Power Government Departments Closing in 10 days TDR #56409788

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Substation, Electrical System Or Installation; Service Provider - Cartage Of The Following Material From Store Centre, Asfabad, Firozaba

Issued by Government Departments · Firozabad, Uttar Pradesh
Tender Value
20 Lakhs
Estimated cost
Bid Submission
21 Jul 2026
10 days left
EMD
20000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Firozabad → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Substation, Electrical System Or Installation; Service Provider - Cartage Of The Following Material From Store Centre, Asfabad, Firozabad To Dump Site Of Work Including Loading And Unloading At The Respective Ends And Also Including The Work Of Dragging Etc. [Distance 00.00 Km To 40 Km] , 8.5/9 Meter Long Pcc Pole , 11/13 Meter Long St Pole , Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator Other Line Material. , Ct Pt Unit Of Diff. Ratings , 11 Kv/33 Kv Cubical Box Of Diff. Ratings , 16 Kva Transformer , 25 Kva Transformer , 63 Kva Transformer , 11 Kv Xlpe Cable 3X70 Mm² / 3 X 120 Mm²/3X185 Mm²/3X300 Mm² , Drilling Of Hole In Channel, Angle. , Painting Of Dropper Channel, Top Channel, T Channel And Guarding Angle With 2 Quote Of Red Oxide Including The Cost Of Paint. , Safe Placement Of 8.5/9 Meter Long Pcc Pole/ 11/13 Meter Long St Pole From Dump Site To The Pit Site Of Work Including The Work Of Dragging Of The Same Through Kachha Pakka Road. , Erection And Grouting Of Double Pole Structure Of 8.5/9 Meter Long Pcc Pole Including Fixing Of Ht Fittings As Per Respo Norms. The Support Shall Be Grouted In Cement, Sand, And Brick Ballast In Ratio 1:2:4. , Erection Of Single Support Of 8.5/9 Meter Long Pcc Pole Including Fixing Of Ht/Lt Fittings As Per Respo Norms. The Support Shall Be Grouted In Cement, Sand, And Brick Ballast. , Erection Of Single Support Of 11/13 Meter Long St Pole Duly Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 Including Fixing Of All Ht Fittings , Erection Of Double Pole Structure Of 11/13 Meter Long St Pole Duly Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 Including Fixing Of All Ht Fittings. , Construction Of Plinth Of Aforesaid Newly Erected 11/13 Meter Long St Pole As Per Respo Norms In Cc 1:2:4 Ratio In Cement, Sand And Stone Grit Duly 12 Mm Thick Plaster In 1:4 Ratio Of Cement And Sand To Give Strengthening. , Grouting, Fixing And Nozzling Of Stay Rod, And Grouting Of Stay Rod Shall Be In Ratio 1:4:8 [Cement, Sand And Brick Ballast], As Per Respo Norm, , Earthing Of Ht Support Through Earthing Rod & And Connecting It Properly As Per Respo Norms. , Chopping Of Tree Branches For Clearance Of Line , Installation Of Extra T As Per Respo Manual , Installation Of Following Material In Proper Alignment And Direction As Per Respo Manual Including The Cost Of Arrangement Of Labourer, T&P Etc Required For Proper Completion Of Work. , 16 Kva Transformer , 25 Kva Transformer , 63 Kva Transformer , Digging, Laying And Back Filling 11 Kv Xlpe Cable 3X70 Mm² / 3 X 120 Mm²/3X185 Mm² /3X300 Mm² Xlpe Cable Trench As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Bricks, Sand, Labourer, T&P Etc. Required For Proper Completion Of Work. , Ct Pt Unit Of Diff. Ratings , Installation Material Contractor Arrange By Own His Coast Installation Of Following Line Material In Proper Alignment And Direction As Per Respo Manual, Including The Cost Fo Arrangement Of Labourer, T&P Etc. Required For Proper Completion Of Work For The Supervising Engineer. , 11 Kv Cross Arm Holding Cl With Nut & Bolt , 11 Kv U Cl With Nut & Bolt , 11 Kv F Cl With Nut & Bolt , Laying Of 3X70 / 3X120 / 3X185 / 3X300 Sqmm. Xlpe Cable In Open And Its Making Connection With Transformer And 11 Kv Feeder Also As Per Direction Of Supervising Engineer. , Laying, Stringing, Sagging, Binding And Jumpering Etc Of Weasel Conductor As Per Respo Norms. , Laying Of Ariel Bunch Conductor Cable Of Size 3X50 Sqr. Mm/ 3X95sqr Mm , Laying, Stringing, Sagging, Binding And Jumpering Etc Of Dog Conductor As Per Respo Norms. , Guarding Of 11 Kv Line. , Installation Of Distribution Box As Per Respo Manual And As Per Direction Of Supervising Engineer. , Fixing Of Tpmo Fuse Set On Newly Erected Transformers. , Installation Of 11 Kv/33 Kv Cubical Box Of Diff. Ratings , Filling And Fixing Of Cable Box Suitable For Xlpe Cable, Including The Cost Of Arrangement Of Labourer, T&P Etc. Required For Proper Completion Of Work, But The Box Shall Be Provided By The Corporation Free Of Cost, As Per Actual Sit Requirement.

BOQ

Sl. No. Item TitleItem Description
1Cartage of the following material from Store Centre, Asfabad, Firozabad to dump site of work including loading and unloading at the respective ends and also including the work of dragging etc. [Distance 00.00 Km to 40 Km]Cartage of the following material from Store Centre, Asfabad, Firozabad to dump site of work including loading and unloading at the respective ends and also including the work of dragging etc. [Distance 00.00 Km to 40 Km]
28.5/9 meter long PCC pole8.5/9 meter long PCC pole
311/13 meter long ST pole11/13 meter long ST pole
4Conductor, GI earth wire, cross arm, angle, channel, insulator other line material.Conductor, GI earth wire, cross arm, angle, channel, insulator other line material.
5CT PT Unit of diff. ratingsCT PT Unit of diff. ratings
611 KV/33 KV Cubical Box of diff. ratings11 KV/33 KV Cubical Box of diff. ratings
716 KVA transformer16 KVA transformer
825 KVA transformer25 KVA transformer
963 KVA transformer63 KVA transformer
1011 KV XLPE cable 3x70 mm² / 3 x 120 mm²/3x185 mm²/3x300 mm²11 KV XLPE cable 3x70 mm² / 3 x 120 mm²/3x185 mm²/3x300 mm²
11Drilling of hole in channel, angle.Drilling of hole in channel, angle.
12Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint.Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint.
13Safe placement of 8.5/9 meter long PCC pole/ 11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road.Safe placement of 8.5/9 meter long PCC pole/ 11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road.
14Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4.Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4.
15Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast.Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast.
16Erection of single support of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittingsErection of single support of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings
17Erection of double pole structure of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings.Erection of double pole structure of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings.
18Construction of plinth of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening.Construction of plinth of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening.
19Grouting, fixing and nozzling of stay rod, and grouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm,Grouting, fixing and nozzling of stay rod, and grouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm,
20Earthing of HT support through earthing rod & and connecting it properly as per RESPO norms.Earthing of HT support through earthing rod & and connecting it properly as per RESPO norms.
21Chopping of tree branches for clearance of lineChopping of tree branches for clearance of line
22Installation of Extra “T” as per RESPO manualInstallation of Extra “T” as per RESPO manual
23Installation of following Material in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work.Installation of following Material in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work.
2416 KVA transformer16 KVA transformer
2525 KVA transformer25 KVA transformer
2663 KVA transformer63 KVA transformer
27Digging, laying and back filling 11 KV XLPE cable 3x70 mm² / 3 x 120 mm²/3x185 mm² /3x300 mm² XLPE cable trench as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of bricks, sand, labourer, T&P etc. required for proper completion of work.Digging, laying and back filling 11 KV XLPE cable 3x70 mm² / 3 x 120 mm²/3x185 mm² /3x300 mm² XLPE cable trench as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of bricks, sand, labourer, T&P etc. required for proper completion of work.
28CT PT Unit of diff. ratingsCT PT Unit of diff. ratings
29Installation material Contractor arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer.Installation material Contractor arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer.
3011 KV cross arm holding clamp with nut & bolt11 KV cross arm holding clamp with nut & bolt
3111 KV U clamp with nut & bolt11 KV U clamp with nut & bolt
3211 KV F clamp with nut & bolt11 KV F clamp with nut & bolt
33Laying of 3x70 / 3x120 / 3x185 / 3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeder also as per direction of supervising engineer.Laying of 3x70 / 3x120 / 3x185 / 3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeder also as per direction of supervising engineer.
34Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms.Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms.
35Laying of Ariel bunch conductor cable of size 3x50 sqr. mm/ 3x95sqr mmLaying of Ariel bunch conductor cable of size 3x50 sqr. mm/ 3x95sqr mm
36Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms.Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms.
37Guarding of 11 KV line.Guarding of 11 KV line.
38Installation of Distribution box as per RESPO manual and as per direction of supervising engineer.Installation of Distribution box as per RESPO manual and as per direction of supervising engineer.
39Fixing of TPMO fuse set on newly erected transformers.Fixing of TPMO fuse set on newly erected transformers.
40Installation of 11 KV/33 KV Cubical Box of diff. ratingsInstallation of 11 KV/33 KV Cubical Box of diff. ratings
41Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement.Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement.

AI Tender Summary

OUR REF NO 56409788
AUTHORITY Government Departments
TENDER VALUE 20 Lakhs
LAST DATE 21-07-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Substation, Electrical System Or Installation; Service Provider - Cartage Of The Following Material From Store Centre, Asfabad, Firozabad To Dump Site Of Work Including Loading And Unloading At The Respective Ends And Also Including The Work Of Dragging Etc. [Distance 00.00 Km To 40 Km] , 8.5/9 Meter Long Pcc Pole , 11/13 Meter Long St Pole , Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator Other Line Material. , Ct Pt Unit Of Diff. Ratings , 11 Kv/33 Kv Cubical Box Of Diff. Ratings , 16 Kva Transformer , 25 Kva Transformer , 63 Kva Transformer , 11 Kv Xlpe Cable 3X70 Mm² / 3 X 120 Mm²/3X185 Mm²/3X300 Mm² , Drilling Of Hole In Channel, Angle. , Painting Of Dropper Channel, Top Channel, T Channel And Guarding Angle With 2 Quote Of Red Oxide Including The Cost Of Paint. , Safe Placement Of 8.5/9 Meter Long Pcc Pole/ 11/13 Meter Long St Pole From Dump Site To The Pit Site Of Work Including The Work Of Dragging Of The Same Through Kachha Pakka Road. , Erection And Grouting Of Double Pole Structure Of 8.5/9 Meter Long Pcc Pole Including Fixing Of Ht Fittings As Per Respo Norms. The Support Shall Be Grouted In Cement, Sand, And Brick Ballast In Ratio 1:2:4. , Erection Of Single Support Of 8.5/9 Meter Long Pcc Pole Including Fixing Of Ht/Lt Fittings As Per Respo Norms. The Support Shall Be Grouted In Cement, Sand, And Brick Ballast. , Erection Of Single Support Of 11/13 Meter Long St Pole Duly Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 Including Fixing Of All Ht Fittings , Erection Of Double Pole Structure Of 11/13 Meter Long St Pole Duly Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 Including Fixing Of All Ht Fittings. , Construction Of Plinth Of Aforesaid Newly Erected 11/13 Meter Long St Pole As Per Respo Norms In Cc 1:2:4 Ratio In Cement, Sand And Stone Grit Duly 12 Mm Thick Plaster In 1:4 Ratio Of Cement And Sand To Give Strengthening. , Grouting, Fixing And Nozzling Of Stay Rod, And Grouting Of Stay Rod Shall Be In Ratio 1:4:8 [Cement, Sand And Brick Ballast], As Per Respo Norm, , Earthing Of Ht Support Through Earthing Rod & And Connecting It Properly As Per Respo Norms. , Chopping Of Tree Branches For Clearance Of Line , Installation Of Extra T As Per Respo Manual , Installation Of Following Material In Proper Alignment And Direction As Per Respo Manual Including The Cost Of Arrangement Of Labourer, T&P Etc Required For Proper Completion Of Work. , 16 Kva Transformer , 25 Kva Transformer , 63 Kva Transformer , Digging, Laying And Back Filling 11 Kv Xlpe Cable 3X70 Mm² / 3 X 120 Mm²/3X185 Mm² /3X300 Mm² Xlpe Cable Trench As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Bricks, Sand, Labourer, T&P Etc. Required For Proper Completion Of Work. , Ct Pt Unit Of Diff. Ratings , Installation Material Contractor Arrange By Own His Coast Installation Of Following Line Material In Proper Alignment And Direction As Per Respo Manual, Including The Cost Fo Arrangement Of Labourer, T&P Etc. Required For Proper Completion Of Work For The Supervising Engineer. , 11 Kv Cross Arm Holding Cl With Nut & Bolt , 11 Kv U Cl With Nut & Bolt , 11 Kv F Cl With Nut & Bolt , Laying Of 3X70 / 3X120 / 3X185 / 3X300 Sqmm. Xlpe Cable In Open And Its Making Connection With Transformer And 11 Kv Feeder Also As Per Direction Of Supervising Engineer. , Laying, Stringing, Sagging, Binding And Jumpering Etc Of Weasel Conductor As Per Respo Norms. , Laying Of Ariel Bunch Conductor Cable Of Size 3X50 Sqr. Mm/ 3X95sqr Mm , Laying, Stringing, Sagging, Binding And Jumpering Etc Of Dog Conductor As Per Respo Norms. , Guarding Of 11 Kv Line. , Installation Of Distribution Box As Per Respo Manual And As Per Direction Of Supervising Engineer. , Fixing Of Tpmo Fuse Set On Newly Erected Transformers. , Installation Of 11 Kv/33 Kv Cubical Box Of Diff. Ratings , Filling And Fixing Of Cable Box Suitable For Xlpe Cable, Including The Cost Of Arrangement Of Labourer, T&P Etc. Required For Proper Completion Of Work, But The Box Shall Be Provided By The Corporation Free Of Cost, As Per Actual Sit Requirement.
Basic Detail
Tender No GEM/2026/B/7774013
Bidding Type Tender
Location
City Firozabad
State Uttar Pradesh
Key Dates
Publish Date 10 Jul 2026
Submission Date 21 Jul 2026
Open Date 21 Jul 2026
Finance
Tender Value 20 Lakhs
Tender Fee Ref. Documents
EMD 20000
Exemption Not Available
Document List
93091895-f346-47e4-83da-2718a85ded68.pdf
1783694348.xlsx
1783694368.pdf
1783694369.pdf
ATC_76752fda-9661-4a6d-a26a1783694496627_BUYEREDCFIROZABAD.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Jul 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

93091895-f346-47e4-83da-2718a85ded68.pdf

xlsx

1783694348.xlsx

pdf

1783694368.pdf

pdf

1783694369.pdf

pdf

ATC_76752fda-9661-4a6d-a26a1783694496627_BUYEREDCFIROZABAD.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders