Tender For Construction Of 35.25 Mld Capacity Sewage Treatment Plant At Arasu Colony With Operation And Maintanence For The Period Of 10 Years At Karur Corporation Package Iii
Tender Value
94.89 Crore
Estimated cost
Bid Submission
24 Aug 2026
43 days left
EMD
94.89 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Karur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of 35.25 Mld Capacity Sewage Treatment Plant At Arasu Colony With Operation And Maintanence For The Period Of 10 Years At Karur Corporation Package Iii
BOQ
| Sl. No. | Item Description |
| 1 | Schedule - 1 - Existing STP improvements |
| 2 | Improvements in existing STP for treating present flow with all necessary improvements required to treat the flow and operation & matainance upto put into use of New proposed STP. Maturation pond and sludge drying bed to be dismantled and levelled to make space for new STP, After construction of new stp, the part of existing STP to be dismantled and levelled to make space for Solar Sludge Drying beds ete., complete |
| 3 | Schedule - 2 - Construction of New STP |
| 4 | Design, construct & commissioning of 35.25 MLD STPs with appropriate hydraulic design & piping for proposed treated water pipeline with all connected pipes / specials, valves, and complete with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity etc, complete. |
| 5 | Construction of Inlet chamber including RCC walkway with S.S. hand railings, necessary S.S. penstock shutter arrangements at the Inlet and outlets (i.e. inlets to Manual screen chamber) civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units and all connected works etc. complete. |
| 6 | Manual Fine Screen Chambers with R.C.C Screen channels including manual medium screen with S.S, Conveyor belt arrangements, RCC walkway slab with S.S. hand rails, S.S. rag disposal trays, necessary S.S. penstock shutter arrangements at the outlets and civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all connected works etc. complete |
| 7 | Mechanical Fine Screen Chambers with R.C.C Screen channel including mechanical fine screen with S.S, Conveyor belt arrangements, RCC walkway slab with S.S. hand rails, S.S. rag disposal trays and cleaning devices all complete as per specification with inlet channel from Manual screen chamber and outlet channels to detritus tank, S.S shutter gates at outlet of screen chamber including all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc. complete |
| 8 | Design, Construct and commissioning of Vortex Grit Chamber and Classifier including necessary inlet and Outlet Channels, S.S. penstock gates both at Inlet , RCC Walkways with S.S. hand rails, RCC staircase with SS hand rails, adjustable type SS velocity control wedges including all mechanical grit cleaning reciprocating/screw type SS classifiers, scrapper arm driving unit, organic return pumps and removal arrangement, with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete as per specification. |
| 9 | Construction of Outlet Channels from Vortex Grit Mechanism detritus tank , parshall flumes, flow measurement device, inlet channel to distribution chambers of SBR basin, RCC Walkways with S.S. hand rails, RCC staircase with SS hand rails, with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete. |
| 10 | Construction of Distribution chambers for SBR Basins, feed pipes / channels between the distribution chambers, feed pipes / channels to SBR basins, SS penstock gates including guide channel, spindle, shaft and all accessories etc. complete, RCC Walkways with S.S.hand rails, with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete. |
| 11 | Design, construct and commissioning of sequential batch reactor compartments with fine bubble EPDM tubular membrane diffusers, MSEP air supply pipes from Blowers to basin header, SS air supply dropper submerged in tank, Subsurface mixer for anoxic compartment, SS supported UPVC air supply pipe and grid submerged in the basin, submersible RAS and SAS pumps, basin decanter mechanism, lifting arrangements for pumps including all S.S. penstock gates, RCC staircase with SS hand rails, RCC walkway with SS hand rails, inlet and basin decanter mechanism with outlet channels in the reactor tank, drain arrangements, channels / pipes to Sludge sump and Construction of Dividing chamber for the reactor tanks, SS penstock gates including guide channel, spindle, shaft and all accessories etc. complete, RCC Walkways with S.S.hand rails, with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete as per specification |
| 12 | Design, construct, commissioning of Air blower room including supply, erect and commissioning of High speed turbo air blowers suitable to deliver dry oil free air for the cyclic Activated sludge process Unit (SBR), all wet ventilation system, VFD control system, lifting arrangements, acoustic control with required air flow pipes, air flow meter, pressure gauges, valves, Air Blowers with accessories, electro mechanical & instrumentation accessories etc., complete as per specification |
| 13 | Providing Bypass arrangements with all RCC Chambers, Pipelines, specials, valves, thrust blocks, valve chambers including all connected Civil & mechanical etc. complete. as per specifications and as directed at site. |
| 14 | Design, construct, commissioning of Sludge sump and pump house to handle SAS/RAS from SBR basins with suitable submersible pumping machinery, air blowers/agitators/ Mixers, EOT lifting arrangements, sludge feed pumps, delivery pipe lines, specials, valves, pumping main to screw press building including all specials with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete.as per specification |
| 15 | Construction of Annex building to the Primary sludge sump to house the Control panels for the Primary sludge pumps, operator cabin/room, toilet/restroom facilities with all connected civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all etc, complete. |
| 16 | Design, construct, commissioning of Screw press building, Sludge balancing tank, Polyelectrolyte solution tanks including providing of the required screw press , sludge feed pumps, sludge balancing tank agitators arrangements, dosing systems, solution tanks agitators, pumps, interconnecting pipes, fittings, valves safety equipment, RCC staircase, walkway with SS hand railing, Centrate pipeline to Supernatant sump including all civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all, etc complete |
| 17 | Construction of Supernatant/ centrate collection well (for pumping supernatant from screw press dewatering machine), including operator cabin/room, toilet/restroom facilities, piping and feeder pipes, suitable submersible pumping machinery and their mechanical standby units all, etc complete Or to be delivered to the PTU by gravity |
| 18 | Design, construct, commissioning of DG room including supply, Diesel generators – 1 No for full working load, with all connected Mechanical, Electrical and Instrumentation works, construction of exhaust gas stack as per PCB norms, and with complete wet ventilation system and all earthing, control system, auxiliary system, diesel storage facilities, total electronic monitoring system for gas engines, safety device including all civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all, etc complete. |
| 19 | Construction of outdoor Type Sub-station Building / Control room / Transformer room for the STP, 11 kV Substation. HT Panel and Allied Works , supply of outdoor transformers, switch gears (HT/LT) and accessories, control panel necessary cable ducts, Power capacitor, HT panel, lighting fixtures, cabling for the entire plant, earthing, safety equipments including all civil, mechanical, electrical & instrumentation works for monitoring, control and data acquisition on quality and quantity and their mechanical standby units all, etc complete. |
| 20 | Design and construction Administrative Building including conference room/ class room with projector arrangements for students, supply of Furniture for office, OH projectors with screen, SCADA control room & fully equipped laboratory room with lab equipment’s & chemicals to test all inlet and outlet parameters, process monitoring parameters etc.,and toiltes facilities complete including providing split AC system as per specification |
| 21 | Supply of equipments/instruments for laboratory including all the equipment’s, instruments & chemicals required to test all inlet and outlet quality parameters, process monitoring parameters, glassware, necessary software & hard ware for analysis, data storage & report generation as per specification |
| 22 | Design & construction of internal RCC road for 6 m wide including preparing base layer as per standard specifications & approved drawings. |
| 23 | Design & construction of internal Roadways, and pathways with PCC for 1.2 m wide including preparing base layer as per standard specifications and approved drawing |
| 24 | Providing Rain Water harvesting for the entire plant as per specification |
| 25 | Providing necessary Bye Pass arrangement, Storm Water Drain, Compound Wall system for the entire plant/building, annex rooms etc., as per specification |
| 26 | Providing Yard Lighting system, Street lighting system, as per specification for entire plant with all accessories, MCB, Switches, luminaries, street lighting, including supply and fixing of poles and tower light of 10m height with necessary lamp twin fitting 8 nos. including foundation work, cabling controlling etc. complete, and street light fitting, cables, S.S control panel etc complete etc complete as per specification |
| 27 | Provision for pump and piping for reuse of treated effluent for landscaping and toilet flushing in toilets/restrooms, flushing of chokes in piping systems, cleaning of roads, outlets points has to be provided at various locations inside plant etc from treated water sump including all control valves, jet pumps, pipelines, etc complete. |
| 28 | Site Clearence, Earth filling, levelling, Landscaping and plantation of tree saplings with all connected works etc complete as per specification |
| 29 | Design and provide Automation & SCADA for entire plants/system as per specification |
| 30 | Providing Safety Equipment, fire extinguishers, fire alarm, Gas leak monitor, fire buckets with stand, shock proof rubber mats, safety equipment’s for chlorinators, Emergency lights etc., complete |
| 31 | UV treatment for 35.25 MLD STP |
| 32 | Screw type filter press at STP |
| 33 | Schedule - 3 - Construction of Solar sludge drying beds |
| 34 | License Fees, Project Management, Drawing, Design, engineering and Consultancy |
| 35 | Mechanical Work – Turning System - Gear motor - Chain conveying (Power transmission) - Exhaust Fan - Broaching Bars for spreading sludge throughout Drying Hall with the help of spikes - fixed rail and expansion rail - elastic wheels - Polyamide Wheels - Sprocket, with integrated with deflection station for alignment |
| 36 | Mechanical Work – Automatic Feeding work - Bunker and Hydrulic push floor system with flaps and Hydraulic Power pack - Bunker cover |
| 37 | Mechanical Work – Shed/Greenhouse - hot dip galvanised iron structure with columns, rafters, truss and purlins - Polycarbonate sheets for roofing and side area (1.3 and 0.8 mm thickness)- Supports for chimney and air curtains Vinyl curtains for efficient air management |
| 38 | Mechanical Work – Ventilator - Vent stack - incl. flue, height 2 meters - Comprehensive air management for maintaining aerobic conditions inside the hall |
| 39 | Mechanical Work – Auto Delivery System - Belt Conveyor - Bucket Elevator- Storage Tank or Silo |
| 40 | Electrical Work - Siemens PLC, integrated with humidity and radiation sensors - Efficient air management by means of continuous ventilation - VFD operated Drive unit , integrated for controlling turning system speed - Auto-delivery system (Belt conveyor and bucket elevator), integrated for optimum sludge discharge - Sensors in wet area |
| 41 | Civil Work - Automatic feeding area (Sludge storage Bunker and machine room for hydraulic push floor system) - Flooring - Sludge drying area - Automatic delivery area (Belt conveyor, Bucket Elevato |
| 42 | Schedule - 4 - Compound wall A) CIVIL WORK |
| 43 | Construction of Boundary Compound wall for a length of 795.00m at the height of 1.8 Mtr and with 230 mm Thick using County Brick, CM 1:5 mix, Plastering with CM 1:5 mix, 12 mm Thick, Painting. Including cost and conveyance of all materials, and all labour Charges etc complete as per standard Specification |
| 44 | Schedule -5, Disposal pipe from STP to channel |
| 45 | Supplying, Laying and Jointing of Disposal main of 800mm Dia HDPE length 200m from STP to irrigation channel including cost of earth work for wide-1.6 M and depth - 1.6M, labour charges for cutting, jointing, laying with necessary joint materials, construction of valve pit chamber of size 1.00 m x 0.60 m, 600mm CI sluice valve, Thrust block 800x90 deg and refilling the excavated area, etc.. complete |
| 46 | Shcedule-6, Road Restoration |
| 47 | Restoration of damaged roads due to laying of Disposal main for a length 200m,using Plain cement concrete 1:4:8 for 1.4m x 0.10 m, and Cement Concrete 1:2:4 using 20mm gauge hard broken stone jelly for 1.4m x 0.075m including cost and conveyance of all materials, labour charges for earth work mixing of concrete, laying compacting, finishing and curing etc ., complete |
| 48 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
| 49 | Schedule-B |
| 50 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 1 |
| 51 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 2 |
| 52 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 3 |
| 53 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 4 |
| 54 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 5 |
| 55 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 6 |
| 56 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 7 |
| 57 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 8 |
| 58 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 9 |
| 59 | Total cost of operation and maintenance of 35.25 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 10 |
| 60 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
| 61 | Schedule C - General Items - Environmental, Social, Health and Safety (ESHS) Cost Schedule |
| 62 | Design based measures |
| 63 | Tree Plantation with guard rails/ Greenbelt Development at project sites |
| 64 | Construction based measures |
| 65 | Organize meetings with line departments. |
| 66 | Workshop on E&S safeguards/ESHS etc and on-job training as identified. |
| 67 | Use of IEC material and use of multi media channel to create public awareness on waste management |
| 68 | Consultations with stakeholders regularly |
| 69 | Meetings of GRC |
| 70 | Environmental monitoring |
| 71 | Health camp, occupational health and prevention |
| 72 | Compensation and assistance to potential temporary economic impacts & revalidation survey during project implementation. |
| 73 | Operation phase |
| 74 | Environmental monitoring |
| 75 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
| 76 | Schedule D - Power Consumption |
| 77 | Design based measures |
| 78 | Power Consumption for Design, Construct & Commissioning of 35.25 MLD STP using SBR Technology. |
| 79 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 11, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 43 daysAug 24, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 43 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender