Tender For Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Horizontal And Vertical Turbine Pumping Units Installed At Different Wsss Of Jal Shakti (Phe) Mechanical Rural Division Srinagar
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Jul 2026
9 days left
EMD
14000
Bank guarantee accepted
Document Fee
400
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Framework/Rate Contract For Repairs/Replacements To The All Types Of Horizontal And Vertical Turbine Pumping Units Installed At Different Wsss Of Jal Shakti (Phe) Mechanical Rural Division Srinagar
BOQ
| Sl. No. | Item Description |
| 1 | Repairs to 3-Phase, 5HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 2 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 3 | Replacement of damaged fan as per sample. |
| 4 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 5 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 6 | Repairs to 3-Phase, 7.5HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 7 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 8 | Replacement of damaged fan as per sample. |
| 9 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 10 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 11 | Repairs to 3-Phase, 10HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 12 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 13 | Replacement of damaged fan as per sample. |
| 14 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 15 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 16 | Repairs to 3-Phase, 12HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 17 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 18 | Replacement of damaged fan as per sample. |
| 19 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 20 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 21 | Repairs to 3-Phase, 15HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 22 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 23 | Replacement of damaged fan as per sample. |
| 24 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 25 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 26 | Repairs to 3-Phase, 17.5HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 27 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 28 | Replacement of damaged fan as per sample. |
| 29 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 30 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 31 | Repairs to 3-Phase, 20HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 32 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 33 | Replacement of damaged fan as per sample. |
| 34 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 35 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 36 | Repairs to 3-Phase, 25HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 37 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 38 | Replacement of damaged fan as per sample. |
| 39 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 40 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 41 | Repairs to 3-Phase, 30HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 42 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 43 | Replacement of damaged fan as per sample. |
| 44 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 45 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 46 | Repairs to 3-Phase, 40HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 47 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 48 | Replacement of damaged fan as per sample. |
| 49 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 50 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 51 | Repairs to 3-Phase, 45HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 52 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 53 | Replacement of damaged fan as per sample. |
| 54 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 55 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 56 | Repairs to 3-Phase, 50HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 57 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 58 | Replacement of damaged fan as per sample. |
| 59 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 60 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 61 | Repairs to 3-Phase, 60HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 62 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 63 | Replacement of damaged fan as per sample. |
| 64 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 65 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 66 | Repairs to 3-Phase, 75HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 67 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 68 | Replacement of damaged fan as per sample. |
| 69 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 70 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 71 | Repairs to 3-Phase, 100HP, Horizontal Motorby way of dismantling of the horizontal motor at site, shifting to the workshop for repairs and shifting back to site, re-assembling and successful testing on full load. |
| 72 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap. |
| 73 | Replacement of damaged fan as per sample. |
| 74 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 75 | Providing/fitting of connection plate for Horizontal motor as per sample. |
| 76 | Cost of scrap copper (dismantle windings) |
| 77 | Repairs to Horizontal Pump having discharge from 3000GPH and below 10000GPH. Dismantling of the Horizontal Pumping unit at site, shifting to the workshop for repairs in a private load carrier to be arranged by the firm, repairing, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items. |
| 78 | Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample. |
| 79 | Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample |
| 80 | Fabrication providing and fitting of Split type MS gland (Machined/Finished) |
| 81 | Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring |
| 82 | Remetalling of bearing seats, and finishing to size for proper fitment of bearings |
| 83 | Remetalling of Pump shaft and finishing to size for proper fitment of bearings |
| 84 | Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample. |
| 85 | Providing and fitting of metallic Palmative packing |
| 86 | Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample |
| 87 | Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample |
| 88 | Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones. |
| 89 | Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones. |
| 90 | Repairs to Horizontal Pump having discharge from 10000GPH and below 30000GPH. Dismantling of the Horizontal Pumping unit at site, shifting to the workshop for repairs in a private load carrier to be arranged by the firm, repairing, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items. |
| 91 | Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample. |
| 92 | Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample |
| 93 | Fabrication providing and fitting of Split type MS gland (Machined/Finished) |
| 94 | Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring |
| 95 | Remetalling of bearing seats, and finishing to size for proper fitment of bearings |
| 96 | Remetalling of Pump shaft and finishing to size for proper fitment of bearings |
| 97 | Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample. |
| 98 | Providing and fitting of metallic Palmative packing |
| 99 | Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample |
| 100 | Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample |
| 101 | Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones. |
| 102 | Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones. |
| 103 | Repairs to Horizontal Pump having discharge from 30000GPH and below 50000GPH. Dismantling of the Horizontal Pumping unit at site, shifting to the workshop for repairs in a private load carrier to be arranged by the firm, repairing, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items. |
| 104 | Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample. |
| 105 | Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample |
| 106 | Fabrication providing and fitting of Split type MS gland (Machined/Finished) |
| 107 | Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring |
| 108 | Remetalling of bearing seats, and finishing to size for proper fitment of bearings |
| 109 | Remetalling of Pump shaft and finishing to size for proper fitment of bearings |
| 110 | Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample. |
| 111 | Providing and fitting of metallic Palmative packing |
| 112 | Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample |
| 113 | Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample |
| 114 | Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones. |
| 115 | Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones. |
| 116 | Repairs to Horizontal Pump having discharge from 50000GPH and below 90000GPH. Dismantling of the Horizontal Pumping unit at site, shifting to the workshop for repairs in a private load carrier to be arranged by the firm, repairing, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items. |
| 117 | Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample. |
| 118 | Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample |
| 119 | Fabrication providing and fitting of Split type MS gland (Machined/Finished) |
| 120 | Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring |
| 121 | Remetalling of bearing seats, and finishing to size for proper fitment of bearings |
| 122 | Remetalling of Pump shaft and finishing to size for proper fitment of bearings |
| 123 | Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample. |
| 124 | Providing and fitting of metallic Palmative packing |
| 125 | Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample |
| 126 | Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample |
| 127 | Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones. |
| 128 | Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones. |
| 129 | Replacement of MS Hub TC-series rubber tyre motor couplings ( complete assembly) of following sizes:- |
| 130 | TC-11 |
| 131 | TC-12 |
| 132 | TC-13 |
| 133 | TC-14 |
| 134 | TC-15 |
| 135 | TC-16 |
| 136 | TC-17 |
| 137 | TC-18 |
| 138 | Providing and fitting of rubber tyre part only to TC couplings of following sizes |
| 139 | TC-11 |
| 140 | TC-12 |
| 141 | TC-13 |
| 142 | TC-14 |
| 143 | TC-15 |
| 144 | TC-16 |
| 145 | TC-17 |
| 146 | TC-18 |
| 147 | Providing of metallic rope/gland packing of following thickness |
| 148 | Repairs to 3-Phase, 25HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 149 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 150 | Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm. |
| 151 | Replacement of damaged fan as per sample. |
| 152 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 153 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 154 | Repairs to 3-Phase, 30HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 155 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 156 | Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm. |
| 157 | Replacement of damaged fan as per sample. |
| 158 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 159 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 160 | Repairs to 3-Phase, 40HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 161 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 162 | Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm. |
| 163 | Replacement of damaged fan as per sample. |
| 164 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 165 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 166 | Repairs to 3-Phase, 45HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 167 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 168 | Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm. |
| 169 | Replacement of damaged fan as per sample. |
| 170 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 171 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 172 | Repairs to 3-Phase, 50HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 173 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 174 | Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm. |
| 175 | Replacement of damaged fan as per sample. |
| 176 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 177 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 178 | Repairs to 3-Phase, 60HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 179 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 180 | Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm. |
| 181 | Replacement of damaged fan as per sample. |
| 182 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 183 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 184 | Repairs to 3-Phase, 75HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 185 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 186 | Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm. |
| 187 | Replacement of damaged fan as per sample. |
| 188 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 189 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 190 | Repairs to 3-Phase, 100HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 191 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 192 | Replacement of damaged Bearing Housing as per sample. The Old scraps shall be retained by the firm. |
| 193 | Replacement of damaged fan as per sample. |
| 194 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 195 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 196 | Repairs to 3-Phase, 120HP, Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop for repairs, shifting back to site, re-assembling of pump motor assembly and successful testing on full load. |
| 197 | Rewinding by using Super Enamelled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by using special tools & tackles, skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by using proper insulating material, varnishing, tape, sleeves, insulated PVC paper, bamboo sticks, thread etc. The job also includes re-assembling of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop.Note: The old copper scrap shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap |
| 198 | Replacement of damaged Bearing Housing as per sample. |
| 199 | Replacement of damaged fan as per sample. |
| 200 | Repairs to Bearing Housing by way of remetalling, machining etc |
| 201 | Providing/fitting of connection plate for Vertical motor as per sample. |
| 202 | REPAIRS TO VERTICAL TURBINE PUMPS |
| 203 | Repairs to VT Pump having discharge from 3000GPH and below 10000GPH. Dismantling of the pumping unit at site, shifting to the workshop for repairs, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items. |
| 204 | Line shaft (finished) out of SS-410 material as per sample |
| 205 | Head shaft (finished) out of SS-410 material as per sample |
| 206 | Rubber liner centre kit bush |
| 207 | Muff coupling (finished) out of SS-400 material as per sample |
| 208 | Gun metal gland/stage bush (finished) as per sample |
| 209 | MS gland (finished) as per sample |
| 210 | Facing /treatment of bowel stage and impeller for proper fitment of wearing ring |
| 211 | GM Wearing Ring (finished) as per sample |
| 212 | Cooling ring (finished) as per sample |
| 213 | Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample |
| 214 | Re-metalling of bearing seats and coupling seat then turning and finishing to size and shape |
| 215 | Check nut (finished) as per sample |
| 216 | Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles. |
| 217 | Cost of scrap copper (dismantle windings) |
| 218 | Repairs to VT Pump having discharge from 10000GPH and below 30000GPH. Dismantling of the pumping unit at site, shifting to the workshop for repairs, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items. |
| 219 | Line shaft (finished) out of SS-410 material as per sample |
| 220 | Head shaft (finished) out of SS-410 material as per sample |
| 221 | Rubber liner centre kit bush |
| 222 | Muff coupling (finished) out of SS-400 material as per sample |
| 223 | Gun metal gland/stage bush (finished) as per sample |
| 224 | MS gland (finished) as per sample |
| 225 | Facing /treatment of bowel stage and impeller for proper fitment of wearing ring |
| 226 | GM Wearing Ring (finished) as per sample |
| 227 | Cooling ring (finished) as per sample |
| 228 | Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample |
| 229 | Re-metalling of bearing seats and coupling seat then turning and finishing to size and shape |
| 230 | Check nut (finished) as per sample |
| 231 | Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles. |
| 232 | Cost of scrap copper (dismantle windings) |
| 233 | Repairs to VT Pump having discharge from 30000GPH and below 50000GPH. Dismantling of the pumping unit at site, shifting to the workshop for repairs, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items. |
| 234 | Line shaft (finished) out of SS-410 material as per sample |
| 235 | Head shaft (finished) out of SS-410 material as per sample |
| 236 | Rubber liner centre kit bush |
| 237 | Muff coupling (finished) out of SS-400 material as per sample |
| 238 | Gun metal gland/stage bush (finished) as per sample |
| 239 | MS gland (finished) as per sample |
| 240 | Facing /treatment of bowel stage and impeller for proper fitment of wearing ring |
| 241 | GM Wearing Ring (finished) as per sample |
| 242 | Cooling ring (finished) as per sample |
| 243 | Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample |
| 244 | Re-metalling of bearing seats and coupling seat then turning and finishing to size and shape |
| 245 | Check nut (finished) as per sample |
| 246 | Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles. |
| 247 | Cost of scrap copper (dismantle windings) |
| 248 | Repairs to VT Pump having discharge from 50000GPH and below 90000GPH. Dismantling of the pumping unit at site, shifting to the workshop for repairs, shifting back to site, re-assembling and successful testing on full load. Note:- The old scrap shall be retained by the firm & shall quote the rates with rebate on account of old scrap for below mentioned items. |
| 249 | Line shaft (finished) out of SS-410 material as per sample |
| 250 | Head shaft (finished) out of SS-410 material as per sample |
| 251 | Rubber liner centre kit bush |
| 252 | Muff coupling (finished) out of SS-400 material as per sample |
| 253 | Gun metal gland/stage bush (finished) as per sample |
| 254 | MS gland (finished) as per sample |
| 255 | Facing /treatment of bowel stage and impeller for proper fitment of wearing ring |
| 256 | GM Wearing Ring (finished) as per sample |
| 257 | Cooling ring (finished) as per sample |
| 258 | Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample |
| 259 | Re-metalling of bearing seats and coupling seat then turning and finishing to size and shape |
| 260 | Check nut (finished) as per sample |
| 261 | Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles. |
| 262 | Cost of scrap copper (dismantle windings) |
| 263 | Replacement of damaged Ball/Thrust bearing for different capacity motors with below mentioned sizes of reputed make with all technical labour for disassembling/assembling, transportation/carriage, fitting the new bearing to both DE and NDE and reassembling of pumping unit thereof:Note:-The bearing should be indian make/ IS Standard |
| 264 | No:6201 |
| 265 | No:6202 |
| 266 | No:6204 |
| 267 | No:6205 |
| 268 | No:6206 |
| 269 | No:6207 |
| 270 | No:6208 |
| 271 | No:6209 |
| 272 | No:6210 |
| 273 | No:6211 |
| 274 | No:6212 |
| 275 | No:6213 |
| 276 | No:6214 |
| 277 | No:6215 |
| 278 | No:6216 |
| 279 | No:6217 |
| 280 | No:6218 |
| 281 | No:6219 |
| 282 | No:6220 |
| 283 | No:6301 |
| 284 | No:6304 |
| 285 | No:6305 |
| 286 | No:6306 |
| 287 | No:6307 |
| 288 | No:6308 |
| 289 | No:6309 |
| 290 | No:6310 |
| 291 | No:6311 |
| 292 | No:6312 |
| 293 | No:6313 |
| 294 | No:6314 |
| 295 | No:6315 |
| 296 | No:6316 |
| 297 | No:6317 |
| 298 | No:6318 |
| 299 | No:6319 |
| 300 | No:6320 |
| 301 | No:7202 |
| 302 | No:7203 |
| 303 | No:7204 |
| 304 | No:7205 |
| 305 | No:7206 |
| 306 | No:7207 |
| 307 | No:7208 |
| 308 | No:7209 |
| 309 | No:7210 |
| 310 | No:7212 |
| 311 | No:7214 |
| 312 | No:7216 |
| 313 | No:7218 |
| 314 | No:7220 |
| 315 | No:7303 |
| 316 | No:7304 |
| 317 | No:7305 |
| 318 | No:7306 |
| 319 | No:7307 |
| 320 | No:7308 |
| 321 | No:7309 |
| 322 | No:7310 |
| 323 | No:7312 |
| 324 | No:7314 |
| 325 | No:7316 |
| 326 | No:7318 |
| 327 | No:7320 |
| 328 | No:3302 |
| 329 | No:3303 |
| 330 | No:3304 |
| 331 | No:3305 |
| 332 | No:3306 |
| 333 | No:3307 |
| 334 | No:3308 |
| 335 | No:3309 |
| 336 | No:3310 |
| 337 | No:3311 |
| 338 | No:5101 |
| 339 | No:51102 |
| 340 | No:51103 |
| 341 | No:51104 |
| 342 | No:51105 |
| 343 | No:51106 |
| 344 | No:51107 |
| 345 | No:51108 |
| 346 | No:51110 |
| 347 | No:51112 |
| 348 | No:51118 |
| 349 | No:51120 |
| 350 | No:51200 |
| 351 | No:51210 |
| 352 | No:51220 |
| 353 | No:51320 |
| 354 | No:29320 |
| 355 | No:29322 |
| 356 | 29324 E |
| 357 | N 313 C3 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysJul 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender