Tender For Supply Installation Testing and Commissioning of Compressor And Gas Filling In Vrv System At Siam Auditorium Tonk
Tender Overview
Project Description
Tender for Supply Installation Testing and Commissioning of Compressor And Gas Filling In Vrv System At Siam Auditorium Tonk
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 15-Jul-2026 | Schedule_H | Financial Bid | 21-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Cost of 20 HP Old (Damaged) modular type Variable Refrigerant Volume air cooled Outdoor unit inverter type twin rotary/Scroll Compressor(s) with two compressors , module, microprocessor based Controller, Side discharge type condensing unit.Make :- Daikin |
| 2 | Gas charging of VRF/VRV system with R410A refrigerant gas. Before gas charging system shall be flushed with high purity Nitrogen Gas to remove carbon content, dirt particles to make sure that there is no chance of mixing any impurity with Refrigerant Gas. Thereafter System shall be tested with Nitrogen Gas at 1.5 Times of working pressure of R410 Refrigerant Gas to ensure leakproof system. Whole system shall be Vacuumed up to 500-micron level which ensures the zero-moisture content level in piping to ensure better cooling efficiency and long life of the system. |
| 3 | Supply, Installation, Testing & Commissioning of modular type Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units suitable for cooling & heating, having 100% hermetically sealed inverter type twin rotary/Scroll Compressor(s) with and minimum two compressors , above 14 HP modules, microprocessor based Controller, Side / top discharge type condensing unit(s), with R-410 A Refrigerant, vibration isolators, with suitable foundation etc. complete as required. The unit shall deliver the rated capacity at AHRI Conditions and work even at 50°C ambient temperature without tripping. The unit shall be suitable to work on 400V +/- 10%, 3 Phase, 50Hz AC power supply. The unit shall be filled with first charge of the refrigerant and ready for use as required. The EER/COP (W/W) at 100% load with AHRI conditions shall not be less than 3.8 etc. complete as required. |
| 4 | 14 HP to 26 HP Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender