCLUDING COST OF GAS/ELECTRICITY AND SINK WITH WATER CONNECTION FOR WASHING OF PLATES, UTENSILS ETC. FRESH WATER RO PURIFIER/ HEAVY DUTY AQUAGUARD TO BE FITTED FOR MEETING GALLEY AND SHIPS CREW WATER REQUIREMENT (AT TWO LOCATIONS VIZ GALLEY AND DINING HALL). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
888ONE AIR CONDITIONED SPACE FOR STORAGE SPACE (12 FEET X 12 FEET) FOR FRESH RATION. ONE MAINTAINED AT TEMPERATURE (1-3°C) AND OTHER AT (-10°C). SPACE FOR RATION IF REQUIRED. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
889AIR CONDITIONED SPACE FOR STOWAGE OF DRY RATION. ( 12 FEET X 12 FFET). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
890PROVISION OF 02 NOS 40 FT CONTAINERS FOR STOWAGE OF DEGUTTED ITEMS DURING SR. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
891SUPPLY 300 LITRES OF DRINKING WATER (AQUAFINA/ KINLEY/ BISLERY) PER DAY ONBOARD SHIP AND OFFICE SPACES. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
892WATER CONNECTION, HEAVY DUTY WASHING MACHINE, DRIER AND DRYING AREA FOR SHIP'S DHOBI FOR REFIT DURATION PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
893AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE (INCLUDING OFFICE TABLE, EXECUTIVE CHAIR, VISITORS SOFA, TV WITH DTH, FIRMLY MOUNTED GODREJ SAFE, 01 STRONG LOCKER AND 03 VISITORS CHAIRS AND DINNING TABLE WITH CHAIR) WITH ATTACHED TOILET AND WASHROOM FOR COMMANDING OFFICER FOR REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
894AC OFFICE SPACE FOR REFIT OFFICE (HALL WITH SEPERATORS/ ROOMS (04)/ CONTAINERS (04) FOR OFFICES VIZ, ENGG OFFICE, ELE OFFICE, HULL OFFICE, GUNNERY/SS OFFICE, SHIPS/REG OFFICE AND REFIT OFFICE, SIX TABLES, 20 CHAIRS AND 08 RACKS WITH LOCK FOR FILE KEEPING ARE TO BE PROVIDED FOR REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
895PROVIDE 01 AC OFFICE SPACE / CONTAINER WITH REFRIGERATOR FOR SHIPS SICK BAY FOR REFIT DURATION INCLUDING BEDS, TABLES AND STORAGE CUPBOARDS (TWO EACH). CLEARNCE OF MEDICAL WASTE ON DAILY BASIS PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
896PROVIDE INTERNET CONNECTION AT ONE LOCATION AS INDICATED BY SHIP STAFF FOR REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
897PROVIDE 02 NO 40 FT CONTAINERS/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF ON BOARD SPARES DURING REFIT TIME. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
898PROVIDE AC 01 CONTAINERS/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF CRITICAL ELECTRONIC SPARES / ITEMS DURING REFIT TIME. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
899PROVIDE TWO SEPARATE AC PORTABLE CABINS FOR OOD AND DUTY WATCH DURING NIGHT ADJACENT TO SHIP IN JETTY FOR THE FULL REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
900PROVIDE THREE PORTABLE WC's ON JETTY (01 FOR SHIPS OFFICERS AND 02 FOR CREW)PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
901(A) PROVIDE FULLY FURNISHED OFFICE SPACE( 400 SQFT) WITH FOR OI/C PROJECT MONITORING TEAM OF NSRY(KOC) WITH TWO ACs, WORK STATION, LOCKERS, STORAGE, ATTACHED TOILET, WASHROOM, CHANGING ROOM, LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION , TV (44 INCH ATLEAST WITH DISH CONNECTION) AND DAILY HOUSEKEEPING. CARTRIDGE FOR PRINTER QTY 08 PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
902(B) FULLY OPERATIONAL PANTRY WITH DAILY HOUSEKEEPING, CLEANING AND HYGIENE UPKEEP TO BE PROVIDED WITH BELL AND ATTENDENT(16 HOURS PER DAY). TEA, COFFEE AND SNACKS WITH SUITABLE CROCKERY AND CUTTLERY TO BE PROVIDED AS REQUIRED DURING THE PERIOD OF 16 HRS PER DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
903(C) ONE FULLY FURNISHED AC OFFICE SPACE FOR FIVE(05) MEMBERS OF THE PROJECT MONITORING TEAM WITH FIVE(05) INDIVIDUAL WORKSTATIONS, STORAGE AND LOCKERS, ATTACHED TOILET, WASHROOM, CHANGING ROOM AND LAND LINE TELEPHONE WITH STD, 01 BROAD BAND CONNECTION AND PAPER SHREDDER ALL OFFICE STATIONARY ITEMS / SUPPLIES AS REQUIRED, FOR THE ENTIRE DURATION OF THE REFIT IS TO BE PROVIDED. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
904ONE OFFICE ASSISTANT/CLEANING STAFF FOR DAILY MAINTENANCE TO BE AVAILABLE 12 HRS IN A DAY FOR REFIT DURATION
905PROVIDE INTERNET CONNECTION AT FOUR LOCATIONS AS INDICATED BY RMT OF NSRY FOR REFIT DURATION
906SHIPYARD TO PROVIDE FULLY EQUIPED AMBULANCE ON SHORT NOTICE.PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS
907STATIONARY, AS INDICATED BY RMT, IS TO BE PROVIDED FOR SMOOTH FUNCTIONING OF RMT(PLANNING & COMMERCIAL) OFFICE OF NSRY FOR Rs 35,000/- PER MONTH. PAYMENT BASED ON THE ACTUALS AS PER WCC ON NOT EXCEEDING BASIS
908ACCOMODATION FOR OFFICERS AND SAILORS (INCLUDING CONSERVENCY, HOT WATER, HOUSE KEEPING,LAUNDRY SERVICE AND FULYY FURNISHED RECREATIONAL AREA/ ANTE ROOM OFFICERS, SENIOR SAILORS & JUNIOR SAILORS): PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS:
909AC DELUXE SUITS FOR CO, AC DELUXE ROOMS FOR 07 OFFICERS WITH ATTACHED TOILETS AND BATHROOMS DURING REFIT DURATION:FULLY FURNISHED WITH ACCESSORIES AND CABLE TV WITH DISPLAY UNIT AT EACH ACCOMODATION: PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS: )
910AC CABINS FOR 10 SENIOR SAILORS OF SHIP ON TWIN SHARING BASIS WITH ATTACHED TOILETS AND BATHROOMS: FULLY FURNISHED WITH ACCESSORIES, CABLE TV AND DISPLAY UNITS DURING REFIT DURATION: PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS:
911AC DORMITORY FOR JUNIOR SAILORS (40 MEN) OF SHIP WITH ATTACHED TOILETS, BATHROOMS, FULLY FURNISHED WITH ACCESSORIES, CABLE TV AND DISPLAY UNITS DURING THE ENTIRE REFIT DURATION: PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS:
912AC DELUXE SUITS FOR OFFICER OF PROJECT (REFIT) MOINTORING TEAM OF DOCKYARD WITH ATTACHED TOILETS AND BATHROOMS DURING REFIT DURATION: FULLY FURNISHED WITH ACCESSORIES AND CABLE TV WITH DISPLAY UNIT AT EACH ACCOMODATION, QTY -03: PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS:
913SINGLE AC CABIN WITH ATTACHED TOILET/BATH: FULLY FURNSIHED WITH ACCESSORIES TV AND DISPLAY UNITS FOR REFIT REVIEW OFFICERS DEPUTED BY COA, QTY-5, PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS:
914TWO ROOMS NEAR SAILORS ACCOMODATION FOR FUNCTIONING OF SHIP'S BARBER SHOP AND DOBHI: PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS:
915PROVIDE 04 DATA ENTRY OPERATORS WITH 1-2 YEARS EXPERIENCE HAVING ADEQUATE COMPUTER KNOWLEDGE AND EXPERIENCE IN MS PROJECT, OFFICE(PPT, WORD, EXCEL, ETC). (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACTIVITIES) FOR PLANNING (02 NOS) & COMMERCIAL (02 NOS) DEPARTMENT OF NSRY. SHIPYARD TO PROVIDE A PROOF OF MINIMUM WAGES OF RS 1465/- PER DAY (EXCLUDING EPF AND ESI CONTRIBUTION OF EMPOLYEE & EMPLOYER) PAID TO THE REFIT DATA ENTRY OPERATORS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
91601 OFFICE ASSISTANCE TO BE PROVIDED TO PROJECT MONITORING TEAM/ OFFICE FOR MOVEMENT OF DOCUMENTS/REPORTS. PEON / OFFICE ASSISTANCE IS REQUIRED TO VISIT ONBOARD SHIP AND LOCATIONS (AS REQUIRED) FOR MOVEMENT OF FILES /OTHER ASSISTANCES ROUND THE CLOCK ON SHIFT BASIS. SHIPYARD TO PROVIDE A PROOF OF MINIMUM WAGES OF RS 1250/- PER DAY (EXCLUDING EPF AND ESI CONTRIBUTION OF EMPOLYEE & EMPLOYER) PAID TO THE POEN / OFFICE ASSISTANCE. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
917PROVIDE 01 REFIT COORDINATORS EACH WITH MINIMUM B.TECH WITH ATLEAST TWO YEAR EXPERIENCE. SALARY TO MATCH SHIPYARD ASSISTANT/ DEPUTY MANAGER LEVEL. (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES) FOR RMT OF NSRY. PAYMENT AT ACTUALS.SHIPYARD TO PROVIDE A PROOF OF MINIMUM WAGES OF RS 2565/- PER DAY (EXCLUDING EPF AND ESI CONTRIBUTION OF EMPOLYEE & EMPLOYER) PAID TO THE REFIT COORDINATORS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
918PROVIDE 01 ACCOUNTANTS CUM AUDITORS WITH ATLEAST BCOM DEGREE AND HAVING 2 YEARS EXPERIENCE IN ACCOUNTING AND AUDIT FOR HANDLING BILLS AND CONTRACTS FOR COMMERCIAL DEPARTMENT OF NSRY. (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES) PAYMENT AT ACTUALS. SHIPYARD TO PROVIDE A PROOF OF MINIMUM WAGES OF RS 2198/- PER DAY (EXCLUDING EPF AND ESI CONTRIBUTION OF EMPOLYEE & EMPLOYER) PAID TO THE REFIT ACCOUNTANT-CUM-AUDITORS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
919PROVIDE ONE TONNER TRUCK (WITH TRANSIT INSURANCE, PACKING AND LOADING) FOR TRANSPORTING SHIPS MATERIAL/SPARES FROM SHIPYARD TO MO(K)/NSRY(K) FOR 12 HRS/100 KMS PER DAY WHICHEVER IS LESS: REQUIREMENT FOR TRANSPORT WILL BE INTIMATED ONE DAY IN ADVANCE: PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS:
920PROVIDE ONE FIVE SEATER AC CAR FOR PROJECT OFFICER OF NSRY, KOCHI (15 HRS/150 KMS PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2024, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES WITH VALID POLICE CLEARANCE CERTIFICATE FOR DRIVERS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
921PROVIDE ONE SEVEN SEATER AC CAR FOR RMT(NSRY) ) (15 HRS/150 KMS PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2024, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES WITH VALID POLICE CLEARANCE CERTIFICATE FOR DRIVERS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
922ONE 05 SEATER AC CAR FOR SHIPS REFIT OFFICERS (15 HRS/100 KMS PER DAY) (CAR REGISTRATION NOT TO BE OLDER THAN 2024, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES WITH VALID POLICE CLEARANCE CERTIFICATE FOR DRIVERS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
923PROVIDE ONE AC CAR FOR CO (15 HRS/150 KMS PER DAY) (**CAR REGISTRATION NOT TO BE OLDER THAN 2024). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
92402 AC 05 SEATER CARS FOR SHIP'S OFFICERS (15 HRS/150 KMS PER DAY) (**CAR REGISTRATION NOT TO BE OLDER THAN 2024) PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
925ONE AC BUS EACH OF 50 SEATER & 25 SEATER (15 HRS/150 KMS PER DAY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
926FOLLOWING TO BE ENSURED FOR ALL ABOVE OFFICE SPACES (A) DRINKING WATER THROUGH RO/AQUAGAUARD WITHIN 50 M (B) SEPARATE TOILETS FOR OFFICERS AND CREW ARE TO BE PROVIDED WITHIN 50M (C) DAILY MAINTENANCE / CLEANING PAYMENT BASED ON THE ACTUALS AS PER WCC ON NOT EXCEEDING BASIS
927LIST OF SPARES TO BE QUOTED BY THE SHIPYARDS
928ALUMINIUM ALLOY ANODE WELDABLE (MK - 11)
929ALUMINIUM ALLOY ANODE WELDABLE(MK - 111)
930ALUMINIUM ALLOY ANODE WELDABLE (MK - 1V)
931PORT HOLE/ACCESSORIES
932SCTTULES RUBBER BEADING
933SCTTULES GLASS
934SCTTULES RETAINER
935TUMBLER BOLTS
936HAND PUMP SEAL KIT
937LOCK NUT (APS)
938OIL FILTER
939GLAND NUT EN 19
940HYDRAULIC OIL
941HAND PUMP HANDLE LOCK WITH LOCK PIN MS DIA: 30MM LEN: 110MM
942HAND PUMP HANDLE HINGE MS, LEN:70MM, THK:10MM
943O RING
944O RING
945HYDRAULIC CYLINDER SEAL KIT
946PUMP SEAL KIT
947MUSHROOM HEAD SPINDLE WITH HAND WHEEL
948MUSHROOM HEAD SPINDLE WITH HAND WHEEL
949RUBBER BEADING 40 X 25MM.
950TAPER ROLLER BEARING 30212 , SKF
951SKF BEARING 6318 ZZ
952BALL BEARING 16012 , SKF
953BRAKE LINER 70 MM WIDTH X 15 MM THK X 1200 MM LONG.
954TAPER ROLLER BEARING 32014 X/Q
955TAPER ROLLER BEARING 30212 J2/Q
956BELZONA 1311
957GEAR OIL SERVO SYSTEM 320
958SS SPACER OD-105 X ID-90 X THICK- 35 MM
959GM BUSH PROOF MACHINED OD 115 X ID 70 X LENGTH 180MM
960MARLIN SPIKES
961CHAIN HOOKS
962ROLLER MAT - PVC. DIA - 40MM, LENGTH- 60MM
963HEALTH FAUCET ALONG WITH STAND
964RUBBER BEADING
965HINGES
966RETAINING HOOK/CLIP
967WIRE MESH
968MORTISE LOCKS OF NWT DOORS
969HYDRAULIC DOOR CLOSER
970BOAT HOOK
971PIPE SECURING CLAMPS
972LOCKERS
973SHUT -OF VALVE R 1/2''
9743 WAY VALVE R 1/2\\"
975NON RETURN VALVE 2\\"
976SHUT -OF VALVE R 2\\"
977MECHANICAL SEAL KIT
978WEARING PLATE KIT
979LOBE EXCHANGEKIT
980VACUUM SENSOR WITH DISPLAY
981SEAT AND COVER TOSCANA
982CONTROL MECHANISM
983WATER VALVE
984DISCHARGE VALVE
985MINI CHECK VALVE
986VACUUM HOSE
987HOSE CLAMP
988FLUSHING RING
989HOSE 4X2X1
990WATER SUPPLY KIT
991CONNECTION HOSE
992RAG SNAG RING
993PNEUMATIC PUSH BUTTON
994OUTLET PIPE
995FASTENING ROD
996WING NUT
997FASTENING PLATE
998INSTALLATION KIT
999PROTECTION PIPE
1000ACTIVATOR AND ADAPTOR FLANGE
1001RUBBER BEND
1002MEMBRANE
1003FLOAT VALVE
1004DISCHARGE VALVE
1005VENTILATOR
1006ELBOW
1007T-CONNECTION
1008FLUSHING VALVE,DN 15
1009GASKET, MOUNTING
1010GASKET, SHREDDER
1011SEAL KIT, BEARING
1012BEARING LOWER
1013RING, RETAINING
1014COUPLING
1015SCREW,SET
1016RING, SNAP
1017BEARING
1018RING SLINGER
1019SEAL, MECHANICAL
1020GASKET, ADAPTER PLATE
1021PIN ROTOR
1022STATOR
1023GASKET REDUCER
1024SCREW
1025TIP CUTTER
1026CLAMP, CUTTER
1027SCREW
1028BEARING ,BALL
1029WASHER,SLINGER
1030REPAIR KIT
1031CELL PROBE ASSEMBLY
1032VALVE CHECK, 1 IN
1033AMMETER,DC 0-30 AMPS
1034RELAY, POWER,30 AMPS:
1035SCR MODULE
1036MODULE ASSSEMBLY ,CIRCUIT BOARD
1037LEVEL FLOAT SWITCH
1038SEDIMENT TANK COVER GASKET
1039TREATMENT TANK COVER GASKET
1040GAUGE, PRESSURE
1041ANODE, SACRIFICAL
1042CLAMP, WORM DRIVE
1043CLAMP, WORM DRIVE
1044CLAMP, WORM DRIVE
1045VALVE SOLENOID
1046VALVE ASSY,FLOAT
1047LEVEL SWITCH
1048CONTACTOR
1049HYDROGEN SULPHIDE DETECTION HEAD
1050BUZZER WITH MUTE FACILITY - RED
1051BUZZER WITH MUTE FACILITY - YELLOW
1052ENGINEERING
1053WASHER,PLAIN
1054HOSE,PLAIN
1055PLUG,ZINC ELECTRODE
1056SCREW,HEXAGON HEAD CAP
1057HOSE,PLAIN
1058CAP,FILLER
1059CLAMP,T BOLT
1060CLAMP,T BOLT
1061SCREEN,FILTER
1062SEAL,RECTANGULAR RING
1063WASHER,PLAIN
1064BALL,CHECK
1065GASKET,INJECTOR
1066RETAINER,SCREEN
1067SEAL,O RING
1068SEAL,O RING
1069HOSE,PLAIN
1070SHAFT,FUEL PUMP DRIVE
1071GASKET,WTR TRF CONNECTION
1072GASKET,AFT HOUSING
1073NUT,REGULAR HEXAGON
1074\\"GASKET,BREATHER\\"
1075\\"ELEMENT,BREATHER\\"
1076CAP,FILLER
1077VALVOLINE PREMIUM BLUE 7800 PLUS 1/20 LTR
1078SCREW,HEX FLANGE HEAD CAP
1079GASKET,WTR TRF CONNECTION
1080\\"SEAL,O RING\\"
1081SEAL,O RING
1082SCREW,CAPTIVE WASHER CAP
1083SHAFT,TACHOMETER DRIVE
1084HOSE,ELBOW
1085GASKET,WTR TRF CONNECTION
1086BELT,V
1087PLUG,INJECTOR ORIFICE
1088SPIDER,JAW COUPLING
1089SCREEN,FILTER
1090GASKET,SEA WATER PUMP
1091GASKET,ROCKER LEVER COVER
1092ELEMENT,LUB OIL FILTER
1093KIT,FUEL FILTER AND RING
1094VALVE,SOLENDID
1095INDICATOR,RESTRICTION
1096KIT,SUPER BYP:FILTER ELEM
1097GASKET,HEAT EXCHANGER
1098GASKET,HEAT EXCHANGER
1099ELEMENT,AIR CLEANER
1100ELEMENT,AIR CLEANER
1101CLAMP,HOSE
1102CLAMP,HOSE
1103CLAMP,HOSE
1104COOLANT,EG 50:50 PREMIXED 50 LT DRUM
1105GASKET GOVERNOR SET
1106NUT,REGULAR HEXAGON
1107DRAINCOCK
1108BEARING,BALL
1109SCREW,SLOTTED SET
1110CORE,COOLER
1111GAUGE,SIGHT
1112TUBE,EXPANSION TANK
1113CORE,AFTERCOOLER
1114PUMP,GEAR FUEL
1115SHAFT,ROCKER LEVER
1116ROD,PUSH
1117ROD,PUSH
1118INJECTOR
1119DAMPER,VIBRATION
1120TURBOCHARGER
1121KIT,TUR REPAIR
1122CORE COOLER
1123DAMPER,FUEL PUMP
1124KIT,BARREL PLUNGER & CUP
1125CLAMP,T BOLT
1126SEAL,O RING
1127SEAL,O RING
1128CLAMP,T BOLT
1129HOSE,PLAIN
1130HOSE,FLEXIBLE
1131HOSE,FLEXIBLE
1132GAUGE,SIGHT
1133HOSE,PLAIN
1134VALVOLINE PREMIUM BLUE 7800 PLUS 1/20 LTR
1135HOSE,PLAIN
1136SCREW,HEX FLANGE HEAD CAP
1137SCREW,BANJO CONNECTOR
1138ELEMENT,LUB OIL FILTER
1139KIT,HX40 TURBO REPAIR
1140KIT,LINER
1141SET,LOWER ENGINE GASKET
1142VALVE,EXHAUST
1143KIT,ENGINE PISTON
1144ELEMENT,AIR CLEANER
1145ELEMENT,AIR CLEANER
1146\\"HOSE,ELBOW\\"
1147INDICATOR,RESTRICTION
1148\\"HOSE,HUMP\\"
1149GASKET,SEA WATER PUMP
1150COLLET,VALVE
1151RING,RETAINING
1152PLUG,EXPANSION
1153BRACE,TUBE
1154BRACE,TUBE
1155CLAMP,V BAND
1156WASHER,SPRING
1157HOSE,FLEXIBLE
1158WASHER,PLAIN
1159HOSE,FLEXIBLE
1160BRACE,TUBE
1161HOSE,ELBOW
1162DRAINCOCK
1163BRACE,TUBE
1164BRACE,TUBE
1165BRACE,TUBE
1166GASKET,OIL COOLER CORE
1167WASHER,SEALING
1168HOSE,PLAIN
1169BRACE,TUBE
1170RING,RETAINING
1171BRACE,TUBE
1172BRACE,TUBE
1173CLAMP,HOSE
1174CLAMP,HOSE
1175CLAMP,HOSE
1176CLAMP,HOSE
1177HOSE,FLEXIBLE
1178VALVE,INTAKE
1179INSERT,VALVE
1180VALVE,CHECK
1181HOSE,PLAIN
1182SPRING,VALVE
1183ROTATOR,VALVE
1184GUIDE,VALVE STEM
1185NUT,HEAVY HEXAGON
1186THERMOSTAT
1187BOLT,CONNECTING ROD
1188INSERT,VALVE
1189GASKET,LUB OIL CLR COVER
1190FILTER,FUEL
1191PIN,PISTON
1192NUT,CONNECTING ROD
1193SCREW,RKR LEVER ADJUSTING
1194CLAMP,HOSE
1195SEAL,O RING
1196BEARING,CONNECTING ROD
1197PLUG,ZINC ELECTRODE
1198\\"RESISTOR,CORROSION\\"
1199GASKET,LUB OIL CLR COVER
1200ISOLATOR,VIBRATION
1201ISOLATOR,VIBRATION
1202ISOLATOR,VIBRATION
1203ISOLATOR,VIBRATION
1204MANIFOLD,FUEL
1205SCREW,CAPTIVE WASHER CAP
1206HOSE,PLAIN
1207SCREW,HEX FLANGE HEAD CAP
1208SEPARATOR,FUEL WATER
1209SEAL,RECTANGULAR RING
1210HOSE,PLAIN
1211CAP,FILLER
1212GASKET,CONNECTION
1213KIT,WATER PUMP
1214KIT,UPPER ENGINE GASKET
1215CLAMP,HOSE
1216CLAMP,HOSE
1217HOSE,PLAIN
1218HOSE,PLAIN
1219HOSE,FLEXIBLE
1220COOLANT,EG 50:50 PREMIXED 50 LT DRUM
1221ISOLATOR,VIBRATION
1222ACTUATOR,ETR FUEL CONTROL
1223KIT,LINER
1224KIT,ENGINE PISTON
1225ALTERNATOR
1226MANIFOLD,FUEL
1227LEVER,ROCKER
1228CLAMP,RETAINING
1229ROD,PUSH
1230GEAR,FLYWHEEL RING
1231CAMSHAFT
1232DAMPER,VIBRATION
1233INJECTOR
1234BOLT,CONNECTING ROD
1235TAPPET,VALVE
1236PIN,PISTON
1237BEARING,CRANKSHAFT THRUST
1238SET,MAIN BEARING (STD)
1239BEARING,CONNECTING ROD
1240TANK,EXPANSION
1241EXCHANGER,HEAT
1242KIT,TURBOCHARGER
1243TUBE,INJECTOR FUEL SUPPLY
1244TUBE,INJECTOR FUEL SUPPLY
1245TUBE,INJECTOR FUEL SUPPLY
1246TUBE,INJECTOR FUEL SUPPLY
1247TUBE,INJECTOR FUEL SUPPLY
1248TUBE,INJECTOR FUEL SUPPLY
1249TANK,FUEL
1250TUBE,FUEL DRAIN
1251PICKUP,MAGNETIC
1252PUMP,SEA WATER
1253AFTERCOOLER
1254ROD,ENGINE CONNECTING
1255BUSHING
1256TENSIONER,BELT
1257MOTOR,STARTING
1258KIT,LUBRICATING OIL PUMP
1259CORE,COOLER
1260SLEEVE GASKET
1261NECK RING
1262MECHANICAL SEAL
1263ANODE PLUG
1264SEAL KIT
1265VALVE KIT
1266SEAL RING ,CHARGING SCREW
12670' RING FOR SAND FILTER HEAD
12680' RING FOR C/F HEAD
1269CARTRIDGE FILTER ELEMENT
1270\\"0\\" RING HP CONNECTION
1271PU 4 HOSE
1272pu-9 HOSE
1273VICTAULIC COUPLERS 1.1/4\\"
12743/8M X PU9 ELBOW
1275PVC ELBOW , 1/4\\" M X PlJ4
1276FESTO TEE PU 9
1277PU4 TEE
12783/8M X PU9 STRAIGHT CONNECTOR
1279RUBBER HOSE 20 MM
1280PRODUCT WATER HOSE
1281H.P. HOSE TO
1282H.P. HOSE TO MODULE IN
1283H.P. HOSE MODULE OUT TO VS60
1284H.p. HOSE MODULE 1 TO MODULE 2
1285H.P. PUMP CRANK CASE OIL
1286JUBILEE CLIP 1/2
1287JUBILEE CLIP, 1A
1288DOLOMITE
1289¼”(F)x PU4 Elbow
1290H.p PUMP DRIVING BELTS, 05 TPD
1291O-RING , OIL FILLER CAP
1292A-V. MOUNTS
1293ST.CONN. PVC 3/8\\" M XPU4
1294PRESSURE SWITCH
1295PRE FILTER / FILTER PUMP MOTOR BEARING NDE
1296REPAIR KIT (WEAR PART KIT)
1297FEMALE ADAPTOR
1298MALE ADAPTOR
1299PVC NON RETURN VALVE 3/8\\" F
1300PRESSURE SWITCH
1301E - SPARE KIT
1302IMPELLER
1303SPACING PIPE ( POS 64.A )
1304OIL SEAL CRANK SHAFT
1305OIL SEAL CRANK CASE
1306VALVE PLUG
1307LOW PRESSURE GAUGE - O - 10 BAR
1308AIR PRESSURE GUAGE
1309HIGH PRESSURE GAUGES -O - 100 BAR
1310PK20 IN/OUT HOSE
1311ABS SERVICE KIT
1312S.S. SERVICE KIT
1313SENSOR CABLE WITH PROBE, (NEW VERSION)
1314AIR ELIMINATOR MAIN KIT
1315COALESCER CARTRIDGE 11\\"
1316END PLATE
1317AGM SET
1318WADDING CLOTH SET
1319GASKET SET
1320WING NUT & WASHER
1321DRAW BOLT 11\\"
1322SOLENOID COIL - 24V
1323REPAIR KIT 1/2\\" INCH OIL VALVE
1324REPAIR KIT 1\\" INCH OIL VALVE
1325REPAIR KIT 1\\" DIVERTER VALVE
1326ROTO 491 HOLE FOR DRY RUNNING
1327DRY RUNNING PROTECTION
1328HEATER
1329AIR ELIMINATOR 1/2\\"
13301ST STAGE PACK CSSOOO MK2
1331PRESSURE RELIEF VALVE 112\\"
1332MEASURING CELL 24VAC
1333OIL DUMP VALVE cm SOL-I\\"
1334VALVE ANGLE SEAT/SOL 1/2\\"
1335DIVERTER VALVE cm AIR SOLENOID
1336PRESSURE GAUGE (0-7 BAR)
1337OIL PROBE - PCB
1338WATER VALVE 1\\"
1339SOLENOID 1/4F 24V AC AIR
1340PERFORATED PLATE
1341HI-VOR CONE
1342PROBE CP4
1343PUMP-FLANGE HOLE DRY RUNNING
1344BIB CORK BEND
1345AIR REGULATOR
1346SEAL KIT, H60/90/110 HELM PUMP
1347SEAL KIT, S-400 CYLINDER
1348SPHERICAL BEARING, S-400
1349MOUNTING PAD PIN, S-400
1350TILLER PIN, S-400
1351SEAL KIT, 3-WAY VALVE (-12)
1352FLEX HOSE, -12 JEC ENDS W/ELBOW
1353FLEX HOSE, EXTRA LONG (-08)
1354SEAL KIT, DARB 10, PUMP & MOTOR ASSEMBLY
1355SEAL KIT, VIO PUMP, PUMP & MOTOR ASSEMBLY
1356MOTOR BEARING, PUMP & MOTOR ASSEMBLY
1357MOTOR BEARING, PUMP & MOTOR ASSEMBLY
1358COUPLING INSERT, PUMP & MOTOR ASSEMBLY
1359BREATHER, RESERVOIR & MANIFOLD ASSEMBLY
1360LEVEL SWITCH, RESERVOIR & MANIFOLD ASSEMBLY
1361SUCTION STRAINER, RESERVOIR & MANIFOLD ASSEMBLY
1362FILTER ELEMENT, RESERVOIR & MANIFOLD ASSEMBLY
1363SERVICE FILTER GAUGE, RESERVOIR & MANIFOLD ASSEMBLY
1364FILTER CLOGGING SENSOR, RESERVOIR & MANIFOLD ASSEMBLY
1365PRESSURE GAUGE, RESERVOIR & MANIFOLD ASSEMBLY
1366SEAL KIT, PSM 200, RESERVOIR & MANIFOLD ASSEMBLY
1367SEAL KIT, HIGH FLOW DHM
1368SEAL KIT DH90/110
1369SEAL KIT HELM CONTROL VALVE
1370MECCAN CHEMICAL
1371TEFLON SEAT
1372VALVE GLAND BUSH
1373REFRIGRENT OIL
1374REFRIGRENT GAS
1375GASKET 4MM NEOPRENE SHEET
1376ANODE / CORROSION PLUG
1377INDUSTRIAL ICE BLOCK 2 NOS (50 KG EACH)
1378Nitrogen
1379OIL IN SEAL PACKAGE
1380O RING SET
1381LOWER BEARING
1382UPPER BEARING
1383LOWER BEARING BRACKET
1384TOP BRACKET
1385CONNECTOR
1386GASKET FOR OUTLET
1387SEAL HOUSING
1388EXHAUST MIXING CHAMBER
1389SUCTION STRAINER
1390COUPLING GUARDS
1391SUCTION/ DISCHARGE COMPENSATORS.
1392SPECIAL TYPE O RING
1393SPECIAL TYPE O RING
1394LUBE OBM ENGINE OIL 4 STROKE 1LTR CAN
1395VALVE NEEDLE
1396SEAL VALVE STEM
1397RING,CROSS PIN
1398RECEIVER ASSY
1399POWER HEAD GASKET KIT
1400PLUG, OIL LEVEL
1401PLUG SPARK
1402PISTON RING SET (STD)
1403PIN STRAIGHT
1404PACKING, LOWER CASING
1405OIL SEAL
1406OIL SEAL
1407OIL SEAL
1408IMPELLER
1409GEAR OIL 1 LTR CAN
1410GASKET
1411FLOAT
1412ELEMENT ASSY OIL CLEANER
1413CLUTCH DOG
1414BRG,CYL-CAL ROLLER 0.19GNT
1415BEARING, CYLINDRICAL(6J8)
1416INTERMEDIATE SERVICE KIT
1417MAJOR SERVICE KIT
1418Pump Service kit
1419BOWL SPINDLE
1420WORM WHEEL SHAFT
1421WORM WHEEL
1422SIGHT GLASS
1423GAUGE GLASS
1424FRICTION BLOCK
1425Top Bearing
1426Cap Nut
1427Set Of Tools
1428GASKET MANIFOLD TO HSG MAIN
1429GASKET COVER TOP
1430RING 'O' BREATHER PIPE
1431SLEEV DRIVE OIL PUMP
1432GASKET PUMP MANIFOLD
1433SPRING ROLLER BEARING REVERSE SHAFT
1434BEARING BALL REV CLUTCH SHAFT& CARRIER BRG.
1435SHAFT REVERSE ASSY
1436RING SNAP ( PINION & SPIDER CLUTCH )
1437PLATE ,STELL
1438PLATE ,SINTERED
1439BLOCK RUBBER
1440BRG CYLINDRICAL ROLLER
1441SEAL OIL
1442BRG BALL FORWARD CLUTCH SHAFT
1443SHAFT FORWARD CLUTCH ASSEMBLY
1444SEAL RUBBER
1445GASKET RET BRG TO FRONT HSG
1446PLATE LOCK
1447WASHER RETAINER ( SHAFT & CLY ROLLER BRG)
1448PIN ROLLER BRG FORWARD ,REVERSE & OUTPUT SHAFT
1449GASKET HSG FRONT TO HSG MAIN
1450GASKET COVER BOTTOM
1451BRG TAPER ROLLER OUTPUT SHAFT
1452SHIM BRG RET
1453RING 'O'
1454SEAL OIL
1455SEAL RUBBER
1456BRG BALL CLUTCH SHAFT
1457RING PISTON CLUTCH SHAFT & MANIFOLD
1458GASKET TROLLING VALVE HOLE
1459PUMP OIL ASSY
1460STRAINER OIL
1461HOUSING STRAINER
1462SELECTOR VALVE ASSY
1463PISTON CLUTCH
1464LOCK WASHER
1465GASKET OIL RETURN PIPE CORPORENE RING
1466BREATHER ASSY
1467FILTER ELEMENT ASSY
1468SLEEV RELEASE SPRING
1469BRG BALL
1470SPRING RELEASE CLUTCH
1471RING PISTON
1472RING PISTON
1473RING PISTON
1474RING PISTON
1475SCREW LOCK
1476NUT HEX
1477BODY BANJO
1478BOLT BANJO
1479KEY PARALLEL TYPE -A
1480KEY PARALLEL TYPE -B OUTPUT SHAFT
1481PINION
1482GEAR COUNTER SHAFT
1483SHAFT OUTPUT
1484SPIDER CLUTCH
1485Ring Driving
1486Gear Reverse Driven
1487Pin Oil Pump Sleeve
1488Gear Reverse Driving
1489BRG (Cylinder Roller)
1490Shaft output
1491Plug Pipe Manifold
1492Pipe Suction
1493Pipe pump to Filter
1494Spider Drive
1495Circlip Ext
1496Pin Roll
1497Gasket Filter Cover
1498Washer plain Copper
1499Adaptor
1500Shim Flange Propeller
1501Shim Flange Propeller
1502Shim Flange Propeller
1503Grease Nipple
1504Gasket Selector Valve
1505Main Housing
1506MECHANICAL SEAL(GENERAL)SHAFT DIA: 25MM
1507MECHANICAL SEAL(GENERAL)SHAFT DIA: 25MM
1508RUBBER COUPLING PAD L-100
1509NR FLAP VALVE OD 90MM
1510NR FLAP VALVE OD 91MM SS
1511BRASS SHIM THICKNESS 0 :3 MM
1512BRASS SHIM THICKNESS 0 :2 MM
1513NR FLAP VALVE OD 90MM
1514MECHANICAL SEAL(GENERAL)SHAFT DIA: 25MM
1515IMPELLER OD 170MM , GM APS
1516MECHANICAL SEAL(GENERAL)SHAFT DIA: 25MM
1517RUBBER COUPLING PAD L-100
1518MECHANICAL SEAL SHAFT DIA 25 MM (APS)
1519BRASS IMPELLER OD 171, ID 20, THK 48MM
1520NR FLAP VALVE OD 90MM
1521MS STRAIGHT COUPLING - 64 OD 23:8 ID 48MM LENGTH
1522RELIEF VALVE
15231/2\\" BALL VALVE
1524VALVE SEAT
1525ROUND ROD 35MM SS 316L
1526ROUND ROD 35MM SS 316L
1527SPRINGWASHER SS M12
1528GRUB SCREW M8 X 12MM,SS
1529MECHANICAL SEAL SHAFT DIA 25 MM (APS)
1530WASHERPLATE SS M12
1531SS316 THREADED PIPE OD-72 ID-63 LEN-100MM
1532MECHANICAL SEAL(GENERAL)SHAFT DIA: 25MM
1533GM BUSH PROOF MACHINED OD 60 X ID 45 X LENGTH 100MM
1534NR FLAP VALVE OD 55MM SS
1535MECHANICAL SEAL (GENERAL SEAL)- SHAFT DIA 16MM,APS
1536IMPELLER APS
1537NR FLAP VALVE OD 55MM SS
1538MS COUPLING - 54 OD 22 ID 15MM
1539SERVICE KIT
1540DIAPHRGAM ASSEMBLY
1541SERVICE KIT
1542ELECTRICAL
1543FUSE KIT, DSC
1544DSC - 100 CARD
1545FUSE, MCP
1546DSC 100 - 102 STEERING CONTROLLER
1547SCP PCB ASSEMBLY, MCP
1548MICRO SWITCH, RFU 2000
15491K POTENTIOMETER SUB ASSEMBLY, RFU 2000
1550IPD PCB REPLACEMENT KIT, RFU 2000
1551RAI 380
1552RAI/ROI 280
1553CONTACTOR, MSA
1554OVERLOAD RELAY, MSA
1555LDM PCB MSA
1556PSS PCB MSA
1557MSA 300 ON BOARD SPARES KIT
1558N.O. CONTACT MSA
1559N.C. CONTACT MSA
1560N.o, N.C. CONTACT MSA
1561ART VM RELAY MSA
1562PHASE FAIL RELAY MSA
1563IOA SPOT RELAY, 24VDC MSA
1564LY4 RELAY, SOLENOID SELECTOR JUNCTtON BOX
1565G2R-2-S RELAY, SOLENOID SELECTOR JUNCTION BOX
1566CONTACTOR, POWER SWITCH UNIT
15673 POS SWITCH, POWER SWITCH UNIT
1568TORSION SPRING JOIOO JOG LEVER
1569AP-36 ALARM PANEL (ECR)
1570AP-36 ALARM PANEL {CHARTHOUSE)
1571CP-33-1 MODE CONTROL PANEL
1572CONNECTOR
1573CONNECTOR
1574CONNECT WELL CONNECTOR 35 SQ.MM
1575CONNECT WELL CONNECTOR 2.5 SQ.MM
1576END CLAMP FOR CONNECTWELL CONNECTORS
1577MCB (03-POLE) 10A
1578MCB, 3 POLES, 25 AMP
15793 POLE MCB 32A 'C' CURVE
1580MCB C-63,3 POLE
1581MCB (03-POLE) 40A
1582MCB, 2 POLES, 20 AMP
1583MCB - 2 POLE, 16A
1584MCB (02-POLE) 10A
1585MCB C-06,2 POLE
1586INDICATION LAMP UNIT WITH LED RED LAMP
1587INDICATION LAMP UNIT WITH LED RED LAMP
1588SINGLE CORE 16 SQMM MULTISTRANDED COPPER CONDUCTOR WITH PVC INSULATED FLEXIBLE (LFH)CABLE, 0.6/1KV,USED FOR CONTROL PANEL WIRING
1589BHH SMOKE DETECTOR-BHH200
1590BF300 MANUAL CALL POINT (MCP)
1591BHH 220 MULTI SENSOR
1592BHH-500/EX SMOKE DETECTOR
1593BG-201 FLAME DETECTOR
1594BHH-300 SMOKE DETECTOR
1595MCP GLASS
1596CONDUIT BOX BWD-100
1597DETECTOR BASE BWA100
15981 X 6 SQ. MM SILICON HEAT RESISTANT CABLE
1599OVEN HEATING COIL 415 V
1600HOT PLATE
1601HOT PLATE
1602OVEN HEATING COIL 415 V
1603OVEN DOOR BEADING APS
1604MAGNETIC CONTACTOR 25A
1605MCB 3 POLE, 40 AMPS
16063 POLE MAGNETIC CONTACTOR
1607MCB, 2 POLES, 20 AMP
1608ZONE INTERFACE CARD
1609CPU CARD
1610LOOP CARD
1611COMMUNICATION STATION WITH BUILT-IN SPEAKER
1612OUTDOOR COMMUNICATION STATION
1613HORN LS (15W) (WT) SET AT 4W
1614HORN LS(15W) SET AT 8W
1615RF CO-AXIAL CABLE
1616UHF CONNECTORS
1617NAVTEX ANTENNA
1618INDICATION LAMP UNIT WITH BULB LED TYPE 24V,22MM DIA. RED COLOUR.
1619INDICATION LAMP UNIT LED TYPE 230V COLOUR: WHITE 22 MM DIA.
1620INDICATION LAMP LED TYPE, YELLOW 24V, DIA:22MM
1621INDICATION LAMP UNIT LED TYPE 230V COLOUR: RED 22MM DIA.
1622INDICATION LAMP LED TYPE YELLOW,230V AC,16MM DIA MAKE SCHNEIDER ELECTRIC
1623INDICATION LAMP LED TYPE RED,230V AC,16MM DIA MAKE SCHNEIDER ELECTRIC
1624INDICATION LAMP LED TYPE GREEN,230V AC,16MM DIA MAKE SCHNEIDER ELECTRIC
1625INDICATION LAMP ASSEMBLY WITH LAMP, 230V, LED TYPE, DIA 22 MM, COLOUR GREEN, MAKE: SCHNEIDER ELECTRIC.
16263 POLE MAGNETIC CONTACTOR
1627ROTARY TYPE ON/OFF SELECTOR SWITCH 3 POLE 25A 440V. MAKE- KAYCEE SRPM-237.
1628ON OFF PUSH BUTTON WITH 1NO AND 1NC PANEL CUTOUT DIA: 22MM
1629PUSH BUTTON ACTUATOR BLACK COLOUR WITH ,2NO ELEMENT. 22MM DIA
1630GLASS RELAY
1631ROTARY SWITCH 3POLE 2WAY WITH OFF 440VAC, 40A MAKE: KAYCEE TYPE:SRPM337B
1632HRC FUSE 2AMPS.
1633BUZZER
1634DR. BECK BECTOL RED
1635BEARING SKF 6308 ZZ
1636BEARING SKF 6307 2Z
1637ENAMEL PAINT LIGHT GRAY
1638BEARINGS SKF 6205 ZZ C3
1639EPOXY PRIMER
1640MOTOR COOLING FAN, ID: 25MM, OD:165MM (PLASTIC)
1641ENAMEL PAINT SMOKE GRAY
1642MOTOR TERMINAL BLOCK 6 WAY 45X70MM
1643RUBBER COUPLING PAD L-100
1644RUBBER COUPLING PAD APS
16452 CORE CABLE
16462 CORE CABLE
1647INDICATION LAMP LED TYPE, RED 230V, DIA:22MM
1648INDICATION LAMP UNIT WITH RED LAMP
1649INDICATION LAMP UNIT WITH BLUE LED LAMP
1650INDICATION LAMP UNIT WITH BLUE LED LAMP
1651INDICATION LAMP UNIT LED TYPE 230V COLOUR: YELLOW22 MM DIA:
1652INDICATION LAMP UNITWITH LED YELLOW LAMP
1653INDICATION LAMP UNIT WITH WHITE LED LAMP
1654INDICATION LAMP UNIT WITH WHITE LED LAMP
1655INDICATION LAMP LED TYPE, GREEN 24V, DIA:22MM
1656INDICATION LAMP LED TYPE, GREEN 230V, DIA:22MM
1657PUSH BUTTON
1658PUSH BUTTON
1659PUSH BUTTON
1660DOUBLE VOLTMETER O-500V,CLASS 1,50HZ AC ANALOG 90DEG SCALE VERTICAL PANEL DOOR MOUNTING TYPE SIZE -96X96MM MAKE- RISHABH WITH CERTIFICATE
1661DOUBLE FREQUENCY METER 45-50-55 RM AT 50HZ
1662AC VOLTMETER 0-500V SISE 96X96
1663DOOR LOCK
1664POWER FACTOR METER0.5-1-0.5,440V,5A,3PJ,1 ELEMENT, SIZE 96 X 96
1665RUBBER GASKET
1666TRIPLE POLE MINIATURE CRCUT BREAKER RATED 63 A
1667TRIPLE POLE MINIATURE CRCUT BREAKER RATED 32 A
1668TRIPLE POLE MINIATURE CRCUT BREAKER RATED 25 A
1669TRIPLE POLE MINIATURE CRCUT BREAKER RATED 16 A
1670TRIPLE POLE MINIATURE CRCUT BREAKER RATED 10 A
1671DISPLAY
1672FLATPACK2 24/1800 POWER SUPPLY INPUT = 35-290VACOUTPUT = 21-29VDC (1800W)
1673SMARTPACKC2 BASIC
1674ROTARY SWITCHES
1675INDICATION LAMPS
167611 PIN RELAY
1677CONTROL CARD
16782 CORE POWER CABLE
1679BELL CIRCUITS LAMP
1680HEATING ELEMENT - 01
1681CONTACTOR - 02
1682MCB - 02
1683TRANSDUCER PCB
1684SUPPORTING LIQUID & DISTILLED WATER
1685LIMIT SWITCHES.
1686BEARING. (DE: 6205, NDE: 6205)
1687BEARINGS
1688VIBRATION MOUNTS
1689RIGGING
1690FORE MASTHEAD JIB HALLIARD
1691FORE MASTHEAD JIB DOWNHAUL
1692FORE MASTHEAD JIB TACK PURCHASE
1693FORE MASTHEAD JIB SHEETS
1694FORE TOPGALLANT OUTER JIB HALLIARD
1695FORE TOPGALLANT OUTER JIB DOWNHAUL
1696FORE TOPGALLANT OUTER JIB TACK PURCHASE
1697FORE TOPGALLANT OUTER JIB SHEETS
1698FORE TOPGALLANT INNER JIB HALLIARD
1699FORE TOPGALLANT INNER JIB DOWNHAUL
1700FORE TOPGALLANT INNER JIB TACK PURCHASE
1701FORE TOPGALLANT INNER JIB SHEETS
1702FORE STAYSAIL HALLIARD
1703FORE STAYSAIL DOWNHAUL
1704FORE STAYSAIL TACK PURCHASE
1705FORE STAYSAIL SHEETS
1706MAIN STAYSAIL HALLIARD, PURCHASE & TACK PENDANT
1707MAIN STAYSAIL DOWNHAUL
1708MAIN STAYSAIL SHEETS
1709MAIN TOPMAST STAYSAIL HALLIARD
1710MAIN TOPMAST STAYSAIL DOWNHAUL
1711MAIN TOPMAST STAYSAIL SHEETS
1712MIZZEN STAYSAIL HALLIARD & TACK PURCHASE
1713MIZZEN STAYSAIL DOWNHAUL
1714MIZZEN STAYSAIL SHEETS
1715MIZZEN TOPMAST STAYSAIL HALLIARD, PURCHASE & TACK PENDANT
1716MIZZEN TOPMAST STAYSAIL DOWNHAUL
1717MIZZEN TOPMAST STAYSAIL SHEETS
1718LOWER SPANKER PEAK HALLIARD
1719LOWER SPANKER THROAT HALLIARD
1720LOWER SPANKER GAFF VANGS
1721SPANKER TOPPING LIFT
1722LOWER SPANKER HEAD INHAUL & OUTHAUL
1723LOWER SPANKER BRAILS
1724LOWER SPANKER FOOT INHAUL
1725LOWER SPANKER FOOT OUTHAUL
1726SPANKER SHEETS
1727MIZZEN BOOM PREVENTER
1728UPPER SPANKER TOPPING LIFT
1729UPPER SPANKER THROAT HALLIARD
1730UPPER SPANKER GAFF VANGS
1731UPPER SPANKER HEAD OUTHAUL
1732UPPER SPANKER HEAD INHAUL
1733UPPER SPANKER BRAILS
1734UPPER SPANKER FOOT OUTHAUL
1735UPPER SPANKER FOOT INHAUL
1736SPANKER TOPSAIL HALLIARD
1737SPANKER TOPSAIL OUTHAUL
1738SPANKER TOPSAIL DOWNHAUL
1739TRISAIL HALLIARD
1740TRISAIL TACK PURCHASE
1741TRISAIL SHEET
1742FORE COURSE LIFTS
1743FORE:COURSE BRACES
1744FORE COURSE SHEETS
1745FORE COURSE TACKS AND BOWLINES
1746FORE COURSE BUNTLINES
1747FORE COURSE CLEW LINES
1748FORE COURSE REEF PURCHASES
1749FORE TOPSAIL HALLIARD
1750FORE TOPSAIL LIFTS
1751FORE TOPSAIL BRACES
1752FORE TOPSAIL SHEETS
1753FORE TOPSAIL BUNTLINES
1754FORE TOPSAIL CLEWLINES
1755FORE TOPSAIL REEF PURCHASES
1756FORE TOPGALLANT HALLIARD
1757FORE TOPSAIL LIFTS
1758FORE TOPGALLANT BRACES
1759FORE TOPGALLANT SHEETS
1760FORE TOPGALLANT BUNTLINES
1761FORE TOPGALLANT CLEWLINES
1762FORE ROYAL HALLIARD
1763FORE ROYAL LIFTS
1764FORE ROYAL BRACES
1765FORE ROYAL SHEETS
1766FORE ROYAL BUNTLINES
1767FORE ROYAL CLEWLINES
1768MAIN COURSE LIFTS
1769MAIN COURSE BRACES
1770MAIN COURSE SHEETS
1771MAIN COURSE TACKS AND BOWLINES
1772MAIN COURSE BUNTLINES
1773MAIN COURSE CLEW LINES
1774MAIN COURSE REEF PURCHASES
1775MAIN TOPSAIL HALLIARD
1776MAN TOPSAIL LIFTS
1777MAIN TOPSAIL BRACES
1778MAIN TOPSAIL SHEETS
1779MAIN TOPSAIL BUNTLINES
1780MAIN TOPSAIL CLEWLINES
1781MAIN TOPSAIL REEF PURCHASES
1782MAIN TOPGALLANT HALLIARD
1783MAIN TOPSAIL LIFTS
1784MAIN TOPGALLANT BRACES
1785MAIN TOPGALLANT SHEETS
1786MAIN TOPGALLANT BUNTLINES
1787FORE TOPGALLANT CLEWLINES
1788MAIN ROYAL HALLIARD
1789MAIN ROYAL LIFTS
1790MAIN ROYAL BRACES
1791MAIN ROYAL SHEETS
1792MAIN ROYAL BUNTLINES
1793FORE ROYAL CLEWLINES
1794FORE, MAIN AND MIZZEN GANTLINES
1795HANDY BILLIES
1796ENSIGN HALLIARD
1797COURTESY FLAG HALLIARDS
1798BOAT DAVIT MIDSHIP TACKLES
1799BOAT DAVIT VEERING TACKLES
1800FOOTROPES
1801FLEMISH HORSES
1802STURRUPS
1803GASKETS
1804CLEW LASHINGS
1805FOREMAST CANELINES
1806MAINMAST CRANELINES
1807MIZZEN CRANELINES
1808SAFETY LINE ON ALL YARDS
1809SAFETY LINE ON BOWSPRIT
1810SAFETY LINE ON ALL TOPS
1811BOSUN CHAIRS
1812DOLPHIN STRIKER
1813SQUARE SAIL GASKETS
1814FULL SET OF SAIL COVERS AND SAIL BAGS
1815FULL SET OF SAILS
1816YARD CHAIN SLINGS Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56449359
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 18-08-2026
Authority
Authority Name Indian Navy
Work Description Tender For Short Refit (Sr 27) Of Installation Sudarshini (O/L)
Basic Detail
Tender No PP/07/3480/SUDARSHINI/SR/27
Bidding Type Tender
Location
City Ernakulam
State Kerala
Key Dates
Publish Date 13 Jul 2026
Submission Date 18 Aug 2026
Open Date 19 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.40 Crore
Exemption Available
Document List
BOQ_871495.xls
e392b9d6-56ca-4a40-91c8-e3c9175cca86.html
RFPSUDARSHINISR27.pdf
Tendernotice_1 (6).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 34 days
Aug 19, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 35 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_871495.xls

html

e392b9d6-56ca-4a40-91c8-e3c9175cca86.html

pdf

RFPSUDARSHINISR27.pdf

pdf

Tendernotice_1 (6).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders