Tender For Madurai Corporation Jaihindpuram Mps 100 Hp , Kovalanpotal Pumping 50 Hp , Villapuram Tnhb Pumping 20 Hp,Gandhiji Street Pumping 3Hp Submersible Pump Repairing.
Tender Value
8.32 Lakhs
Estimated cost
Bid Submission
20 Jul 2026
6 days left
EMD
8320
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Madurai → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Madurai Corporation Jaihindpuram Mps 100 Hp , Kovalanpotal Pumping 50 Hp , Villapuram Tnhb Pumping 20 Hp,Gandhiji Street Pumping 3Hp Submersible Pump Repairing.
BOQ
| Sl. No. | Item Description |
| 1 | Jaihindpuram Head Drainage Pumping Station (MPS)100 Hp Submersible Motor in Well . Lifting 100Hp Submersible Using Grane then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber, |
| 2 | Dismandling Of 100 Hp Motor Pump Bottum Side Double Row Ball Bearing 1 No ,Top Side Rubber Sealed Ball Bearing 1 no Removing Using Hydralic Machine then Transportation , Loading and UnloadingCharges |
| 3 | 100 HP Motor Stator Coil Burnout.Removing Complete Startor coil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” ClassInsulation, “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Lugs Supply and Gripping. |
| 4 | Supply of Motor Top Side Carbon Segment Vs SS Mechanical oil Seal |
| 5 | Supply of Motor Bottom Side Diapharm Fixed Siliicon metal Oil Seal |
| 6 | Motor Top Side Rubber Sealed Ball Bearing 1 nos,and Bottum Double row Ball Bearing 1 no Over all 2 Nos Supply,1kg High TempPetrolium Bearing Grease Supply |
| 7 | Motor and Pump Plugs With Sealing Rings |
| 8 | Motor and Pump Profile Gasket |
| 9 | Motor and Pump Circlips |
| 10 | Replacement of Motor and Pump Side “O” Rings |
| 11 | Replacement Pump Side Oil Chamber 100/120 Grade oil 30 lts |
| 12 | Replacement of Motor and Pump Cable Entry Gland |
| 13 | Dynamic Balancing of Pump Shaft Impeller Should be Welding By S.S Material and Machining to the Lathe Works |
| 14 | Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell,Pump ImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling,New Alanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Grane and Testing |
| 15 | KovalanPotal Pumping 50 Hp Repairing KovalanPotal Pumping Station (MPS) 50 Hp Submersible Motor in Well . Lifting 50Hp Submersible Using Grane then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber, |
| 16 | Dismandling Of 50 Hp Motor Pump Bottum Side Double Row Ball Bearing 1 No ,Top Side Rubber Sealed Ball Bearing 1 no Removing Using Hydralic Machine then Transportation , Loading and UnloadingCharges |
| 17 | 50HP Motor Stator Coil Complete Burnout.Removing Complete Startor coil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” ClassInsulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Lugs Supply and Gripping. |
| 18 | Supply of Motor Top Side Carbon Segment Vs SS Mechanical oil Seal |
| 19 | Supply of Motor Bottom Side Diapharm Fixed Siliicon metal Oil Seal |
| 20 | Motor Top Side Rubber Sealed Ball Bearing 1 nos,and Bottum Double row Ball Bearing 1 no Over all 2 Nos Supply,1kg High TempPetrolium Bearing Grease Supply |
| 21 | Motor and Pump Plugs With Sealing Rings |
| 22 | Motor and Pump Profile Gasket |
| 23 | Motor and Pump Circlips |
| 24 | Replacement of Motor and Pump Side “O” Rings |
| 25 | Replacement Pump Side Oil Chamber 100/120 Grade oil 30 lts |
| 26 | Replacement of OlR |
| 27 | Replacement of 125 Amps MCCB |
| 28 | Dynamic Balancing of Pump Shaft Impeller Should be Welding By S.S Material and Machining to the Lathe Works |
| 29 | Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell,Pump ImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling,New Alanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Grane and Testing |
| 30 | Villapuram Pumping 20 Hp Repairing Villapuram Pumping Drainage Pumping Station 20Hp Submersible Motor in Well .Lifting 20Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body. |
| 31 | 20HP Motor Stator Coil Complete Burnout.Removing Complete Startorcoil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” Class Insulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Legs Supply and Gripping. |
| 32 | Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply, High TempPetrolium Bearing Grease Supply and Fixing. |
| 33 | Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no. |
| 34 | Motor Bottum Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply. |
| 35 | Replacement Pump Side Oil Chamber 100/120 Grade oil Motor Teriminal Block replacement and fixing |
| 36 | Replacement of Motor and Pump Side “O” Rings |
| 37 | Dyanamic Balancing of pump shaft Impeller |
| 38 | Replacement of Motor Cable ( 15*800) |
| 39 | Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor BodyCell,PumpImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling,NewAlanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chainblock and Testing |
| 40 | Gandhiji Street pumping 3Hp Gandhiji Drainage Pumping Station 3Hp Submersible Motor in Well .Lifting 3Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body. |
| 41 | 3HP Motor Stator Coil Complete Rewinding Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Heater Replacement and 6 Nos Copper Lu and Gripping. |
| 42 | Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply,HighTempPetrolium Bearing Grease Supply and Fixing. |
| 43 | Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no. |
| 44 | Motor Bottum Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply. |
| 45 | Replacement Pump Side Oil Chamber 100/120 Grade oil . |
| 46 | Replacement of Motor Cable 10 mts |
| 47 | Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell, Pump Impeller Rotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Pump assembling,NewAlanscrows and Spring Washer , Painting and Erection in Well Loading &Unloading Charge Using chain Block and Testing. |
| 48 | Old Material Less (-) |
| 49 | Add GST 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysJul 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.