Power Boards / Undertakings / PSU Closing in 31 days TDR #56407901

Bids Are invited for Round The Clock Operation Routine And Preventive Mechanical Maintenance Of Ahd

Issued by Boards / Undertakings / PSU · Sonbhadra, Uttar Pradesh
Tender Value
8.87 Crore
Estimated cost
Bid Submission
12 Aug 2026
31 days left
EMD
11.28 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sonbhadra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
33143

Project Description

Bids Are invited for Round The Clock Operation Routine And Preventive Mechanical Maintenance Of Ahd Round The Clock Operation And Preventive Maintenance Work - Round The Clock Operation Routine And Preventive Mechanical Maintenance And Housekeeping And Cleaning Works Of Complete Ash Handling Plant Of 2X660mw Ctps Obra, Sonebhadra. , Dismantling And Shifting Of Asp - Dismantling And Shifting Of Ash Slurry Pump From Its Foundation To Maintenance Bay , Shifting Of Overhauled Or New Asp - Shifting Of Overhauled New Ash Slurry Pump From Maintenance Bay To The Foundation Of Pump , Oh Of Asp - Complete Overhauling Of Ms Indure Make Ash Slurry Pumps , Dismantling And Shifting Of Coarse Ash Pump - Dismantling And Shifting Of Coarse Ash Pump From Its Foundation To Maintenance Bay , Shifting Of Overhauled Or New Coarse Ash Pump - Shifting Of Overhauled New Coarse Ash Pump From Maintenance Bay To The Foundation Of Pump , Oh Of Coarse Ash Pump - Complete Overhauling Of Ms Indure Make Coarse Ash Pump , Dismantling And Shifting Of Vp - Dismantling And Shifting Of Vacuum Pumps From Its Foundation To Maintenance Bay , Shifting Of Overhauled Or New Vp - Shifting Of Overhauled New Vacuum Pumps From Maintenance Bay To The Foundation Of The Pump , Manpower Assistance For Oh Of Vp - Providing Manpower Assistance For Overhauling Of Vacuum Pumps In Presence Of Oem Ta Make Vacuunair Aeromatic Capacity 3871 Cubic Meter Per Hour , Manpower Assistance For Servicing Of Iac - Providing Manpower Assistance For Servicing Of Instrument Air Compressor With Drier In Presence Of Oem Ta Make Atlas Copco Capacity 1300 Cubic Meter Per Hour , Manpower Assistance For Servicing Of Tac - Providing Manpower Assistance For Servicing Of Transport Air Compressor In Presence Of Oem Ta Make Atlas Copco Capacity 8250 Or 7500 Cubic Meter Per Hour , Oh Of Esp Blower - Complete Overhauling Of Esp Fluidizing Air Blower Make Model Rh 120Ac Capacity 660 Cubic Meter Per Hour , Oh Of Im And Terminal Silo Blower - Complete Overhauling Of Im And Terminal Silo Aeration Blower Fluidizing Air Blower Make Model Rhh 20Wc Capacity 1400 Cubic Meter Per Hour , Oh Of Im And Terminal Silo Vent Air Fan - Complete Overhauling Of Im And Terminal Silo Vent Air Fan Type Centrifugal Make Ms Maxim Air , Oh Or Servicing Of Hmdc - Complete Overhauling Or Servicing Of Hmdc Installed At Im And Terminal Silo , Oh Or Servicing Of Rotary Feeder - Complete Overhauling Or Servicing Of Rotary Feeder Installed In Im And Terminal Silo Tank , Dismantling And Shifting Of Balp Or Fwp Or Fahp Or Bahp Or Eco Pump Or Hcsd Pump - Dismantling And Shifting Of Balp Or Fwp Or Fahp Or Bahp Or Eco. Pump Or Hcsd Pump From Its Foundation To Maintenance Bay , Shifting Of Overhauled Or New Balp Or Fwp Or Fahp Or Bahp Or Eco Pump Or Hcsd Pump - Shifting Of Overhauled Or New Balp Or Fwp Or Fahp Or Bahp Or Eco. Pump Or Hmdc Pump From Maintenance Bay To The Foundation Of The Pump , Oh Of Fwp - Overhauling Of Flushing Water Pump Fwp , Oh Of Balp Pump - Overhauling Of Bottom Ash Low Pressure Pump Balp , Oh Of Fahp Pump - Overhauling Of Fly Ash High Pressure Pump Fahp , Oh Of Bahp Pump - Overhauling Of Bottom Ash High Pressure Pump Bahp , Oh Of Economizer Pump - Overhauling Of Economizer Pump , Oh Of Hmdc Pump - Overhauling Of Hydro Mix Dust Conditioner Pump Hmdc For Im And Terminal Silo , Oh Of Hp Swp - Overhauling Of Hp Seal Water Pump , Oh Of Lp Swp - Overhauling Of Lp Seal Water Pump , Oh Of Baofp - Overhauling Of Bottom Ash Overflow Pump Baofp , Oh Of Rwp - Overhauling Of Recycle Water Pump Rwp , Oh Of Ahp Clarifier Sludge Pump - Overhauling Of Ahp Clarifier Sludge Pump , Oh Of Dosing Pump - Overhauling Of Alum Lime And Poly Electrolyte Dosing Pump , Oh Of Awrp - Overhauling Of Ash Water Recovery Pump , Oh Of Rpswp - Overhauling Of Recovery Pump Seal Water Pump , Oh Of Drain Pump - Overhauling Of Drain Pumps Installed At Ba Hopper Area Ash Slurry Pump House Vacuum Pump Area Silo Area And Recovery Clarifier Area. , Oh Of Baha Jet Type Drain Pump - Overhauling Of Bottom Ash Hopper Area Jet Type Drain Pump , Manpower Assistance For Fc Of Asp - Providing Manpower Assistance For Overhauling Of Fluidomat Make Fluid Coupling Model Sc 10 300Kw Or 1480 Rpm Motor Of Ash Slurry Pump In Presence Of Oem Ta , Manpower Assistance For Fc Of Coarse Ash Pump - Providing Manpower Assistance For Overhauling Of Fluidomat Make Model Sc 8 50Kw Or 1480 Rpm Motor Speed Variation +20 To -20 Percentage Fluid Coupling Of Course Ash Pump And Clinker Grinder Drive Assembly In Presence Of Oem Ta , Oh Of Gb Of Asp - Overhauling Of New Allen Berry Works Make Gear Box Of Ash Slurry Pump Model Csa250 260Kw Or 1150 Rpm , Oh Of Gb Of Coarse Ash Pump - Overhauling Of New Allen Berry Works Make Gear Box Of Coarse Ash Pump And Clinker Grinder Drive Assembly Model Csa125 55Kw Or 1500 Rpm , Oh Of Lop Of Fc Of Asp - Overhauling Of Lube Oil Pump Of Fluid Coupling Of Ash Slurry Pump , Servicing Of Oc Of Fc Of Asp - Servicing Of Oil Cooler Of Fluid Coupling Of Ash Slurry Pump , Servicing Of Tds Of Clarifier - Complete Servicing Of Turbo Driving System Of Clarifier , Alignment Of Asp - Alignment Of Ash Slurry Pump , Rotation Of As Disposal Line - Rotation Of Ash Slurry Disposal Lines 400X 9.5Mm Thk Nb , Rotation Of Ba Discharge Pipe Line - Rotation Of Bottom Ash Discharge Pipe Line 200 Nb , Replacement Of Ms Pipe Line Dia 250 Nb To 350 Nb , Replacement Of Ci Pipe Line Dia 200 Nb To 250 Nb - Replacement Of Ci Pipe Line Dia.200 Nb To 250 Nb , Ash Disposal By Dumper Or Trolley To Outside Power House - In Case The Huge Quantity Of Ash Accumulated At Esp Or Im Silo Or Terminal Silo Floor The Same Shall Be Segregated And Lifted By Dumper Or Trolley To Outside Powerhouse Boundary For Its Disposal Of 2X660mw Ctps. One Dumper Equal To Two Tractor Trolley , Servicing Of Dewatering Pump - Complete Servicing Of Dewatering Pump. , Servicing Of Submersible Pump - Servicing Of Goodwin Make Submersible Pump Of Capacity 200 Cubic Meter Per Hour Mechanical Work , Removal Of Wornout Or Damage Valves - Removal Of Worn Out Or Damaged Valves Of Size More Than 80Mm Nb From Ash Disposal Line Or Seal Water Line Or Ash Water Line Etc. , Inatallation Of New Or Repaired Valves - Installation Of New Or Repaired Valves Of Size More Than 80Mm Nb In Ash Disposal Line Or Seal Water Line Or Ash Water Line Etc. , Replacement Of Spout - Replacement Or Repairing Of Spout Of Im Silo Or Terminal Silo , Pipe Laying And Alignment Of Ms Pipe 406.4Mm - Pipe Laying And Alignment Of Following Diameter Ms Pipe Over The Rcc Pedestal Of Height Approx. Varies From 300 To 1500Mm Which Includes Transportation Of Pipe And Its Accessories At Erection Site Including Cutting, Grinding As Well As Its Welding Tightening Of Coupling Cl Ing Bolt And Nuts Gasket Etc. Including Testing As Per Recommendation Of Field Quality Plan Satisfactory Hydraulic Testing Commissioning Etc. Required For Proper Completion Of Work Including Cost Of All Labour Material T And P Etc. Erw Ms Pipe Od 406.4Mm Near Im Silo Area , Refractory Works In Bah - Refractory Works In Bottom Ash Hopper , Providing Shuttering To Carry Out The Refractory Work , Fabrication And Erection Of Anchor Of Bah , Scaffolding Work In Bottom Ash Hopper , Isolation Of Bottom Ash Hopper , Hiring Of 01 No. Jcb Or Compact Loader Bobcat - Hiring Of 01 No. Jcb Or Compact Loader Bobcat , Manpower Assistance For Oh Or Servicing Of Drier - Providing Manpower Assistance For Overhauling Or Servicing Of Drier In Presence Of Oem Ta Make Ms Mellcon Job No Csu 58 I Total Quantity : 33143

BOQ

Sl. No. Item TitleItem Description
1Round the clock operation and preventive maintenance workRound the Clock Operation Routine and Preventive mechanical maintenance and housekeeping and cleaning works of Complete Ash Handling Plant of 2X660MW CTPS Obra, Sonebhadra.
2Dismantling and shifting of ASPDismantling and shifting of Ash Slurry Pump from its foundation to maintenance bay
3Shifting of overhauled or New ASPShifting of Overhauled New Ash Slurry Pump from maintenance bay to the foundation of Pump
4OH of ASPComplete overhauling of Ms Indure make Ash Slurry Pumps
5Dismantling and shifting of Coarse Ash PumpDismantling and shifting of Coarse Ash Pump from its foundation to maintenance bay
6Shifting of overhauled or New Coarse Ash PumpShifting of Overhauled New Coarse Ash Pump from maintenance bay to the foundation of Pump
7OH of Coarse Ash PumpComplete overhauling of Ms Indure make Coarse Ash Pump
8Dismantling and Shifting of VPDismantling and Shifting of Vacuum Pumps from its foundation to maintenance bay
9Shifting of Overhauled or New VPShifting of Overhauled New Vacuum Pumps from maintenance bay to the foundation of the pump
10Manpower assistance for OH of VPProviding manpower assistance for Overhauling of Vacuum Pumps in presence of OEM TA Make vacuunair aeromatic Capacity 3871 cubic meter per hour
11Manpower assistance for servicing of IACProviding manpower assistance for servicing of Instrument Air Compressor with drier in presence of OEM TA Make Atlas Copco Capacity 1300 cubic meter per hour
12Manpower assistance for servicing of TACProviding manpower assistance for servicing of Transport Air Compressor in presence of OEM TA Make Atlas Copco Capacity 8250 or 7500 cubic meter per hour
13OH of ESP BlowerComplete overhauling of ESP fluidizing air blower Make Model RH 120AC Capacity 660 cubic meter per hour
14OH of IM and Terminal Silo BlowerComplete overhauling of IM and Terminal Silo Aeration Blower fluidizing air blower Make Model RHH 20WC Capacity 1400 cubic meter per hour
15OH of IM and Terminal Silo vent air fanComplete overhauling of IM and Terminal Silo vent air fan Type centrifugal Make Ms Maxim air
16OH or Servicing of HMDCComplete overhauling or Servicing of HMDC installed at IM and Terminal silo
17OH or Servicing of rotary feederComplete overhauling or Servicing of rotary feeder installed in IM and Terminal silo tank
18Dismantling and shifting of BALP or FWP or FAHP or BAHP or Eco Pump or HCSD PumpDismantling and Shifting of BALP or FWP or FAHP or BAHP or Eco. Pump or HCSD Pump from its foundation to maintenance bay
19Shifting of overhauled or new BALP or FWP or FAHP or BAHP or Eco Pump or HCSD PumpShifting of overhauled or new BALP or FWP or FAHP or BAHP or Eco. Pump or HMDC Pump from maintenance bay to the foundation of the pump
20OH of FWPOverhauling of Flushing Water Pump FWP
21OH of BALP PumpOverhauling of Bottom Ash Low Pressure Pump BALP
22OH of FAHP PumpOverhauling of Fly Ash High Pressure Pump FAHP
23OH of BAHP PumpOverhauling of Bottom Ash High Pressure Pump BAHP
24OH of Economizer PumpOverhauling of Economizer Pump
25OH of HMDC PumpOverhauling of Hydro Mix Dust Conditioner Pump HMDC for IM and Terminal Silo
26OH of HP SWPOverhauling of HP Seal Water Pump
27OH of LP SWPOverhauling of LP Seal Water Pump
28OH of BAOFPOverhauling of Bottom Ash Overflow Pump BAOFP
29OH of RWPOverhauling of Recycle Water Pump RWP
30OH of AHP Clarifier Sludge PumpOverhauling of AHP Clarifier Sludge Pump
31OH of Dosing PumpOverhauling of Alum Lime and Poly Electrolyte Dosing Pump
32OH of AWRPOverhauling of Ash Water Recovery Pump
33OH of RPSWPOverhauling of Recovery Pump Seal Water Pump
34OH of Drain PumpOverhauling of Drain Pumps installed at BA Hopper area Ash Slurry pump house Vacuum pump area Silo area and Recovery clarifier area.
35OH of BAHA Jet type Drain PumpOverhauling of Bottom Ash Hopper Area Jet type Drain Pump
36Manpower assistance for FC of ASPProviding manpower assistance for Overhauling of Fluidomat Make Fluid Coupling model SC 10 300kw or 1480 rpm motor of Ash Slurry Pump in presence of OEM TA
37Manpower assistance for FC of Coarse Ash PumpProviding manpower assistance for Overhauling of Fluidomat Make model SC 8 50kw or 1480 rpm motor speed variation +20 to -20 percentage Fluid Coupling of Course Ash Pump and Clinker Grinder drive assembly in presence of OEM TA
38OH of GB of ASPOverhauling of New Allen berry works Make Gear Box of Ash Slurry Pump MODEL CSA250 260KW or 1150 RPM
39OH of GB of Coarse Ash PumpOverhauling of New Allen berry works Make Gear Box of Coarse Ash Pump and Clinker Grinder drive assembly model CSA125 55KW or 1500 RPM
40OH of LOP of FC of ASPOverhauling of Lube Oil Pump of Fluid Coupling of Ash Slurry Pump
41Servicing of OC of FC of ASPServicing of Oil Cooler of Fluid Coupling of Ash Slurry Pump
42Servicing of TDS of ClarifierComplete Servicing of Turbo driving system of Clarifier
43Alignment of ASPAlignment of Ash Slurry Pump
44Rotation of AS Disposal lineRotation of Ash Slurry disposal lines 400x 9.5mm thk NB
45Rotation of BA discharge pipe lineRotation of Bottom ash discharge pipe line 200 NB
46Replacement of MS pipe line Dia 250 NB to 350 NBReplacement of MS pipe line Dia 250 NB to 350 NB
47Replacement of CI pipe line Dia 200 NB to 250 NBReplacement of CI pipe line Dia.200 NB to 250 NB
48Ash disposal by dumper or trolley to outside Power houseIn case the huge quantity of ash accumulated at ESP or IM Silo or Terminal Silo floor the same shall be segregated and lifted by dumper or trolley to outside Powerhouse boundary for its disposal of 2x660MW CTPS. one dumper equal to two tractor trolley
49Servicing of Dewatering PumpComplete servicing of dewatering pump.
50Servicing of Submersible PumpServicing of Goodwin make submersible pump of capacity 200 cubic meter per hour Mechanical work
51Removal of wornout or damage valvesRemoval of worn out or damaged valves of size more than 80mm Nb from ash disposal line or seal water line or ash water line etc.
52Inatallation of new or repaired valvesInstallation of new or repaired valves of size more than 80mm Nb in ash disposal line or seal water line or ash water line etc.
53Replacement of SpoutReplacement or repairing of spout of IM Silo or Terminal Silo
54Pipe laying and alignment of MS Pipe 406.4mmPipe Laying and alignment of following diameter MS pipe over the RCC pedestal of height approx. varies from 300 to 1500mm which includes transportation of pipe and its accessories at erection site including cutting, grinding as well as its welding tightening of coupling clamping bolt and nuts gasket etc. including testing as per recommendation of Field Quality Plan satisfactory hydraulic testing commissioning etc. required for proper completion of work including cost of all labour material T and P etc. ERW MS pipe OD 406.4mm Near IM Silo area
55Refractory works in BAHRefractory works in Bottom ash hopper
56Providing shuttering to carry out the refractory workProviding shuttering to carry out the refractory work
57Fabrication and Erection of Anchor of BAHFabrication and Erection of Anchor of BAH
58Scaffolding work in Bottom ash hopperScaffolding work in Bottom ash hopper
59Isolation of Bottom ash hopperIsolation of Bottom ash hopper
60Hiring of 01 no. JCB or Compact Loader BobcatHiring of 01 no. JCB or Compact Loader Bobcat
61Manpower assistance for OH or servicing of DrierProviding manpower assistance for Overhauling or servicing of Drier in presence of OEM TA Make Ms Mellcon Job no CSU 58 I

AI Tender Summary

OUR REF NO 56407901
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 8.87 Crore
LAST DATE 12-08-2026
Authority
Authority Name Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited
Work Description Bids Are invited for Round The Clock Operation Routine And Preventive Mechanical Maintenance Of Ahd Round The Clock Operation And Preventive Maintenance Work - Round The Clock Operation Routine And Preventive Mechanical Maintenance And Housekeeping And Cleaning Works Of Complete Ash Handling Plant Of 2X660mw Ctps Obra, Sonebhadra. , Dismantling And Shifting Of Asp - Dismantling And Shifting Of Ash Slurry Pump From Its Foundation To Maintenance Bay , Shifting Of Overhauled Or New Asp - Shifting Of Overhauled New Ash Slurry Pump From Maintenance Bay To The Foundation Of Pump , Oh Of Asp - Complete Overhauling Of Ms Indure Make Ash Slurry Pumps , Dismantling And Shifting Of Coarse Ash Pump - Dismantling And Shifting Of Coarse Ash Pump From Its Foundation To Maintenance Bay , Shifting Of Overhauled Or New Coarse Ash Pump - Shifting Of Overhauled New Coarse Ash Pump From Maintenance Bay To The Foundation Of Pump , Oh Of Coarse Ash Pump - Complete Overhauling Of Ms Indure Make Coarse Ash Pump , Dismantling And Shifting Of Vp - Dismantling And Shifting Of Vacuum Pumps From Its Foundation To Maintenance Bay , Shifting Of Overhauled Or New Vp - Shifting Of Overhauled New Vacuum Pumps From Maintenance Bay To The Foundation Of The Pump , Manpower Assistance For Oh Of Vp - Providing Manpower Assistance For Overhauling Of Vacuum Pumps In Presence Of Oem Ta Make Vacuunair Aeromatic Capacity 3871 Cubic Meter Per Hour , Manpower Assistance For Servicing Of Iac - Providing Manpower Assistance For Servicing Of Instrument Air Compressor With Drier In Presence Of Oem Ta Make Atlas Copco Capacity 1300 Cubic Meter Per Hour , Manpower Assistance For Servicing Of Tac - Providing Manpower Assistance For Servicing Of Transport Air Compressor In Presence Of Oem Ta Make Atlas Copco Capacity 8250 Or 7500 Cubic Meter Per Hour , Oh Of Esp Blower - Complete Overhauling Of Esp Fluidizing Air Blower Make Model Rh 120Ac Capacity 660 Cubic Meter Per Hour , Oh Of Im And Terminal Silo Blower - Complete Overhauling Of Im And Terminal Silo Aeration Blower Fluidizing Air Blower Make Model Rhh 20Wc Capacity 1400 Cubic Meter Per Hour , Oh Of Im And Terminal Silo Vent Air Fan - Complete Overhauling Of Im And Terminal Silo Vent Air Fan Type Centrifugal Make Ms Maxim Air , Oh Or Servicing Of Hmdc - Complete Overhauling Or Servicing Of Hmdc Installed At Im And Terminal Silo , Oh Or Servicing Of Rotary Feeder - Complete Overhauling Or Servicing Of Rotary Feeder Installed In Im And Terminal Silo Tank , Dismantling And Shifting Of Balp Or Fwp Or Fahp Or Bahp Or Eco Pump Or Hcsd Pump - Dismantling And Shifting Of Balp Or Fwp Or Fahp Or Bahp Or Eco. Pump Or Hcsd Pump From Its Foundation To Maintenance Bay , Shifting Of Overhauled Or New Balp Or Fwp Or Fahp Or Bahp Or Eco Pump Or Hcsd Pump - Shifting Of Overhauled Or New Balp Or Fwp Or Fahp Or Bahp Or Eco. Pump Or Hmdc Pump From Maintenance Bay To The Foundation Of The Pump , Oh Of Fwp - Overhauling Of Flushing Water Pump Fwp , Oh Of Balp Pump - Overhauling Of Bottom Ash Low Pressure Pump Balp , Oh Of Fahp Pump - Overhauling Of Fly Ash High Pressure Pump Fahp , Oh Of Bahp Pump - Overhauling Of Bottom Ash High Pressure Pump Bahp , Oh Of Economizer Pump - Overhauling Of Economizer Pump , Oh Of Hmdc Pump - Overhauling Of Hydro Mix Dust Conditioner Pump Hmdc For Im And Terminal Silo , Oh Of Hp Swp - Overhauling Of Hp Seal Water Pump , Oh Of Lp Swp - Overhauling Of Lp Seal Water Pump , Oh Of Baofp - Overhauling Of Bottom Ash Overflow Pump Baofp , Oh Of Rwp - Overhauling Of Recycle Water Pump Rwp , Oh Of Ahp Clarifier Sludge Pump - Overhauling Of Ahp Clarifier Sludge Pump , Oh Of Dosing Pump - Overhauling Of Alum Lime And Poly Electrolyte Dosing Pump , Oh Of Awrp - Overhauling Of Ash Water Recovery Pump , Oh Of Rpswp - Overhauling Of Recovery Pump Seal Water Pump , Oh Of Drain Pump - Overhauling Of Drain Pumps Installed At Ba Hopper Area Ash Slurry Pump House Vacuum Pump Area Silo Area And Recovery Clarifier Area. , Oh Of Baha Jet Type Drain Pump - Overhauling Of Bottom Ash Hopper Area Jet Type Drain Pump , Manpower Assistance For Fc Of Asp - Providing Manpower Assistance For Overhauling Of Fluidomat Make Fluid Coupling Model Sc 10 300Kw Or 1480 Rpm Motor Of Ash Slurry Pump In Presence Of Oem Ta , Manpower Assistance For Fc Of Coarse Ash Pump - Providing Manpower Assistance For Overhauling Of Fluidomat Make Model Sc 8 50Kw Or 1480 Rpm Motor Speed Variation +20 To -20 Percentage Fluid Coupling Of Course Ash Pump And Clinker Grinder Drive Assembly In Presence Of Oem Ta , Oh Of Gb Of Asp - Overhauling Of New Allen Berry Works Make Gear Box Of Ash Slurry Pump Model Csa250 260Kw Or 1150 Rpm , Oh Of Gb Of Coarse Ash Pump - Overhauling Of New Allen Berry Works Make Gear Box Of Coarse Ash Pump And Clinker Grinder Drive Assembly Model Csa125 55Kw Or 1500 Rpm , Oh Of Lop Of Fc Of Asp - Overhauling Of Lube Oil Pump Of Fluid Coupling Of Ash Slurry Pump , Servicing Of Oc Of Fc Of Asp - Servicing Of Oil Cooler Of Fluid Coupling Of Ash Slurry Pump , Servicing Of Tds Of Clarifier - Complete Servicing Of Turbo Driving System Of Clarifier , Alignment Of Asp - Alignment Of Ash Slurry Pump , Rotation Of As Disposal Line - Rotation Of Ash Slurry Disposal Lines 400X 9.5Mm Thk Nb , Rotation Of Ba Discharge Pipe Line - Rotation Of Bottom Ash Discharge Pipe Line 200 Nb , Replacement Of Ms Pipe Line Dia 250 Nb To 350 Nb , Replacement Of Ci Pipe Line Dia 200 Nb To 250 Nb - Replacement Of Ci Pipe Line Dia.200 Nb To 250 Nb , Ash Disposal By Dumper Or Trolley To Outside Power House - In Case The Huge Quantity Of Ash Accumulated At Esp Or Im Silo Or Terminal Silo Floor The Same Shall Be Segregated And Lifted By Dumper Or Trolley To Outside Powerhouse Boundary For Its Disposal Of 2X660mw Ctps. One Dumper Equal To Two Tractor Trolley , Servicing Of Dewatering Pump - Complete Servicing Of Dewatering Pump. , Servicing Of Submersible Pump - Servicing Of Goodwin Make Submersible Pump Of Capacity 200 Cubic Meter Per Hour Mechanical Work , Removal Of Wornout Or Damage Valves - Removal Of Worn Out Or Damaged Valves Of Size More Than 80Mm Nb From Ash Disposal Line Or Seal Water Line Or Ash Water Line Etc. , Inatallation Of New Or Repaired Valves - Installation Of New Or Repaired Valves Of Size More Than 80Mm Nb In Ash Disposal Line Or Seal Water Line Or Ash Water Line Etc. , Replacement Of Spout - Replacement Or Repairing Of Spout Of Im Silo Or Terminal Silo , Pipe Laying And Alignment Of Ms Pipe 406.4Mm - Pipe Laying And Alignment Of Following Diameter Ms Pipe Over The Rcc Pedestal Of Height Approx. Varies From 300 To 1500Mm Which Includes Transportation Of Pipe And Its Accessories At Erection Site Including Cutting, Grinding As Well As Its Welding Tightening Of Coupling Cl Ing Bolt And Nuts Gasket Etc. Including Testing As Per Recommendation Of Field Quality Plan Satisfactory Hydraulic Testing Commissioning Etc. Required For Proper Completion Of Work Including Cost Of All Labour Material T And P Etc. Erw Ms Pipe Od 406.4Mm Near Im Silo Area , Refractory Works In Bah - Refractory Works In Bottom Ash Hopper , Providing Shuttering To Carry Out The Refractory Work , Fabrication And Erection Of Anchor Of Bah , Scaffolding Work In Bottom Ash Hopper , Isolation Of Bottom Ash Hopper , Hiring Of 01 No. Jcb Or Compact Loader Bobcat - Hiring Of 01 No. Jcb Or Compact Loader Bobcat , Manpower Assistance For Oh Or Servicing Of Drier - Providing Manpower Assistance For Overhauling Or Servicing Of Drier In Presence Of Oem Ta Make Ms Mellcon Job No Csu 58 I Total Quantity : 33143
Basic Detail
Tender No GEM/2026/B/7756391
Bidding Type Tender
Location
City Sonbhadra
State Uttar Pradesh
Key Dates
Publish Date 10 Jul 2026
Submission Date 12 Aug 2026
Open Date 12 Aug 2026
Finance
Tender Value 8.87 Crore
Tender Fee Ref. Documents
EMD 11.28 Lakhs
Exemption Not Available
Document List
34435d5d-fabf-4ec1-8594-1e60302400b3.pdf
9572225_Boq_1.xlsx
scope_of_work_ahd_2026-07-07-17-57-49_32f67a05d11f42c648f4793b57f47093.pdf
TSD1_6b4312f0-efde-475d-8cb31783429044801_ee_ahd_ctps_obra.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 31 days
Aug 12, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 31 days

Tender Documents

Download All (ZIP) ↓
pdf

34435d5d-fabf-4ec1-8594-1e60302400b3.pdf

xlsx

9572225_Boq_1.xlsx

pdf

scope_of_work_ahd_2026-07-07-17-57-49_32f67a05d11f42c648f4793b57f47093.pdf

pdf

TSD1_6b4312f0-efde-475d-8cb31783429044801_ee_ahd_ctps_obra.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders