Tender For Bus Body Repair/Renovation Of Sbstc Buses Inside Workshop Premises.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Aug 2026
16 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Paschim Bardhaman → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Bus Body Repair/Renovation Of Sbstc Buses Inside Workshop Premises.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 13-Jul-2026 | Change in NIT | Technical Bid | 01-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Full body renovation job(For Aluminum Structure):- No. of working days- 35 days (Given in NIT) |
| 2 | Partial body renovation job(For Aluminum Structure):- No. of working days- 30 days (Given in NIT) |
| 3 | Full body renovation job(For A.C. Coach):-No. of working days. – 45 days (Given in NIT) |
| 4 | Partial body renovation job(For A.C. Coach):-No. of working days. – 35 days (Given in NIT) |
| 5 | Full body renovation job( For Midi Bus):- No. of working days. – 25 days (Given in NIT) |
| 6 | Partial body renovation job( For Midi Bus):- No. of working days. – 20 days (Given in NIT) |
| 7 | Miscellaneous body repairing jobs:- No. of working days. Mentioned below:- |
| 8 | Looking glass to fit. ⅛ day |
| 9 | Looking glass to fit after braket repairing. ¼ day |
| 10 | Inside LCD Monitor to fit. ¼ day |
| 11 | Radiator mounting braket to repair each. ¼ day |
| 12 | Radiator braket to repair. ¼ day |
| 13 | Timing cover to repair. ¼ day |
| 14 | Passenger gate for A/C to adjust for proper closing & opening. ½ day |
| 15 | Bonnet lock to fit/repair each. ¼ day |
| 16 | Driver gate/Passenger gate door lock to changed. ¼ day |
| 17 | Mudguard to repair. ½ day |
| 18 | Engine bonnet to be repair. ½ day |
| 19 | Roof top cover to repair for A/C. ½ day |
| 20 | Radiator grill to repair. ½ day |
| 21 | Radiator grill to make newly. 2 days |
| 22 | Driver gate to repair. 1 day |
| 23 | Driver gate to make newly. 2 days |
| 24 | Foot rest for A/C passenger seat to repair. 1 day |
| 25 | Passenger seat shock absorber to repair. ¼ day |
| 26 | Dickey lock to repair/changed. ¼ day |
| 27 | Gear lever bottom cover to make by rexine. ¼ day |
| 28 | Electrical G/check. ½ day |
| 29 | Wipper machine to fit. ¼ |
| 30 | Wipper machine to fit after linkage modifyng. ½ |
| 31 | Roof light to fit each. ¼ |
| 32 | Head light L/S & R/S to fit & line to connect. ½ |
| 33 | Back light L/S & R/S to fit & line to connect. ½ |
| 34 | Electric horn to fit & line to connect. ¼ |
| 35 | Indicator light to fit & line to connect. ¼ |
| 36 | Combination switch to change. ¼ |
| 37 | Stop light line to change. ¼ |
| 38 | Louver to change for each pair. ¼ |
| 39 | Self to change. ½ |
| 40 | Alternator to change. ½ |
| 41 | Floor mat pasting for A/C buses. 2 days |
| 42 | Valvate pasting for roof inside ceiling. 1 day |
| 43 | Passenger stair mat to paste for A/C buses. ½ |
| 44 | Passenger seat clamp making for each. ¼ |
| 45 | Back side grill to repair.½ |
| 46 | Back side grill to make newly. 1 day |
| 47 | Electrical wiring newly making & fitting. 4 days |
| 48 | New trolly making. 2.5 days |
| 49 | Trolley repair. 1 day |
| 50 | Back restcap making (each). ⅛ days |
| 51 | Accidental bend chassis to repair (minor). 3 days |
| 52 | Accidental bend chassis to repair (major). 5 days |
| 53 | Stepny braket to repair. 1 day |
| 54 | Propeler Shaft cross member to repair. ½ day |
| 55 | Passenger gate with passenger stair height to shorten. 2 days |
| 56 | Passenger seat handle making (wooden). ⅛ day |
| 57 | Passenger seat handle making (M/S). ½ day |
| 58 | Inside body post to fit. ¼ day |
| 59 | Back seat platform to repair. 1 day |
| 60 | All passenger seat & back rest opening & fitting. 1 day |
| 61 | Head light portion to modify. 2 days |
| 62 | Front left/Right ventilator glass frame repair/newly makeup. ½ day |
| 63 | Window upper glass to fit. ½ day |
| 64 | Marcopolo window glass and rubber to change. ½ day |
| 65 | Marcopolo window glass sliding to change. ¼ day |
| 66 | Left side golai to repair. 3 days |
| 67 | Right side golai to repair. 3 days |
| 68 | Mudguard rubber to fit. ¼ day |
| 69 | Passenger seat frame newly making (each) (3 seater Deluxe). 2 days |
| 70 | Passenger seat frame newly making (each) (2 seater Deluxe). 2 days |
| 71 | Passenger seat frame newly making (each) (3 seater Semi deluxe). 2 days |
| 72 | Passenger seat frame newly making (each) (2 seater Semi deluxe). 2 days |
| 73 | Window glass guard M.S. flat/pipe to fit (each side). ¼ day |
| 74 | Body- u-bolt to tighten/change. 1 day |
| 75 | Front show lower both side newly made & painting. 7 days |
| 76 | Miscellaneous body repairing jobs:-No. of working days mentioned below:- |
| 77 | Front structure to be made new. (Top to bottom)with painting. 08 days |
| 78 | Left or right side structure to be repair. (Major). 04 days |
| 79 | Front structure to be repair. (Minor). 04 days |
| 80 | Front wind screen to change left/right side. ¼ day |
| 81 | Front wind screen to change both side. ½ day |
| 82 | Front wind screen to change after structure repairing. ½ day |
| 83 | Newly making of curved glass structure to fit new curved glass of varying sizes. 04 days |
| 84 | a) Passenger gate with glass frame to be made newly & painting. 04 days |
| 85 | b) Emergency gate with glass frame to be made newly & painting. 03 days |
| 86 | Stair case to repair (minor). 02 days |
| 87 | Stair case to repair (major). 03 days |
| 88 | a) Window glass frame to repair (each). ½ day |
| 89 | b) Window broken glass to changed (each). ¼ day |
| 90 | Window glass frame to making newly (each). 1 day |
| 91 | Window glass rubber to change (each).¼ day |
| 92 | Window glass frame panel structure to repair (each). 1 day |
| 93 | a) Back side body to repair with painting. 3 days |
| 94 | b) Back side body to be made newly including painting. 5days |
| 95 | Roof tar felt to fit. ½ day |
| 96 | Passenger seat frame to repair (Semi deluxe) each (including painting). 1 day |
| 97 | Passenger seat frame to repair (Deluxe) each (including painting). 1day |
| 98 | Front Cabin floor to repair. 2days |
| 99 | Passenger gate golai to repair. 2 days |
| 100 | Diesel tank to washing, repairing & painting. 1 day |
| 101 | Silencer box to repair (opening & fitting). 1 day |
| 102 | Silencer pipe to repair (opening & fitting). 1 day |
| 103 | Air pipe, Diesel pipe, Engine oil pipe to repair (each point). ⅛ day |
| 104 | Front wind screen (Single glass) to change. 1 day |
| 105 | Front wind screen (Single glass) to change after frame repairing. 2 days |
| 106 | Front wind screen (Single glass) to change after frame newly making. 10 days |
| 107 | Front structure to be modify in to two parts from single wind screen. 7 days |
| 108 | A.C. Coach window glass to change (each). ½ day |
| 109 | A.C. Coach window glass to change after structure repairing (each). ½ day |
| 110 | Each passenger seat to repair Rexene changed only (Semi deluxe).½ day |
| 111 | Each passenger seat (Semi deluxe) to repair Rexene & Ply board to changed. ½ day |
| 112 | Each passenger seat back rest Rexene to change only (Semi deluxe).½ day |
| 113 | Each passenger seat back rest Rexene & Ply board to change (Semi deluxe).½ day |
| 114 | Each passenger seat to repair Rexene to change only (Deluxe).½ day |
| 115 | Each passenger seat to repair Rexene & Ply board to change (Deluxe).½ day |
| 116 | Each passenger seat back rest & Rexene changed. ½ day |
| 117 | Each passenger seat back rest Rexene & ply board to changed (Deluxe).½ day |
| 118 | Engine bonnet, Fr. bumper, Fr. cross member & Fr. grill opening & fitting.½ day |
| 119 | a) Front bumper to repair.½ day |
| 120 | b) Front bumper to be made newly & painting. 2 days |
| 121 | a) Rear bumper to repair.½ day |
| 122 | b) Rear bumper to be made newly & painting. 2 days |
| 123 | Front cross member to repair.½ day |
| 124 | Luggage carrier to repair (Inside). 1 day |
| 125 | Luggage Dickey to repair.1 day |
| 126 | Engine Dash board to repair.1 day |
| 127 | Rear glass to fit.½ day |
| 128 | Rear glass to fit after making 2 parts. 1 day |
| 129 | Checker plate (gangway) riveting. 1 day |
| 130 | Checker plate (Full) riveting (after seat frame opening). 3 days |
| 131 | Head light cashing (bed Foard types) making incase of FRB show. 2 days |
| 132 | Air cleaner (damaged) repairing.½ day |
| 133 | Vehicle inside & outside washing.½ day |
| 134 | Each Tyre lever/hammer wooden handle making.½ day |
| 135 | Bolt cutting/welding (each).⅛ day |
| 136 | Any spares heating by gas.⅛ day |
| 137 | Route board making & painting.½ days |
| 138 | Route board with frame making & painting & fitting on the vehicle. 1 day |
| 139 | Vehicle under chassis washing.1 day |
| 140 | Ceiling velvet pasting (full). 2 days |
| 141 | Ceiling velvet pasting (half).1 day |
| 142 | Accidental body panel (8’ X 4’) repairing & painting.3 days |
| 143 | Big window glass to change. 1 day |
| 144 | Floor plywood change with mat pasting of A.C. coach.6 days |
| 145 | Each passenger seat back rest to be made newly of A.C. coach.1 day |
| 146 | Each passenger seat cushion to be made newly of A.C. coach. 1 day |
| 147 | Each chassis u-bolt of body to be changed & fitment with new balata packing. ½ day |
| 148 | Front engine cashing full repair & properly aligned.3 days |
| 149 | Each chassis cross member to be changed (including paint). ½ day |
| 150 | BS-IV & VI wiring harness fitting/repairing (engine portion).2 days Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 13, 2026
11:30 IST
Tender Published
Tender notice published.
Completed
Aug 01, 2026
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 16 daysAug 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender