Tender For Operation & Maintenance Of Iron Elimination Plant (Pressure Type) Capacity 31.75M3 Of Different Teinpur Zone-Ii, Under Nadia Division, Phe Dte. For 1(One ) Year
Tender Value
4.69 Lakhs
Estimated cost
Bid Submission
24 Jul 2026
7 days left
EMD
9384
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Nadia → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Operation & Maintenance Of Iron Elimination Plant (Pressure Type) Capacity 31.75M3 Of Different Teinpur Zone-Ii, Under Nadia Division, Phe Dte. For 1(One ) Year
BOQ
| Sl. No. | Item Description |
| 1 | Opening & closing of all the different dia. sluice valves on different places along the alignment of the Rising main and distribution main within Head Works site daily as and when required for regulating the Supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve if required including opening the cap/plug of wash out point or opening the sluice valves including de- jointing flange joints including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re filling the excavated earth, taking out of RCC slab cover and refixing true to position etc. including back wash on daily basis all complete as per the specification and direction of EIC. |
| 2 | NB a). Contractor have to issue Identity Card to the valve operator. b). Contractor have to product proper payment voucher in every month of daily worker to the EIC through concerned Assistant Engineer. c) Daily rate to each labour will have to be paid by the agency not less than Rs.487/= (Rupees Four hundred four )only per day and bonus amounting @ 8.33% per day of daily worker d). payment of each month have to be paid within 07th of following month. f) noncompliance of payment terms by the Agency will attract action towards payment of Valve Operators in case of exigencies by EIC directly as a principal employer as per availability of fund and no payment will be made against this item to the Agency. This may lead to termination of tender firth with and the agency may be barred from participation in tending process for 3(three) years. |
| 3 | Arear payment of Operators for previous month |
| 4 | Supervision charges for electrical installation by licensed Electrician as per IE Rules, 1956 read with latest amendments overhead expenditure |
| 5 | During the period of Operation & Maintenance ,all necessary manpower technical skilled or unskilled, all accessories (civil, mechanical, electrical and instrumental)oil, lubricants and other consumable materials for Blower & Compressor etc. which are required for normal operation shall be provided by the at his own cost, PHE Department will bear only the cost electricity. Any petty repairing, breakdown of defect shall be promptly rectified or replaced by contractor and cost of oil, lubricant or consumable materials for repairs etc. that during the period shall be borne by the contractor fails to rectify or replace the defects in reasonable time, the same will be done by employing other agency and the relevant expenditure will be realized from the payments and S.D. Money. Responsible technical representative of the contractor must visit the site at regular intervals and also on call during the period and inform to the EIC. 7470.00/1.01/1.12= 6603.61 +18%1188.65=7792.26+1% 77.92= 7870.18 |
| 6 | During the period of Operation & Maintenance, all necessary manpower technical skilled or unskilled, all accessories related to all kind of valves of pipeline and vessels which are required for normal operation shall be the contractor at his own cost, maintenance of pipeline related to IEP within head works site. Any petty repairing or defect shall be promptly rectified or replaced by contractor during the idle period shall be borne by the contractor. If the contractor fails to rectify or replace the defects in reasonable time, the same will be done by employing other agency and the relevant expenditure will be realized from the payments and S.D. money. Responsible technical representative of the contractor must visit the site at regular intervals and also on call during the period and inform to the EIC 9605.00/1.01/1.12=8490.98+18%1528.38=10019.36+1%100.19= 10119.55 |
| 7 | Chemical & Bacteriological testing of Raw Water & Treated water sample including cast of collection after each unit carrying to designated PHE/other laboratories and submission of report to the EIC at regular interval (4 Times in a year, quarterly basis) by the contractor at his cost during the O& M period. New Rate :- PWD S/P Schedule item 23 @ Rs. 1231x4=4924.00 +18% GST + 1% Cess = 5868.42 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 13, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysJul 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender