Tender For Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Ht/Lt Distribution Transformers Installed At Different Water Supply Schemes Of This Division
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Jul 2026
6 days left
EMD
16000
Bank guarantee accepted
Document Fee
400
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Ht/Lt Distribution Transformers Installed At Different Water Supply Schemes Of This Division
BOQ
| Sl. No. | Item Description |
| 1 | Repairs to 25KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV) and (6.6/0.44KV) |
| 2 | Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load |
| 3 | Providing & Fitting of HV winding (Aluminum) |
| 4 | Providing & Fitting of LV Winding (Aluminum) |
| 5 | Providing & Fitting of HV Porcelain bushings |
| 6 | Providing & Fitting of HV terminal Bolt with 4 nuts and washer. |
| 7 | Providing & Fitting of LV Bushing. |
| 8 | Providing & Fitting of LV terminal Bolt with 4 nuts and washer. |
| 9 | Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc. |
| 10 | Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush |
| 11 | Providing & Fitting of Breather with Silica Gel |
| 12 | Providing & Fitting of Drain Valve and Filter Valve with Plug |
| 13 | Providing & Fitting of CRGO Lamination of grade M4 or M3 |
| 14 | Providing & Fitting of Explosion vent |
| 15 | Providing & Fitting of Core Bolt with insulation |
| 16 | Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc |
| 17 | Providing & applying of Paint to Tank as per IEE rules |
| 18 | Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size |
| 19 | Providing & Fitting of Connection Wire (Copper) |
| 20 | Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc. |
| 21 | Providing & Fitting of SRBP Tube |
| 22 | Providing & Fitting of Lid bolts |
| 23 | Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap |
| 24 | Welding of tank and other parts at the point of leakages near leaking bushes |
| 25 | Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer |
| 26 | Cost on account of Oil filtering to remove carbon content and other desired impurities |
| 27 | Cost of scrap windings (Aluminum) |
| 28 | Damaged brass parts |
| 29 | Cost of scrap Iron /Mild Steel |
| 30 | Repairs to 63KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV) and (6.6/0.44KV) |
| 31 | Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load |
| 32 | Providing & Fitting of HV winding (Aluminum) |
| 33 | Providing & Fitting of LV Winding (Aluminum) |
| 34 | Providing & Fitting of HV Porcelain bushings |
| 35 | Providing & Fitting of HV terminal Bolt with 4 nuts and washer. |
| 36 | Providing & Fitting of LV Bushing. |
| 37 | Providing & Fitting of LV terminal Bolt with 4 nuts and washer. |
| 38 | Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc. |
| 39 | Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush |
| 40 | Providing & Fitting of Breather with Silica Gel |
| 41 | Providing & Fitting of Drain Valve and Filter Valve with Plug |
| 42 | Providing & Fitting of CRGO Lamination of grade M4 or M3 |
| 43 | Providing & Fitting of Explosion vent |
| 44 | Providing & Fitting of Core Bolt with insulation |
| 45 | Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc |
| 46 | Providing & applying of Paint to Tank as per IEE rules |
| 47 | Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size |
| 48 | Providing & Fitting of Connection Wire (Copper) |
| 49 | Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc. |
| 50 | Providing & Fitting of SRBP Tube |
| 51 | Providing & Fitting of Lid bolts |
| 52 | Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap |
| 53 | Welding of tank and other parts at the point of leakages near leaking bushes |
| 54 | Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer |
| 55 | Cost on account of Oil filtering to remove carbon content and other desired impurities |
| 56 | Cost of scrap windings (Aluminum) |
| 57 | Damaged brass parts |
| 58 | Cost of scrap Iron /Mild Steel |
| 59 | Repairs to 100KVA HT/LT (Aluminium wound) Transformer with respect following works (11/0.44 KV) and (6.6/0.44KV) |
| 60 | Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load |
| 61 | Providing & Fitting of HV winding (Aluminum) |
| 62 | Providing & Fitting of LV Winding (Aluminum) |
| 63 | Providing & Fitting of HV Porcelain bushings |
| 64 | Providing & Fitting of HV terminal Bolt with 4 nuts and washer. |
| 65 | Providing & Fitting of LV Bushing. |
| 66 | Providing & Fitting of LV terminal Bolt with 4 nuts and washer. |
| 67 | Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc. |
| 68 | Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush |
| 69 | Providing & Fitting of Breather with Silica Gel |
| 70 | Providing & Fitting of Drain Valve and Filter Valve with Plug |
| 71 | Providing & Fitting of CRGO Lamination of grade M4 or M3 |
| 72 | Providing & Fitting of Explosion vent |
| 73 | Providing & Fitting of Core Bolt with insulation |
| 74 | Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc |
| 75 | Providing & applying of Paint to Tank as per IEE rules |
| 76 | Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size |
| 77 | Providing & Fitting of Connection Wire (Copper) |
| 78 | Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc. |
| 79 | Providing & Fitting of SRBP Tube |
| 80 | Providing & Fitting of Lid bolts |
| 81 | Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap |
| 82 | Welding of tank and other parts at the point of leakages near leaking bushes |
| 83 | Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer |
| 84 | Cost on account of Oil filtering to remove carbon content and other desired impurities |
| 85 | Cost of scrap windings (Aluminum) |
| 86 | Damaged brass parts |
| 87 | Cost of scrap Iron /Mild Steel |
| 88 | Repairs to 250KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV) |
| 89 | Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load |
| 90 | Providing & Fitting of HV winding (Aluminum) |
| 91 | Providing & Fitting of LV Winding (Aluminum) |
| 92 | Providing & Fitting of HV Porcelain bushings |
| 93 | Providing & Fitting of HV terminal Bolt with 4 nuts and washer. |
| 94 | Providing & Fitting of LV Bushing. |
| 95 | Providing & Fitting of LV terminal Bolt with 4 nuts and washer. |
| 96 | Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc. |
| 97 | Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush |
| 98 | Providing & Fitting of Breather with Silica Gel |
| 99 | Providing & Fitting of Drain Valve and Filter Valve with Plug |
| 100 | Providing & Fitting of CRGO Lamination of grade M4 or M3 |
| 101 | Providing & Fitting of Explosion vent |
| 102 | Providing & Fitting of Core Bolt with insulation |
| 103 | Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc |
| 104 | Providing & applying of Paint to Tank as per IEE rules |
| 105 | Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size |
| 106 | Providing & Fitting of Connection Wire (Copper) |
| 107 | Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc. |
| 108 | Providing & Fitting of SRBP Tube |
| 109 | Providing & Fitting of Lid bolts |
| 110 | Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap |
| 111 | Welding of tank and other parts at the point of leakages near leaking bushes |
| 112 | Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer |
| 113 | Cost on account of Oil filtering to remove carbon content and other desired impurities |
| 114 | Cost of scrap windings (Aluminum) |
| 115 | Damaged brass parts |
| 116 | Cost of scrap Iron /Mild Steel |
| 117 | Repairs to 250KVA (Copper Wound) HT/LT Transformer with respect following works (11/0.44 KV) |
| 118 | Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load |
| 119 | Providing & Fitting of HV winding (Copper) |
| 120 | Providing & Fitting of LV Winding (Copper) |
| 121 | Providing & Fitting of HV Porcelain bushings |
| 122 | Providing & Fitting of HV terminal Bolt with 4 nuts and washer |
| 123 | Providing & Fitting of LV Bushing |
| 124 | Providing & Fitting of LV terminal Bolt with 4 nuts and washer |
| 125 | Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc. |
| 126 | Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush |
| 127 | Providing & Fitting of Breather with Silica Gel |
| 128 | Providing & Fitting of Drain Valve and Filter Valve with Plug |
| 129 | Providing & Fitting of CRGO Lamination of grade M4 or M3 |
| 130 | Providing & Fitting of Explosion vent |
| 131 | Providing & Fitting of Core Bolt with insulation |
| 132 | Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc |
| 133 | Providing & applying of Paint to Tank as per IEE rules |
| 134 | Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size |
| 135 | Providing & Fitting of Connection Wire (Copper) |
| 136 | Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc. |
| 137 | Providing & Fitting of SRBP Tube |
| 138 | Providing & Fitting of Lid bolts |
| 139 | Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap |
| 140 | Welding of tank and other parts at the point of leakages near leaking bushes |
| 141 | Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer |
| 142 | Cost on account of Oil filtering to remove carbon content and other desired impurities |
| 143 | Cost of scrap windings (Copper) |
| 144 | Damaged brass parts |
| 145 | Cost of scrap Iron /Mild Steel |
| 146 | Repairs to 400KVA (Copper wound) HT/LT Transformer with respect following works (11/0.44 KV) |
| 147 | Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load |
| 148 | Providing & Fitting of HV winding (Copper) |
| 149 | Providing & Fitting of LV Winding (Copper) |
| 150 | Providing & Fitting of HV Porcelain bushings |
| 151 | Providing & Fitting of HV terminal Bolt with 4 nuts and washer |
| 152 | Providing & Fitting of LV Bushing |
| 153 | Providing & Fitting of LV terminal Bolt with 4 nuts and washer |
| 154 | Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc. |
| 155 | Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush |
| 156 | Providing & Fitting of Breather with Silica Gel |
| 157 | Providing & Fitting of Drain Valve and Filter Valve with Plug |
| 158 | Providing & Fitting of CRGO Lamination of grade M4 or M3 |
| 159 | Providing & Fitting of Explosion vent |
| 160 | Providing & Fitting of Core Bolt with insulation |
| 161 | Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc |
| 162 | Providing & applying of Paint to Tank as per IEE rules |
| 163 | Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size |
| 164 | Providing & Fitting of Connection Wire (Copper) |
| 165 | Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc. |
| 166 | Providing & Fitting of SRBP Tube |
| 167 | Providing & Fitting of Lid bolts |
| 168 | Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap |
| 169 | Welding of tank and other parts at the point of leakages near leaking bushes |
| 170 | Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer |
| 171 | Cost on account of Oil filtering to remove carbon content and other desired impurities |
| 172 | Cost of scrap windings (Copper) |
| 173 | Damaged brass parts |
| 174 | Cost of scrap Iron /Mild Steel |
| 175 | Repairs to 400KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV) |
| 176 | Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load |
| 177 | Providing & Fitting of HV winding (Aluminum) |
| 178 | Providing & Fitting of LV Winding (Aluminum) |
| 179 | Providing & Fitting of HV Porcelain bushings |
| 180 | Providing & Fitting of HV terminal Bolt with 4 nuts and washer. |
| 181 | Providing & Fitting of LV Bushing. |
| 182 | Providing & Fitting of LV terminal Bolt with 4 nuts and washer. |
| 183 | Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc. |
| 184 | Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush |
| 185 | Providing & Fitting of Breather with Silica Gel |
| 186 | Providing & Fitting of Drain Valve and Filter Valve with Plug |
| 187 | Providing & Fitting of CRGO Lamination of grade M4 or M3 |
| 188 | Providing & Fitting of Explosion vent |
| 189 | Providing & Fitting of Core Bolt with insulation |
| 190 | Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc |
| 191 | Providing & applying of Paint to Tank as per IEE rules |
| 192 | Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size |
| 193 | Providing & Fitting of Connection Wire (Copper) |
| 194 | Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc. |
| 195 | Providing & Fitting of SRBP Tube |
| 196 | Providing & Fitting of Lid bolts |
| 197 | Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap |
| 198 | Welding of tank and other parts at the point of leakages near leaking bushes |
| 199 | Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer |
| 200 | Cost on account of Oil filtering to remove carbon content and other desired impurities |
| 201 | Cost of scrap windings (Aluminum) |
| 202 | Damaged brass parts |
| 203 | Cost of scrap Iron /Mild Steel |
| 204 | Repairs to 630 KVA (Copper wound) HT/LT Transformer with respect following works (11/0.44 KV) |
| 205 | Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load |
| 206 | Providing & Fitting of HV winding Copper) |
| 207 | Providing & Fitting of LV Winding (Copper) |
| 208 | Providing & Fitting of HV Porcelain bushings |
| 209 | Providing & Fitting of HV terminal Bolt with 4 nuts and washer |
| 210 | Providing & Fitting of LV Bushing |
| 211 | Providing & Fitting of LV terminal Bolt with 4 nuts and washer |
| 212 | Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc. |
| 213 | Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush |
| 214 | Providing & Fitting of Breather with Silica Gel |
| 215 | Providing & Fitting of Drain Valve and Filter Valve with Plug |
| 216 | Providing & Fitting of CRGO Lamination of grade M4 or M3 |
| 217 | Providing & Fitting of Explosion vent |
| 218 | Providing & Fitting of Core Bolt with insulation |
| 219 | Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc |
| 220 | Providing & applying of Paint to Tank as per IEE rules |
| 221 | Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size |
| 222 | Providing & Fitting of Connection Wire (Copper) |
| 223 | Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc. |
| 224 | Providing & Fitting of SRBP Tube |
| 225 | Providing & Fitting of Lid bolts |
| 226 | Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap |
| 227 | Welding of tank and other parts at the point of leakages near leaking bushes |
| 228 | Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer |
| 229 | Cost on account of Oil filtering to remove carbon content and other desired impurities |
| 230 | Cost of scrap windings (Copper) |
| 231 | Damaged brass parts |
| 232 | Cost of scrap Iron /Mild Steel |
| 233 | Substation Items |
| 234 | Cost of 20 mm2 ACSR Conductor |
| 235 | Cost of 30 mm2 ACSR Conductor |
| 236 | Cost of 50 mm2 ACSR Conductor |
| 237 | 35 mm2 AB HT Cable (3x35 +1x35) XLPE 3C+ Earth |
| 238 | 50 mm2 AB HT Cable (3x35 +1x35) XLPE 3C+ Earth |
| 239 | 35 mm2 AB LT Cable (3x50 +1x35) XLPE (1.1 Kv,3+1C, Al) |
| 240 | 50 mm2 AB LT Cable (3x50 +1x35) XLPE (1.1 Kv,3+1C, Al) |
| 241 | 70 mm2 AB LT Cable (3x70 +1x35) XLPE (1.1 Kv,3+1C, Al) |
| 242 | 11Kv Polymeric composite Pin Insulator 12 KV, min failing load 45 kN |
| 243 | 33 Kv Polymeric composite Pin Insulator 36 kV ,10kN |
| 244 | Heat shrinkable outdoor cable termination kit up to 70 mm (3 core) |
| 245 | Mid span Straight through joining kit for 1.1KVA ABC up to 120 sq. mm |
| 246 | PG clamps for 50 mm2 ACSR conductor |
| 247 | Gapless surge arrestor, 9kV, 10 kA, LA with polymer housing |
| 248 | Galvanized Nuts and bolts |
| 249 | GI V cross-arm with top bracket including clamp |
| 250 | GI channel X- arm including clamps and braces |
| 251 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 252 | Providing and fixing of Air Brake Switch Handle |
| 253 | Providing of Breather with silica gel |
| 254 | 11 kV Horn Gap Fuse set 3 phase 200 A |
| 255 | Supply of Neoprene Rubberized Gasket Sheet |
| 256 | 3mm thick |
| 257 | 5mm thick |
| 258 | 6mm thick |
| 259 | Providing of metal part stem with allied fittings of transformer bushings (HV/ LV) as under: |
| 260 | Brass |
| 261 | Aluminium |
| 262 | Copper |
| 263 | Fuse element of required current rating for DO Fuse. |
| 264 | Link set (3-piece set) |
| 265 | Providing of requisite tinned copper fuse wire Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 13, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysJul 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender