Tender For Repair/ Maintenance And Improvement Of Lt Network, Ug Cables, Oh Lines, Lt Panels And Other Connected Items At Various Locations Of Garhi Cantt Area Under Age E/M-Ii Of Ge Dehradun.
Tender Overview
Project Description
Tender for Repair/ Maintenance And Improvement Of Lt Network, Ug Cables, Oh Lines, Lt Panels And Other Connected Items At Various Locations Of Garhi Cantt Area Under Age E/M-Ii Of Ge Dehradun.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-Aug-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 10-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | DESCRIPTION OF ITEMS |
| 2 | Excavation in trenches in any type of soil not exc. 1.5 mtr wide and not exc. 1.5 mtr in depth for laying of cable, foundation etc and getting out complete all as specified and directed. |
| 3 | Material and labour for sand cushioning & covering of UG cable using crushed metal sand in trenches for cable protection complete all as specified and directed. NOTE: - Punned thickness shall be measurement & paid. |
| 4 | Material and labour for sub class B bricks well burnt of size 23 x 11.5 x 7.5 cm for protection of UG cable laid dry flat over the cable width wise across the length of the cable and abutting each other with gap less than 10mm between the adjacent bricks in trenches complete all as specified and directed. |
| 5 | Returning, filling in including spreading levelling watering and well ramming in layers not exceeding 25 cm in soil complete all as specified and directed. |
| 6 | Removing of excavated soil to a distance n exc 50 mtr and deposited where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed. |
| 7 | Material and labour for cutting existing road/ hardstanding of any type by using crow bar chisel upto a depth of 60 cm for laying HDPE/ GI pipe upto 100 mm including making good the surface by returning, filling, watering, ramming in layers of 150 mm thick PCC 1:2:4 over 200 mm thick hard core of broken bricks/stones over returning filling watering ramming in layers not exceeding 25 cm thick complete all as specified and directed. |
| 8 | Material and labour for cement concrete (1:4:8) type D-2 (using 40 mm graded crushed stone aggregate) as in foundations and mass concrete for foundations of poles etc complete all as specified and directed. |
| 9 | Material and labour for cement concrete (1:2:4) type B-1 (using 20 mm graded crushed stone aggregate) for coping of poles including necessary from work for finishing exposed faces of concrete smooth and even using extra cement complete all as specified and directed. |
| 10 | Taking out carefully LT cable of any size from 10 sqmm to 300 sqmm or of any type or make from ground/ poles/ pipes etc and testing for serviceability and laying the same serviceable LT cables under ground/ on poles/ through pipes etc at same or any other location and testing after connections complete all as specified and directed.Note:- (a) Item to be measured only when cable is found serviceble for reuse.(b) Necessary excavation, sand cushioning, cable protection covers, returning, removal etc shall be measured and paid separately under relevant items. |
| 11 | Material and labour for laying, jointing and testing in replacement underground XLPE insulated & PVC sheathed, armoured heavy duty multistranded electric cable with aluminium conductor, 1100 volts grade in trenches/ ducts/ along poles/ through pipe/ under road/ PCC etc and connecting with new aluminium lugs including taking out existing unserviceable of any size/ type complete for the following cables of cross sectional area all as directed: Notes:(a) Excavation, returning, removal, sand cushioning, cable protection covers, GI protection pipe etc shall be measured and paid separately.(b) Any damage done during cable excavation to the existing UG infra like UG pipelines, UG electric cables, OFC etc shall be repaired by the contractor at their own expenses.(c) Cost of T&P required for handling/ laying of cable is deemed to be included in the rate quoted by the contractor. |
| 12 | 10.0 Sqmm, 4 core. |
| 13 | 16.0 Sqmm, 4 core. |
| 14 | 25.0 Sqmm, 4 core. |
| 15 | 50.0 Sqmm, 3.5 core. |
| 16 | 70.0 Sqmm, 3.5 core. |
| 17 | 95.0 Sqmm, 3.5 core. |
| 18 | 120.0 Sqmm, 3.5 core. |
| 19 | 150.0 Sqmm, 3.5 core. |
| 20 | 185.0 Sqmm, 3.5 core. |
| 21 | 240.0 Sqmm, 3.5 core. |
| 22 | 300.0 Sqmm, 3.5 core. |
| 23 | Supply and laying in trenches/ fixed to poles/ wall/ laid in floor GI steel tubing 80mm bore (dia) light grade including fitting bolt, nut & washers etc or wooden rubber bushing at the ends of complete all as directed incl disconnection and taking down existing tubing complete all as specified and directed. |
| 24 | Description all as per item No 11 but size of pipe 50mm dia. |
| 25 | Supply and laying of High density polyethylene pipes (HDPE) of pressure rating PN 6 size laid in trenches/ fixed to poles/ wall/ laid in floor for the protection of UG cable for following bore of pipes: |
| 26 | size 50 mm |
| 27 | size 80 mm |
| 28 | Supplying, errecting and fixing in replacement steel tubular swaged poles, type 410-SP-31, 9.00 metre long height, complete with cast iron base plate, heat resistance finial taper plug, bolts, nuts and screws as specified including painting with two coats of synthetic enamalled paint over one coat of red oxide primer and 06 Nos bands/straps with white/ red/ black/ yellow as required (30cm wide each) epoxy heat resistant paint at a distance 30cm from plinth block and numbering of poles with black synthetic enamel paint in 2.5 cm height including taking out existing unserviceable pole of any type/ height/ make etc complete all as specified and directed.Notes: 1. Excavation, returning, removal, PCC for foundation and coping etc shall be measured and paid separately.2. Any damage done during erection of pole to the existing UG infra like UG pipelines, UG electric cables, OFC etc shall be repaired by the contractor at their own expenses.3. Cost of T&P required for transporting/ handling/ erection etc of pole is deemed to be included in the rate quoted by the contractor. |
| 29 | Material and labour for fixing in replacement cross arms, bracing, supports, clamps and back plates fabricated from structural steel section (flat iron/ angle iron/ MS sheet) including back plate, MS boxes made out of MS sheet, clamps or D clamps made out of MS flat iron made to shape including nuts, bolts, washers, welding, bending hot or cold, drilling holes for bolt in any size or shape as directed inclusive of two coats of aluminium paint over a coat of red oxide primer including taking out existing unserviceable of any size/ type etc complete all as specified and directed. |
| 30 | Material and labour for fixing in replacement Danger notice plate of 1.6 mm thick mild steel sheet, vitreous enamelled white, with letters, figures and conventional skull and bones in signal red colour and fixed with M.S. clamps, bolts and nuts for LT of size 20 x 15 cm. including taking down existing unserviceable of any type/ size etc complete all as specified and directed. |
| 31 | Dismantling existing steel poles/stuts ,any size carefully for reuse inclding necessary excavation, demolition of concrete etc and removing the old unserviceable poles/rubbish off the premises etc complete all as specified and directed. |
| 32 | Fixing only of street light poles of any length and dia retrieved against respective dismantling from ser item no 17 above including loading, shifting, unloading errection in true vertical position complete all as specified and directed. Note : Excavation and PCC for fixing of pole shall be measured and paid separately. |
| 33 | Material and labour for trimming/ pruning of tree branches up to 5 meters above & below and both sides to obtain clearance all around the LT over head lines / HT over head lines conductor upto 5 mtr from conductor including removing of cut branches and cleaning of site complete all as specified and directed. |
| 34 | Material and labour for painting of steel pole 09 meter height after preparing the surface by scrapping old paint with sand paper with two coat of aluminium paint over a coat of red oxide primer incuding making 5 nos of alternative strips of black and yellow paint of 30 cm width & numbering of pole as per existing complete all as specified and directed. Please Enable Macros to View BoQ information |
| 35 | Material and labour for painting of steel pole 09 meter height after preparing the surface by scrapping old paint with sand paper with two coat of aluminium paint over a coat of red oxide primer incuding making 5 nos of alternative strips of black and yellow paint of 30 cm width & numbering of pole as per existing complete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender