Drinking Water Supply and Sanitation Government Departments Closing in 9 days TDR #56406203

Tender For Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Horizontal And Vertical Turbine Pumping Units Installed At Different Wsss Of Jal Shakti (Phe) Mechanical Rural Division Srinagar

Issued by Government Departments · Srinagar, Jammu and Kashmir
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Jul 2026
9 days left
EMD
14000
Bank guarantee accepted
Document Fee
400
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Horizontal And Vertical Turbine Pumping Units Installed At Different Wsss Of Jal Shakti (Phe) Mechanical Rural Division Srinagar

BOQ

Name of Work:- Annual Framework/Rate Contract for Repairs/replacements to the all types of Horizontal and Vertical Turbine pumping units installed at different WSSs of Jal Shakti (PHE) Mechanical Rural Division Srinagar
Sl. No. Item Description
1Repairs to 3-Phase, 5HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
2Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
3Replacement of damaged fan as per sample.
4Repairs to Bearing Housing by way of remetalling, machining etc
5Providing/fitting of connection plate for Horizontal motor as per sample.
6Repairs to 3-Phase, 7.5HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
7Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
8Replacement of damaged fan as per sample.
9Repairs to Bearing Housing by way of remetalling, machining etc
10Providing/fitting of connection plate for Horizontal motor as per sample.
11Repairs to 3-Phase, 10HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
12Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
13Replacement of damaged fan as per sample.
14Repairs to Bearing Housing by way of remetalling, machining etc
15Providing/fitting of connection plate for Horizontal motor as per sample.
16Repairs to 3-Phase, 12HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
17Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
18Replacement of damaged fan as per sample.
19Repairs to Bearing Housing by way of remetalling, machining etc
20Providing/fitting of connection plate for Horizontal motor as per sample.
21Repairs to 3-Phase, 15HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
22Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
23Replacement of damaged fan as per sample.
24Repairs to Bearing Housing by way of remetalling, machining etc
25Providing/fitting of connection plate for Horizontal motor as per sample.
26Repairs to 3-Phase, 17.5HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
27Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
28Replacement of damaged fan as per sample.
29Repairs to Bearing Housing by way of remetalling, machining etc
30Providing/fitting of connection plate for Horizontal motor as per sample.
31Repairs to 3-Phase, 20HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
32Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
33Replacement of damaged fan as per sample.
34Repairs to Bearing Housing by way of remetalling, machining etc
35Providing/fitting of connection plate for Horizontal motor as per sample.
36Repairs to 3-Phase, 25HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
37Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
38Replacement of damaged fan as per sample.
39Repairs to Bearing Housing by way of remetalling, machining etc
40Providing/fitting of connection plate for Horizontal motor as per sample.
41Repairs to 3-Phase, 30HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
42Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
43Replacement of damaged fan as per sample.
44Repairs to Bearing Housing by way of remetalling, machining etc
45Providing/fitting of connection plate for Horizontal motor as per sample.
46Repairs to 3-Phase, 40HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
47Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
48Replacement of damaged fan as per sample.
49Repairs to Bearing Housing by way of remetalling, machining etc
50Providing/fitting of connection plate for Horizontal motor as per sample.
51Repairs to 3-Phase, 45HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
52Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
53Replacement of damaged fan as per sample.
54Repairs to Bearing Housing by way of remetalling, machining etc
55Providing/fitting of connection plate for Horizontal motor as per sample.
56Repairs to 3-Phase, 50HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
57Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
58Replacement of damaged fan as per sample.
59Repairs to Bearing Housing by way of remetalling, machining etc
60Providing/fitting of connection plate for Horizontal motor as per sample.
61Repairs to 3-Phase, 60HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
62Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
63Replacement of damaged fan as per sample.
64Repairs to Bearing Housing by way of remetalling, machining etc
65Providing/fitting of connection plate for Horizontal motor as per sample.
66Repairs to 3-Phase, 75HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
67Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
68Replacement of damaged fan as per sample.
69Repairs to Bearing Housing by way of remetalling, machining etc
70Providing/fitting of connection plate for Horizontal motor as per sample.
71Repairs to 3-Phase, 100HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load.
72Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap.
73Replacement of damaged fan as per sample.
74Repairs to Bearing Housing by way of remetalling, machining etc
75Providing/fitting of connection plate for Horizontal motor as per sample.
76Cost of scrap copper (dismantle windings)
77Repairs to Horizontal Pump having discharge from 3000GPH and below 10000GPH. Dismantling of the Horizontal Pumping unit at site, shifting to the workshop for repairs in a private load carrier to be arranged by the firm, repairing, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items.
78Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
79Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
80Fabrication providing and fitting of Split type MS gland (Machined/Finished)
81Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
82Remetalling of bearing seats, and finishing to size for proper fitment of bearings
83Remetalling of Pump shaft and finishing to size for proper fitment of bearings
84Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
85Providing and fitting of metallic Palmative packing
86Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
87Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
88Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
89Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
90Repairs to Horizontal Pump having discharge from 10000GPH and below 30000GPH. Dismantling of the Horizontal Pumping unit at site, shifting to the workshop for repairs in a private load carrier to be arranged by the firm, repairing, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items.
91Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
92Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
93Fabrication providing and fitting of Split type MS gland (Machined/Finished)
94Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
95Remetalling of bearing seats, and finishing to size for proper fitment of bearings
96Remetalling of Pump shaft and finishing to size for proper fitment of bearings
97Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
98Providing and fitting of metallic Palmative packing
99Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
100Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
101Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
102Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
103Repairs to Horizontal Pump having discharge from 30000GPH and below 50000GPH. Dismantling of the Horizontal Pumping unit at site, shifting to the workshop for repairs in a private load carrier to be arranged by the firm, repairing, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items.
104Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
105Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
106Fabrication providing and fitting of Split type MS gland (Machined/Finished)
107Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
108Remetalling of bearing seats, and finishing to size for proper fitment of bearings
109Remetalling of Pump shaft and finishing to size for proper fitment of bearings
110Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
111Providing and fitting of metallic Palmative packing
112Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
113Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
114Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
115Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
116Repairs to Horizontal Pump having discharge from 50000GPH and below 90000GPH. Dismantling of the Horizontal Pumping unit at site, shifting to the workshop for repairs in a private load carrier to be arranged by the firm, repairing, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items.
117Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
118Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
119Fabrication providing and fitting of Split type MS gland (Machined/Finished)
120Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
121Remetalling of bearing seats, and finishing to size for proper fitment of bearings
122Remetalling of Pump shaft and finishing to size for proper fitment of bearings
123Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
124Providing and fitting of metallic Palmative packing
125Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
126Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
127Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
128Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
129Replacement of MS Hub TC-series rubber tyre motor couplings ( complete assembly) of following sizes:-
130TC-11
131TC-12
132TC-13
133TC-14
134TC-15
135TC-16
136TC-17
137TC-18
138Providing and fitting of rubber tyre part only to TC couplings of following sizes
139TC-11
140TC-12
141TC-13
142TC-14
143TC-15
144TC-16
145TC-17
146TC-18
147Providing of metallic rope/gland packing of following thickness
148Repairs to 3-Phase, 25HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
149Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
150Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm.
151Replacement of damaged fan as per sample.
152Repairs to Bearing Housing by way of remetalling, machining etc
153Providing/fitting of connection plate for Vertical motor as per sample.
154Repairs to 3-Phase, 30HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
155Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
156Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm.
157Replacement of damaged fan as per sample.
158Repairs to Bearing Housing by way of remetalling, machining etc
159Providing/fitting of connection plate for Vertical motor as per sample.
160Repairs to 3-Phase, 40HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
161Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
162Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm.
163Replacement of damaged fan as per sample.
164Repairs to Bearing Housing by way of remetalling, machining etc
165Providing/fitting of connection plate for Vertical motor as per sample.
166Repairs to 3-Phase, 45HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
167Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
168Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm.
169Replacement of damaged fan as per sample.
170Repairs to Bearing Housing by way of remetalling, machining etc
171Providing/fitting of connection plate for Vertical motor as per sample.
172Repairs to 3-Phase, 50HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
173Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
174Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm.
175Replacement of damaged fan as per sample.
176Repairs to Bearing Housing by way of remetalling, machining etc
177Providing/fitting of connection plate for Vertical motor as per sample.
178Repairs to 3-Phase, 60HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
179Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
180Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm.
181Replacement of damaged fan as per sample.
182Repairs to Bearing Housing by way of remetalling, machining etc
183Providing/fitting of connection plate for Vertical motor as per sample.
184Repairs to 3-Phase, 75HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
185Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
186Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm.
187Replacement of damaged fan as per sample.
188Repairs to Bearing Housing by way of remetalling, machining etc
189Providing/fitting of connection plate for Vertical motor as per sample.
190Repairs to 3-Phase, 100HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
191Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
192Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm.
193Replacement of damaged fan as per sample.
194Repairs to Bearing Housing by way of remetalling, machining etc
195Providing/fitting of connection plate for Vertical motor as per sample.
196Repairs to 3-Phase, 120HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load.
197Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
198Replacement of damaged Bearing Housing as per sample.
199Replacement of damaged fan as per sample.
200Repairs to Bearing Housing by way of remetalling, machining etc
201Providing/fitting of connection plate for Vertical motor as per sample.
202REPAIRS TO VERTICAL TURBINE PUMPS
203Repairs to VT Pump having discharge from 3000GPH and below 10000GPH. Dismantling of the pumping unit at site, shifting to the workshop for repairs, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items.
204Line shaft (finished) out of SS-410 material as per sample
205Head shaft (finished) out of SS-410 material as per sample
206Rubber liner centre kit bush
207Muff coupling (finished) out of SS-400 material as per sample
208Gun metal gland/stage bush (finished) as per sample
209MS gland (finished) as per sample
210Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
211GM Wearing Ring (finished) as per sample
212Cooling ring (finished) as per sample
213Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
214Re-metalling of bearing seats and coupling seat then turning and finishing to size and shape
215Check nut (finished) as per sample
216Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
217Cost of scrap copper (dismantle windings)
218Repairs to VT Pump having discharge from 10000GPH and below 30000GPH. Dismantling of the pumping unit at site, shifting to the workshop for repairs, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items.
219Line shaft (finished) out of SS-410 material as per sample
220Head shaft (finished) out of SS-410 material as per sample
221Rubber liner centre kit bush
222Muff coupling (finished) out of SS-400 material as per sample
223Gun metal gland/stage bush (finished) as per sample
224MS gland (finished) as per sample
225Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
226GM Wearing Ring (finished) as per sample
227Cooling ring (finished) as per sample
228Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
229Re-metalling of bearing seats and coupling seat then turning and finishing to size and shape
230Check nut (finished) as per sample
231Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
232Cost of scrap copper (dismantle windings)
233Repairs to VT Pump having discharge from 30000GPH and below 50000GPH. Dismantling of the pumping unit at site, shifting to the workshop for repairs, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items.
234Line shaft (finished) out of SS-410 material as per sample
235Head shaft (finished) out of SS-410 material as per sample
236Rubber liner centre kit bush
237Muff coupling (finished) out of SS-400 material as per sample
238Gun metal gland/stage bush (finished) as per sample
239MS gland (finished) as per sample
240Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
241GM Wearing Ring (finished) as per sample
242Cooling ring (finished) as per sample
243Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
244Re-metalling of bearing seats and coupling seat then turning and finishing to size and shape
245Check nut (finished) as per sample
246Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
247Cost of scrap copper (dismantle windings)
248Repairs to VT Pump having discharge from 50000GPH and below 90000GPH. Dismantling of the pumping unit at site, shifting to the workshop for repairs, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items.
249Line shaft (finished) out of SS-410 material as per sample
250Head shaft (finished) out of SS-410 material as per sample
251Rubber liner centre kit bush
252Muff coupling (finished) out of SS-400 material as per sample
253Gun metal gland/stage bush (finished) as per sample
254MS gland (finished) as per sample
255Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
256GM Wearing Ring (finished) as per sample
257Cooling ring (finished) as per sample
258Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
259Re-metalling of bearing seats and coupling seat then turning and finishing to size and shape
260Check nut (finished) as per sample
261Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
262Cost of scrap copper (dismantle windings)
263Replacement of damaged Ball/Thrust bearing for different capacity motors with below mentioned sizes of reputed make with all technical labour for disassembling/assembling, transportation/carriage, fitting the new bearing to both DE and NDE and reassembling of pumping unit thereof:Note:-The bearing should be indian make/ IS Standard
264No:6201
265No:6202
266No:6204
267No:6205
268No:6206
269No:6207
270No:6208
271No:6209
272No:6210
273No:6211
274No:6212
275No:6213
276No:6214
277No:6215
278No:6216
279No:6217
280No:6218
281No:6219
282No:6220
283No:6301
284No:6304
285No:6305
286No:6306
287No:6307
288No:6308
289No:6309
290No:6310
291No:6311
292No:6312
293No:6313
294No:6314
295No:6315
296No:6316
297No:6317
298No:6318
299No:6319
300No:6320
301No:7202
302No:7203
303No:7204
304No:7205
305No:7206
306No:7207
307No:7208
308No:7209
309No:7210
310No:7212
311No:7214
312No:7216
313No:7218
314No:7220
315No:7303
316No:7304
317No:7305
318No:7306
319No:7307
320No:7308
321No:7309
322No:7310
323No:7312
324No:7314
325No:7316
326No:7318
327No:7320
328No:3302
329No:3303
330No:3304
331No:3305
332No:3306
333No:3307
334No:3308
335No:3309
336No:3310
337No:3311
338No:5101
339No:51102
340No:51103
341No:51104
342No:51105
343No:51106
344No:51107
345No:51108
346No:51110
347No:51112
348No:51118
349No:51120
350No:51200
351No:51210
352No:51220
353No:51320
354No:29320
355No:29322
35629324 E
357N 313 C3 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56406203
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 20-07-2026
Authority
Authority Name Public Health Engineering Department
Work Description Tender for Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Horizontal And Vertical Turbine Pumping Units Installed At Different Wsss Of Jal Shakti (Phe) Mechanical Rural Division Srinagar
Basic Detail
Tender No PHE/MRD/TS 13 OF 07/2026
Bidding Type Tender
Location
City Srinagar
State Jammu and Kashmir
Key Dates
Publish Date 10 Jul 2026
Submission Date 20 Jul 2026
Open Date 20 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee 400
EMD 14000
Exemption Not Available
Document List
3d07415a-fd17-458d-bf59-433a48a91fd1.html
BOQ_1023238.xls
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Jul 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
html

3d07415a-fd17-458d-bf59-433a48a91fd1.html

xls

BOQ_1023238.xls

pdf

Tendernotice_1 (10).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders