Tender For Laying Of 33 Kv New Line From 220 Kva Housing Development To 33/11 Kv Substation Arjunganj, With A View To Maintain Uninterrupted Power Supply To The Substation Powered From A Single Source, At 33/11 Substation Arjunganj In The Area Under
Tender Overview
Project Description
Tender for Laying Of 33 Kv New Line From 220 Kva Housing Development To 33/11 Kv Substation Arjunganj, With A View To Maintain Uninterrupted Power Supply To The Substation Powered From A Single Source, At 33/11 Substation Arjunganj In The Area Under Executive Engineer 33 Kv, Central Zone, Lucknow. Under Business Plan 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Safe carriage, loading-unloading with proper stacking of following material from ESC-Daliganj to JE -Dump Store – |
| 2 | 33 KV 3X300 SQ MM XLPE CABLE |
| 3 | 33 KV ST/TH C/J KIT 3X300SQ MM |
| 4 | 33 KV END TERMINATION O/DOOR & I/DOOR 3X300 SQ MM |
| 5 | 11 MTR ST POLE |
| 6 | 33 KV POLYMER PIN INSULATOR |
| 7 | TOP CHANNEL 125X65X3200 MM |
| 8 | DROPPER CHANNEL 100X50X2600 MM |
| 9 | Safe carriage loading unloading with proper stacking of following material from JE dump store to work site. |
| 10 | 33 KV 3X300 SQ MM XLPE CABLE |
| 11 | 33 KV ST/TH C/J KIT 3X300SQ MM |
| 12 | 33 KV END TERMINATION O/DOOR & I/DOOR 3X300 SQ MM |
| 13 | 11 MTR ST POLE |
| 14 | 33 KV POLYMER PIN INSULATOR |
| 15 | TOP CHANNEL 125X65X3200 MM |
| 16 | DROPPER CHANNEL 100X50X2600 MM |
| 17 | S/C Cable laying by drill mothod with HDPE Pipe |
| 18 | Hoisting of 33 KV 3x300 Sqmm XLPE cable |
| 19 | High Pressure testing of 33/11 KV 3x300 sqmm. XLPE cable. |
| 20 | Fabrication & erection of 33 KV cable exposure type double pole with the provision of separate bus bar for each cable with fixing of necessary clamps and other accessories (all meterial arranged by contractor except steel pole). |
| 21 | Grouting of ST Pole |
| 22 | Concriting of Pole |
| 23 | Painting of Pole |
| 24 | Fixing of earth rod and 6 swg gi wire earthing. (All Materials provided by contractor.) |
| 25 | Cable Rout Marker |
| 26 | Scanning/Tracing of existing underneath power cables, water pipe line, gas pipe line, sewer pipe line on proposed route.(Tracing Equipment shall be arrange by the contractor) |
| 27 | All taxess as applicable shall be paid time to time extra Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender