Bids Are invited for Custom Bid For Services - Sporadic Work Outsourcing Package - Safety - Operation And Maintenance Of Safety Detection Systems And Fire Protection Systems And Maintain Log Books For 2 Years. , Preparation Of Stock Item And Segregat
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Sporadic Work Outsourcing Package - Safety - Operation And Maintenance Of Safety Detection Systems And Fire Protection Systems And Maintain Log Books For 2 Years. , Preparation Of Stock Item And Segregating Pipe And Fitting And Consumable Item In Store Rack And Maintaining The Stock Register For 2 Years. , Preparation Of Bill Of Materials For Fire Protection Systems And Receipt Of Materials, Maintaining Logbook For Activities For Establishment Of Fire Protection Systems For 2 Years. , Mounting & Dismantling Of Flange Joints:- Mounting Refers To Aligning Of Pipe Flanges (2 Nos.) & Positioning Of Gasket Properly And Tightening The Flanges With Proper Torque With The Given Bolts & Studs For 2 Years. , Assembly & Removal Of Flanged Manual / Ep Valves/ Safety Relief Valves / Deluge Valves For 2 Years. , Sporadic Work Outsourcing Contract: Calibration Of H2/O2, Flame Detectors And Ensuring Its Fitness, Service, Dismantling/Mounting And Changing For 2 Years. , Sporadic Work Outsourcing Contract: Fabrication Of Safety Barricades & Sign Boards (Size: 75X75mm, 75X300mm, 400X600mm) For 2 Years. , Installation Of Safety Equipments - Mounting /Dismounting Safety Shower, Anemometer, Road Mirror, Wind Socks, Siren. Installation/Positioning Of Safety Barricade During Hazardous Operations For 2 Years. , Taking Measurement Of Piping, Equipment, Components At Site For Fire Protection Systems. Including Support Activities For General Equipment Maintenance Works For 2 Years. , Sporadic Work Outsourcing Contract: Charging Of Gn2 Cylinders With Gn2 During Test Operations At Cryo Test Stand For 2 Years. , Setting Of Pressure Regulator Involving Opening Of Discharge Valves Of High Pressure Gn2 Cylinders And Associated Manual Valves And Setting The Regulator To The Required Pressure Value 2 Years. , Shifting Of Structural Materials Like Angles, Channels, I-Beams, Pipes, Fittings, Etc., For 2 Years , Collecting Inputs On Safety Inspection, Surveillance, Support In Worksite/Test Activities For Cryo And Earth Storable Test Facilities & Storage Areas For 2 Years. , Mounting And Removal Of Pumps And Motors Of Remote Control Water Monitor And Other General Pumps & Motors For 2 Years. , Sporadic Work Outsourcing Contract: Mounting And Removal Of Ro Pumps And Motors: Trouble Shooting And Servicing For 2 Years. , Maintenance Of Ro Plant: Cleaning, Checking, Refitting, Topping-Up, Filling Anti Scalant, Handling Chemicals As Per Approved Procedures Etc., For 2 Years. , Scrubber Charging At Pts, Rcs, Lus-Tf, Sttf: Dismantling, Cleaning Process, Solution Preparation Etc., For 2 Years. , Air Compressor Operation For Charging Of (Scaba): Servicing, Assembling And Charging For 2 Years. , Air Compressor Periodic Maintenance (Preventative Maintenance, Oil Filling, Gaskets Changing, Belt Changing Etc) 03 Months Once For 2 Years. , Servicing And Maintenance Of Outdoor Weather Monitoring Board And Automatic Weather Station Maintenance And Ensuring Its Fitness At Various Locations (Once In 03 Months Approx) 2 Years. , Cleaning And Mounting/Dismantling Of Deluge Nozzles In Nos., Servicing Of Water Strainers (Sizes 50 Nb To 200 Nb) In Nos., For 2 Years , Operation Of Ro Plant In Cubic Meter: From Operation Of Feed Pump To Operation Of Permeate Supply (To Dm Plant) Pump For 2 Years , Drilling Of Holes In Ms/Ss Components And In Structure Shall Be Carried Out Either By Portable Hand Drilling Machine Or In Drilling Machine For 2 Years. , Painting Of Pipelines, Equipment, Fixtures And Structure Etc., For 2 Years. , Mounting And Dismantling Of Spring Loaded Regulator & Filter Assembly For 2 Years. , Preparation/Editing Of Auto Cad Drawings, Making Fabrication /Isometric Drawing, Layout Drawing And Correction Of Drawing For 2 Years. , General Housekeeping In The Form Of Removing All Unwanted Materials Lying In And Around The Work Place Regularly Once In A Week Or More Depending Upon The Need For 2 Years. , Mounting Of Detectors And Other Electronic Equipments And Storing. For The Weight Given Below: A. Weight<=10 Kgs, B. Weight >10 Kgs <= 25 Kgs Is Only Indicative For 2 Years. , Deo Work : Typing Of Technical Checklist (100 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Technical Specifications For (200 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Monthly Report For (10 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Leave / Tour Report For (50 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Indent Documentation For (90 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Letters / Fax Messages / Emails / Logistic Request For (200 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Procedure Documents And Manuals For (250 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Minutes Of Meeting For (100 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Up-Keeping Inward / Outward Records Entries For (310 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Photocopy Of Documents And Records For (1300 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Scanning Of Documents And Records For (540 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Filing And Organising Of Records And Documents For (310 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Operation and maintenance of safety Detection systems and fire protection systems and maintain log books for 2 years. | Operation and maintenance of safety Detection systems and fire protection systems and maintain log books for 2 years. |
| 2 | Preparation of stock item and segregating pipe and fitting and consumable item in store rack and maintaining the stock register for 2 years. | Preparation of stock item and segregating pipe and fitting and consumable item in store rack and maintaining the stock register for 2 years. |
| 3 | Preparation of bill of materials for Fire Protection Systems and Receipt of materials, maintaining logbook for activities for Establishment of Fire Protection Systems for 2 years. | Preparation of bill of materials for Fire Protection Systems and Receipt of materials, maintaining logbook for activities for Establishment of Fire Protection Systems for 2 years. |
| 4 | Mounting & dismantling of flange joints:- Mounting refers to aligning of pipe flanges (2 nos.) & positioning of gasket properly and tightening the flanges with proper torque with the given bolts & studs for 2 years. | Mounting & dismantling of flange joints:- Mounting refers to aligning of pipe flanges (2 nos.) & positioning of gasket properly and tightening the flanges with proper torque with the given bolts & studs for 2 years. |
| 5 | Assembly & removal of flanged manual / EP valves/ safety relief valves / deluge valves for 2 years. | Assembly & removal of flanged manual / EP valves/ safety relief valves / deluge valves for 2 years. |
| 6 | Sporadic Work Outsourcing Contract: Calibration of H2/O2, flame detectors and ensuring its fitness, service, dismantling/mounting and changing for 2 years. | Sporadic Work Outsourcing Contract: Calibration of H2/O2, flame detectors and ensuring its fitness, service, dismantling/mounting and changing for 2 years. |
| 7 | Sporadic Work Outsourcing Contract: Fabrication of safety barricades & sign boards (size: 75x75mm, 75x300mm, 400x600mm) for 2 years. | Sporadic Work Outsourcing Contract: Fabrication of safety barricades & sign boards (size: 75x75mm, 75x300mm, 400x600mm) for 2 years. |
| 8 | Installation of safety equipments - Mounting /dismounting safety shower, Anemometer, Road mirror, Wind socks, Siren. Installation/positioning of safety barricade during hazardous operations for 2 years. | Installation of safety equipments - Mounting /dismounting safety shower, Anemometer, Road mirror, Wind socks, Siren. Installation/positioning of safety barricade during hazardous operations for 2 years. |
| 9 | Taking measurement of piping, Equipment, components at site for Fire Protection Systems. Including support activities for general equipment maintenance works for 2 years. | Taking measurement of piping, Equipment, components at site for Fire Protection Systems. Including support activities for general equipment maintenance works for 2 years. |
| 10 | Sporadic Work Outsourcing Contract: Charging of GN2 cylinders with GN2 during test operations at cryo test stand for 2 years. | Sporadic Work Outsourcing Contract: Charging of GN2 cylinders with GN2 during test operations at cryo test stand for 2 years. |
| 11 | Setting of pressure regulator involving opening of discharge valves of high pressure GN2 cylinders and associated manual valves and setting the regulator to the required pressure value 2 years. | Setting of pressure regulator involving opening of discharge valves of high pressure GN2 cylinders and associated manual valves and setting the regulator to the required pressure value 2 years. |
| 12 | Shifting of structural materials like angles, channels, I-beams, pipes, fittings, etc., for 2 years | Shifting of structural materials like angles, channels, I-beams, pipes, fittings, etc., for 2 years |
| 13 | Collecting inputs on safety Inspection, surveillance, support in worksite/test activities for cryo and earth storable test facilities & storage areas for 2 years. | Collecting inputs on safety Inspection, surveillance, support in worksite/test activities for cryo and earth storable test facilities & storage areas for 2 years. |
| 14 | Mounting and removal of pumps and motors of remote control water monitor and other general pumps & motors for 2 years. | Mounting and removal of pumps and motors of remote control water monitor and other general pumps & motors for 2 years. |
| 15 | Sporadic Work Outsourcing Contract: Mounting and removal of RO pumps and motors: Trouble shooting and servicing for 2 years. | Sporadic Work Outsourcing Contract: Mounting and removal of RO pumps and motors: Trouble shooting and servicing for 2 years. |
| 16 | Maintenance of RO plant: Cleaning, checking, refitting, topping-up, filling anti scalant, handling chemicals as per approved procedures etc., for 2 years. | Maintenance of RO plant: Cleaning, checking, refitting, topping-up, filling anti scalant, handling chemicals as per approved procedures etc., for 2 years. |
| 17 | Scrubber Charging at PTS, RCS, LUS-TF, STTF: Dismantling, cleaning process, solution preparation etc., for 2 years. | Scrubber Charging at PTS, RCS, LUS-TF, STTF: Dismantling, cleaning process, solution preparation etc., for 2 years. |
| 18 | Air compressor operation for charging of (SCABA): servicing, assembling and charging for 2 years. | Air compressor operation for charging of (SCABA): servicing, assembling and charging for 2 years. |
| 19 | Air compressor periodic maintenance (preventative maintenance, oil filling, gaskets changing, belt changing etc) 03 months once for 2 years. | Air compressor periodic maintenance (preventative maintenance, oil filling, gaskets changing, belt changing etc) 03 months once for 2 years. |
| 20 | Servicing and maintenance of Outdoor weather monitoring board and Automatic weather station maintenance and ensuring its fitness at various locations (once in 03 months approx) 2 years. | Servicing and maintenance of Outdoor weather monitoring board and Automatic weather station maintenance and ensuring its fitness at various locations (once in 03 months approx) 2 years. |
| 21 | Cleaning and mounting/dismantling of deluge nozzles in nos., Servicing of water strainers (sizes 50 NB to 200 NB) in nos., for 2 years | Cleaning and mounting/dismantling of deluge nozzles in nos., Servicing of water strainers (sizes 50 NB to 200 NB) in nos., for 2 years |
| 22 | Operation of RO Plant in Cubic meter: From operation of Feed Pump to Operation of permeate supply (to DM plant) pump for 2 years | Operation of RO Plant in Cubic meter: From operation of Feed Pump to Operation of permeate supply (to DM plant) pump for 2 years |
| 23 | Drilling of holes in MS/SS components and in structure shall be carried out either by portable hand drilling machine or in drilling machine for 2 years. | Drilling of holes in MS/SS components and in structure shall be carried out either by portable hand drilling machine or in drilling machine for 2 years. |
| 24 | Painting of pipelines, equipment, fixtures and structure etc., for 2 years. | Painting of pipelines, equipment, fixtures and structure etc., for 2 years. |
| 25 | Mounting and dismantling of spring loaded regulator & filter assembly for 2 years. | Mounting and dismantling of spring loaded regulator & filter assembly for 2 years. |
| 26 | Preparation/Editing of Auto Cad drawings, Making fabrication /Isometric drawing, layout drawing and correction of drawing for 2 years. | Preparation/Editing of Auto Cad drawings, Making fabrication /Isometric drawing, layout drawing and correction of drawing for 2 years. |
| 27 | General housekeeping in the form of removing all unwanted materials lying in and around the work place regularly once in a week or more depending upon the need for 2 years. | General housekeeping in the form of removing all unwanted materials lying in and around the work place regularly once in a week or more depending upon the need for 2 years. |
| 28 | Mounting of detectors and other electronic equipments and storing. For the weight given below: a. Weight<=10 kgs, b. Weight >10 kgs <= 25 kgs is only indicative for 2 years. | Mounting of detectors and other electronic equipments and storing. For the weight given below: a. Weight<=10 kgs, b. Weight >10 kgs <= 25 kgs is only indicative for 2 years. |
| 29 | DEO Work : Typing of Technical Checklist (100 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | DEO Work : Typing of Technical Checklist (100 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 30 | Typing of Technical Specifications for (200 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Typing of Technical Specifications for (200 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 31 | Typing of Monthly Report for (10 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Typing of Monthly Report for (10 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 32 | Typing of Leave / Tour Report for (50 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Typing of Leave / Tour Report for (50 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 33 | Typing of indent documentation for (90 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Typing of indent documentation for (90 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 34 | Typing of Letters / Fax messages / Email’s / Logistic request for (200 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Typing of Letters / Fax messages / Email’s / Logistic request for (200 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 35 | Typing of procedure documents and manuals for (250 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Typing of procedure documents and manuals for (250 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 36 | Typing of Minutes of meeting for (100 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Typing of Minutes of meeting for (100 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 37 | Up-keeping Inward / Outward records entries for (310 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Up-keeping Inward / Outward records entries for (310 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 38 | Photocopy of documents and records for (1300 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Photocopy of documents and records for (1300 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 39 | Scanning of documents and records for (540 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Scanning of documents and records for (540 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
| 40 | Filing and organising of records and documents for (310 pages per month, approx) the above is only indicative numbers for the duration of 2 years. | Filing and organising of records and documents for (310 pages per month, approx) the above is only indicative numbers for the duration of 2 years. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 21 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender