Bids Are invited for Fully Automatic Biochemistry Analyzer (V2) (Q2) - System Type: Fully Automated Random Access(For Routine And Stat S Le) Open System (Should Be Compatible To Analytical Grade Fully Automated Biochemistry Reagents) , Type Of Bioche
Tender Overview
Project Description
Bids Are invited for Fully Automatic Biochemistry Analyzer (V2) (Q2) - System Type: Fully Automated Random Access(For Routine And Stat S Le) Open System (Should Be Compatible To Analytical Grade Fully Automated Biochemistry Reagents) , Type Of Biochemistry: Floor Model Type/Bench Model Type , S Le Type: Serum,Plasma,Whole Blood,Urine,Csf S Les/Apecimens & Ise (Sodium,Pottasium & Chloride) , Assay Type: End-Point, Rate, Kinetic & Two-Point Assays/Methodologies & Optional Ise , Throughput Tests / Hour Photometric Tests With Ise Module: 400 Or More , Throughput Tests/Hour Photometric Tests Without Ise Module: 560 Or More , Calibration Facility: Factor, Linear (One, Two And Multi-Point), Exponential, Logit-Log, Spline, Non-Linear , Equipment Must Have Self Diagnostic Tests With Error Message And Online Display , Equipment Must Be Programmable For All Test Menus And State Of The Art Work Station Should Be Up-Gradable By Addition Of Ise Module , S Le Loading Type: S Le Loading Capacity Should Be 125 Or More And Should Have Liquid Level Detection , Equipment Should Have Both Internal And External Probe Cleaning/Washing Capacity To Avoid Carry Over , Repeat Facility Should Be Available For Calibrator And Control , Should Have Reagent Refill Message And Monitoring Facility , Minimum Number Of Test Parameters On Board At A Time: ≥ 30 , Minimum S Le Capacity At A Time: 50 To 99 , Minimum Number Of Stat S Les At A Time: ≥ 10 , Should Have Pre Post And Auto Dilution Of S Les And Return Capability For Out Of Range S Les , Probe Dispensers Must Have Level Detectors And Must Typically Use Between 2-35 Μl Of S Le And Have The Ability To Aspirate Liquid From Micro S Le Viales With Liquid Level Detection , Should Have Clot Detection Capability For S Le And Should Be A Critical Alert , Should Have Vertical Collision Protection For The Integrated Reagent (R1 & R2& S Le Probe) , Should Have Non-Stop 24 Hour Cooling With Peltier Element , Spectoral Range In Nm: 340 To 670 Nm , Wave Length Selection Method: Diffraction Grating System , Light Source: Led Light Source , Life Of L In Hrs: ≥ 1000 , Power Consumption Of L In Va: ≤ 1000 , Type Of S Le Cups: Reusable , Number Of S Le Cups Provided With Machine: 1000 , Qc Program :Qc Programme With L-J Graphs, Print Out Of Reports/ Westgard Rules , Reaction Cuvette: Reusable And Is Of Borosilicate Glass/And The Analyzer Should Have Onboard Cuvette Integrity Check And Rotating With Atleast 120 Cuvette Available For Analyser , System Should Have On Board Cooling System: Refrigerated At 6 Degree C - 11 Degree C , Provide Di Water Plant For The Washing Of The Cuvettes/ To Avoid Carry Over And Contamination (Optional) , Should Provide Compatible On Line Ups: 5Kva , Back Up Time: 1 Hour , Data Management Software: Equipment To Be Provided With Compatible Programmable Windows Based Comprehensive Data Processing And Management System Graphical User Interface Software, Lm Capability Complete Back Up Of Data Base For Calibration Control And Patient S Le Results, Capability For Bi-Directional Interfacing With Lis , Patient Result Storage Capacity: 1000000 Or More , Onboard 7 Step Cuvette Washing & 2 Step Drying Facility Should Be Provided , Should Provide Photometeric Checking Of Cuvettes Before Next Reaction , System Should Have Facility For Reading Results On Monitor And Print Out Facility , Reports: Prinout Of Reports And Full Patient Demographics Should Be Available , Should Have Availability Of Rs 232 Port/Usb For Data Transfer , Power Supply: 220-230V Ac, 50Hz-60Hz Single Phase , Reagents Position: 75 Or More , Should Provide With Bar Code Reader For Reagents , Should Provide Bar Code Reader For S Les , Seller Must Provide Original Documentary Proof Of The Date And Place Of Manufacturing Of Provided Equipment , Service Manual And Operating Manual To Be Provided , System Shall Be Provided With A Compatible Desktop Pc , Speed Of Processor In Ghz: Greater Than 3 Ghz , Ram In Mb: ≥ 512 Mb Or Compatible , Hard Disk Drive Capacity In Gb: ≥ 80 Gb , Monitor: Led/ Digital Color Monitor , Monitor Size (Inches): 17 Inches Or More , Compatible Operating System Should Be Provided In Pc , Should Provide With Laser Printer/Inkjet Printer , The Unit Shall Be Capable Of Operating Continuously In Ambient Temperature And Relative Humidity: Temp Of 10° To 25° C , Startup Kit, Calibrators, Consumables Required In Training The Staff/Technician/Doctors Should Be Provided At The Time Of Installation &Training , The Reaction Cuvettes Should Be Replaced At Free Of Cost When Ever Required During The Warranty Period , The Analyser Should Atleast Have Pre-Dilusion Ratio Of 1:200 For S Les Oh High Concentration , Waste Tank Should Have Sensing Capability To Alert The End User For Liquid Fill , Water Consumption Should Be Less Then 14 Litres Per Hour And Have Sensors To Alert The End User For Liquid Insufficiency/Exhaust , Certification And Reports , Should Have European Ce/Fda(Us)/Stqc Cb Certificate/Stqc/Iec Certificate Or Valid Electrical And Functioinal Safety Test Reports , Manufacturing Unit Certification Should Be Iso:13485 (Latest) , Should Provide With Calibration Certificates Issued By Manufacturer At The Time Of Installation , Submission Of All Necessary Certifications, Licenses And Test Reports To The Buyer At The Time Of Bid Submission And/Or Along With Supplies As Per Buyer Requirement , Analyzer Should Have Integritated Mixer Systems With Standardise Mixing Procedures For Optimal Homogenisation Of The Reagent And S Le , Miscellaneous Requirements , Principal Manufacturer Shall Ensure Uninterrupted Availability Of All Spares For Atleast 10 Years , Availability Of Toll Free Facility For Technical Support Maintened By Principal Manufacturer Or Authorized Agencies , User/Technical/Maintenance Manuals To Be Provided In English In Hard And Soft Copy , List Of Important Spares And Accessories, With Their Part Numbers To Be Provided To The Buyer At The Time Of Supplying The Equipment , Installation And Demonstration Of Equipment And Training To Be Provided After Completing Supplies Before Acceptance , The Principal Manufacturer Must Have Direct Presence/Approved Service Center In India , Calibration Certificates As Per Nabh Requirement , Warranty , Ø Warranty In Years(Including Machine, Di Water Plant If Provided , Ups, Computer And Printer) Should Be Of 2 Years , Additional Requirement , Breakdown Calls Should Be Attended Within 24 Hours Of Brakdown , Preventive Maintenance To Be Carried Out Atleast Twice A Year , Should Be Supplied Complete With Probes/Accessories, Consumables, User & Service Manuals, Certificates At Time Of Installation , Delivery: The Item To Be Delivered At 2 X North Goa District Hospital (Asilo), Mapusa, Goa Total Quantity : 2
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | System type: Fully Automated Random Access(for Routine and STAT sample) open System (Should be compatible to analytical grade fully automated biochemistry reagents) | System type: Fully Automated Random Access(for Routine and STAT sample) open System (Should be compatible to analytical grade fully automated biochemistry reagents) |
| 2 | Type of Biochemistry: Floor Model type/Bench model type | Type of Biochemistry: Floor Model type/Bench model type |
| 3 | Sample type: Serum,Plasma,whole blood,Urine,CSF samples/apecimens & ISE (sodium,pottasium & chloride) | Sample type: Serum,Plasma,whole blood,Urine,CSF samples/apecimens & ISE (sodium,pottasium & chloride) |
| 4 | Assay type: End-point, Rate, Kinetic & two-point assays/methodologies & optional ISE | Assay type: End-point, Rate, Kinetic & two-point assays/methodologies & optional ISE |
| 5 | Throughput tests / hour Photometric Tests with ISE module: 400 or more | Throughput tests / hour Photometric Tests with ISE module: 400 or more |
| 6 | Throughput tests/hour Photometric Tests without ISE Module: 560 or more | Throughput tests/hour Photometric Tests without ISE Module: 560 or more |
| 7 | Calibration Facility: Factor, Linear (one, two and multi-point), Exponential, Logit-Log, Spline, Non-Linear | Calibration Facility: Factor, Linear (one, two and multi-point), Exponential, Logit-Log, Spline, Non-Linear |
| 8 | Equipment must have self diagnostic tests with error message and online display | Equipment must have self diagnostic tests with error message and online display |
| 9 | Equipment must be programmable for all test menus and state of the art work station should be up-gradable by addition of ISE module | Equipment must be programmable for all test menus and state of the art work station should be up-gradable by addition of ISE module |
| 10 | Sample loading type: Sample Loading capacity should be 125 or more and should have liquid level detection | Sample loading type: Sample Loading capacity should be 125 or more and should have liquid level detection |
| 11 | Equipment should have both internal and external probe cleaning/washing capacity to avoid carry over | Equipment should have both internal and external probe cleaning/washing capacity to avoid carry over |
| 12 | Repeat facility should be available for calibrator and control | Repeat facility should be available for calibrator and control |
| 13 | Should have reagent refill message and monitoring facility | Should have reagent refill message and monitoring facility |
| 14 | Minimum number of test parameters on board at a time: ≥ 30 | Minimum number of test parameters on board at a time: ≥ 30 |
| 15 | Minimum sample capacity at a time: 50 to 99 | Minimum sample capacity at a time: 50 to 99 |
| 16 | Minimum number of STAT samples at a time: ≥ 10 | Minimum number of STAT samples at a time: ≥ 10 |
| 17 | Should have pre post and auto dilution of samples and return capability for out of range samples | Should have pre post and auto dilution of samples and return capability for out of range samples |
| 18 | Probe dispensers must have level detectors and must typically use between 2-35 μl of sample and have the ability to aspirate liquid from micro sample viales with liquid level detection | Probe dispensers must have level detectors and must typically use between 2-35 μl of sample and have the ability to aspirate liquid from micro sample viales with liquid level detection |
| 19 | Should have clot detection capability for sample and should be a critical alert | Should have clot detection capability for sample and should be a critical alert |
| 20 | Should have vertical collision protection for the integrated reagent (R1 & R2& sample probe) | Should have vertical collision protection for the integrated reagent (R1 & R2& sample probe) |
| 21 | Should have non-stop 24 hour cooling with Peltier element | Should have non-stop 24 hour cooling with Peltier element |
| 22 | Spectoral range in nm: 340 to 670 nm | Spectoral range in nm: 340 to 670 nm |
| 23 | Wave length selection method: Diffraction Grating system | Wave length selection method: Diffraction Grating system |
| 24 | Light source: LED light source | Light source: LED light source |
| 25 | Life of lamp in hrs: ≥ 1000 | Life of lamp in hrs: ≥ 1000 |
| 26 | Power consumption of lamp in VA: ≤ 1000 | Power consumption of lamp in VA: ≤ 1000 |
| 27 | Type of sample cups: reusable | Type of sample cups: reusable |
| 28 | Number of sample cups provided with machine: 1000 | Number of sample cups provided with machine: 1000 |
| 29 | QC program :QC programme with L-j graphs, print out of reports/ westgard rules | QC program :QC programme with L-j graphs, print out of reports/ westgard rules |
| 30 | Reaction Cuvette: reusable and is of borosilicate glass/and the analyzer should have onboard cuvette integrity check and rotating with atleast 120 cuvette available for analyser | Reaction Cuvette: reusable and is of borosilicate glass/and the analyzer should have onboard cuvette integrity check and rotating with atleast 120 cuvette available for analyser |
| 31 | System should have on board cooling system: Refrigerated at 6 degree C - 11 degree C | System should have on board cooling system: Refrigerated at 6 degree C - 11 degree C |
| 32 | Provide DI water plant for the washing of the cuvettes/ to avoid carry over and contamination (optional) | Provide DI water plant for the washing of the cuvettes/ to avoid carry over and contamination (optional) |
| 33 | Should provide Compatible on line UPS: 5KVA | Should provide Compatible on line UPS: 5KVA |
| 34 | Back up time: 1 hour | Back up time: 1 hour |
| 35 | Data management software: Equipment to be provided with compatible programmable windows based comprehensive data processing and management system graphical user interface software, LM Capability complete back up of data base for calibration control and patient sample results, capability for Bi-directional interfacing with LIS | Data management software: Equipment to be provided with compatible programmable windows based comprehensive data processing and management system graphical user interface software, LM Capability complete back up of data base for calibration control and patient sample results, capability for Bi-directional interfacing with LIS |
| 36 | Patient result storage capacity: 1000000 or more | Patient result storage capacity: 1000000 or more |
| 37 | Onboard 7 step cuvette washing & 2 step drying facility should be provided | Onboard 7 step cuvette washing & 2 step drying facility should be provided |
| 38 | Should provide Photometeric Checking of cuvettes before next reaction | Should provide Photometeric Checking of cuvettes before next reaction |
| 39 | System should have facility for reading results on monitor and print out facility | System should have facility for reading results on monitor and print out facility |
| 40 | Reports: Prinout of reports and full patient demographics should be available | Reports: Prinout of reports and full patient demographics should be available |
| 41 | Should have availability of RS 232 port/USB for data transfer | Should have availability of RS 232 port/USB for data transfer |
| 42 | Power supply: 220-230V AC, 50Hz-60Hz Single phase | Power supply: 220-230V AC, 50Hz-60Hz Single phase |
| 43 | Reagents position: 75 or more | Reagents position: 75 or more |
| 44 | Should provide with Bar code reader for reagents | Should provide with Bar code reader for reagents |
| 45 | Should provide bar code reader for samples | Should provide bar code reader for samples |
| 46 | Seller must provide original documentary proof of the date and place of manufacturing of provided equipment | Seller must provide original documentary proof of the date and place of manufacturing of provided equipment |
| 47 | Service manual and operating manual to be provided | Service manual and operating manual to be provided |
| 48 | System shall be provided with a compatible desktop PC | System shall be provided with a compatible desktop PC |
| 49 | Speed of processor in GHZ: Greater than 3 GHZ | Speed of processor in GHZ: Greater than 3 GHZ |
| 50 | RAM in MB: ≥ 512 MB or compatible | RAM in MB: ≥ 512 MB or compatible |
| 51 | Hard disk drive capacity in GB: ≥ 80 GB | Hard disk drive capacity in GB: ≥ 80 GB |
| 52 | Monitor: LED/ Digital color monitor | Monitor: LED/ Digital color monitor |
| 53 | Monitor size (inches): 17 inches or more | Monitor size (inches): 17 inches or more |
| 54 | Compatible operating system should be provided in PC | Compatible operating system should be provided in PC |
| 55 | Should provide with laser printer/inkjet printer | Should provide with laser printer/inkjet printer |
| 56 | The unit shall be capable of operating continuously in ambient temperature and relative humidity: Temp of 10° to 25° C | The unit shall be capable of operating continuously in ambient temperature and relative humidity: Temp of 10° to 25° C |
| 57 | Startup kit, Calibrators, consumables required in training the staff/Technician/Doctors should be provided at the time of installation &Training | Startup kit, Calibrators, consumables required in training the staff/Technician/Doctors should be provided at the time of installation &Training |
| 58 | The reaction cuvettes should be replaced at free of cost when ever required during the warranty period | The reaction cuvettes should be replaced at free of cost when ever required during the warranty period |
| 59 | The analyser should atleast have pre-dilusion ratio of 1:200 for samples oh high concentration | The analyser should atleast have pre-dilusion ratio of 1:200 for samples oh high concentration |
| 60 | Waste tank should have sensing capability to alert the end user for liquid fill | Waste tank should have sensing capability to alert the end user for liquid fill |
| 61 | Water consumption should be less then 14 litres per hour and have sensors to alert the end user for liquid insufficiency/Exhaust | Water consumption should be less then 14 litres per hour and have sensors to alert the end user for liquid insufficiency/Exhaust |
| 62 | Certification and reports | Certification and reports |
| 63 | Should have European CE/FDA(US)/STQC CB certificate/STQC/IEC certificate or valid electrical and functioinal safety test reports | Should have European CE/FDA(US)/STQC CB certificate/STQC/IEC certificate or valid electrical and functioinal safety test reports |
| 64 | Manufacturing unit certification should be ISO:13485 (Latest) | Manufacturing unit certification should be ISO:13485 (Latest) |
| 65 | Should provide with calibration certificates issued by manufacturer at the time of installation | Should provide with calibration certificates issued by manufacturer at the time of installation |
| 66 | Submission of all necessary certifications, licenses and test reports to the buyer at the time of bid submission and/or along with supplies as per buyer requirement | Submission of all necessary certifications, licenses and test reports to the buyer at the time of bid submission and/or along with supplies as per buyer requirement |
| 67 | Analyzer should have integritated mixer systems with standardise mixing procedures for optimal homogenisation of the reagent and sample | Analyzer should have integritated mixer systems with standardise mixing procedures for optimal homogenisation of the reagent and sample |
| 68 | MISCELLANEOUS REQUIREMENTS | MISCELLANEOUS REQUIREMENTS |
| 69 | Principal Manufacturer shall ensure uninterrupted availability of all spares for atleast 10 years | Principal Manufacturer shall ensure uninterrupted availability of all spares for atleast 10 years |
| 70 | Availability of toll free facility for technical support maintened by principal Manufacturer or authorized agencies | Availability of toll free facility for technical support maintened by principal Manufacturer or authorized agencies |
| 71 | User/Technical/Maintenance manuals to be provided in English in hard and soft copy | User/Technical/Maintenance manuals to be provided in English in hard and soft copy |
| 72 | List of important spares and accessories, with their part numbers to be provided to the buyer at the time of supplying the equipment | List of important spares and accessories, with their part numbers to be provided to the buyer at the time of supplying the equipment |
| 73 | Installation and Demonstration of equipment and training to be provided after completing supplies before acceptance | Installation and Demonstration of equipment and training to be provided after completing supplies before acceptance |
| 74 | The Principal Manufacturer must have direct Presence/approved service center In India | The Principal Manufacturer must have direct Presence/approved service center In India |
| 75 | Calibration certificates as per NABH requirement | Calibration certificates as per NABH requirement |
| 76 | Warranty | Warranty |
| 77 | Ø Warranty in years(including machine, DI Water Plant if provided , UPS, computer and printer) should be of 2 years | Ø Warranty in years(including machine, DI Water Plant if provided , UPS, computer and printer) should be of 2 years |
| 78 | Additional Requirement | Additional Requirement |
| 79 | Breakdown calls should be attended within 24 hours of brakdown | Breakdown calls should be attended within 24 hours of brakdown |
| 80 | Preventive maintenance to be carried out atleast twice a year | Preventive maintenance to be carried out atleast twice a year |
| 81 | Should be supplied complete with probes/accessories, consumables, user & service manuals, certificates at time of installation | Should be supplied complete with probes/accessories, consumables, user & service manuals, certificates at time of installation |
| 82 | Delivery: The item to be delivered at 2 x North Goa District Hospital (Asilo), Mapusa, Goa | Delivery: The item to be delivered at 2 x North Goa District Hospital (Asilo), Mapusa, Goa |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender