Tender For Interception & Diversion Of Nallahs With Stp Works Project Of Baldevgarh Town Under Sbm 2.0
Tender Value
4.15 Crore
Estimated cost
Bid Submission
18 Aug 2026
27 days left
EMD
2.07 Lakhs
Bank guarantee accepted
Document Fee
15000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Tikamgarh → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Interception & Diversion Of Nallahs With Stp Works Project Of Baldevgarh Town Under Sbm 2.0
BOQ
| Sl. No. | Item Description |
| 1 | 1. Design and build 1 Nos. sewage treatment plant of installed capacity 0.9 MLD, and all appurtenant structures and allied works;2. Construction /Strengthening of1 NO. 370 m Long RCC Drain necessary work, as per approved drawing & design3. Construction of 3 NOS I & D Structure4. Construction of 3 NOS Intermediate Sewage Pumping station with Pump house including Boundary, Approach road, Gate, site development & all necessary electrical and mechanical accessories. Job includes Pumps and required associated works to complete the job in all respect capacity are 0.3 0.7 & 0.9 respectively 5. Providing and Laying non-pressure (NP3) RCC socket & spigot pipes with rubber gasket joint including testing of joints. Dia 500 mm length 150 m6. Providing, laying, jointing & testing of socket & spigot centrifugally cast (Spun) Ductile Iron pressure pipes with inside cement mortar lining (class K-7) with suitable Rubber Gasket (Push on) joints as per IS:5382/85 including testing of joint. 100 mm to 150 mm length 1250 m7. Providing, laying, Jointing & field testing of High Density Polyethylene pipes, (HDPE) confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing material like mechanical connector or jointing pipes by heating to the ends of pipes with the help of Teflon coated electric mirror/ heater to the required temperature and then pressing the ends together against each other, to form a monolithic & leak proof joint by thermosetting process. It may be required to be done with Jacks/Hydraulic Jacks/ But fusion machine. (50mm & above fusion jointed & below 50mm mechanical jointed)90 mm dia and length 500 meters8. R.C.C. Ground Service Reservoirs & Sumps capacity 25 kl9. Substation, HT/LT Feeder10. Plantation and Landscaping OF STP Compus & both side of I&D nalla11. Online Control Monitoring System (OCMS ) |
| 2 | Operation and Maintenance Cost For 1st Years |
| 3 | Operation and Maintenance Cost For 2nd Years |
| 4 | Operation and Maintenance Cost For 3rd Years |
| 5 | Operation and Maintenance Cost For 4th Years |
| 6 | Operation and Maintenance Cost For 5th Years |
| 7 | Operation and Maintenance Cost For 6th Years |
| 8 | Operation and Maintenance Cost For 7th Years |
| 9 | Operation and Maintenance Cost For 8th Years |
| 10 | Operation and Maintenance Cost For 9th Years |
| 11 | Operation and Maintenance Cost For 10th Years |
| 12 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 1st year |
| 13 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 2nd year |
| 14 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 3rd year |
| 15 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 4th year |
| 16 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 5th year |
| 17 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 6th year |
| 18 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 7th year |
| 19 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 8th year |
| 20 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 9th year |
| 21 | NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 10th year |
| 22 | Power Consuption @ 6.5 Rs per unit For 1st Year |
| 23 | Power Consuption @ 6.5 Rs per unit For 2nd Year |
| 24 | Power Consuption @ 6.5 Rs per unit For 3rd Year |
| 25 | Power Consuption @ 6.5 Rs per unit For 4th Year |
| 26 | Power Consuption @ 6.5 Rs per unit For 5th Year |
| 27 | Power Consuption @ 6.5 Rs per unit For 6th Year |
| 28 | Power Consuption @ 6.5 Rs per unit For 7th Year |
| 29 | Power Consuption @ 6.5 Rs per unit For 8th Year |
| 30 | Power Consuption @ 6.5 Rs per unit For 9th Year |
| 31 | Power Consuption @ 6.5 Rs per unit For 10th Year |
| 32 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 1st Year |
| 33 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 2nd Year |
| 34 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 3rd Year |
| 35 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 4th Year |
| 36 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 5th Year |
| 37 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 6th Year |
| 38 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 7th Year |
| 39 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 8th Year |
| 40 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 9th Year |
| 41 | NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 10th Year Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 13, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 18, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 27 daysAug 19, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 28 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender