Supply Of UNDER FRAME COMPLETE FOR LHB SCN (EOG) COACHES.
Tender Overview
Project Description
Supply Of under frame complete for lhb scn (eog) coaches. , under frame complete for lhb scn (eog) coaches note:-(1)crf items are to be manufactured as per dy. cple-iii letter no. rcf/hsq/plg/mpsh/510003/lhb dated 04/04/2024. (2) p rotection procedure as per dy cple-iii annexure-app dated 14/05/2024. note-(3).mounting a rrangement on underframe for biological tank as per drg no. le11442 alt f ., as per dra wing: ls11196 alth & as per schedule of technical as per specfication no. mdts21320 rev -02 dated 09.06.2020 02 & masking as per drg. no. mi007679 alt.nil note: 1. supporting me mber on trough floor to drg.no. ls10206 altf, packing instruction: pi042 ver 3.0. [ warrant y period: 84 months after the date of delivery ] ]
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender