Defence Statutory Bodies & Commissions/Committees Closing in 13 days TDR #56428594

Tender For Repair/Maint Of Ci/Di/Gi/Ppr Pipe Line Distribution System Network And Other Allied Work In Domestic Area, 3 Afru And Rajwai At Air Force Station Jaisalmer

Issued by Statutory Bodies & Commissions/Committees · Jaisalmer, Rajasthan
Tender Value
18 Lakhs
Estimated cost
Bid Submission
31 Jul 2026
13 days left
EMD
36000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jaisalmer → Rajasthan
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Repair/Maint Of Ci/Di/Gi/Ppr Pipe Line Distribution System Network And Other Allied Work In Domestic Area, 3 Afru And Rajwai At Air Force Station Jaisalmer

BOQ

Name of Work:- REPAIR/MAINT OF CI/DI/GI/PPR PIPE LINE DISTRIBUTION SYSTEM NETWORK AND OTHER ALLIED WORK IN DOMESTIC AREA, 3 AFRU AND RAJWAI AT AIR FORCE STATION JAISALMER
Sl. No. Item Description
1Excavation in trenches, not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for pipe line etc. not exceeding 10 sqm area on plan and not exceeding 1.5 metre in depth and getting out in soft / loose soil complete all as specified.
2Returning filling in including spreading, levelling, watering and well ramming in layers not exc 25 cm thick complete all as specified.
3Removing excavated soil to a distance not exc 50 mtr and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified.
4Taking out from trench existing old unservicable rusted / corroded/Vintage CI /DI pipe of size 300 mm bore spigot and socketed ends ( including all fittings) push on tyton joints (rubber gasket) including balling out dirty / muddy water if necessary complete all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works. 2. The rate of balling out dirty / muddy water is included in this item and nothing shall be paid extra on this account.
5Taking out from trench existing old unservicable rusted / corroded/Vintage CI /DI pipe of size 200 mm bore spigot and socketed ends ( including all fittings) rubber gasket Tyton push on Joints including balling out dirty / muddy water if necessary complete all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works. 2. The rate of balling out dirty / muddy water is included in this item and nothing shall be paid extra on this account.
6Taking out from trench existing old unservicable rusted / corroded/Vintage CI /DI pipe of size 150 mm bore spigot and socketed ends ( including all fittings) rubber gasket Tyton push on Joints including balling out dirty / muddy water if necessary complete all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works. 2. The rate of balling out dirty / muddy water is included in this item and nothing shall be paid extra on this account.
7Taking out from trench existing old unservicable rusted / corroded/Vintage CI /DI pipe of size 100 mm bore spigot and socketed ends ( including all fittings) rubber gasket Tyton push on Joints including balling out dirty / muddy water if necessary complete all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works. 2. The rate of balling out dirty / muddy water is included in this item and nothing shall be paid extra on this account.
8Taking out from trench existing old unservicable rusted / corroded/Vintage CI /DI pipe of size 80 mm bore spigot and socketed ends ( including all fittings) rubber gasket Tyton push on Joints including balling out dirty / muddy water if necessary complete all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works. 2. The rate of balling out dirty / muddy water is included in this item and nothing shall be paid extra on this account.
9Supplying, laying, jointing, commissioning & testing in replacement DI pipes with rubber gasket Tyton push on Joints of spigot and socket ends centrifugally cast(spun) class \\" K-7\\" conforming to IS-8329 -2000 in any length of size 300mm bore laid in trenches complete all as specified. Notes :- (1) DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works. (2) The rates of rubber gasket Tyton push on Joints is inclueded in this item and nothing shall be extra paid for Tyton Joints.
10Supplying, laying, jointing, commissioning & testing in replacement DI pipes with rubber gasket Tyton push on Joints of spigot and socket ends centrifugally cast(spun) class \\" K-7\\" conforming to IS-8329 -2000 in any length of size 200mm bore laid in trenches complete all as specified. Notes :- (1) DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works. (2) The rates of rubber gasket Tyton push on Joints is inclueded in this item and nothing shall be extra paid for Tyton Joints.
11Supplying, laying, jointing, commissioning & testing in replacement DI pipes with rubber gasket Tyton push on Joints of spigot and socket ends centrifugally cast(spun) class \\" K-7\\" conforming to IS-8329 -2000 in any length of size 150mm bore laid in trenches complete all as specified. Notes :-Notes :- (1) DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works. (2) The rates of rubber gasket Tyton push on Joints is inclueded in this item and nothing shall be extra paid for Tyton Joints.
12Supplying, laying, jointing, commissioning & testing in replacement DI pipes with rubber gasket Tyton push on Joints of spigot and socket ends centrifugally cast(spun) class \\" K-7\\" conforming to IS-8329 -2000 in any length of size 100mm bore laid in trenches complete all as specified. Notes :- (1) DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works. (2) The rates of rubber gasket Tyton push on Joints is inclueded in this item and nothing shall be extra paid for Tyton Joints.
13Supplying, laying, jointing, commissioning & testing in replacement DI pipes with rubber gasket Tyton push on Joints of spigot and socket ends centrifugally cast(spun) class \\" K-7\\" conforming to IS-8329 -2000 in any length of size 80mm bore laid in trenches complete all as specified. Notes :- (1) DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works. (2) The rates of rubber gasket Tyton push on Joints is inclueded in this item and nothing shall be extra paid for Tyton Joints.
14Laying, jointing, commissioning & testing only in trenches old servicable CI/DI pipe retrieved from Srl item No 4.00 of BoQ here-in-before size of 300 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 Rubber gasket tyton push on joint for this item shall be measured and paid seperately under respective item of schedule of works. 3. CI/DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works.
15Laying, jointing, commissioning & testing only in trenches old servicable CI/DI pipe retrieved from Srl item No 5.00 of BoQ here-in-before size of 200 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 Rubber gasket tyton push on joint for this item shall be measured and paid seperately under respective item of schedule of works. 3. CI/DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works.
16Laying, jointing, commissioning & testing only in trenches old servicable CI/DI pipe retrieved from Srl item No 6.00 of BoQ here-in-before size of 150 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 Rubber gasket tyton push on joint for this item shall be measured and paid seperately under respective item of schedule of works. 3. CI/DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works.
17Laying, jointing, commissioning & testing only in trenches old servicable CI/DI pipe retrieved from Srl item No 7.00 of BoQ here-in-before size of 100 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 Rubber gasket tyton push on joint for this item shall be measured and paid seperately under respective item of schedule of works. 3. CI/DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works.
18Laying, jointing, commissioning & testing only in trenches old servicable CI/DI pipe retrieved from Srl item No 8.00 of BoQ here-in-before size of 80 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 Rubber gasket tyton push on joint for this item shall be measured and paid seperately under respective item of schedule of works. 3. CI/DI fittings and earth work shall be measured & paid for separately under respective items of schedule of works.
19Material and labour Rubber gasket push on joint for size of 300 mm bore DI Pipe including rubber ring gasket complete all as specified and as directed by Engineer-in-charge.
20Material and labour Rubber gasket tyton push on joint for size of 200 mm bore DI Pipe including rubber ring gasket complete all as specified and as directed by Engineer-in-charge.
21Material and labour Rubber gasket tyton push on joint for size of 150 mm bore DI Pipe including rubber ring gasket complete all as specified and as directed by Engineer-in-charge.
22Material and labour Rubber gasket tyton push on joint for size of 100 mm bore DI Pipe including rubber ring gasket complete all as specified and as directed by Engineer-in-charge.
23Material and labour Rubber gasket tyton push on joint for size of 80 mm bore DI Pipe including rubber ring gasket complete all as specified and as directed by Engineer-in-charge.
24Supply and fixing CI/DI Special fittings in replacement upto 150mm dia (any type, radius and angle) like collar, bends, tee, tail piece caps and pugs, single branch ‘Y’ junction, double branch, cross, spigot & socket or taper and flanged, straight bend, increasing decreasing or double socket, reducer etc. all as per requires at site complete all as specified and as directed by Engineer-in-charge. Note :-The weight of the fittings for the purpose of payment shall be actual weight of the fittings or as specified in IS code whichever is less. if the actual weight to be considered for payment purpose , the Board of officer shall be ordered by the GE to ascertain the weight of fittings and counter signed by GE and the copy of the same shall be enclosed with final Bill.
25Supply and fixing CI/DI Special fittings in replacement 200mm dia and upto 300mm dia (any type, radius and angle) like collar, bends, tee, tail piece caps and pugs, single branch ‘Y’ junction, double branch, cross, spigot & socket or taper and flanged, straight bend, increasing decreasing or double socket, reducer etc. all as per requires at site complete all as specified and as directed by Engineer-in-charge. Note :-The weight of the fittings for the purpose of payment shall be actual weight of the fittings or as specified in IS code whichever is less. if the actual weight to be considered for payment purpose , the Board of officer shall be ordered by the GE to ascertain the weight of fittings and counter signed by GE and the copy of the same shall be enclosed with final Bill.
26Taking out from trenchs / from under roads existing old unservicable rusted / corroded GI pipe and connections of size 100 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
27Taking out from trenchs / from under roads existing old unservicable rusted / corroded GI pipe and connections of size 80 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
28Taking out from trenchs / from under roads existing old unservicable rusted / corroded GI pipe and connections of size 50 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
29Taking out from trenchs / from under roads existing old unservicable rusted / corroded GI pipe and connections of size 40 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
30Taking out from trenchs / from under roads existing old unservicable rusted / corroded GI pipe and connections of size 25 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
31Taking down from walls / ceilings/ laid in floors existing old unservicable rusted / corroded GI pipe and connections of size 25 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
32Taking out from trenchs / from under roads existing old unservicable rusted / corroded GI pipe and connections of size 20 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
33Taking down from walls / ceilings / laid in floors existing old unservicable rusted / corroded GI pipe and connections of size 20 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
34Taking out from trenchs / from under roads existing old unservicable rusted / corroded GI pipe and connections of size 15 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
35Taking down from walls / ceilings / laid in floors existing old unservicable rusted / corroded GI pipe and connections of size 15 mm bore including all fittings all as specified and as directed by Engineer-in-charge.Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
36Supplying, Laying, jointing and testing in replacement of Steel water tubing 100 mm bore ISI marked medium grade galvanised including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint laid in trenches/under road complete all as specified.Note :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account. (ii) Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
37Supplying, Laying, jointing and testing in replacement of Steel water tubing 80 mm bore ISI marked medium grade galvanised including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint laid in trenches/under road complete all as specified.Note :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account. (ii) Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
38Supplying, Laying, jointing and testing in replacement of Steel water tubing 50 mm bore ISI marked medium grade galvanised including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint laid in trenches/under road complete all as specified.Note :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account. (ii) Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
39Supplying, Laying, jointing and testing in replacement of Steel water tubing 40 mm bore ISI marked medium grade galvanised including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint laid in trenches/under road complete all as specified.Note :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account. (ii) Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
40Supplying, Laying, jointing and testing in replacement of Steel water tubing 25 mm bore ISI marked medium grade galvanised including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint laid in trenches/under road complete all as specified.Note :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account. (ii) Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
41Supplying, Laying, jointing and testing in replacement of Steel water tubing 25 mm bore medium grade, galvanised, ISI Marked including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint fixed to walls, ceiling or under floors etc complete all as specifiedNote :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account.
42Supplying, Laying, jointing and testing in replacement of Steel water tubing 20 mm bore ISI marked medium grade galvanised including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint laid in trenches/under road complete all as specified.Note :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account. (ii) Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
43Supplying, Laying, jointing and testing in replacement of Steel water tubing 20 mm bore medium grade, galvanised, ISI Marked including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint fixed to walls, ceiling or under floors etc complete all as specifiedNote :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account.
44Supplying, Laying, jointing and testing in replacement of Steel water tubing 15 mm bore ISI marked medium grade galvanised including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint laid in trenches/under road complete all as specified.Note :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account. (ii) Excavation and earth work shall be measured & paid separately under respective items of schedule of works.
45Supplying, Laying, jointing and testing in replacement of Steel water tubing 15 mm bore medium grade, galvanised, ISI Marked including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint fixed to walls, ceiling or under floors etc complete all as specifiedNote :- (i) The rate of GI fittings is included in this item and nothing shall be paid extra on this account.
46Laying, jointing, commissioning & testing only in trenches old servicable GI pipe retrieved from Srl item No 26 of BoQ here-in-before size of 100 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.3. old pipe fitting should not be used in this item.
47Laying, jointing, commissioning & testing only in trenches old servicable GI pipe retrieved from Srl item No 27.00 of BoQ here-in-before size of 80 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.3. old pipe fitting should not be used in this item.
48Laying, jointing, commissioning & testing only in trenches old servicable GI pipe retrieved from Srl item No 28.00 of BoQ here-in-before size of 50 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.3. old pipe fitting should not be used in this item.
49Laying, jointing, commissioning & testing only in trenches old servicable GI pipe retrieved from Srl item No 29.00 of BoQ here-in-before size of 40 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.3. old pipe fitting should not be used in this item.
50Laying, jointing, commissioning & testing only in trenches old servicable GI pipe retrieved from Srl item No 30 .00 of BoQ here-in-before size of 25 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.4. old pipe fitting should not be used in this item.
51Fixing , jointing, commissioning & testing only to walls, ceilings or in walls old servicable GI pipe retrieved from Srl item No 31.00 of BoQ here-in-before size of 25 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.4. old pipe fitting should not be used in this item.
52Laying, jointing, commissioning & testing only in trenches old servicable GI pipe retrieved from Srl item No 32.00 of BoQ here-in-before size of 20 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.3. old pipe fitting should not be used in this item.
53Fixing , jointing, commissioning & testing only to walls, ceilings or in walls old servicable GI pipe retrieved from Srl item No 33.00 of BoQ here-in-before size of 20 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.3. old pipe fitting should not be used in this item.
54Laying, jointing, commissioning & testing only in trenches old servicable GI pipe retrieved from Srl item No 34.00 of BoQ here-in-before size of 15 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.3. old pipe fitting should not be used in this item.
55Fixing , jointing, commissioning & testing only to walls, ceilings or in walls old servicable GI pipe retrieved from Srl item No 35.00 of BoQ here-in-before size of 15 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and as directed by Engineer-in-Charge. Note : - 1.The rate of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing shall be extra paid on this account. 2 The rate of new tube fittings is included in this item and nothing shall be paid extra on this account. 3. Earth work shall be measured & paid for separately under respective items of schedule of works.3. old pipe fitting should not be used in this item.
56Supply and Fixing in replacement Gun metal globe or gate valve size of 50 mm bore pipe , with iron wheel head, screwed both ends for iron pipe conform to IS 778 - 1984 complete all as specified
57Supply and Fixing in replacement Gun metal globe or gate valve size of 40 mm bore pipe , with iron wheel head, screwed both ends for iron pipe conform to IS 778 - 1984 complete all as specified
58Supply and Fixing in replacement Gun metal globe or gate valve size of 25 mm bore pipe , with iron wheel head, screwed both ends for iron pipe conform to IS 778 - 1984 complete all as specified
59Supply and Fixing in replacement Gun metal globe or gate valve size of 20 mm bore pipe , with iron wheel head, screwed both ends for iron pipe conform to IS 778 - 1984 complete all as specified
60Supply and Fixing in replacement Gun metal globe or gate valve size of 15 mm bore pipe , with iron wheel head, screwed both ends for iron pipe conform to IS 778 - 1984 complete all as specified
61Supply and Fixing in replacement cast iron body sluice valve heavy duty class PN 1.6 300 mm bore ISI marked with confirming to IS 14846-2000 both flanged ends and drilled high tensile stainless steel spindle ,cast iron gate with brass ring ,non rising type cast iron wheel handle cast iron cap complete with mm thick neoprene rubber gasket joint and nuts bolts (high tensile) washers etc and testing including dismantling & taking out old unserviceable sluice valve of 300 mm bore complete all as specified and directed.
62Supply and Fixing in replacement cast iron body sluice valve heavy duty class PN 1.6 200 mm bore ISI marked with confirming to IS 14846-2000 both flanged ends and drilled high tensile stainless steel spindle ,cast iron gate with brass ring ,non rising type cast iron wheel handle cast iron cap complete with mm thick neoprene rubber gasket joint and nuts bolts (high tensile) washers etc and testing including dismantling & taking out old unserviceable sluice valve of 200 mm bore complete all as specified and directed.
63Supply and Fixing in replacement cast iron body sluice valve heavy duty class PN 1.6 150 mm bore ISI marked with confirming to IS 14846-2000 both flanged ends and drilled high tensile stainless steel spindle ,cast iron gate with brass ring ,non rising type cast iron wheel handle cast iron cap complete with mm thick neoprene rubber gasket joint and nuts bolts (high tensile) washers etc and testing including dismantling & taking out old unserviceable sluice valve of 150 mm bore complete all as specified and directed.
64Supply and Fixing in replacement cast iron body sluice valve heavy duty class PN 1.6 100 mm bore ISI marked with confirming to IS 14846-2000 both flanged ends and drilled high tensile stainless steel spindle ,cast iron gate with brass ring ,non rising type cast iron wheel handle cast iron cap complete with mm thick neoprene rubber gasket joint and nuts bolts (high tensile) washers etc and testing including dismantling & taking out old unserviceable sluice valve of 100 mm bore complete all as specified and directed.
65Supply and Fixing in replacement cast iron body sluice valve heavy duty class PN 1.6 80 mm bore ISI marked with confirming to IS 14846-2000 both flanged ends and drilled high tensile stainless steel spindle ,cast iron gate with brass ring ,non rising type cast iron wheel handle cast iron cap complete with mm thick neoprene rubber gasket joint and nuts bolts (high tensile) washers etc and testing including dismantling & taking out old unserviceable sluice valve of 80 mm bore complete all as specified and directed.
66Demolition of old valve pit and Material and Labour Construction of valve pit Type 'B' of size 120 cm x 120 cm x 120 cm ( internal dimension ) of brick masonry /Stone masonary laid with cement mortar (1:4). from the top of surface including cover of MS sheet 3.15 mm thick and angle iron 50mm x 50mm x 6mm with hinges, handle and locking arrangement including painting with two coat of synthetic enamelled paint over a coat of red oxide and grouting to PCC 1:2:4 type B-1, using 20mm graded crushed stone aggregates , Rendering 15mm thick in cement mortar 1:3, including three coats of white wash on internal surfaces and external exposed surfaces , foundation concrete 1:3:6 type C-2 using 40mm graded crushed stone aggregates including necessary earthwork , returning filling , removal complete all as specified.
67Material and labour for repair,rectifying and arresting the water leakage in already laid CI / DI pipe line of dia 300 mm dia including necessary excavation and earth work , bailing out stagnated /muddy water and providing CI / DI joint etc complete to stop the leakage all as specified and directed by Engr-in-Charge.Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage can not be handed over to contractor ,Site of leakage only handed over the contractor on site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. on his own arrangement for rectifying the complaint as per site requirement and no extra payment will be paid on this account. (ii) The rate of Excavation & earth work & D-Joint or MS Clamp is included in this item nothing shall be paid extra on this account. (iii), CI / DI fittings, Rubber Gasket tyton Push on joints shall be measured & paid separately under respective items of schedule of works.
68Material and labour for repair,rectifying and arresting the water leakage in already laid CI / DI pipe line of dia 200 mm dia including necessary excavation and earth work , bailing out stagnated /muddy water and providing CI / DI joint etc complete to stop the leakage all as specified and directed by Engr-in-Charge.Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage can not be handed over to contractor ,Site of leakage only handed over the contractor on site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. on his own arrangement for rectifying the complaint as per site requirement and no extra payment will be paid on this account. (ii) The rate of Excavation & earth work & D-Joint or MS Clamp is included in this item nothing shall be paid extra on this account. (iii), CI / DI fittings, Rubber Gasket tyton Push on joints shall be measured & paid separately under respective items of schedule of works.
69Material and labour for repair,rectifying and arresting the water leakage in already laid CI / DI pipe line of dia 150 mm dia including necessary excavation and earth work , bailing out stagnated /muddy water and providing CI / DI joint etc complete to stop the leakage all as specified and directed by Engr-in-Charge.Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage can not be handed over to contractor ,Site of leakage only handed over the contractor on site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. on his own arrangement for rectifying the complaint as per site requirement and no extra payment will be paid on this account. (ii) The rate of Excavation & earth work & D-Joint or MS Clamp is included in this item nothing shall be paid extra on this account. (iii) CI / DI fittings, Rubber Gasket tyton Push on joints shall be measured & paid separately under respective items of schedule of works.
70Material and labour for repair,rectifying and arresting the water leakage in already laid CI / DI pipe line of dia 100 mm dia including necessary excavation and earth work , bailing out stagnated /muddy water and providing CI / DI joint etc complete to stop the leakage all as specified and directed by Engr-in-Charge.Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage can not be handed over to contractor ,Site of leakage only handed over the contractor on site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. on his own arrangement for rectifying the complaint as per site requirement and no extra payment will be paid on this account. (ii) The rate of Excavation & earth work & D-Joint or MS Clamp is included in this item nothing shall be paid extra on this account. (iii) CI / DI fittings, Rubber Gasket tyton Push on joints shall be measured & paid separately under respective items of schedule of works.
71Material and labour for repair,rectifying and arresting the water leakage in already laid CI / DI pipe line of dia 80 mm dia including necessary excavation and earth work , bailing out stagnated /muddy water and providing CI / DI joint etc complete to stop the leakage all as specified and directed by Engr-in-Charge.Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage can not be handed over to contractor ,Site of leakage only handed over the contractor on site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. on his own arrangement for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(ii) The rate of Excavation & earth work & D-Joint or MS Clamp is included in this item nothing shall be paid extra on this account. (iii) CI / DI fittings, Rubber Gasket tyton Push on joints shall be measured & paid separately under respective items of schedule of works.
72Material and labour for repair / replacement for leakage of GI pipe line 80 mm dia including bailing out of stagnated / muddy water till restore the water supply with replacement of necessary new fittings such as elbows ,nipples union,reducers etc, GI pipe medium grade upto 1.00 mtr long as per site requirement if required, including earth work such as excavation , returning and removal etc. and all as specified and directed by Eng-in-Charge. Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi)The rate of excavation & earth work and new fittings such as elbows ,nipples union,reducers etc, and GI pipe medium grade upto 1.00 mtr long of required size is included in this item and nothing shall be paid extra on this account.
73Material and labour for repair / replacement for leakage of GI pipe line 40mm / 50 mm dia including bailing out of stagnated / muddy water till restore the water supply with replacement of necessary new fittings such as elbows ,nipples union,reducers etc, GI pipe medium grade upto 1.00 mtr long as per site requirement if required, including earth work such as excavation , returning and removal etc. and all as specified and directed by Eng-in-Charge. .Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi)The rate of excavation & earth work and new fittings such as elbows ,nipples union,reducers etc, and GI pipe medium grade upto 1.00 mtr long of required size is included in this item and nothing shall be paid extra on this account.
74Material and labour for repair / replacement for leakage of GI pipe line 25mm dia including bailing out of stagnated / muddy water till restore the water supply with replacement of necessary new fittings such as elbows ,nipples union,reducers etc, GI pipe medium grade upto 1.00 mtr long as per site requirement if required, including earth work such as excavation , returning and removal etc. and all as specified and directed by Eng-in-Charge. Note:- The rate of excavation & earth work and new fittings such as elbows ,nipples union,reducers etc, and GI pipe medium grade upto 1.00 mtr long of required size is included in this item and nothing shall be paid extra on this account.Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi)The rate of excavation & earth work and new fittings such as elbows ,nipples union,reducers etc, and GI pipe medium grade upto 1.00 mtr long of required size is included in this item and nothing shall be paid extra on this account.
75Material and labour for repair / replacement for leakage of GI pipe line 15mm/20mm dia including bailing out of stagnated / muddy water till restore the water supply with replacement of necessary new fittings such as elbows ,nipples union,reducers etc, GI pipe medium grade upto 1.00 mtr long as per site requirement if required, including earth work such as excavation , returning and removal etc. and all as specified and directed by Eng-in-Charge. Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi)The rate of excavation & earth work and new fittings such as elbows ,nipples union,reducers etc, and GI pipe medium grade upto 1.00 mtr long of required size is included in this item and nothing shall be paid extra on this account.D78:D79
76Material and labour for repair and arresting water leakage from the exising PPR pipe line of 75mm/90mm bore including supply and fixing new PPR fittings of require size along with necessary Joint including necessay excavation earth work and bailing out stagnated /muddy water etc all as specified and directed by Engineer-in-charge. Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi) The rate of Excavation & earth work is included in this item nothing shall be paid extra on this account. (vii)The rate of PPR fittings along with necessary Joint of required size is included in this item and nothing shall be paid extra on this account.
77Material and labour for repair and arresting water leakage from the exising PPR pipe line of 50mm/63mm bore including supply and fixing new PPR fittings of require size along with necessary Joint including necessay excavation earth work and bailing out stagnated /muddy water etc all as specified and directed by Engineer-in-charge. Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi) The rate of Excavation & earth work is included in this item nothing shall be paid extra on this account. (vii)The rate of PPR fittings along with necessary Joint of required size is included in this item and nothing shall be paid extra on this account.
78Material and labour for repair and arresting water leakage from the exising PPR pipe line of 32mm/40mm bore including supply and fixing new PPR fittings of require size along with necessary Joint including necessay excavation earth work and bailing out stagnated /muddy water etc all as specified and directed by Engineer-in-charge. Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi) The rate of Excavation & earth work is included in this item nothing shall be paid extra on this account. (vii)The rate of PPR fittings along with necessary Joint of required size is included in this item and nothing shall be paid extra on this account.
79Material and labour for repair and arresting water leakage from the exising PPR pipe line of 25mm bore including supply and fixing new PPR fittings of require size along with necessary Joint including necessay excavation earth work and bailing out stagnated /muddy water etc all as specified and directed by Engineer-in-charge. Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi) The rate of Excavation & earth work is included in this item nothing shall be paid extra on this account. (vii)The rate of PPR fittings along with necessary Joint of required size is included in this item and nothing shall be paid extra on this account.
80Material and labour for repair and arresting water leakage from the exising PPR pipe line of 15mm/20mm bore including supply and fixing new PPR fittings of require size along with necessary Joint including necessay excavation earth work and bailing out stagnated /muddy water etc all as specified and directed by Engineer-in-charge. Note :-(i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor etc. to attend the leakage /complaint on daily basis as per complaint trace out . (ii) Complete site for attend the leakage shall not be handed over to contractor ,Site of leakage only be handed over to the contractor as per site requirement basis. (iii) Contractor/Supervisor will collect complaint of leakage from concern JE as daily basis and will complete same day. (iv) If leakage again found during the currency period of contract at same location contractor will repair it again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. at his own arrangement and cost for rectifying the complaint as per site requirement and no extra payment will be paid on this account.(vi) The rate of Excavation & earth work is included in this item nothing shall be paid extra on this account. (vii)The rate of PPR fittings along with necessary Joint of required size is included in this item and nothing shall be paid extra on this account. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56428594
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 18 Lakhs
LAST DATE 31-07-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Repair/Maint Of Ci/Di/Gi/Ppr Pipe Line Distribution System Network And Other Allied Work In Domestic Area, 3 Afru And Rajwai At Air Force Station Jaisalmer
Basic Detail
Tender No 8448/GE/E8
Bidding Type Tender
Location
City Jaisalmer
State Rajasthan
Key Dates
Publish Date 11 Jul 2026
Submission Date 31 Jul 2026
Open Date 03 Aug 2026
Finance
Tender Value 18 Lakhs
Tender Fee 500
EMD 36000
Exemption Available
Document List
29634d6a-932b-4fbd-aa25-e142cfa85a40.html
8448Tenderdouc.pdf
BOQ_871454.xls
Tendernotice_1 (6).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 11, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 13 days
Aug 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
html

29634d6a-932b-4fbd-aa25-e142cfa85a40.html

pdf

8448Tenderdouc.pdf

xls

BOQ_871454.xls

pdf

Tendernotice_1 (6).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders