Drinking Water Supply and Sanitation Government Departments Closing in 6 days TDR #56441066

Tender For Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Ht/Lt Distribution Transformers Installed At Different Water Supply Schemes Of This Division

Issued by Government Departments · Srinagar, Jammu and Kashmir
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Jul 2026
6 days left
EMD
16000
Bank guarantee accepted
Document Fee
400
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Ht/Lt Distribution Transformers Installed At Different Water Supply Schemes Of This Division

BOQ

Name of Work:- Annual Framework/Rate Contract for Repairs/replacements to the all types of HT/LT Distribution Transformers installed at different Water Supply Schemes of this Division
Sl. No. Item Description
1Repairs to 25KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV) and (6.6/0.44KV)
2Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
3Providing & Fitting of HV winding (Aluminum)
4Providing & Fitting of LV Winding (Aluminum)
5Providing & Fitting of HV Porcelain bushings
6Providing & Fitting of HV terminal Bolt with 4 nuts and washer.
7Providing & Fitting of LV Bushing.
8Providing & Fitting of LV terminal Bolt with 4 nuts and washer.
9Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
10Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
11Providing & Fitting of Breather with Silica Gel
12Providing & Fitting of Drain Valve and Filter Valve with Plug
13Providing & Fitting of CRGO Lamination of grade M4 or M3
14Providing & Fitting of Explosion vent
15Providing & Fitting of Core Bolt with insulation
16Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
17Providing & applying of Paint to Tank as per IEE rules
18Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size
19Providing & Fitting of Connection Wire (Copper)
20Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc.
21Providing & Fitting of SRBP Tube
22Providing & Fitting of Lid bolts
23Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
24Welding of tank and other parts at the point of leakages near leaking bushes
25Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
26Cost on account of Oil filtering to remove carbon content and other desired impurities
27Cost of scrap windings (Aluminum)
28Damaged brass parts
29Cost of scrap Iron /Mild Steel
30Repairs to 63KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV) and (6.6/0.44KV)
31Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
32Providing & Fitting of HV winding (Aluminum)
33Providing & Fitting of LV Winding (Aluminum)
34Providing & Fitting of HV Porcelain bushings
35Providing & Fitting of HV terminal Bolt with 4 nuts and washer.
36Providing & Fitting of LV Bushing.
37Providing & Fitting of LV terminal Bolt with 4 nuts and washer.
38Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
39Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
40Providing & Fitting of Breather with Silica Gel
41Providing & Fitting of Drain Valve and Filter Valve with Plug
42Providing & Fitting of CRGO Lamination of grade M4 or M3
43Providing & Fitting of Explosion vent
44Providing & Fitting of Core Bolt with insulation
45Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
46Providing & applying of Paint to Tank as per IEE rules
47Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size
48Providing & Fitting of Connection Wire (Copper)
49Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc.
50Providing & Fitting of SRBP Tube
51Providing & Fitting of Lid bolts
52Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
53Welding of tank and other parts at the point of leakages near leaking bushes
54Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
55Cost on account of Oil filtering to remove carbon content and other desired impurities
56Cost of scrap windings (Aluminum)
57Damaged brass parts
58Cost of scrap Iron /Mild Steel
59Repairs to 100KVA HT/LT (Aluminium wound) Transformer with respect following works (11/0.44 KV) and (6.6/0.44KV)
60Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
61Providing & Fitting of HV winding (Aluminum)
62Providing & Fitting of LV Winding (Aluminum)
63Providing & Fitting of HV Porcelain bushings
64Providing & Fitting of HV terminal Bolt with 4 nuts and washer.
65Providing & Fitting of LV Bushing.
66Providing & Fitting of LV terminal Bolt with 4 nuts and washer.
67Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
68Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
69Providing & Fitting of Breather with Silica Gel
70Providing & Fitting of Drain Valve and Filter Valve with Plug
71Providing & Fitting of CRGO Lamination of grade M4 or M3
72Providing & Fitting of Explosion vent
73Providing & Fitting of Core Bolt with insulation
74Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
75Providing & applying of Paint to Tank as per IEE rules
76Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size
77Providing & Fitting of Connection Wire (Copper)
78Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc.
79Providing & Fitting of SRBP Tube
80Providing & Fitting of Lid bolts
81Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
82Welding of tank and other parts at the point of leakages near leaking bushes
83Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
84Cost on account of Oil filtering to remove carbon content and other desired impurities
85Cost of scrap windings (Aluminum)
86Damaged brass parts
87Cost of scrap Iron /Mild Steel
88Repairs to 250KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
89Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
90Providing & Fitting of HV winding (Aluminum)
91Providing & Fitting of LV Winding (Aluminum)
92Providing & Fitting of HV Porcelain bushings
93Providing & Fitting of HV terminal Bolt with 4 nuts and washer.
94Providing & Fitting of LV Bushing.
95Providing & Fitting of LV terminal Bolt with 4 nuts and washer.
96Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
97Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
98Providing & Fitting of Breather with Silica Gel
99Providing & Fitting of Drain Valve and Filter Valve with Plug
100Providing & Fitting of CRGO Lamination of grade M4 or M3
101Providing & Fitting of Explosion vent
102Providing & Fitting of Core Bolt with insulation
103Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
104Providing & applying of Paint to Tank as per IEE rules
105Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size
106Providing & Fitting of Connection Wire (Copper)
107Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc.
108Providing & Fitting of SRBP Tube
109Providing & Fitting of Lid bolts
110Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
111Welding of tank and other parts at the point of leakages near leaking bushes
112Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
113Cost on account of Oil filtering to remove carbon content and other desired impurities
114Cost of scrap windings (Aluminum)
115Damaged brass parts
116Cost of scrap Iron /Mild Steel
117Repairs to 250KVA (Copper Wound) HT/LT Transformer with respect following works (11/0.44 KV)
118Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
119Providing & Fitting of HV winding (Copper)
120Providing & Fitting of LV Winding (Copper)
121Providing & Fitting of HV Porcelain bushings
122Providing & Fitting of HV terminal Bolt with 4 nuts and washer
123Providing & Fitting of LV Bushing
124Providing & Fitting of LV terminal Bolt with 4 nuts and washer
125Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
126Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
127Providing & Fitting of Breather with Silica Gel
128Providing & Fitting of Drain Valve and Filter Valve with Plug
129Providing & Fitting of CRGO Lamination of grade M4 or M3
130Providing & Fitting of Explosion vent
131Providing & Fitting of Core Bolt with insulation
132Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
133Providing & applying of Paint to Tank as per IEE rules
134Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size
135Providing & Fitting of Connection Wire (Copper)
136Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc.
137Providing & Fitting of SRBP Tube
138Providing & Fitting of Lid bolts
139Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
140Welding of tank and other parts at the point of leakages near leaking bushes
141Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
142Cost on account of Oil filtering to remove carbon content and other desired impurities
143Cost of scrap windings (Copper)
144Damaged brass parts
145Cost of scrap Iron /Mild Steel
146Repairs to 400KVA (Copper wound) HT/LT Transformer with respect following works (11/0.44 KV)
147Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
148Providing & Fitting of HV winding (Copper)
149Providing & Fitting of LV Winding (Copper)
150Providing & Fitting of HV Porcelain bushings
151Providing & Fitting of HV terminal Bolt with 4 nuts and washer
152Providing & Fitting of LV Bushing
153Providing & Fitting of LV terminal Bolt with 4 nuts and washer
154Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
155Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
156Providing & Fitting of Breather with Silica Gel
157Providing & Fitting of Drain Valve and Filter Valve with Plug
158Providing & Fitting of CRGO Lamination of grade M4 or M3
159Providing & Fitting of Explosion vent
160Providing & Fitting of Core Bolt with insulation
161Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
162Providing & applying of Paint to Tank as per IEE rules
163Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size
164Providing & Fitting of Connection Wire (Copper)
165Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc.
166Providing & Fitting of SRBP Tube
167Providing & Fitting of Lid bolts
168Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
169Welding of tank and other parts at the point of leakages near leaking bushes
170Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
171Cost on account of Oil filtering to remove carbon content and other desired impurities
172Cost of scrap windings (Copper)
173Damaged brass parts
174Cost of scrap Iron /Mild Steel
175Repairs to 400KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
176Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
177Providing & Fitting of HV winding (Aluminum)
178Providing & Fitting of LV Winding (Aluminum)
179Providing & Fitting of HV Porcelain bushings
180Providing & Fitting of HV terminal Bolt with 4 nuts and washer.
181Providing & Fitting of LV Bushing.
182Providing & Fitting of LV terminal Bolt with 4 nuts and washer.
183Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
184Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
185Providing & Fitting of Breather with Silica Gel
186Providing & Fitting of Drain Valve and Filter Valve with Plug
187Providing & Fitting of CRGO Lamination of grade M4 or M3
188Providing & Fitting of Explosion vent
189Providing & Fitting of Core Bolt with insulation
190Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
191Providing & applying of Paint to Tank as per IEE rules
192Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size
193Providing & Fitting of Connection Wire (Copper)
194Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc.
195Providing & Fitting of SRBP Tube
196Providing & Fitting of Lid bolts
197Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
198Welding of tank and other parts at the point of leakages near leaking bushes
199Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
200Cost on account of Oil filtering to remove carbon content and other desired impurities
201Cost of scrap windings (Aluminum)
202Damaged brass parts
203Cost of scrap Iron /Mild Steel
204Repairs to 630 KVA (Copper wound) HT/LT Transformer with respect following works (11/0.44 KV)
205Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop for repairs, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop in presence of concerned site incharge, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
206Providing & Fitting of HV winding Copper)
207Providing & Fitting of LV Winding (Copper)
208Providing & Fitting of HV Porcelain bushings
209Providing & Fitting of HV terminal Bolt with 4 nuts and washer
210Providing & Fitting of LV Bushing
211Providing & Fitting of LV terminal Bolt with 4 nuts and washer
212Providing & Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
213Providing & Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
214Providing & Fitting of Breather with Silica Gel
215Providing & Fitting of Drain Valve and Filter Valve with Plug
216Providing & Fitting of CRGO Lamination of grade M4 or M3
217Providing & Fitting of Explosion vent
218Providing & Fitting of Core Bolt with insulation
219Providing & Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
220Providing & applying of Paint to Tank as per IEE rules
221Providing & Fitting of MS bolts and Nuts, washers, spring washers of different size
222Providing & Fitting of Connection Wire (Copper)
223Providing & Fitting of Soldering Lead & Brazing Rod with filler material etc.
224Providing & Fitting of SRBP Tube
225Providing & Fitting of Lid bolts
226Providing & filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
227Welding of tank and other parts at the point of leakages near leaking bushes
228Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
229Cost on account of Oil filtering to remove carbon content and other desired impurities
230Cost of scrap windings (Copper)
231Damaged brass parts
232Cost of scrap Iron /Mild Steel
233Substation Items
234Cost of 20 mm2 ACSR Conductor
235Cost of 30 mm2 ACSR Conductor
236Cost of 50 mm2 ACSR Conductor
23735 mm2 AB HT Cable (3x35 +1x35) XLPE 3C+ Earth
23850 mm2 AB HT Cable (3x35 +1x35) XLPE 3C+ Earth
23935 mm2 AB LT Cable (3x50 +1x35) XLPE (1.1 Kv,3+1C, Al)
24050 mm2 AB LT Cable (3x50 +1x35) XLPE (1.1 Kv,3+1C, Al)
24170 mm2 AB LT Cable (3x70 +1x35) XLPE (1.1 Kv,3+1C, Al)
24211Kv Polymeric composite Pin Insulator 12 KV, min failing load 45 kN
24333 Kv Polymeric composite Pin Insulator 36 kV ,10kN
244Heat shrinkable outdoor cable termination kit up to 70 mm (3 core)
245Mid span Straight through joining kit for 1.1KVA ABC up to 120 sq. mm
246PG clamps for 50 mm2 ACSR conductor
247Gapless surge arrestor, 9kV, 10 kA, LA with polymer housing
248Galvanized Nuts and bolts
249GI V cross-arm with top bracket including clamp
250GI channel X- arm including clamps and braces
25111kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
252Providing and fixing of Air Brake Switch Handle
253Providing of Breather with silica gel
25411 kV Horn Gap Fuse set 3 phase 200 A
255Supply of Neoprene Rubberized Gasket Sheet
2563mm thick
2575mm thick
2586mm thick
259Providing of metal part stem with allied fittings of transformer bushings (HV/ LV) as under:
260Brass
261Aluminium
262Copper
263Fuse element of required current rating for DO Fuse.
264Link set (3-piece set)
265Providing of requisite tinned copper fuse wire Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56441066
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 20-07-2026
Authority
Authority Name Public Health Engineering Department
Work Description Tender for Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Ht/Lt Distribution Transformers Installed At Different Water Supply Schemes Of This Division
Basic Detail
Tender No PHE/MRD/TS 14 OF 07/2026
Bidding Type Tender
Location
City Srinagar
State Jammu and Kashmir
Key Dates
Publish Date 13 Jul 2026
Submission Date 20 Jul 2026
Open Date 20 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee 400
EMD 16000
Exemption Not Available
Document List
015de245-04d9-44d7-8a03-79d34121babd.html
BOQ_1025981.xls
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Jul 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
html

015de245-04d9-44d7-8a03-79d34121babd.html

xls

BOQ_1025981.xls

pdf

Tendernotice_1 (10).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders