Tender For Construction Of Vrb At Km 20.550 On Rapti Main Canal In District Shrawasti.
Tender Value
2.92 Crore
Estimated cost
Bid Submission
27 Jul 2026
0 days left
EMD
5.85 Lakhs
Bank guarantee accepted
Document Fee
5452
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Shravasti → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Vrb At Km 20.550 On Rapti Main Canal In District Shrawasti.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 15-Jul-2026 | BOQ CORRIGENDUM | Financial Bid | 27-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. |
| 2 | Earth work in making Canal diversion in all type of soil with proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. |
| 3 | Earth work in making Ringbund / coffer dam / embankment/dowla / ramp in all type of soil including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work. |
| 4 | Laying P.C.C in 1:2:4 with cement, Hamirpur coarse sand F.M. not less than 2.00 and 20 to 40mm crushed Kabrai stone ballast with mechanical mixing, ramming, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. |
| 5 | Laying C.C 1:2:4 with cement, Hamirpur Coarse sand F.M. not less than 2.00 and 4.75 to 20mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. |
| 6 | Laying R.C.C M25 in super structure of bridge with cement, Hamirpur Coarse sand F.M. not less than 2.00 and 4.75 to 20mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. |
| 7 | Laying R.C.C M25 in super structure of bridge with cement, Hamirpur coarse sand and 4.75 to 12 mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. |
| 8 | Laying R.C.C M30 in super structure of bridge with cement, Hamirpur coarse sand and 4.75 to 12 mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. |
| 9 | Supply and laying graded filter materials including cost of all material, labour, T&P etc. required for proper completion of work.(a) Coarse sand, FM not less than 2.00 |
| 10 | Supply and laying graded filter materials including cost of all material, labour, T&P etc. required for proper completion of work.(b) Pea gravel 6mm to 10mm size |
| 11 | Supply and laying graded filter materials including cost of all material, labour, T&P etc. required for proper completion of work.(c) Natural shingle, 20mm to 40mm size |
| 12 | Centering & Shuttering for C.C work & enclosed filter with cost of Shuttering including all cost of material, labour, T&P etc required for completion of work. |
| 13 | Centering & Shuttering for R.C.C work with cost of shuttering including all cost of material, labour T&P etc required for completion of work. |
| 14 | Centering & Shuttering for R.C.C work T-Beam & slab with cost of Shuttering including all cost of material, labour, T&P etc required for completion of work. |
| 15 | Steel Reinforcement (Fe 415 TMT bar) for R.C.C work of SAIL or TATA only including cutting, bending, binding and placing of reinforcement in proper position with cost of binding wire and cost of steel including all cost of material, labour, T&P etc. required for proper completion of work |
| 16 | Supplying & fixing 100 mm dia drainage spout G.I pipe including all cost of material, labour, T&P required for proper completion of work. |
| 17 | Dewatering for excavation of foundation & C.C work with all cost of power, P.O.L, machines, pump, well point system and operator etc with assembling and deassembling of machines etc required for proper completion of work |
| 18 | Supplying & fixing R.C.C 1:1:2 wheel guard stone having average dia. 0.175m, length 90cm fixing with C.C 1:2:4 with cost of excavation, centering & Shuttering, steel reinforcement including all cost of material, labour, T&P etc required for proper completion of work as per direction of Engineer in charge |
| 19 | Making subgrade for lining work including watering, compaction and preparation of surface including all lead & lift, levelling, dressing etc required for proper completion of work as per direction of Engineer-in-charge |
| 20 | Supplying & fixing 20 mm thick joint filler board in construction joint including all cost of material, labour, T&P etc required for proper completion of work |
| 21 | Providing and fixing steel expansion joint having angle 75mmX75mmX10mm and steel plate 100X10mm as per drawing including all cost of material, labour, T&P etc required for proper completion of work |
| 22 | Laying porous concrete in porous window in 1:0:4 with cement and 20 to 40 mm kabrai stone ballast including all cost of material, labour, T&P etc required for proper completion of work. |
| 23 | Dry local sand filling below foundation including all cost of material, labour, T&P etc required for proper completion of work. |
| 24 | Supplying & fixing elastomeric bearing of size 400 mmX250mmX65 mm including all cost of material, labour, T&P etc. required for proper completion of work. |
| 25 | Earth work in removing Ring bund/Coffer dam/embankment in all type of soil including proper disposal, all lead & lift, levelling, dressing, manual compaction etc required for proper completion of work. |
| 26 | Supplying & laying Geotextile sheet 200 GSM woven multifilament polypropylene yarn on slope with pegs including all cost of material, labour, T&P etc required for proper completion of work and making canal bank section. |
| 27 | Earth work in filling canal diversion and making canal bank section in all type of soil including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work |
| 28 | Supplying & laying L.D.P.E film 200 micron thick (1st grade) on subgrade before construction of lining including all cost of material, labour, T&P etc required for proper completion of work |
| 29 | Finishing wall/ceiling with premium Acrylic smooth exterior/ interior paint with silicon additive of required shade two coat applied @ 1.43 litre/10 sqm over and including priming coat applied @ 2.00 kg /10 sqm including preparing the surface even and sand papered smooth and all cost material, labour, T&P etc required for proper completion or work. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 15, 2026
11:30 IST
Tender Published
Tender notice published.
Completed
Jul 27, 2026
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
TodayJul 27, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender