Tender for Supply Of Decentralized Materials & Works For Shiffting And Dismantling Of 33 Kv, 11 Kv, Lt Line & 11/0.4 Kva Dtr Passing Over The Premieses Of Primary/Middle/Composite School Under Edd-Chunar, Mirzapur Under Deposit Scheme 2026-27.
BOQ
| Sl. No. | Item Description |
| 1 | Supply of following Decentralized materials at the works site as per RESSPO norms |
| 2 | X-arms holding clamps with bolts & nuts for ST/PCC pole |
| 3 | M.S clamp for T-off channel with bolts & nuts for ST/PCC pole |
| 4 | Stone pad, 300x300x75 mm |
| 5 | F-bracket with bolts & nuts for ST/PCC pole |
| 6 | E-bracket with bolts & nuts for ST/PCC pole |
| 7 | Clamps with nuts & bolts for Top Channel for ST/PCC pole |
| 8 | All. Binding wire 6 mm |
| 9 | PG Clamp |
| 10 | Danger Board with clamps & nuts for ST/PCC pole |
| 11 | Suspension clamp with nuts & bolts for ST/PCC pole |
| 12 | Three phase Distribution Box Clamp (LS) for ST/PCC pole |
| 13 | Dead end clamp |
| 14 | Eye-Hook |
| 15 | J Hook |
| 16 | Stay clamp with nut & bolts for ST/PCC pole |
| 17 | Stay Insulator |
| 18 | LT Clamp with Nut & bolts for PCC Poles |
| 19 | LT Shackle Insulators |
| 20 | Nuts & bolts for Shackle Insulators |
| 21 | GI Pipe 6\\" dia |
| 22 | Clamp for fixing pipe to pole |
| 23 | Cartage of following materials from Electricity Store Center, Mirzapur to dump site near work site including loading/unloading and proper stocking. |
| 24 | ST/PCC Poles 11/9 mtr long |
| 25 | PCC Poles 8.5 mtr long |
| 26 | Line materials with ACSR Weasel/Dog Conductor |
| 27 | 11 KV XLPE Cable 3x70 mm2 |
| 28 | Cable Jointing Kit I/D/O/D |
| 29 | Arial Bunch Cable 3x120+1x95+1x16 mm2/ 3x95+1x70+1x16 mm2/3x50+1x35+1x16 mm2 |
| 30 | Erection |
| 31 | Erection of single support ST/PCC Pole for construction of 33 KV/11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 32 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 33 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 34 | Earthing of Poles as per RESSPO norms |
| 35 | Stringing & sagging of 3 phase 33 KV/11 KV/LT line upto proper sag including laying of ACSR Weasel/Dog Conductor, binding with insulators & jumpering as per RESSPO norms |
| 36 | Laying, Streaching of Arial Bunch Cable size 3x120+1x95+1x16 mm2/3x95+1x70+1x16 mm2/3x50+1x35+1x16 mm2 as per RESSPO norms |
| 37 | Erection of Four Pole Structure of PCC Pole for 33 KV Section, including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 38 | Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, grouting, earthing of each pole & other required works. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 39 | Shifting of 10 KVA Transformer at proposed site alongwith mounting as per RESSPO norms |
| 40 | Shifting of 25 KVA Transformer at proposed site alongwith mounting as per RESSPO norms |
| 41 | Shifting of 63 KVA Transformer at proposed site alongwith mounting as per RESSPO norms |
| 42 | Shifting of 100 KVA Transformer at proposed site alongwith mounting as per RESSPO norms |
| 43 | Dismantalling of old 33 KV/11 KV /LT line & poles |
| 44 | Drill/cut of stone in hilly area for erection of Pole & Stay |
| 45 | Cartage of received back scrap ACSR Weasel/Dog Conductor from site to ESC, Mirzapur |
| 46 | Cartage of received back scrap AB Cable from site to ESC, Mirzapur |
| 47 | Cartage of received back scrap Iron from site to ESC, Mirzapur Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamber Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender